CN109087048A - Assembled architecture component method for tracing based on two dimensional code - Google Patents

Assembled architecture component method for tracing based on two dimensional code Download PDF

Info

Publication number
CN109087048A
CN109087048A CN201810939426.1A CN201810939426A CN109087048A CN 109087048 A CN109087048 A CN 109087048A CN 201810939426 A CN201810939426 A CN 201810939426A CN 109087048 A CN109087048 A CN 109087048A
Authority
CN
China
Prior art keywords
construction
prefabricated components
information
production
dimensional code
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810939426.1A
Other languages
Chinese (zh)
Inventor
岳乃华
任志旭
刘敬疆
朱新颖
于德湖
孙慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yuguang Information Technology Co Ltd
Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China
Qingdao University of Technology
Original Assignee
Qingdao Yuguang Information Technology Co Ltd
Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yuguang Information Technology Co Ltd, Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China, Qingdao University of Technology filed Critical Qingdao Yuguang Information Technology Co Ltd
Priority to CN201810939426.1A priority Critical patent/CN109087048A/en
Publication of CN109087048A publication Critical patent/CN109087048A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0833Tracking
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/14Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation using light without selection of wavelength, e.g. sensing reflected white light
    • G06K7/1404Methods for optical code recognition
    • G06K7/1408Methods for optical code recognition the method being specifically adapted for the type of code
    • G06K7/14172D bar codes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Electromagnetism (AREA)
  • Quality & Reliability (AREA)
  • Toxicology (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of assembled architecture component method for tracing based on two dimensional code, belongs to assembled architecture technical field.Method which solve existing BIM platform still without carrying out unified tracking for assembled architecture component, the more low problem of efficiency.S1: tracing management system building, including two dimensional code system construction, roduction track system construction and construction tracking system construction, S2: tracing management system monitoring, including production task monitoring, delivery process monitoring and construction task monitoring.The present invention realizes the promotion of tracking efficiency the purpose is to organically combine the tracking of assembled architecture component and BIM platform.

Description

Assembled architecture component method for tracing based on two dimensional code
Technical field
The present invention relates to a kind of assembled architecture component method for tracing based on two dimensional code belongs to assembled architecture technology neck Domain.
Background technique
Assembled architecture refers to prefabricated component building made of assemble in site, passes through that " standardized designs, factory are raw Metaplasia production, fabricated construction, integration finishing, information system management ", General Promotion architecture quality and efficiency of construction, reaching can hold The target of supervention exhibition.Assembled architecture component tracking after fractionation is key link.The U.S. is using planar bar code technology to prefabricated structure Part is transported in way orientation management, and carries out real-time typing to the essential information of component;South Korea is carried out using planar bar code technology Const ruction supply chain management realizes construction supply chain efficient operation, improves performance.Existing BIM platform is not built for assembled still The method that component carries out unified tracking is built, efficiency is more low.
Summary of the invention
In view of the foregoing defects the prior art has, the invention proposes a kind of assembled architecture component based on two dimensional code Method for tracing realizes mentioning for tracking efficiency the purpose is to organically combine the tracking of assembled architecture component and BIM platform It rises.
Assembled architecture component method for tracing of the present invention based on two dimensional code, includes the following steps:
S1: tracing management system building, including two dimensional code system construction, roduction track system construction and construction tracking system Building, specific as follows:
S11: two dimensional code system construction: two dimensional code system include prefabricated components, two-dimension code label and with two-dimension code label pair The reader for two-dimension code answered, two-dimension code label are fixedly connected with prefabricated components, and reader for two-dimension code is fixed on roduction track system On;
S12: roduction track system construction: roduction track system includes production Internet of Things platform, utilizes production Internet of Things platform pair The production information of each component is tracked, and when tracking is first scanned the two-dimension code label of prefabricated components, then to each life Prefabricated components in production are taken pictures, and roduction track data are obtained, and roduction track data are then stored in production Internet of Things platform Terminal, production Internet of Things platform is a kind of based on manufacturing production Internet of things system;
S13: construction tracking system construction: construction tracking system includes construction Internet of Things platform, utilizes construction Internet of Things platform pair The construction information of each component is tracked, and when tracking is first scanned the two-dimension code label of prefabricated components, then to respectively applying Prefabricated components in work are taken pictures, and construction tracking data are obtained, and construction tracking data are then stored in construction Internet of Things platform Terminal, construction Internet of Things platform is a kind of based on manufacturing construction Internet of things system;
S2: tracing management system monitoring, including production task monitoring, delivery process monitoring and construction task monitoring, specifically It is as follows:
S21: production task monitoring: roduction track system is sent to terminal by BIM database production task, while handle is beaten It prints off the two-dimensional bar code material board papery version come and task list is assigned to direct labor;
S22: delivery process monitoring: the monitoring of prefabricated components delivery process, after prefabricated components are offline from production line, by producing Responsible person scans the two-dimension code label bundled on finished product, and checks according to prefabricated components, certainly to the roduction track system checked Dynamic to pass through wireless network transmissions BIM database, it is errorless by confirming to have completed delivery prefabricated components to change the state of product After transfer to construction Internet of Things platform carry out being distributed to construction site;
S23: construction task monitoring: the monitoring of prefabricated components installation process, construction site construction responsible person are read using two dimensional code It reads device and checks and accepts prefabricated components, change the state of product to have completed to receive, and is online, real in each critical process to prefabricated components Shi Jinhang is accurately tracked.
Preferably, in step S11, the spatial data and attribute number of the prefabricated components are stored on the two-dimension code label According to the spatial data includes: object mounting position information and location information, and the attribute data includes: type information, time Information and identification information.
Preferably, in step S12, roduction track system further includes monitoring device, material vehicle in indoor storage building On monitoring device.
Preferably, in step S13, construction tracking system further includes the reader for two-dimension code for incuding two dimensional code system, For the tester of prefabricated components all data, for receiving the R-T unit of tester data, and for receiving two dimensional code Reader, R-T unit data and the processing platform for handling the data;Between the reader for two-dimension code and processing platform, transmitting-receiving By wireless network connection between device and processing platform, and number can be mutually received and dispatched between the R-T unit and processing platform According to.
Preferably, in step 21, production task monitoring further includes that information in typing production process and process check information, Information in production process includes scene photograph, raw material test report;Process checks that information includes meeting component in process inspection It is defective in quality, retract flow operations information in mobile phone terminal, and issue quality notice in time and carry out rectification information, it is ensured that Each process completes the quality of rear part.
Preferably, it in step S22, is tracked on the whole fabricated prefabricated components lines of BIM database realizing, accurate perception Each component current state realizes zero inventory for project, and every batch of component is transported from processing factory to after scene, without storage, directly Capable lifting is tapped into, is provided a strong guarantee.
Preferably, in step S23, site operation personnel directly acquire component by being scanned to component built-in chip Size and its location information under construction, can also as needed, in called data library the construction technology of the component and Points for attention, after lifting component is completed, construction personnel lifts information by terminal scanning record, and lifting information will synchronize to In BIM model, project implementation progress can be respectively checked in visualization of 3 d model.
The beneficial effects of the present invention are: using the assembled architecture component tracking side of the present invention based on two dimensional code Method organically combines the tracking of assembled architecture component and BIM platform, realizes the promotion of tracking efficiency.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
In order to which the object of the invention, technical solution is more clearly understood, below with reference to embodiment, the present invention is made further It is described in detail.
As shown in Figure 1, the assembled architecture component method for tracing of the present invention based on two dimensional code, including walk as follows It is rapid:
S1: tracing management system building, including two dimensional code system construction, roduction track system construction and construction tracking system Building, specific as follows:
S11: two dimensional code system construction: two dimensional code system include prefabricated components, two-dimension code label and with two-dimension code label pair The reader for two-dimension code answered, two-dimension code label are fixedly connected with prefabricated components, and reader for two-dimension code is fixed on roduction track system On;
S12: roduction track system construction: roduction track system includes production Internet of Things platform, utilizes production Internet of Things platform pair The production information of each component is tracked, and when tracking is first scanned the two-dimension code label of prefabricated components, then to each life Prefabricated components in production are taken pictures, and roduction track data are obtained, and roduction track data are then stored in production Internet of Things platform Terminal, production Internet of Things platform is a kind of based on manufacturing production Internet of things system;
S13: construction tracking system construction: construction tracking system includes construction Internet of Things platform, utilizes construction Internet of Things platform pair The construction information of each component is tracked, and when tracking is first scanned the two-dimension code label of prefabricated components, then to respectively applying Prefabricated components in work are taken pictures, and construction tracking data are obtained, and construction tracking data are then stored in construction Internet of Things platform Terminal, construction Internet of Things platform is a kind of based on manufacturing construction Internet of things system;
S2: tracing management system monitoring, including production task monitoring, delivery process monitoring and construction task monitoring, specifically It is as follows:
S21: production task monitoring: roduction track system is sent to terminal by BIM database production task, while handle is beaten It prints off the two-dimensional bar code material board papery version come and task list is assigned to direct labor;
S22: delivery process monitoring: the monitoring of prefabricated components delivery process, after prefabricated components are offline from production line, by producing Responsible person scans the two-dimension code label bundled on finished product, and checks according to prefabricated components, certainly to the roduction track system checked Dynamic to pass through wireless network transmissions BIM database, it is errorless by confirming to have completed delivery prefabricated components to change the state of product After transfer to construction Internet of Things platform carry out being distributed to construction site;
S23: construction task monitoring: the monitoring of prefabricated components installation process, construction site construction responsible person are read using two dimensional code It reads device and checks and accepts prefabricated components, change the state of product to have completed to receive, and is online, real in each critical process to prefabricated components Shi Jinhang is accurately tracked.
Preferably, in step S11, the spatial data and attribute number of the prefabricated components are stored on the two-dimension code label According to the spatial data includes: object mounting position information and location information, and the attribute data includes: type information, time Information and identification information.
Preferably, in step S12, roduction track system further includes monitoring device, material vehicle in indoor storage building On monitoring device.
Preferably, in step S13, construction tracking system further includes the reader for two-dimension code for incuding two dimensional code system, For the tester of prefabricated components all data, for receiving the R-T unit of tester data, and for receiving two dimensional code Reader, R-T unit data and the processing platform for handling the data;Between the reader for two-dimension code and processing platform, transmitting-receiving By wireless network connection between device and processing platform, and number can be mutually received and dispatched between the R-T unit and processing platform According to.
Preferably, in step 21, production task monitoring further includes that information in typing production process and process check information, Information in production process includes scene photograph, raw material test report;Process checks that information includes meeting component in process inspection It is defective in quality, retract flow operations information in mobile phone terminal, and issue quality notice in time and carry out rectification information, it is ensured that Each process completes the quality of rear part.
Preferably, it in step S22, is tracked on the whole fabricated prefabricated components lines of BIM database realizing, accurate perception Each component current state realizes zero inventory for project, and every batch of component is transported from processing factory to after scene, without storage, directly Capable lifting is tapped into, is provided a strong guarantee.
Preferably, in step S23, site operation personnel directly acquire component by being scanned to component built-in chip Size and its location information under construction, can also as needed, in called data library the construction technology of the component and Points for attention, after lifting component is completed, construction personnel lifts information by terminal scanning record, and lifting information will synchronize to In BIM model, project implementation progress can be respectively checked in visualization of 3 d model.
The beneficial effects of the present invention are: using the assembled architecture component tracking side of the present invention based on two dimensional code Method organically combines the tracking of assembled architecture component and BIM platform, realizes the promotion of tracking efficiency.
The present invention can be widely used in assembled architecture occasion.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation with the present invention, all in essence of the invention Made impartial modifications, equivalent substitutions and improvements etc., should be included in patent covering scope of the invention within mind and principle.

Claims (7)

1. a kind of assembled architecture component method for tracing based on two dimensional code, which comprises the steps of:
S1: tracing management system building, including two dimensional code system construction, roduction track system construction and construction tracking system structure It builds, specific as follows:
S11: two dimensional code system construction: two dimensional code system includes prefabricated components, two-dimension code label and corresponding with two-dimension code label Reader for two-dimension code, two-dimension code label are fixedly connected with prefabricated components, and reader for two-dimension code is fixed in roduction track system;
S12: roduction track system construction: roduction track system includes production Internet of Things platform, using production Internet of Things platform to each structure The production information of part is tracked, and when tracking is first scanned the two-dimension code label of prefabricated components, then in each production Prefabricated components take pictures, obtain roduction track data, then by roduction track data be stored in production Internet of Things platform end End, production Internet of Things platform are a kind of based on manufacturing production Internet of things system;
S13: construction tracking system construction: construction tracking system includes construction Internet of Things platform, using construction Internet of Things platform to each structure The construction information of part is tracked, and when tracking is first scanned the two-dimension code label of prefabricated components, then in each construction Prefabricated components take pictures, obtain construction tracking data, then by construction tracking data be stored in construction Internet of Things platform end End, construction Internet of Things platform are a kind of based on manufacturing construction Internet of things system;
S2: tracing management system monitoring, including production task monitoring, delivery process monitoring and construction task monitoring, specific as follows:
S21: production task monitoring: roduction track system is sent to terminal by BIM database production task, while handle prints The two-dimensional bar code material board papery version and task list come are assigned to direct labor;
S22: delivery process monitoring: the monitoring of prefabricated components delivery process after prefabricated components are offline from production line, is responsible for by producing People scans the two-dimension code label bundled on finished product, and checks according to prefabricated components, leads to automatically to the roduction track system checked Wireless network transmissions BIM database is crossed, the state for changing product is to have completed delivery prefabricated components to hand over after confirmation is errorless It carries out being distributed to construction site by construction Internet of Things platform;
S23: construction task monitoring: the monitoring of prefabricated components installation process, construction site construction responsible person use reader for two-dimension code Check and accept prefabricated components, the state for changing product be completed to receive, and to prefabricated components each critical process it is online, in real time into Row accurately tracking.
2. the assembled architecture component method for tracing according to claim 1 based on two dimensional code, which is characterized in that step In S11, the spatial data and attribute data of the prefabricated components, the spatial data packet are stored on the two-dimension code label Include: object mounting position information and location information, the attribute data include: type information, temporal information and identification information.
3. the assembled architecture component method for tracing according to claim 1 based on two dimensional code, which is characterized in that step In S12, roduction track system further includes the monitoring device in indoor storage building, the monitoring device on material vehicle.
4. the assembled architecture component method for tracing according to claim 1 based on two dimensional code, which is characterized in that step In S13, construction tracking system further includes the reader for two-dimension code for incuding two dimensional code system, is used for prefabricated components all data Tester, for receiving the R-T unit of tester data, and for receiving reader for two-dimension code, R-T unit data simultaneously Handle the processing platform of the data;Between the reader for two-dimension code and processing platform, lead between R-T unit and processing platform Wireless network connection is crossed, and can mutual sending and receiving data between the R-T unit and processing platform.
5. the assembled architecture component method for tracing according to claim 1 based on two dimensional code, which is characterized in that step 21 In, production task monitoring further includes information and process inspection information in typing production process, and the information in production process includes Scene photograph, raw material test report;Process check information include process check in meet component it is defective in quality, in mobile phone terminal Flow operations information is retracted, and issues quality notice in time and carries out rectification information, it is ensured that each process completes rear part Quality.
6. the assembled architecture component method for tracing according to claim 1 based on two dimensional code, which is characterized in that step In S22, tracked on the whole fabricated prefabricated components lines of BIM database realizing, each component current state of accurate perception is Project realizes zero inventory, and every batch of component is transported to after scene from processing factory, without storage, directly lifted, and provides strong It ensures.
7. the assembled architecture component method for tracing according to claim 1 based on two dimensional code, which is characterized in that step In S23, site operation personnel directly acquire the size and its under construction of component by being scanned to component built-in chip Location information, can also as needed, and the construction technology and points for attention of the component in called data library, lifting component are completed Later, construction personnel lifts information by terminal scanning record, and lifting information will synchronize in BIM model, respectively can be visual Change in threedimensional model and checks project implementation progress.
CN201810939426.1A 2018-08-17 2018-08-17 Assembled architecture component method for tracing based on two dimensional code Pending CN109087048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810939426.1A CN109087048A (en) 2018-08-17 2018-08-17 Assembled architecture component method for tracing based on two dimensional code

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810939426.1A CN109087048A (en) 2018-08-17 2018-08-17 Assembled architecture component method for tracing based on two dimensional code

Publications (1)

Publication Number Publication Date
CN109087048A true CN109087048A (en) 2018-12-25

Family

ID=64793752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810939426.1A Pending CN109087048A (en) 2018-08-17 2018-08-17 Assembled architecture component method for tracing based on two dimensional code

Country Status (1)

Country Link
CN (1) CN109087048A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110457801A (en) * 2019-07-30 2019-11-15 上海建工集团股份有限公司 The monitoring method and system of assembled project component
CN110866712A (en) * 2019-07-31 2020-03-06 浙江精工钢结构集团有限公司 Intelligent component logistics positioning method and system based on BIM (building information modeling) plug-in
CN111444141A (en) * 2020-03-26 2020-07-24 长沙中交京纬工程技术有限公司 Data archive storage method based on BIM
CN113128974A (en) * 2021-04-28 2021-07-16 天津智中新窗业有限公司 Intelligent progress control method and device for building matching product and electronic information platform
CN113283874A (en) * 2021-06-09 2021-08-20 青岛理工大学 Intelligent building overall process simulation method for fabricated building based on BIM and two-dimensional code
CN115187200A (en) * 2022-07-11 2022-10-14 山西省安装集团股份有限公司 Assembly type machine room construction management system based on BIM digital-analog separation
CN115807412A (en) * 2022-11-29 2023-03-17 中国电建集团成都勘测设计研究院有限公司 Intelligent installation method for large-diameter pressure steel pipe in hole
CN117094606A (en) * 2023-10-18 2023-11-21 中亿丰数字科技集团有限公司 Building element full life cycle quality tracking method and system based on BIM

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data
CN105654318A (en) * 2016-01-13 2016-06-08 上海振华重工(集团)股份有限公司 Production internet of things management method
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM
US20170132567A1 (en) * 2015-11-06 2017-05-11 Benjamin F. GLUNZ Method and system for native object collaboration, revision and analytics for bim and other design platforms
CN107169539A (en) * 2016-03-08 2017-09-15 上海宝冶集团有限公司 Reinforcing bar automation processing delivery system and method based on two-dimensional bar code
CN108154340A (en) * 2017-12-08 2018-06-12 山东聊建集团有限公司 Prefabricated component informationization management system based on BIM cloud platforms

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data
US20170132567A1 (en) * 2015-11-06 2017-05-11 Benjamin F. GLUNZ Method and system for native object collaboration, revision and analytics for bim and other design platforms
CN105654318A (en) * 2016-01-13 2016-06-08 上海振华重工(集团)股份有限公司 Production internet of things management method
CN107169539A (en) * 2016-03-08 2017-09-15 上海宝冶集团有限公司 Reinforcing bar automation processing delivery system and method based on two-dimensional bar code
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM
CN108154340A (en) * 2017-12-08 2018-06-12 山东聊建集团有限公司 Prefabricated component informationization management system based on BIM cloud platforms

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110457801A (en) * 2019-07-30 2019-11-15 上海建工集团股份有限公司 The monitoring method and system of assembled project component
CN110866712A (en) * 2019-07-31 2020-03-06 浙江精工钢结构集团有限公司 Intelligent component logistics positioning method and system based on BIM (building information modeling) plug-in
CN110866712B (en) * 2019-07-31 2024-02-23 比姆泰客信息科技(上海)有限公司 Component intelligent logistics positioning method and system based on BIM model plug-in
CN111444141A (en) * 2020-03-26 2020-07-24 长沙中交京纬工程技术有限公司 Data archive storage method based on BIM
CN111444141B (en) * 2020-03-26 2022-12-02 北京中交京纬公路造价技术有限公司 Data archive storage method based on BIM
CN113128974A (en) * 2021-04-28 2021-07-16 天津智中新窗业有限公司 Intelligent progress control method and device for building matching product and electronic information platform
CN113283874A (en) * 2021-06-09 2021-08-20 青岛理工大学 Intelligent building overall process simulation method for fabricated building based on BIM and two-dimensional code
WO2022257100A1 (en) * 2021-06-09 2022-12-15 青岛理工大学 Intelligent assembled building whole construction process simulation method based on bim and two-dimensional code
CN115187200A (en) * 2022-07-11 2022-10-14 山西省安装集团股份有限公司 Assembly type machine room construction management system based on BIM digital-analog separation
CN115807412A (en) * 2022-11-29 2023-03-17 中国电建集团成都勘测设计研究院有限公司 Intelligent installation method for large-diameter pressure steel pipe in hole
CN117094606A (en) * 2023-10-18 2023-11-21 中亿丰数字科技集团有限公司 Building element full life cycle quality tracking method and system based on BIM
CN117094606B (en) * 2023-10-18 2024-04-05 中亿丰数字科技集团有限公司 Building element full life cycle quality tracking method and system based on BIM

Similar Documents

Publication Publication Date Title
CN109087048A (en) Assembled architecture component method for tracing based on two dimensional code
CN106709703A (en) Method and system of decoration project construction management based on technology of internet of things
CN103778472A (en) Mobile built product resume system and management and control method of production line operation
CN103810576A (en) Workshop production management method and system based on Internet of Things
CN103116821A (en) Whole course tracking method and whole course tracking system of discrete manufacturing workshop production process quality
CN107516136A (en) Power Line Inspection System
CN106228297A (en) A kind of management system of fixed assets information
CN106789221A (en) Automobile storage site management system and its management method based on UWB positioning
CN110648422A (en) Standardized inspection method, system and platform
CN108375963A (en) Collecting method based on Internet of Things
CN111399467A (en) Intelligent manufacturing platform for customized plate-type furniture
CN107169539A (en) Reinforcing bar automation processing delivery system and method based on two-dimensional bar code
CN203552288U (en) Electric pole routing-inspection data-collecting label based tablet PC
CN206937352U (en) A kind of material fetching mechanism of automatic identification pcb board
CN107609447A (en) A kind of optical detection apparatus, system and method
CN206541333U (en) A kind of decoration project work progress management system based on technology of Internet of things
CN202773089U (en) Intelligent mobile terminal of IOT (Internet of Things)
CN204856612U (en) Steel construction construction management system based on mobile internet
CN205563673U (en) Process management system of smart business
CN106355335A (en) Quick production work order operation progress acquiring method
CN106004716B (en) A kind of intelligent logistic car networked system
CN107730142A (en) Using Quick Response Code in BIM project management system
CN102446262A (en) RFID (Radio Frequency Identification) automatic correlation system and method and portable equipment with system
CN209087002U (en) Inspection device based on two dimensional code and wireless location
CN208400183U (en) A kind of terminal device that electric inspection process personnel use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225

RJ01 Rejection of invention patent application after publication