CN105654318A - Production internet of things management method - Google Patents

Production internet of things management method Download PDF

Info

Publication number
CN105654318A
CN105654318A CN201610020044.XA CN201610020044A CN105654318A CN 105654318 A CN105654318 A CN 105654318A CN 201610020044 A CN201610020044 A CN 201610020044A CN 105654318 A CN105654318 A CN 105654318A
Authority
CN
China
Prior art keywords
production
component
platform
thing connection
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610020044.XA
Other languages
Chinese (zh)
Inventor
马立芬
杨春松
庞延波
吴新宇
潘浩
王帅
周华
展多武
张仁凯
高强
章黄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN201610020044.XA priority Critical patent/CN105654318A/en
Publication of CN105654318A publication Critical patent/CN105654318A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products

Abstract

The invention relates to a production internet of things management method. The method comprises the steps of: generating a two-dimension code of a product by a two-dimension code generator, and fixing the two-dimension code to a corresponding component; scanning the two-dimension code of the component by adopting a production internet of things platform, photographing the component and obtaining production tracking data; transmitting the production tracking data to a BIM platform, and visually observing the production state of the component. The production internet of things management method has advantages that the production internet of things method combines the two-dimension code, the production internet of things platform and the BIM platform together and visually feeds back the production tracking data to a three-dimension information model; the two-dimension code is applicable to the field of production tracking; the production internet of things platform is mainly used for user management, process management, two-dimension code scanning, photographing, data uploading and historical data checking; and the BIM takes relevant information data of a construction project as a base of the model, has five advantages of visualization, harmony, simulation, optimization and mappability, and is wider and wider in application.

Description

A kind of thing of producing joins management process
Technical field
The present invention relates to and a kind of produce thing connection management process, in particular to a kind of Quick Response Code and BIM produce thing union manage in application.
Background technology
Product tracking and progress management are important contents of production management, and most of production management system all can relate to this content.
Traditional mode of production method for tracing is convenient not, easily obscure, and to scheme or the form display of table, not intuitively, readding property and visual degree are lower; Particularly in the heavy constructions such as building, bridge, it relates to the engineering amount arrived is big, it is necessary to the quantity of information of tracking is big, and chart is numerous, and above problem is more obvious. Therefore it is badly in need of the production thing connection management process that a kind of degree directly perceived, visual of development is higher, through retrieval, does not find the technical scheme same or similar with the present invention.
Summary of the invention
The technical problem to be solved in the present invention is to provide the higher production thing connection management process of a kind of degree directly perceived, visual.
For solving the problems of the technologies described above, the technical scheme of the present invention is: a kind of thing of producing joins management process, and its innovative point is: described management process is specific as follows:
(1) generation of product Quick Response Code: obtain the ID of each component, numbering, weight, material and specification from the three-dimensional model of product, generates the Quick Response Code comprising above information by two-dimension code generator;
(2) product Quick Response Code is fixing: be fixed on by the Quick Response Code of generation on corresponding component; Wherein, for the component having bolt to connect hole, the mode listed is adopted to fix; For the component connecing hole without bolt, adopt and fix in the method for paste;
(3) acquisition of roduction track data: utilize production thing connection platform the production information of each component to be followed the trail of, first the Quick Response Code of component is scanned during tracking, then the component in each production is taken pictures, obtain roduction track data, roduction track data are then stored in the terminal producing thing connection platform, and described production thing connection platform is a kind of production Internet of things system based on production;
(4) BIM platform is imported: based on three-dimensional model, first develop BIM platform, described BIM platform is a kind of architecture information model, then BIM platform is docked with production thing connection platform, and the roduction track transfer that production thing connection platform is obtained is in the three-dimensional model of BIM platform.
Further, described step (3) is produced thing connection platform and in units of the manufacturing procedure of component, the production information of each component is followed the trail of.
Further, in described step (4), each component in the three-dimensional model of BIM platform adopts distinct colors to distinguish according to production status difference.
It is an advantage of the current invention that:
(1) produce thing connection management process by Quick Response Code, production thing connection platform and BIM platform triplicity, intuitively roduction track data are fed back in three-dimensional information model; Wherein Quick Response Code has the characteristics such as storage capacity is big, strong, standby the helping property of confidentiality height, traceability height, damage resistance is big, cost is cheap, is applicable to generate tracking field; Producing thing connection platform is a kind of production Internet of things system based on production, is mainly used in user management, authority management, process management, Quick Response Code scan, take pictures, data upload and historical data are checked; BIM is the basis using every relevant information data of construction-engineering project as model, carry out building the foundation of model, the real information being had by numerical information emulation simulant building thing, it has visual, the big feature of Harmony, simulation, optimization and publishing picture property five, BIM extend to the industries such as bridge construction now from building trade, applies more and more extensive.
(2) produce thing connection platform the production information of each component to be followed the trail of in units of the manufacturing procedure of component, obtain more perfect component production information, make the production status of terminal observes component more convenient.
(3) each component in the three-dimensional model of BIM platform adopts distinct colors to distinguish according to production status difference, and the visual degree that component is produced is higher, avoids traditional chart display mode.
Accompanying drawing explanation
Fig. 1 is a kind of system architecture and data flow graph producing thing connection management process of the present invention.
Fig. 2 is a kind of operating process figure producing thing connection management process of the present invention.
Embodiment
As depicted in figs. 1 and 2, the present invention discloses a kind of thing of producing and joins management process, and this management process is specific as follows:
(1) generation of product Quick Response Code: obtain the ID of each component, numbering, weight, material and specification from the three-dimensional model of product, generates the Quick Response Code comprising above information by two-dimension code generator;
(2) product Quick Response Code is fixing: be fixed on by the Quick Response Code of generation on corresponding component; Wherein, for the component having bolt to connect hole, the mode listed is adopted to fix; For the component connecing hole without bolt, adopt and fix in the method for paste;
(3) acquisition of roduction track data: produce thing connection platform and in units of the manufacturing procedure of component, the production information of each component is followed the trail of, first the Quick Response Code of component is scanned during tracking, then the component in each production is taken pictures, obtain roduction track data, roduction track data are then stored in the terminal producing thing connection platform, and described production thing connection platform is a kind of production Internet of things system based on production;
(4) importing BIM platform: first develop BIM platform based on three-dimensional model, described BIM platform is a kind of architecture information model, and wherein each component in three-dimensional model adopts distinct colors to distinguish according to production status difference; Then BIM platform dock with production thing connection platform, and the roduction track transfer producing thing connection platform acquisition in the three-dimensional model of BIM platform, and directly observe the production status of the component of different colours.
More than show and describe the ultimate principle of the present invention and main feature.The technician of the industry should understand; the present invention is not restricted to the described embodiments; the principle that the present invention is just described described in above-described embodiment and specification sheets; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention. The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (3)

1. produce thing connection management process for one kind, it is characterised in that: described management process is specific as follows:
(1) generation of product Quick Response Code: obtain the ID of each component, numbering, weight, material and specification from the three-dimensional model of product, generates the Quick Response Code comprising above information by two-dimension code generator;
(2) product Quick Response Code is fixing: be fixed on by the Quick Response Code of generation on corresponding component; Wherein, for the component having bolt to connect hole, the mode listed is adopted to fix; For the component connecing hole without bolt, adopt and fix in the method for paste;
(3) acquisition of roduction track data: utilize production thing connection platform the production information of each component to be followed the trail of, first the Quick Response Code of component is scanned during tracking, then the component in each production is taken pictures, obtain roduction track data, roduction track data are then stored in the terminal producing thing connection platform, and described production thing connection platform is a kind of production Internet of things system based on production;
(4) BIM platform is imported: based on three-dimensional model, first develop BIM platform, described BIM platform is a kind of architecture information model, then BIM platform is docked with production thing connection platform, and the roduction track transfer that production thing connection platform is obtained is in the three-dimensional model of BIM platform.
2. one according to claim 1 produces thing connection management process, it is characterised in that: described step (3) is produced thing connection platform and in units of the manufacturing procedure of component, the production information of each component is followed the trail of.
3. one according to claim 1 produces thing connection management process, it is characterised in that: in described step (4), each component in the three-dimensional model of BIM platform adopts distinct colors to distinguish according to production status difference.
CN201610020044.XA 2016-01-13 2016-01-13 Production internet of things management method Pending CN105654318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610020044.XA CN105654318A (en) 2016-01-13 2016-01-13 Production internet of things management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610020044.XA CN105654318A (en) 2016-01-13 2016-01-13 Production internet of things management method

Publications (1)

Publication Number Publication Date
CN105654318A true CN105654318A (en) 2016-06-08

Family

ID=56487092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610020044.XA Pending CN105654318A (en) 2016-01-13 2016-01-13 Production internet of things management method

Country Status (1)

Country Link
CN (1) CN105654318A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106124812A (en) * 2016-06-12 2016-11-16 宁波迦南电子有限公司 A kind of single-phase charge-controlled intelligent electric meter production management system
CN107194831A (en) * 2017-06-01 2017-09-22 上海宝冶集团有限公司 BIM and application process of the Quick Response Code in construction management
CN108134836A (en) * 2017-12-25 2018-06-08 中山市小榄企业服务有限公司 A kind of intelligence manufacture manages Internet of Things information system
CN108427803A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of external coordination mold management method and system
CN108665245A (en) * 2018-05-23 2018-10-16 华北水利水电大学 A kind of prefabricated component information fusion management system and method based on DT-BIM
CN108717623A (en) * 2018-05-18 2018-10-30 深圳大学 A kind of assembled architecture tracks of device, method and system based on BIM
CN109087048A (en) * 2018-08-17 2018-12-25 青岛理工大学 Assembled architecture component method for tracing based on two dimensional code

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN104331770A (en) * 2014-11-03 2015-02-04 叶校然 Intelligent management system of flexible production enterprise
CN104573999A (en) * 2015-01-30 2015-04-29 浙江精工钢结构集团有限公司 Application method of steel structure BIM (building information modeling) information platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN104331770A (en) * 2014-11-03 2015-02-04 叶校然 Intelligent management system of flexible production enterprise
CN104573999A (en) * 2015-01-30 2015-04-29 浙江精工钢结构集团有限公司 Application method of steel structure BIM (building information modeling) information platform

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106124812A (en) * 2016-06-12 2016-11-16 宁波迦南电子有限公司 A kind of single-phase charge-controlled intelligent electric meter production management system
CN107194831A (en) * 2017-06-01 2017-09-22 上海宝冶集团有限公司 BIM and application process of the Quick Response Code in construction management
CN108427803A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of external coordination mold management method and system
CN108134836A (en) * 2017-12-25 2018-06-08 中山市小榄企业服务有限公司 A kind of intelligence manufacture manages Internet of Things information system
CN108717623A (en) * 2018-05-18 2018-10-30 深圳大学 A kind of assembled architecture tracks of device, method and system based on BIM
CN108665245A (en) * 2018-05-23 2018-10-16 华北水利水电大学 A kind of prefabricated component information fusion management system and method based on DT-BIM
CN108665245B (en) * 2018-05-23 2022-01-25 华北水利水电大学 Assembled prefabricated part information fusion management system and method based on DT-BIM
CN109087048A (en) * 2018-08-17 2018-12-25 青岛理工大学 Assembled architecture component method for tracing based on two dimensional code

Similar Documents

Publication Publication Date Title
CN105654318A (en) Production internet of things management method
CN109685891B (en) Building three-dimensional modeling and virtual scene generation method and system based on depth image
US9679038B2 (en) Systems and methods for construction field management and operations with building information modeling
CN103093663B (en) Hydropower station three-dimensional precise modeling and visualization simulation training system and implementation method thereof
CN103606188B (en) Geography information based on imaging point cloud acquisition method as required
CN106611246A (en) Integrated management system of land and resources
CN108256831B (en) Method for managing engineering data based on visual BIM model
CN103984720B (en) Tile map creation method and device based on OpenGL
CN102254251A (en) Power grid three-dimensional design result data management system and digital management method thereof
CN104392387A (en) Unity3D-based circular coal yard three-dimensional (3D) intelligent visualization display platform
CN110310365A (en) A kind of three-dimensional rebuilding method and device
CN110443499A (en) A kind of inventory project amount automatic generation method and system
CN105989213A (en) Communication engineering drawing generation method and drawing design client
CN109901123A (en) Transducer calibration method, device, computer equipment and storage medium
CN103824228A (en) Application of three-dimensional system based on electric power GIS
KR101117239B1 (en) Object identification system and method of identifying an object using the same
CN110706331A (en) Construction quality control method based on BIM point cloud technology and three-dimensional scanning
CN105741340A (en) Transmission line 3D scene simulation method and transmission line 3D scene simulation system for webpage display
Frank et al. Digital sculpting for historical representation: Neville tomb case study
CN109344439A (en) A kind of modeling of building block formula and its simulative construction method based on BIM
CN104750468A (en) Server side topological data conversion method and device
CN207020712U (en) Intelligent electric meter quality of production managing and control system
CN110458413A (en) A kind of working procedure management method, system, storage medium and electric terminal
CN105881910A (en) Object faxing method based on 3D scanning, 3D printing and cloud services
CN109754162A (en) Single data processing method and device are enabled for generating industrial part work

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180428

Address after: 200120 China (Shanghai) free trade pilot area 3470 Pudong South Road

Applicant after: Shanghai Zhenhua Heavy Industries (Group) Co., Ltd.

Applicant after: Long Highway Bridge Construction CCCC National Engineering Research Center Co., Ltd.

Address before: 200120 Pudong South Road, Pudong New Area, Pudong New Area, Shanghai

Applicant before: Shanghai Zhenhua Heavy Industries (Group) Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20160608

RJ01 Rejection of invention patent application after publication