CN206541333U - A kind of decoration project work progress management system based on technology of Internet of things - Google Patents

A kind of decoration project work progress management system based on technology of Internet of things Download PDF

Info

Publication number
CN206541333U
CN206541333U CN201720186721.5U CN201720186721U CN206541333U CN 206541333 U CN206541333 U CN 206541333U CN 201720186721 U CN201720186721 U CN 201720186721U CN 206541333 U CN206541333 U CN 206541333U
Authority
CN
China
Prior art keywords
rfid
zigbee
dpm
management system
rfid reader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720186721.5U
Other languages
Chinese (zh)
Inventor
刘群
高仲杰
阎美怡
郁秋梅
刘永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HUAHUI ANDERSON DECORATION ENGINEERING Co Ltd
Original Assignee
TIANJIN HUAHUI ANDERSON DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HUAHUI ANDERSON DECORATION ENGINEERING Co Ltd filed Critical TIANJIN HUAHUI ANDERSON DECORATION ENGINEERING Co Ltd
Priority to CN201720186721.5U priority Critical patent/CN206541333U/en
Application granted granted Critical
Publication of CN206541333U publication Critical patent/CN206541333U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Information Transfer Between Computers (AREA)

Abstract

The utility model discloses a kind of decoration project work progress management system based on technology of Internet of things, including:DPM data servers, and collection in worksite device, electronic tag;The electronic tag includes bar coded sticker, two-dimension code label and RFID, and the collection in worksite device includes reading bar coded sticker, the client device of two-dimension code label, and reads the RFID reader of RFID.The utility model passes through in project construction site setup bar coded sticker, two-dimension code label, RFID reader and electronic tag, constitute front end data acquisition system, project construction scene is connected with DPM data servers, to realize the transmission of the live real time data of project construction and share;Information is solved the problem of in terms of promptness, accuracy, accurate data basis is provided with excavating for data analysis.

Description

A kind of decoration project work progress management system based on technology of Internet of things
Technical field
The utility model belongs to decoration industry administrative skill field, is related to a kind of decoration project based on Internet of Things and constructed Thread management system.
Background technology
As country continues to increase infrastructure construction, various buildings rising sheer from level ground like the mushrooms after rain, building is applied Industrial and commercial bank's industry has also welcome new opportunity to develop, while being also faced with bigger challenge.Aesthetic property of the people to building decoration, practicality Property, the requirement more and more higher in terms of quality, design concept and construction technology, make rapid progress, weed out the old and bring forth the new, not only quantities by Year increases, and difficulty of construction also climbs up and up, construction material enormous variety, is managed, can not met using traditional extensive style The requirement of enterprise development.Decoration Construction Enterprise, sizes up the current situation, combining information technology, promotes construction industry DPM management systems Using DPM systems can solve the problem that management and control of the project management process in terms of cost, progress, quality, safety, realize to project People, wealth, the management of machine three elements, information transmission and shared, but need to be improved in terms of information ground promptness, accuracy.
The problem of in order to solve information promptness and accuracy, accurate big data is provided with excavating for data analysis Basis, it is necessary to design a kind of decoration project work progress management method and system based on Internet of Things, realize decoration project cost, The real-time transmission of the information such as progress, quality, safety and shared, makes DPM system informations collect promptness and accuracy problem landing.
The content of the invention
The utility model provides a kind of decoration project work progress management system based on technology of Internet of things, it is intended to solve dress Adorn the real-time transmission of information such as project cost, progress, quality, safety and shared, realize that DPM system informations collect promptness and standard True sex chromosome mosaicism.
It should be noted that a kind of decoration project work progress pipe based on technology of Internet of things provided by the utility model Reason system is a kind of structural scheme, for wherein involved each equipment monomer, and its realization should each realize the specific of function Structure has existed in the prior art, and agreement involved during processing, software or program are operated between it also existing Exist in technology, those skilled in the art fully know, the utility model is not to do any change to the monomer of each equipment Enter, therefore be not related to the content of software, but each part of dependence is organically integrated, be integrated into an entirety, i.e., there is provided one Plant structural scheme.
To reach above-mentioned purpose, what the technical solution of the utility model was realized in:It is a kind of based on technology of Internet of things Decoration project work progress management system, including:DPM data servers, and collection in worksite device, electronic tag;The electricity Subtab includes bar coded sticker, two-dimension code label and RFID, and the collection in worksite device includes reading bar code The client device of label, two-dimension code label, and read the RFID reader of RFID;
The bar coded sticker, two-dimension code label are pasted according to the ready-portioned construction area of unit;
The RFID is embedded in decoration project construction material;
The client device passes through network connection DPM data servers;
The RFID reader is controlled by Zigbee terminal management servers by Zigbee network, the Zigbee Terminal management server passes through network connection DPM data servers.
Further, the Zigbee network includes Zigbee telegons and Zigbee routers, the Zigbee terminals Management server sends read write command, RFID reader via Zigbee telegons and Zigbee routers to RFID reader Radiofrequency signal is sent, triggering electronic tag works, electronic tag is according to instruction by data information transfer RFID reader, and RFID is read Write device and the data received are uploaded to DPM data servers by Zigbee wireless networks and internet.
Further, the client device is PC equipment or mobile device, by manually using, in scanning electron label Bar coded sticker or two-dimension code label, and it is uploaded to DPM data servers through internet.
Further, the RFID is also embedded into according to the ready-portioned construction area of unit.
Further, the bar coded sticker, two-dimension code label are further affixed to decoration project construction material.
Further, the Zigbee terminal management servers are provided with DPM management system interfaces, pass through network connection DPM Data server;The DPM management system interfaces are the independent data transmission interface of connection DPM data servers.
Relative to prior art, the decoration project work progress management system described in the utility model based on technology of Internet of things System has the advantage that:
The utility model passes through in project construction site setup bar coded sticker, two-dimension code label, RFID reader and electricity Subtab, constitutes front end data acquisition system, project construction scene is connected with DPM data servers, to realize that project is applied The transmission of work scene real time data and shared;Information is solved the problem of in terms of promptness, accuracy, is data analysis Accurate data basis is provided with excavating.
Brief description of the drawings
Constitute a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not constitute to improper restriction of the present utility model. In accompanying drawing:
Fig. 1 is system structure diagram of the present utility model.
Wherein:
1st, DPM data servers;2nd, DPM management system interfaces;3rd, client;
4th, Zigbee network terminal management server;5th, Zigbee routers;6th, Zigbee telegons;
7th, RFID reader;8th, electronic tag;9th, bar coded sticker, two-dimension code label.
Embodiment
It should be noted that in the case where not conflicting, feature in embodiment and embodiment of the present utility model can be with It is mutually combined.
It should be noted that the electronic label technology that the utility model is related to
Bar code (barcode) label technique is the multiple secret notes and blank for not waiting width on label, according to certain Coding rule arrangement, the graphical identifier to express a group information.Common bar code is differed greatly by reflectivity The pattern of parallel lines that secret note (abbreviation bar) and informal voucher (referred to as empty) are lined up.Bar code can mark many information of article.
Quick Response Code (2-dimensional bar code) label technique is by a set pattern with certain specific geometric figure The chequered with black and white graphic recording data symbol information that rule is distributed in label plane (on two-dimensional directional);It is skilful on coding It is corresponding with binary system using several wonderfully using the concept of " 0 ", " 1 " bit stream for constituting computer-internal logical foundations Geometrical body represent word numerical information, by image input device or photoelectric scanning device automatically identifying and reading to realize information Automatically process:It has some general character of barcode technology:Every kind of code system has its specific character set;Each character occupies certain Width;With certain verifying function etc..Also there is the information automatic identification function to not going together and processing figure rotation simultaneously Change point.
RFID technique is by spatial electromagnetic coupling to realize contactless information transmission using radiofrequency signal, and passes through and transmitted Information realization object identification.The interoperability information of specification is store in RFID tag, by wired or wireless mode them Automatic data collection realizes the identification to article to CIS, so as to realize that information is exchanged and shared by internet, realizes " transparent " management to article.
The utility model provides a kind of decoration project work progress management system based on technology of Internet of things, including:1、 DPM data servers, 2, DPM management system interfaces, 3, client computer are divided into PC ends and mobile terminal, 4, Zigbee network end Hold management server, 5, Zigbee routers, 6, Zigbee telegons, 7, RFID reader, 8, electronic tag, 9, bar code mark Label, two-dimension code label;The various information that DPM data servers 1 are used for the job site to collecting are stored, analyzed and located Reason;
DPM management system interfaces 2 are connected with DPM data servers, for by the various information of the job site collected Uploaded, stored, analyzed and handled;
3 points of client is PC ends and mobile terminal, and for participating in project manager's login system, electronic tag is adopted Collection, in the range of corresponding authority, is checked and is managed to task;
Zigbee terminal management servers 4 are connected with Zigbee telegons 6, for being sent and received to RFID card reader 7 Control instruction.
The connection Zigbee of Zigbee telegons 6 routers 5, service real for setting up the Zigbee network at project construction scene The function of existing data transfer layer;
Match somebody with somebody with bar coded sticker, two-dimension code label 9, RFID reader 7 and electronic tag 8 client computer mobile terminal 3 Close, the people of assembled item job site, material, the data message of machine are acquired.
The utility model takes two kinds of data acquisition modes, the first:Using client computer mobile terminal 3, to dividing The mode that bar coded sticker, two-dimension code label 9 in region are scanned, collects data.Second:By Zigbee terminal managements Server 4, by Zigbee network service, controls RFID reader 7, the mode of reading electronic labels 8 collects data.
In collection project construction procedural information such as:During the data such as progress, quality, using first way, by manually using Client computer mobile terminal 3 (equipment such as mobile phone, PDA), scanning is pasted onto the bar coded sticker or Quick Response Code mark of construction area Label 9, by mobile terminal software, DPM data servers 1 are uploaded to through internet.
When collection construction material goes out to be put in storage information, using Zigbee network service, assisted by terminal server 4 through Zigbee Device 6 and Zigbee routers 5 are adjusted, RFID reader 7 is controlled, the information of reading electronic labels 8 is soft by terminal server Part, DPM data servers 1 are uploaded to through internet.According to project construction field condition, the first collection side can also be used Formula.
The scanning of client 3 bar coded sticker, the operation principle of two-dimension code label are by the light detected using photoelectric cell Signal is converted into electric signal, and electric signal is converted into data signal by analog-digital converter, after being handled through computer, reduction Corresponding information.
RFID reader 7 read RFID operation principle be terminal server 4 by software, via Zigbee Telegon 6 and Zigbee routers 5, read write command is sent to RFID reader 7, and RFID reader 7 sends radiofrequency signal, triggering RFID 8 works, and RFID 8 is according to instruction by data information transfer RFID reader 7, RFID reader 7 The data received are uploaded to DPM data servers 1 by Zigbee wireless networks and internet.
RFID 8 is embedded on object correlation, is provided with wireless transmitter, built-in storage chip, The information for being responsible for RFID is preserved, built-in dual-mode antenna, for receiving and sending information.When object passes through or is placed into During 7 identification range of RFID reader, the radiofrequency signal that RFID reader 7 is sent, after RFID 8 is received, by RFID electricity The information stored in the chip of subtab 8 is sent to corresponding RFID reader 7.
RFID 8 is the information of passive type storage identification object, and passive type RFID is passive RFID, electric flux is that the electromagnetic signal sent by RFID reader 7 is produced.When RFID 8 enters During the identification range of RFID reader 7, the antenna of RFID 8 receives the radio frequency letter sent from RFID reader 7 After number, the characteristic transmitted using radiofrequency signal and Space Coupling produces energy, is operated RFID 8, so that RFID reader 7 can just receive the data message being stored in the chip of RFID 8.The core of RFID 8 Piece is made up of holder, modulator, power-supply controller of electric, clock, logic unit, digital circuit.The antenna of RFID 8 The bridge that to be RFID reader 7 link up with RFID 8, antenna receives the radiofrequency signal that RFID reader 7 sends and referred to Order, and the data message that RFID 8 is stored is sent to RFID reader 7.
RFID reader 7 be read and write the information of RFID 8 equipment, RFID reader 7 by transceiver, memory, Microprocessor, external sensor I/O interfaces, communication interface and power supply composition, it by the read write command of terminal management server 4, RFID 8 is sent to by Radio Network System, and data are encrypted, and the letter beamed back to RFID Breath is decrypted, and sends terminal management server 4 to, by application software control them between data transfer, RFID reader 7 After the instruction for receiving application software, radiofrequency signal is sent to RFID 8, RFID 8 receives radiofrequency signal Afterwards, relevant information is returned to RFID reader 7, and RFID reader 7 is received after relevant information handled, and passes through network system Data message is uploaded into terminal management server 4.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (6)

1. a kind of decoration project work progress management system based on technology of Internet of things, it is characterised in that including:DPM data take Business device, and collection in worksite device, electronic tag;The electronic tag includes bar coded sticker, two-dimension code label and RFID electricity Subtab, the collection in worksite device includes reading bar coded sticker, the client device of two-dimension code label, and reads RFID The RFID reader of electronic tag;
The bar coded sticker, two-dimension code label are pasted according to the ready-portioned construction area of unit;
The RFID is embedded in decoration project construction material;
The client device passes through network connection DPM data servers;
The RFID reader is controlled by Zigbee terminal management servers by Zigbee network, the Zigbee terminals Management server passes through network connection DPM data servers.
2. management system according to claim 1, it is characterised in that the Zigbee network include Zigbee telegons and Zigbee routers, the Zigbee terminal management servers are read via Zigbee telegons and Zigbee routers to RFID Write device and send read write command, RFID reader sends radiofrequency signal, triggering electronic tag work, electronic tag is according to instruction by number According to information transfer RFID reader, the data received are uploaded to by RFID reader by Zigbee wireless networks and internet DPM data servers.
3. management system according to claim 1, it is characterised in that the client device is that PC equipment or movement are set It is standby, by manually using, bar coded sticker or two-dimension code label in scanning electron label, and it is uploaded to DPM data through internet Server.
4. management system according to claim 1, it is characterised in that the RFID is also embedded into according to unit Ready-portioned construction area.
5. management system according to claim 1, it is characterised in that the bar coded sticker, two-dimension code label are also pasted To decoration project construction material.
6. management system according to claim 1, it is characterised in that the Zigbee terminal management servers are provided with DPM Management system interface, passes through network connection DPM data servers;
The DPM management system interfaces are the independent data transmission interface of connection DPM data servers.
CN201720186721.5U 2017-02-28 2017-02-28 A kind of decoration project work progress management system based on technology of Internet of things Active CN206541333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720186721.5U CN206541333U (en) 2017-02-28 2017-02-28 A kind of decoration project work progress management system based on technology of Internet of things

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720186721.5U CN206541333U (en) 2017-02-28 2017-02-28 A kind of decoration project work progress management system based on technology of Internet of things

Publications (1)

Publication Number Publication Date
CN206541333U true CN206541333U (en) 2017-10-03

Family

ID=59946589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720186721.5U Active CN206541333U (en) 2017-02-28 2017-02-28 A kind of decoration project work progress management system based on technology of Internet of things

Country Status (1)

Country Link
CN (1) CN206541333U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN108225814A (en) * 2017-11-25 2018-06-29 佛山职业技术学院 A kind of soil sample method based on technology of Internet of things
CN109190424A (en) * 2018-07-25 2019-01-11 国网浙江省电力有限公司杭州供电公司 electronic tag data acquisition system and method
CN112417929A (en) * 2019-08-22 2021-02-26 阿里巴巴集团控股有限公司 Logistics object identification method, device and system
CN112633444A (en) * 2021-01-27 2021-04-09 湖南惠诚控制系统有限公司 Vehicle-mounted RFID radio frequency intelligent detection system based on engineering machinery field
CN112906848A (en) * 2021-03-29 2021-06-04 上海华兴数字科技有限公司 Operation metering system and method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN108225814A (en) * 2017-11-25 2018-06-29 佛山职业技术学院 A kind of soil sample method based on technology of Internet of things
CN109190424A (en) * 2018-07-25 2019-01-11 国网浙江省电力有限公司杭州供电公司 electronic tag data acquisition system and method
CN109190424B (en) * 2018-07-25 2023-08-25 国网浙江省电力有限公司杭州供电公司 Electronic tag data acquisition system and method
CN112417929A (en) * 2019-08-22 2021-02-26 阿里巴巴集团控股有限公司 Logistics object identification method, device and system
CN112633444A (en) * 2021-01-27 2021-04-09 湖南惠诚控制系统有限公司 Vehicle-mounted RFID radio frequency intelligent detection system based on engineering machinery field
CN112906848A (en) * 2021-03-29 2021-06-04 上海华兴数字科技有限公司 Operation metering system and method

Similar Documents

Publication Publication Date Title
CN206541333U (en) A kind of decoration project work progress management system based on technology of Internet of things
CN106709703A (en) Method and system of decoration project construction management based on technology of internet of things
TW201737208A (en) Method, system and communication terminal for patrol with scanning tags
CN201780604U (en) Intelligent museum management system
CN103810576A (en) Workshop production management method and system based on Internet of Things
CN104240005A (en) Application information management system, device and method
CN204965470U (en) Optical cable information management system based on cloud label
CN102368306A (en) Tourism Internet of things (IoT) control system and IoT method used for tourism
CN106682547B (en) A kind of portable integrated intelligence is received terminal and its application
CN111612116B (en) Ultrahigh frequency RFID electronic tag, read-write device, cloud end and cloud management system
CN205318553U (en) Data processing device and system and printer
CN101086763B (en) A collaborative working method between RFID reader
CN201247475Y (en) System for dynamically managing telecom industry asset physical goods based on RFID technology
CN104281974A (en) Mobile operation unified identifying, recognizing and information obtaining method and system
CN200980082Y (en) Radio frequency recognizing and administering system for real assets
CN207882954U (en) Intelligent movable Warehouse Management System based on technology of Internet of things
CN109658638A (en) Drinks consume monitoring management method and system
CN203012737U (en) Power asset inspection system
CN104240009A (en) Method for managing wiring relation by bar code combination
CN207637170U (en) The anti-lost cloud service system of Quick Response Code
KR101236854B1 (en) Method for Managing Production of Manufactures
CN109272085B (en) RFID intelligent tool management system based on cloud data
CN206711091U (en) A kind of hospital's inventory of fixed asset system
Kumar et al. Design and implementation of an automated office environment system using embedded sensors
CN210082986U (en) Electric bicycle charging pile based on two-dimensional code and RFID technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant