CN110159016B - 一种预制装配式可调节轨顶标高的柱式检查坑 - Google Patents

一种预制装配式可调节轨顶标高的柱式检查坑 Download PDF

Info

Publication number
CN110159016B
CN110159016B CN201910561621.XA CN201910561621A CN110159016B CN 110159016 B CN110159016 B CN 110159016B CN 201910561621 A CN201910561621 A CN 201910561621A CN 110159016 B CN110159016 B CN 110159016B
Authority
CN
China
Prior art keywords
steel plate
short column
prefabricated
sleeve
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910561621.XA
Other languages
English (en)
Other versions
CN110159016A (zh
Inventor
刘强
高修建
宋长江
张伟
闫世杰
韩倩
陈奇
宋智勇
林敏博
齐旭东
张浩亮
王林辉
李得昌
曹宇泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN201910561621.XA priority Critical patent/CN110159016B/zh
Publication of CN110159016A publication Critical patent/CN110159016A/zh
Application granted granted Critical
Publication of CN110159016B publication Critical patent/CN110159016B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/06Pits or building structures for inspection or services

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

本发明公开一种预制装配式可调节轨顶标高的柱式检查坑,包括,工厂预制件中空上部短柱和工厂预制浇筑为一体U形底板、下部短柱和抗滑凸隼;下部短柱的顶部预埋有下部套筒钢板,中空上部短柱的底部预埋有中部套筒钢板,中空上部短柱的顶部预埋有上部套筒钢板;下部套筒钢板和中部套筒钢板之间旋入镜像丝扣调高螺杆,轨道及轨道连接件安装在上部套筒钢板的套筒中。有益效果是,由于预制部件有效避免现场湿化作业,预制件装配简单、快捷,缩短了施工工期,提高了工程质量;通过调节镜像丝扣调高螺杆的拧入程度从而控制轨顶标高,实现施工期间、竣工后轨顶标高均能够调节,该操作简单有效,取消大范围地基处理工作内容,减少施工工序、降低工程造价。

Description

一种预制装配式可调节轨顶标高的柱式检查坑
技术领域
本发明涉及一种城轨列车柱式检查坑;特别是涉及一种预制装配式可调节轨顶标高的柱式检查坑。
背景技术
目前城轨交通场段大库中均采用现浇柱式检查坑作为城轨列车的日常检修之用。图1是现有柱式检查坑的平面示意图,该现浇柱式检查坑优点施工方便、整体性能好,缺点是现场湿作业体量大、污染严重,且柱式检查坑的沉降要求苛刻,一般工程均采用地基处理方案控制其沉降影响,施工繁琐、造价高,且竣工后无法二次调节轨顶高度,一旦竣工后柱式检查坑上的轨道沉降超标,会造成列车行走颠簸,钢轮磨损,甚至存在列车倾斜、倾覆的风险。
发明内容
本发明所要解决的技术问题是,克服已有技术缺陷,提供一种无湿作业,施工时间短,且能够控制轨顶标高的柱式检查坑。
本发明所采用的技术方案是,一种预制装配式可调节轨顶标高的柱式检查坑,包括,工厂预制件中空上部短柱和工厂预制浇筑为一体的U形底板、下部短柱和抗滑凸隼;所述下部短柱的顶部预埋有下部套筒钢板,所述中空上部短柱的底部预埋有中部套筒钢板,中空上部短柱的顶部预埋有上部套筒钢板;所述下部套筒钢板和中部套筒钢板之间旋入镜像丝扣调高螺杆,轨道及轨道连接件安装在上部套筒钢板的套筒中。
所述下部套筒预埋钢板和中部套筒预埋钢板均由块带中孔的钢板、个钢套筒和数根钢筋相互焊接而成;所述上部套筒钢板由1块带中孔的钢板、2个钢套筒和数根钢筋相互焊接而成,其中2个钢套筒为轨道连接件所用;镜像丝扣调高螺杆由2根镜像丝扣螺杆、中部带十字贯通孔的钢球块焊接而成,每个丝扣上各带1个螺栓,防止调节标高后丝扣滑动,钢球块中部的十字贯通孔方便钢棒插入、旋转螺杆之用。
所述中空上部短柱的中空形状与抗滑凸隼上部形状相适配。
所述U形底板、下部短柱、抗滑凸隼和中空上部短柱为配筋高强混凝土预制构件。
本发明的有益效果是,由于工厂预制部件有效避免了现场湿化作业,预制件装配简单、快捷,缩短了施工工期、充分发挥高强混凝土在装配式结构中的优势,提高了工程质量;特别是,通过调节镜像丝扣调高螺杆的拧入程度从而控制轨顶标高,实现了施工期间、竣工后的轨顶标高均能够调节的目的,该操作简单有效,取消了大范围的地基处理工作内容,减少施工工序、显著降低工程造价。
附图说明
图1是现有柱式检查坑的平面示意图;
图2是本发明预制装配式柱式检查坑的平面示意图;
图3是本发明浇筑为一体的安装在底板上的部件A的平面示意图;
图4是本发明安装在中空上部短柱上的部件B的平面示意图;
图5是本发明下部和中部套筒钢板示意图;
图6是本发明上部套筒钢板示意图;
图7是本发明镜像丝扣调高螺杆的平面示意图。
图中:
1. U形底板 2. 下部短柱 3. 下部套筒钢板 4. 抗滑凸隼
5. 镜像丝扣调高螺杆 6. 中部套筒钢板 7. 中空上部短柱
8. 上部套筒钢板 9. 轨道及轨道连接件。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细说明:
如图2至图7所示,本发明预制装配式可调节轨顶标高的柱式检查坑,包括,工厂预制件中空上部短柱7和工厂预制浇筑为一体的U形底板1、下部短柱2和抗滑凸隼4;所述下部短柱2的顶部预埋有下部套筒钢板3,所述中空上部短柱7的底部预埋有中部套筒钢板6,中空上部短柱7的顶部预埋有上部套筒钢板8;所述下部套筒钢板3和中部套筒钢板6之间旋入镜像丝扣调高螺杆5,轨道及轨道连接件9安装在上部套筒钢板8的套筒中。
所述下部套筒预埋钢板3和中部套筒预埋钢板6均由1块带中孔的钢板、4个钢套筒和数根钢筋相互焊接而成;所述上部套筒钢板8由1块带中孔的钢板、2个钢套筒和数根钢筋相互焊接而成,其中2个钢套筒为轨道连接件所用;镜像丝扣调高螺杆5由防滑螺母51,2根镜像丝扣53螺杆、中部带十字贯通孔52的钢球块焊接而成,每个丝扣上各带1个螺栓,防止调节标高后丝扣滑动,钢球块中部的十字贯通孔方便钢棒插入、旋转螺杆之用。所述中空上部短柱7的中空形状与抗滑凸隼4上部形状相适配。所述U形底板1、下部短柱2、抗滑凸隼4和中空上部短柱7为配筋高强混凝土预制构件。
本发明预制装配式可调节轨顶标高的柱式检查坑的U形底板1、下部短柱2、下部套筒钢板3和抗滑凸隼4集合简称预制结构A;中部套筒钢板6、中空上部短柱7和上部套筒钢板8集合简称预制结构B;现场安装时,首先放置预制结构A,之后把4根镜像丝扣调高螺杆5初拧入下部4孔套筒预埋钢板3的套筒中,再把预制结构B的中孔对准预制抗滑凸隼4插入,然后把4根镜像丝扣调高螺杆5续拧入中部4孔套筒预埋钢板6的套筒中,最后把轨道及轨道连接件9安装于上部2孔套筒预埋钢板8的套筒中。该预制装配式可调节高度城轨列车柱式检查坑装配程度高、无湿作业内容;在施工阶段及运营阶段,通过调节4根镜像丝扣调高螺杆5的拧入程度从而控制轨顶标高,实现了竣工后的轨顶标高调节功能,取消地基处理工作内容,显著降低工程造价。
值得指出的是,本发明的保护范围并不局限于上述具体实例方式,根据本发明的基本技术构思,也可用基本相同的结构,可以实现本发明的目的,只要本领域普通技术人员无需经过创造性劳动,即可联想到的实施方式,均属于本发明的保护范围。

Claims (3)

1.一种预制装配式可调节轨顶标高的柱式检查坑,其特征在于,包括,工厂预制件中空上部短柱(7)和工厂预制浇筑为一体的U形底板(1)、下部短柱(2)和抗滑凸隼(4);所述下部短柱(2)的顶部预埋有下部套筒钢板(3),所述中空上部短柱(7)的底部预埋有中部套筒钢板(6),中空上部短柱(7)的顶部预埋有上部套筒钢板(8);所述下部套筒钢板(3)和中部套筒钢板(6)之间旋入镜像丝扣调高螺杆(5),轨道及轨道连接件(9)安装在上部套筒钢板(8)的套筒中;所述镜像丝扣调高螺杆(5)由2根镜像丝扣螺杆、中部带十字贯通孔的钢球块焊接而成,每个丝扣上各带1个螺栓,防止调节标高后丝扣滑动,钢球块中部的十字贯通孔方便钢棒插入、旋转螺杆之用;所述中空上部短柱(7)的中空形状与抗滑凸隼(4)上部形状相适配。
2.根据权利要求1所述的预制装配式可调节轨顶标高的柱式检查坑,其特征在于,所述下部套筒预埋钢板(3)和中部套筒预埋钢板(6)均由1块带中孔的钢板、4个钢套筒和数根钢筋相互焊接而成;所述上部套筒钢板(8)由1块带中孔的钢板、2个钢套筒和数根钢筋相互焊接而成,其中2个钢套筒为轨道连接件所用。
3.根据权利要求1所述的预制装配式可调节轨顶标高的柱式检查坑,其特征在于,所述U形底板(1)、下部短柱(2)、抗滑凸隼(4)和中空上部短柱(7)为配筋高强混凝土预制构件。
CN201910561621.XA 2019-06-26 2019-06-26 一种预制装配式可调节轨顶标高的柱式检查坑 Active CN110159016B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910561621.XA CN110159016B (zh) 2019-06-26 2019-06-26 一种预制装配式可调节轨顶标高的柱式检查坑

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910561621.XA CN110159016B (zh) 2019-06-26 2019-06-26 一种预制装配式可调节轨顶标高的柱式检查坑

Publications (2)

Publication Number Publication Date
CN110159016A CN110159016A (zh) 2019-08-23
CN110159016B true CN110159016B (zh) 2023-12-05

Family

ID=67626932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910561621.XA Active CN110159016B (zh) 2019-06-26 2019-06-26 一种预制装配式可调节轨顶标高的柱式检查坑

Country Status (1)

Country Link
CN (1) CN110159016B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114941444B (zh) * 2022-06-21 2024-03-01 南京工大桥隧与轨道交通研究院有限公司 一种装配式短柱的高程调节装置

Citations (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2727199A1 (fr) * 1994-11-23 1996-05-24 Scherrer Gilles Banc de controle de la geometrie des roues d'un vehicule automobile
CN201386349Y (zh) * 2009-03-11 2010-01-20 浙江中联建设集团有限公司 混凝土结构预埋钢板安装简易微调整平器
CN102615277A (zh) * 2012-03-15 2012-08-01 中国十七冶集团有限公司 一种钢包车轨道安装的施工方法
CN202416087U (zh) * 2011-12-02 2012-09-05 铁道第三勘察设计院集团有限公司 一种地沟式检查坑用扣件
EP2559817A2 (en) * 2011-08-16 2013-02-20 Prefabricados Dinescon, S.L. Adjustable system for embedded union of prefabricated concrete elements for building structures, and method for performing the union of prefabricated concrete elements
EP2762378A1 (de) * 2013-02-05 2014-08-06 Rehm GmbH Industriesysteme Anlagenbau Durchtrittsicherungssystem für eine Fahrzeugwartungshalle
CN104234267A (zh) * 2014-09-04 2014-12-24 中国建筑股份有限公司 可调节高度的预制装配钢筋混凝土剪力墙板及其安装方法
CN105019318A (zh) * 2015-06-15 2015-11-04 襄阳航生石化环保设备有限公司 一种组合式轨道调节构件
CN105544322A (zh) * 2015-12-30 2016-05-04 中铁第四勘察设计院集团有限公司 一种磁悬浮列车库内检修用的离散型柱式轨道桥系统
CN105735063A (zh) * 2016-03-29 2016-07-06 中铁城建集团第一工程有限公司 采用胶粘法及架轨工装吊轨法铺设检查坑轨道的施工方法
CN106192608A (zh) * 2016-08-29 2016-12-07 中冶焦耐(大连)工程技术有限公司 一种焦炉推焦机轨道基础施工方法
WO2017135863A1 (en) * 2016-02-03 2017-08-10 Bill Andersson Fordonslyftar Ab Service pit and method for assembling and installing the service pit
CN107268348A (zh) * 2017-07-25 2017-10-20 中铁六局集团天津铁路建设有限公司 地铁柱式检查坑施工方法
CN107313314A (zh) * 2017-07-19 2017-11-03 中铁上海工程局集团有限公司 一种地铁车辆段预留立柱检查坑轨道施工方法
CN107893370A (zh) * 2017-12-26 2018-04-10 中国铁路设计集团有限公司 一种锚固装置与调高支座及其施工方法
CN108162162A (zh) * 2017-12-22 2018-06-15 中铁第四勘察设计院集团有限公司 一种预制混凝土柱及其制备方法和使用方法
CN108221504A (zh) * 2018-01-03 2018-06-29 上海市城市建设设计研究总院(集团)有限公司 软土地区有轨电车装配式路基轨道板床的施工方法
CN108316061A (zh) * 2018-01-31 2018-07-24 周兆弟 一种轨道梁安装方法及其轨道基础施工方法
CN108842530A (zh) * 2018-06-29 2018-11-20 中国建筑第五工程局有限公司 一种新型的跨座式单轨双线组合轨道梁结构
CN208168479U (zh) * 2018-04-24 2018-11-30 建华建材(中国)有限公司 一种检查坑预制柱结构
CN208168396U (zh) * 2018-03-28 2018-11-30 中国建筑第八工程局有限公司 隔震支座下预埋件标高精微调整装置
CN208250830U (zh) * 2018-01-22 2018-12-18 中铁上海工程局集团有限公司 一种适用于道床结构的新型调轨支架支撑底座装置
CN109112903A (zh) * 2018-09-27 2019-01-01 中建安装工程有限公司 一种场段库内立柱式检查坑整体道床无轨施工技术
CN208346567U (zh) * 2018-05-18 2019-01-08 中铁二院工程集团有限责任公司 一种全预制装配式混凝土货运悬挂式单轨结构
CN109594437A (zh) * 2019-01-25 2019-04-09 中国铁道科学研究院集团有限公司铁道建筑研究所 一种轨道简易可调支撑系统及其施工方法
CN208869880U (zh) * 2018-09-15 2019-05-17 杭州保利电梯导轨制造有限公司 一种铁路导轨快速定位配件
CN109853973A (zh) * 2018-11-26 2019-06-07 南京兴华建筑设计研究院股份有限公司 用于预制空调板现场安装的悬挑式支撑定位装置
CN209010006U (zh) * 2018-09-05 2019-06-21 维机轨道交通科技(镇江)有限公司 轨道交通管片预埋件
CN210622405U (zh) * 2019-06-26 2020-05-26 中国铁路设计集团有限公司 预制装配式可调节轨顶标高的柱式检查坑
CN116006005A (zh) * 2022-09-05 2023-04-25 中国铁路设计集团有限公司 一种全装配后灌芯的柱式检查坑结构及施工方法
CN219864319U (zh) * 2023-03-30 2023-10-20 中国铁路设计集团有限公司 一种可正向施工柱脚栓接预制空心方柱柱式检查坑

Patent Citations (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2727199A1 (fr) * 1994-11-23 1996-05-24 Scherrer Gilles Banc de controle de la geometrie des roues d'un vehicule automobile
CN201386349Y (zh) * 2009-03-11 2010-01-20 浙江中联建设集团有限公司 混凝土结构预埋钢板安装简易微调整平器
EP2559817A2 (en) * 2011-08-16 2013-02-20 Prefabricados Dinescon, S.L. Adjustable system for embedded union of prefabricated concrete elements for building structures, and method for performing the union of prefabricated concrete elements
CN202416087U (zh) * 2011-12-02 2012-09-05 铁道第三勘察设计院集团有限公司 一种地沟式检查坑用扣件
CN102615277A (zh) * 2012-03-15 2012-08-01 中国十七冶集团有限公司 一种钢包车轨道安装的施工方法
EP2762378A1 (de) * 2013-02-05 2014-08-06 Rehm GmbH Industriesysteme Anlagenbau Durchtrittsicherungssystem für eine Fahrzeugwartungshalle
CN104234267A (zh) * 2014-09-04 2014-12-24 中国建筑股份有限公司 可调节高度的预制装配钢筋混凝土剪力墙板及其安装方法
CN105019318A (zh) * 2015-06-15 2015-11-04 襄阳航生石化环保设备有限公司 一种组合式轨道调节构件
CN105544322A (zh) * 2015-12-30 2016-05-04 中铁第四勘察设计院集团有限公司 一种磁悬浮列车库内检修用的离散型柱式轨道桥系统
WO2017135863A1 (en) * 2016-02-03 2017-08-10 Bill Andersson Fordonslyftar Ab Service pit and method for assembling and installing the service pit
CN105735063A (zh) * 2016-03-29 2016-07-06 中铁城建集团第一工程有限公司 采用胶粘法及架轨工装吊轨法铺设检查坑轨道的施工方法
CN106192608A (zh) * 2016-08-29 2016-12-07 中冶焦耐(大连)工程技术有限公司 一种焦炉推焦机轨道基础施工方法
CN107313314A (zh) * 2017-07-19 2017-11-03 中铁上海工程局集团有限公司 一种地铁车辆段预留立柱检查坑轨道施工方法
CN107268348A (zh) * 2017-07-25 2017-10-20 中铁六局集团天津铁路建设有限公司 地铁柱式检查坑施工方法
CN108162162A (zh) * 2017-12-22 2018-06-15 中铁第四勘察设计院集团有限公司 一种预制混凝土柱及其制备方法和使用方法
CN107893370A (zh) * 2017-12-26 2018-04-10 中国铁路设计集团有限公司 一种锚固装置与调高支座及其施工方法
CN108221504A (zh) * 2018-01-03 2018-06-29 上海市城市建设设计研究总院(集团)有限公司 软土地区有轨电车装配式路基轨道板床的施工方法
CN208250830U (zh) * 2018-01-22 2018-12-18 中铁上海工程局集团有限公司 一种适用于道床结构的新型调轨支架支撑底座装置
CN108316061A (zh) * 2018-01-31 2018-07-24 周兆弟 一种轨道梁安装方法及其轨道基础施工方法
CN208168396U (zh) * 2018-03-28 2018-11-30 中国建筑第八工程局有限公司 隔震支座下预埋件标高精微调整装置
CN208168479U (zh) * 2018-04-24 2018-11-30 建华建材(中国)有限公司 一种检查坑预制柱结构
CN208346567U (zh) * 2018-05-18 2019-01-08 中铁二院工程集团有限责任公司 一种全预制装配式混凝土货运悬挂式单轨结构
CN108842530A (zh) * 2018-06-29 2018-11-20 中国建筑第五工程局有限公司 一种新型的跨座式单轨双线组合轨道梁结构
CN209010006U (zh) * 2018-09-05 2019-06-21 维机轨道交通科技(镇江)有限公司 轨道交通管片预埋件
CN208869880U (zh) * 2018-09-15 2019-05-17 杭州保利电梯导轨制造有限公司 一种铁路导轨快速定位配件
CN109112903A (zh) * 2018-09-27 2019-01-01 中建安装工程有限公司 一种场段库内立柱式检查坑整体道床无轨施工技术
CN109853973A (zh) * 2018-11-26 2019-06-07 南京兴华建筑设计研究院股份有限公司 用于预制空调板现场安装的悬挑式支撑定位装置
CN109594437A (zh) * 2019-01-25 2019-04-09 中国铁道科学研究院集团有限公司铁道建筑研究所 一种轨道简易可调支撑系统及其施工方法
CN210622405U (zh) * 2019-06-26 2020-05-26 中国铁路设计集团有限公司 预制装配式可调节轨顶标高的柱式检查坑
CN116006005A (zh) * 2022-09-05 2023-04-25 中国铁路设计集团有限公司 一种全装配后灌芯的柱式检查坑结构及施工方法
CN219864319U (zh) * 2023-03-30 2023-10-20 中国铁路设计集团有限公司 一种可正向施工柱脚栓接预制空心方柱柱式检查坑

Also Published As

Publication number Publication date
CN110159016A (zh) 2019-08-23

Similar Documents

Publication Publication Date Title
CN110159016B (zh) 一种预制装配式可调节轨顶标高的柱式检查坑
CN106049760B (zh) 震后快速修复预制混凝土柱脚及其施工、维护方法
CN210622405U (zh) 预制装配式可调节轨顶标高的柱式检查坑
CN107841954A (zh) 一种轨道梁球铰线形精调装置和方法
CN214657263U (zh) 一种预应力可调节后浇带传力装置
CN201245970Y (zh) 制式模板单元
CN203639753U (zh) 铁路路基挡砟板
CN216427849U (zh) 预制轨道板
CN212154137U (zh) 装配式免支撑吊模
CN208430523U (zh) 铁路支柱或砼基础预理地脚螺栓组的加工装置
CN112391882A (zh) 一种crts i型双块式无砟轨道轨枕离缝冒浆病害的整治方法
CN107354877B (zh) 一种声屏障用整体式杯口安装结构
CN105839479B (zh) 一种新型轨枕及其制造方法
CN219344154U (zh) 一种悬挑构件支撑加固装置
CN220184675U (zh) 一种用于预制梁柱连接的外附支撑结构
CN220132756U (zh) 一种桥梁顶升加高支撑装置及支座构造
CN213806176U (zh) 用于轨道交通车辆段或停车场的预制混凝土立柱结构
CN204658640U (zh) 模板调节结构
CN220450676U (zh) 一种锚固式墩身支架扶墙结构
CN217003701U (zh) 水平度调节结构
CN219364694U (zh) 一种可拆卸式混凝土地脚螺栓定位装置
CN213772911U (zh) 一种可调节支座垫石
CN220908035U (zh) 一种检修地沟上轨道结构
CN208009900U (zh) 一种建筑浇筑模板固定机构
CN219951584U (zh) 一种桥头跳车修复结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant