CN110029623A - It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method - Google Patents

It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method Download PDF

Info

Publication number
CN110029623A
CN110029623A CN201910280571.8A CN201910280571A CN110029623A CN 110029623 A CN110029623 A CN 110029623A CN 201910280571 A CN201910280571 A CN 201910280571A CN 110029623 A CN110029623 A CN 110029623A
Authority
CN
China
Prior art keywords
frame
plant biological
biological bag
retaining wall
build
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910280571.8A
Other languages
Chinese (zh)
Inventor
袁以美
叶合欣
叶济华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Polytechnic of Water Resources and Electric Engineering Guangdong Water Resources and Electric Power Technical School
Original Assignee
Guangdong Polytechnic of Water Resources and Electric Engineering Guangdong Water Resources and Electric Power Technical School
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Polytechnic of Water Resources and Electric Engineering Guangdong Water Resources and Electric Power Technical School filed Critical Guangdong Polytechnic of Water Resources and Electric Engineering Guangdong Water Resources and Electric Power Technical School
Priority to CN201910280571.8A priority Critical patent/CN110029623A/en
Publication of CN110029623A publication Critical patent/CN110029623A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor

Abstract

The invention discloses the inclined retaining walls that plant biological bag greening is filled out in a kind of chain block frame, including inclined retaining wall, tenon, anti-skidding key-wall, drainage hole, block frame, plant biological bag, geotextiles, pitman, bolt hole, spats jackstone.Inclined retaining wall bottom surface is set as counter-slope and tenon, and foundation is set up defences slip teeth wall.Back-tilting type abuts metope, and the block frame that installation up and down can be chain forms step face near water.Neighbouring block frame is connected with inverted L shape pitman, and the adjacent block frame in left and right is connected with bolt.Lower half storey fill block stone erratic boulder, upper half storey fill out plant biological bag in frame.Plant biological bag surface layer is stained with the seed of shrub and grass, filling planting soil or channel cleanout material in bag.The gap between frame and barricade is built, it is closely knit with the filling of channel cleanout material, and set geotextiles and be separated by with frame is built.The present invention guarantees structural stability by barricade, ecological by block frame and plant biological bag offer, makes full use of channel cleanout material, and climb disembarkation convenient for unfortunate drowning people, structure novel is easy for construction.

Description

It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method
Technical field
The present invention relates to a kind of barricade, more particularly, to it is a kind of it is chain build filled out in frame plant biological bag greening inclined retaining wall and Its construction method.
Background technique
Ecological Civilization Construction is the task of paramount importance of relationship Chinese nation Sustainable Development, and ecology is emerging then civilized emerging, and ecology declines then Civilization declines.Inclined retaining wall belongs to one kind of Gravity Retaining Wall, hydraulic engineering river regulation, slope of highway processing in using compared with It is more.Inclined retaining wall is preferably preferentially used to the soil-slope that rock side slope and excavation are formed, the biggish soil-slope of height is preferably adopted With load retaining wall or inclined retaining wall.As it can be seen that the inclined retaining wall scope of application is wider.Studies in China person is mostly in barricade Force Calculation Method, stability and the upper concern of application are more, but do not see public reporting to how to assign its ecological functions.Inclined retaining wall Mostly stone masonry or concrete material, sidelight cunning is risen steeply near water, stiff and dull, lacks ecosystem characterization, and unfortunate drowning people is not It can climb and debark along metope, it is not in tune with the theory of adhering to harmony between man and nature symbiosis if large-scale use.But face upward inclined Barricade has the advantages that uniqueness, and e.g., the suffered soil pressure of wall back is smaller, and wall back is relatively bonded with excavation face side slope, thus excavated volume It is smaller with backfill amount.
It, can not only be in the ecological landscape of the retaining wall all standing of side formation near water if ecological reconstruction can be carried out to inclined retaining wall Beauty, moreover it is possible to facilitate unfortunate drowning people and climb disembarkation to save oneself, this to meeting the growing graceful Ecological water environment needs of the people, Building safety green ecological water system has great importance comprehensively.Now propose that a kind of chain build fills out facing upward tiltedly for plant biological bag greening in frame Formula barricade and construction method.
Summary of the invention
The purpose of the present invention is to solve defects in the prior art, provide and fill out plant biological bag greening in the chain block frame of one kind Inclined retaining wall and its construction method, the soil pressure for making full use of inclined retaining wall wall back suffered is smaller, wall back and excavation face Side slope is relatively bonded, excavated volume and the lesser advantage of backfill amount, meanwhile, ecology transformation is carried out to inclined retaining wall, assigns it Ecological functions, and facilitate unfortunate drowning people's climbing disembarkation and save oneself, structure novel is easy to operate.
To achieve the above object, technical scheme is as follows:
Counter-slope is set by the toe of wall bottom surface of inclined retaining wall, and surface is set up defences slip teeth wall, and bottom is equipped with tenon.Back-tilting type is tight By inclined retaining wall side wall near water, until the lower and upper layer-by-layer block frame for retreating installation up and down can be chain, being formed has platform The face near water of stepwise.Neighbouring frame of building is connected with inverted L shape pitman by the vertical jack on frame side, the adjacent block in left and right Frame bolt is connected by horizontal bolt hole.Lower half storey fills block stone erratic boulder in frame, and upper half storey fills plant biological bag, plant biological bag table Layer is stained with the seed of shrub and grass, filling planting soil or channel cleanout material in bag.The gap between frame and barricade is built, it is clear with river Material filling of becoming silted up is closely knit, and sets geotextiles and be isolated with frame is built.The present invention guarantees overall structure stability by inclined retaining wall, by It builds plant biological bag in frame and the ecological of inclined retaining wall is provided, and make full use of channel cleanout material, and facilitate unfortunate drowning people Climbing disembarkation is saved oneself, and structure novel is easy for construction.
It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall construction method, which is characterized in that including following step It is rapid:
S1. it is no less than 2m outside barricade foot at a distance, carries out soil property cofferdam, clear base is to designing excavation line.
S2. thick 10cmC10 concrete cushion is poured.
S3. formwork erection pours C20 inclined retaining wall concrete.Coincide to make to build frame and barricade face, the slope in barricade face than preferably with The jack for building frame is consistent, and the different slope ratios such as 1:0.35,1:0.5,1:0.65,1:0.9 may be selected.
S4. after concrete reaches design strength, chain block frame is installed along side wall near water.According to the gradient in barricade face, The connecting hole for adjusting adjacent upper and lower level frame is securely connected upper and lower level frame with pitman.Meanwhile two adjacent frames of left and right are logical with bolt Bolt hole is crossed securely to connect.
As soon as S5. frame is built in every installation layer, to the plant biological bag of frame Internal Code heap filling planting soil (or channel cleanout material), and it is stained with The one side of seed must be upward.
S6. the chain gap built between frame and barricade, filled with channel cleanout material it is closely knit, and with geotextiles by dredging material with It is completely separated to build frame, to prevent the soil body to be lost.
S7. the fill block stone throwing spats erosion control at barricade.
S8. cofferdam is removed.
S9. to further realize the present invention, each watering is primary sooner or later for 15 days domestic demands after plant biological bag is laid with, during 16~30 days Watering is primary daily, waters weekly twice during 31~60 days.Each irrigation amount is advisable with drenched 10cm soil layer (has natural rainfall Except), to guarantee plant growth needs.
Beneficial effect
1. one kind disclosed by the invention is chain to build the inclined retaining wall and its construction method that plant biological bag greening is filled out in frame, due to Frame is built in installation on the outside of barricade, and overall structure stability is guaranteed by barricade completely, is thoroughly solved block frame self stability and is asked Topic.
2. one kind disclosed by the invention is chain to build the inclined retaining wall and its construction method for filling out plant biological bag greening in frame, frame is built Inner stiffener stone erratic boulder and plant biological bag, facilitate plant health to grow, ecological, the structure that solves the problems, such as that inclined retaining wall lacks Novelty, it is easy to operate.
3. one kind disclosed by the invention is chain to build the inclined retaining wall and its construction method for filling out plant biological bag greening in frame, can fill Divide and fill plant biological bag using channel cleanout material, reduces and abandoned outside silt material.
4. one kind disclosed by the invention is chain to build the inclined retaining wall and its construction method for filling out plant biological bag greening in frame, construction 90~120 days afterwards, mean temperature was at 20 DEG C or more round the clock, and under water sufficiency, plant biological bag can be grown in 90-120d The vegetation for covering side water side out, it is significant to reach ecological effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the inclined retaining wall of plant biological bag greening is filled out in a kind of chain block frame of the embodiment of the present invention;
Fig. 2 is the structure chart that Fig. 1 builds frame;
Fig. 3 is that Fig. 1 builds frame plan view;
Fig. 4 is that Fig. 1 builds frame front elevation;
Fig. 5 is that Fig. 1 builds frame back view;
Fig. 6 is that Fig. 1 builds frame side view.
Description of symbols
1- tenon, 2- jackstone, the anti-skidding key-wall of 3-, 4- build frame, 41- block stone erratic boulder, 42- plant biological bag, 43- location hole, 44- spiral shell Keyhole, 5- inverted L shape pitman, 6- geotextiles, 7- channel cleanout material, 8- drainpipe (upstream end outsourcing geotextiles), 9-C20 is faced upward Inclined concrete guard wall, 10- design water level, 11- soil property cofferdam, 12- construction time water level
Specific embodiment
Present invention will now be described in further detail with reference to the embodiments and the accompanying drawings, but embodiments of the present invention are unlimited In this.
As shown in figs 1 to 6, present embodiment discloses a kind of chain build, and the inclined retaining wall of plant biological bag greening is filled out in frame, It include: that C20 faces upward inclined concrete guard wall 9, tenon 1, anti-skidding key-wall 3, drainpipe 8, builds frame 4, plant biological bag 42, geotextiles 6, inverted L Type pitman 5,44 hole of bolt, channel cleanout material 7, spats jackstone 2.C20 faces upward a part of inclined concrete guard wall as dyke, Play the role of supporting and retaining system.
In the present embodiment, counter-slope is set by the wall bottom of C20 inclined retaining wall 9, slope ratio is 1:15, and bottom sets tenon 1, to increase the stability against sliding of C20 inclined retaining wall 9.
Further, it sets up defences slip teeth wall 3 on 9 toe of wall surface of C20 inclined retaining wall, sets slot after anti-skidding key-wall 3, slot bottom is same Sample is set as counter-slope, and slope ratio is 1:15, to increase the stability against sliding for building frame 4.
Specifically, C20 faces upward inclined concrete guard wall 9 equipped with drainage hole 8, outsourcing geotextiles in upstream end are in plum on metope Flower pattern or rectangular arrangement, pitch-row 3-5m.
Further, C20, which is faced upward, is equipped with spats jackstone 2 at 9 toe of wall of inclined concrete guard wall.
Specifically, the side wall near water of C20 inclined retaining wall 9 is abutted, until lower and upper layer-by-layer retrogressing installation surrounding can be chain Block frame 4, formed have stepped face near water.Neighbouring block frame 4 L-type pitman 5 passes through vertical slotting on frame side Hole is connected, and the adjacent block frame 4 in left and right is connected with bolt 44 by horizontal bolt hole.
Further, lower half storey filling block stone erratic boulder 41 in frame 4, upper half storey filling plant biological bag 42,42 table of plant biological bag are being built Layer is stained with the seed of shrub and grass, fills planting soil in bag.The gap between frame 4 and C20 inclined retaining wall 9 is built, it is clear with river 7 filling of material of becoming silted up is closely knit, and sets geotextiles 6 and be isolated with frame 4 is built, to prevent the soil body to be lost.
Preferably, frame 4 2m long (along water (flow) direction) is built, wide 1.0m, high 1.0m, frame wall thickness 0.1m, bottom surface is equipped with anti-skidding convex Tenon 1, top are equipped with non-slip groove, are formed by high-intensitive C40 is concrete prefabricated.For convenience of the masonry of corner part, length is (along water flow Direction) 1m can also be shorten to.
Further, each reserved 5 vertical jacks in every frame side on 4 upper and lower surface of frame are built, diameter 2cm, each hole can shape At different slope ratios, respectively by the setting of the different gradients such as 1:0., 1:0.35,1:0.5,1:0.65,1:0.9, to facilitate L-type to connect The fixed neighbouring block frame 4 of stick 5.Build each reserved 1 horizontal direction bolt hole 44, diameter 3cm in the left and right sides of frame 4.
Preferably, plant biological bag 42 are by seed, fertilizer, water-retaining agent, soil conditioner etc. and web integrated bond and to stitch What system was formed, the satchel that suitable for plant is grown after inside is banketed.The wherein selection of seed should be carried out according to actual demands of engineering Collocation.Plant biological bag 42 is filled into planting soil (or channel cleanout material), fastens sack.Plant biological bag 42 fills before soil having a size of 60 × 40cm, size is preferably 50 × 30 × 15cm after dress is native.Plant biological bag 42 glues seed-bearing one side when building and piling up in frame 4 must court On.
It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall construction method, comprising the following steps:
Step 1, it is no less than 2m outside barricade foot at a distance, carries out soil property cofferdam, clear base is to designing excavation line.
Step 2, thick 10cmC10 concrete cushion is poured.
Step 3, formwork erection pours C20 inclined retaining wall concrete.It coincide to make to build frame and barricade face, the slope ratio in barricade face It is preferably consistent with the jack of frame is built, the different slopes such as 1:0.35,1:0.5,1:0.65,1:0.9 ratio may be selected.
Step 4, after concrete reaches design strength, chain block frame is installed along side wall near water.According to the slope in barricade face Degree, adjusts the connecting hole of adjacent upper and lower level frame, is securely connected upper and lower level frame with pitman.Meanwhile two adjacent frame spiral shells of left and right Bolt is securely connected by bolt hole.
Step 5, as soon as frame is built in every installation layer, to the plant biological bag of frame Internal Code heap filling planting soil (or channel cleanout material), and Gluing seed-bearing one side must be upward.
Step 6, the chain gap built between frame and barricade, filled with channel cleanout material it is closely knit, and with geotextiles by dredging Material and block frame are completely separated, to prevent the soil body to be lost.
Step 7, the fill block stone throwing spats erosion control at barricade.
Step 8, cofferdam is removed.
Step 9, to further realize the present invention, each watering is primary sooner or later for 15 days domestic demands after plant biological bag is laid with, and 16~30 days Period waters once daily, waters weekly twice during 31~60 days.Each irrigation amount is advisable with drenched 10cm soil layer (to be had natural Except rainfall), to guarantee plant growth needs.
The above embodiment is a preferred embodiment of the present invention, but embodiments of the present invention are not by above-described embodiment Limitation, other any changes, modifications, substitutions, combinations, simplifications made without departing from the spirit and principles of the present invention, It should be equivalent substitute mode, be included within the scope of the present invention.

Claims (8)

  1. Chain build the inclined retaining wall that plant biological bag greening is filled out in frame 1. a kind of, which is characterized in that including inclined retaining wall, tenon, Anti-skidding key-wall, builds frame, plant biological bag, geotextiles, pitman, bolt hole, spats jackstone at drainage hole;The wall of the inclined retaining wall Toe bottom surface is counter-slope, and surface is set up defences slip teeth wall, and bottom is equipped with tenon;The block frame back-tilting type abuts inclined retaining wall side wall near water On face, until lower and upper layer-by-layer near water face of the formation with step after retreating installation;It is packed into after the raw bag filling planting soil of described value It builds in frame.
  2. 2. one kind according to claim 1 is chain to build the inclined retaining wall for filling out plant biological bag greening in frame, which is characterized in that build Frame is formed by C40 strong concrete is prefabricated, and neighbouring frame of building passes through the vertical jack phase on frame side with inverted L shape pitman Even, the adjacent block frame in left and right is connected with bolt by frame bottom horizontal bolt hole, and back-tilting type leans against the gear inclined retaining wall On metope.
  3. 3. one kind according to claim 1 is chain to build the inclined retaining wall for filling out plant biological bag greening in frame, which is characterized in that build Lower half storey filling block stone and erratic boulder in frame, upper half storey fill plant biological bag, and plant biological bag surface layer is stained with the seed of shrub and grass, fills in bag Fill out planting soil or channel cleanout material.
  4. 4. one kind according to claim 1 is chain to build the inclined retaining wall for filling out plant biological bag greening in frame, which is characterized in that build Gap between frame and barricade, it is closely knit with the filling of channel cleanout material, and set geotextiles and be isolated with frame is built, to prevent soil body stream It loses.
  5. 5. one kind according to claim 1 is chain to build the inclined retaining wall for filling out plant biological bag greening in frame, which is characterized in that face upward Inclined barricade is equipped with drainage hole, and outsourcing geotextiles in upstream end are in blossom type or rectangular arrangement, pitch-row 3-5m on metope.
  6. 6. one kind according to claim 1 is chain to build the inclined retaining wall for filling out plant biological bag greening in frame, which is characterized in that face upward Jackstone spats is equipped at inclined barricade toe of wall.
  7. 7. one kind according to claim 1 is chain to build the inclined retaining wall for filling out plant biological bag greening in frame, which is characterized in that plant Raw bag is by seed, fertilizer, water-retaining agent, soil conditioner etc. and web integrated bond and to sew formation, after inside is banketed The satchel of suitable for plant growth;The selection of the seed should arrange in pairs or groups according to actual demands of engineering;The plant biological bag is filled Full planting soil or channel cleanout material fasten sack, and plant biological bag dress soil is preceding having a size of 60 × 40cm, and size is preferably 50 × 30 after filling soil ×10cm.The plant biological bag glues seed-bearing one side when building and piling up in frame must be upward.
  8. 8. a kind of build the inclined retaining wall construction party filling out plant biological bag in frame and afforesting using chain as described in claim 1~7 is any Method, which comprises the following steps:
    S1. it is no less than 2m outside barricade foot at a distance, carries out soil property cofferdam, clear base is to designing excavation line.
    S2. thick 10cmC10 concrete cushion is poured.
    S3. formwork erection pours C20 inclined retaining wall concrete.Coincide to make to build frame and barricade face, the slope in barricade face than preferably with build frame Jack it is consistent, the different slopes ratios such as 1:0.35,1:0.5,1:0.65,1:0.9 may be selected.
    S4. after concrete reaches design strength, chain block frame is installed along side wall near water.According to the gradient in barricade face, adjustment The connecting hole of adjacent upper and lower level frame is securely connected upper and lower level frame with pitman.Meanwhile two adjacent frame bolts of left and right pass through spiral shell Keyhole securely connects.
    As soon as S5. frame is built in every installation layer, to the plant biological bag of frame Internal Code heap filling planting soil (or channel cleanout material), and it is stained with seed One side must be upward.
    S6. the chain gap built between frame and barricade, it is closely knit with the filling of channel cleanout material, and by dredging material and frame is built with geotextiles It is completely separated, to prevent the soil body to be lost.
    S7. the fill block stone throwing spats erosion control at barricade.
    S8. cofferdam is removed.
    S9. to further realize the present invention, each watering is primary sooner or later for 15 days domestic demands after plant biological bag is laid with, during 16~30 days daily Watering is primary, waters weekly twice during 31~60 days.Each irrigation amount is advisable with drenched 10cm soil layer (has natural rainfall to remove Outside), to guarantee plant growth needs.
CN201910280571.8A 2019-04-09 2019-04-09 It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method Pending CN110029623A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910280571.8A CN110029623A (en) 2019-04-09 2019-04-09 It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910280571.8A CN110029623A (en) 2019-04-09 2019-04-09 It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method

Publications (1)

Publication Number Publication Date
CN110029623A true CN110029623A (en) 2019-07-19

Family

ID=67237667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910280571.8A Pending CN110029623A (en) 2019-04-09 2019-04-09 It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method

Country Status (1)

Country Link
CN (1) CN110029623A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453644A (en) * 2019-08-28 2019-11-15 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of bank slope structure and its construction method using channel cleanout material remodeling mima type microrelief
CN110552323A (en) * 2019-08-28 2019-12-10 广东水利电力职业技术学院(广东省水利电力技工学校) Stepped ecological slope protection and construction method thereof
CN113737722A (en) * 2021-09-29 2021-12-03 中冶华天工程技术有限公司 Have concurrently stone concrete barricade shore protection of view nature suitable for city river course
CN116988429A (en) * 2023-09-26 2023-11-03 中交第一航务工程局有限公司 River course bank slope ecological protection structure and dredging method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3049120U (en) * 1996-12-22 1998-06-02 隆昭 遠藤 Concrete retaining wall for greening
JPH10183649A (en) * 1996-12-21 1998-07-14 Takaaki Endo Construction method for retaining wall for greening
KR19990086706A (en) * 1998-05-29 1999-12-15 허태학 Planting method of fill slope
KR20040094917A (en) * 2003-05-06 2004-11-12 홍원국 Method for vegetation on stone wall's surface
CN104186233A (en) * 2014-08-15 2014-12-10 申新山 Frame beam slope greening method and frame beam slope greening facility
CN206457845U (en) * 2017-02-13 2017-09-01 福建启鹏生态科技有限公司 Class cavernous body ecological concrete retaining wall building block
CN207295759U (en) * 2017-09-26 2018-05-01 福州市规划设计研究院 One kind is prefabricated to face upward three storehouse retaining wall structure of inclined
CN207348021U (en) * 2017-07-01 2018-05-11 中国水利水电科学研究院 A kind of earth working material complex ecological bank protection structure
CN108193705A (en) * 2018-02-28 2018-06-22 合肥仁创新材料科技有限公司 A kind of barricade bank protection integration earthen structure
CN108221861A (en) * 2018-01-23 2018-06-29 浙江建设职业技术学院 A kind of ecological slope protection structure to prevent erosion and its construction method
CN208604624U (en) * 2018-05-14 2019-03-15 赵君 A kind of ecological concrete retaining wall
CN211395560U (en) * 2019-04-09 2020-09-01 广东水利电力职业技术学院(广东省水利电力技工学校) Upward inclined retaining wall for greening by filling plant growth bags in chain building frame

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10183649A (en) * 1996-12-21 1998-07-14 Takaaki Endo Construction method for retaining wall for greening
JP3049120U (en) * 1996-12-22 1998-06-02 隆昭 遠藤 Concrete retaining wall for greening
KR19990086706A (en) * 1998-05-29 1999-12-15 허태학 Planting method of fill slope
KR20040094917A (en) * 2003-05-06 2004-11-12 홍원국 Method for vegetation on stone wall's surface
CN104186233A (en) * 2014-08-15 2014-12-10 申新山 Frame beam slope greening method and frame beam slope greening facility
CN206457845U (en) * 2017-02-13 2017-09-01 福建启鹏生态科技有限公司 Class cavernous body ecological concrete retaining wall building block
CN207348021U (en) * 2017-07-01 2018-05-11 中国水利水电科学研究院 A kind of earth working material complex ecological bank protection structure
CN207295759U (en) * 2017-09-26 2018-05-01 福州市规划设计研究院 One kind is prefabricated to face upward three storehouse retaining wall structure of inclined
CN108221861A (en) * 2018-01-23 2018-06-29 浙江建设职业技术学院 A kind of ecological slope protection structure to prevent erosion and its construction method
CN108193705A (en) * 2018-02-28 2018-06-22 合肥仁创新材料科技有限公司 A kind of barricade bank protection integration earthen structure
CN208604624U (en) * 2018-05-14 2019-03-15 赵君 A kind of ecological concrete retaining wall
CN211395560U (en) * 2019-04-09 2020-09-01 广东水利电力职业技术学院(广东省水利电力技工学校) Upward inclined retaining wall for greening by filling plant growth bags in chain building frame

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453644A (en) * 2019-08-28 2019-11-15 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of bank slope structure and its construction method using channel cleanout material remodeling mima type microrelief
CN110552323A (en) * 2019-08-28 2019-12-10 广东水利电力职业技术学院(广东省水利电力技工学校) Stepped ecological slope protection and construction method thereof
CN113737722A (en) * 2021-09-29 2021-12-03 中冶华天工程技术有限公司 Have concurrently stone concrete barricade shore protection of view nature suitable for city river course
CN116988429A (en) * 2023-09-26 2023-11-03 中交第一航务工程局有限公司 River course bank slope ecological protection structure and dredging method
CN116988429B (en) * 2023-09-26 2023-11-28 中交第一航务工程局有限公司 River course bank slope ecological protection structure and dredging method

Similar Documents

Publication Publication Date Title
CN110029623A (en) It is a kind of it is chain build frame in fill out plant biological bag greening inclined retaining wall and its construction method
CN101451355B (en) Water retention method of back fill course
CN107989051B (en) Ecological slope protection system with combination of grid slope protection, sand well water seepage and water guide slope
CN102561370B (en) Protective structure for reinforcing high-liquid-limit soil slope
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN108166514A (en) Greening Retaining Wall construction between stake
CN107190836A (en) A kind of U-shaped gutter in park and its construction method
CN106988320A (en) Limestone zone discards pit and is transformed into reservoir, the pool, the reclamation method in pond
CN110226430A (en) A kind of avenue tree planting plant hole structure and its construction method
CN107503323B (en) A kind of method of construction of ecological slope protection
CN206693140U (en) A kind of protection slope
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN202509511U (en) Protective structure for reinforcing high liquid limit soil side slope
CN113585296B (en) Artificial slope assembly type flexible support ecological comprehensive treatment structure and construction method thereof
CN107152012A (en) Sluice construction technique
CN207392127U (en) A kind of bank protection barricade applied to hydraulic engineering
CN207109721U (en) A kind of river channel ecology Afforestation Landscape structure
CN109479603A (en) Waterproof place planting tree method suitable for park plaza tree battle array
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN112726638A (en) Expansive soil cutting slope protection structure and construction method
CN112064756A (en) Detachable three-dimensional ecological drainage ditch structure and construction method
CN108951557B (en) Irrigation and flood control dam for hydraulic engineering
CN206545257U (en) A kind of novel greening band water storage structure
CN206143713U (en) Cast -in -place ecological concrete barricade slope protection structure of muscle not
CN206143783U (en) Prevent supporting device on mud stone landslide

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination