CN109487955A - 一种预制混凝土柱原位现浇施工方法 - Google Patents
一种预制混凝土柱原位现浇施工方法 Download PDFInfo
- Publication number
- CN109487955A CN109487955A CN201811232998.2A CN201811232998A CN109487955A CN 109487955 A CN109487955 A CN 109487955A CN 201811232998 A CN201811232998 A CN 201811232998A CN 109487955 A CN109487955 A CN 109487955A
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- concrete column
- column
- template
- column template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种预制混凝土柱原位现浇施工方法,包括钢筋套筒预埋、预制混凝土柱模板制作、预制混凝土柱模板吊装、缆风绳固定、调整、预制混凝土柱模板进行混凝土浇筑、养护、拆模的过程。本发明方法合理有效,合理利用装配式与混凝土现浇相结合,省去需在绑扎钢筋和模板施工时搭设的脚手架,节省工期、节约造价,并且混凝土成型质量高。另外部分资源可回收利用,绑扎钢筋等工作可以在室内作业,提高施工人员作业环境,符合绿色施工要求。
Description
技术领域
本发明涉及一种预制混凝土柱原位现浇施工方法,应用于外墙采用彩钢板等仓储建筑结构体系。
背景技术
现有仓储建筑,外墙一般采用彩钢板加保温棉的体系,施工时不需要脚手架,而当其框架柱采用混凝土结构时,由于其层高大,绑扎钢筋和支设模板必须搭设脚手架,造成搭设脚手架利用率低、造价高,并且绑扎钢筋、支设模板均为露天作业,劳力强度大、作业环境恶劣。而若柱子采用全部预制后吊装的方法,由于柱子长度一般超过10m,截面超过0.8×0.8 m,需要大吨位起重机而不经济或影响柱子质量。
发明内容
本发明的目的在于针对现有施工技术的不足,提供一种预制混凝土柱原位现浇施工方法。本方法能有效解决工程为了施工框架柱而搭设脚手架、脚手架利用率低、造价高等问题。
为达到上述目的,本发明采用如下技术方案:
一种预制混凝土柱原位现浇施工方法,包括如下步骤:
A、钢筋套筒预埋:在独立基础上的短柱中,根据设计尺寸预埋钢筋套筒,再进行短柱的混凝土浇筑,使短柱设置有多个与上部预制混凝土柱模板纵向钢筋数量、位置相同的套筒通孔;
B、预制混凝土柱模板制作:在场地上事先绑扎柱钢筋,拼装钢模板和钢楞;
C、预制混凝土柱模板吊装:用起重装置将拼装好的预制混凝土柱模板吊起,通过预制混凝土柱模板下端部外伸的柱钢筋与短柱上预留的套筒通孔相连;
D、缆风绳固定、调整:在预制混凝土柱模板四周均匀对称布置缆风绳,缆风绳从预制混凝土柱模板顶部拉至地锚固定,调整预制混凝土柱模板的垂直度;
E、预制混凝土柱模板进行混凝土浇筑;
F、养护、拆模:砼达到一定强度后,拆除钢模板。
与现有技术相比,本发明具有如下的优点:
本发明方法合理有效,合理利用装配式与混凝土现浇相结合,省去需在绑扎钢筋和模板施工时搭设的脚手架,节省工期、节约造价,并且混凝土成型质量高。另外部分资源可回收利用,绑扎钢筋等工作可以在室内作业,提高施工人员作业环境,符合绿色施工要求。
附图说明
图1为本发明方法施工时的三维结构示意图。
图2为短柱三维结构示意图。
图3为缆风绳固定预制混凝土柱三维结构示意图。
具体实施方式
下面结合附图,对本发明的具体实施做进一步的说明。
如图1至图3所示,一种预制混凝土柱原位现浇施工方法,包括如下步骤:
A、钢筋套筒预埋:在独立基础上的短柱中,根据设计尺寸预埋钢筋套筒,再进行短柱的混凝土浇筑,使短柱设置有多个与上部预制混凝土柱模板纵向钢筋数量、位置相同的套筒通孔;
B、预制混凝土柱模板制作:在场地上事先绑扎柱钢筋,拼装钢模板和钢楞;
C、预制混凝土柱模板吊装:用起重装置将拼装好的预制混凝土柱模板吊起,通过预制混凝土柱模板下端部外伸的柱钢筋与短柱上预留的套筒通孔相连;
D、缆风绳固定、调整:在预制混凝土柱模板四周均匀对称布置缆风绳,缆风绳从预制混凝土柱模板顶部拉至地锚固定,调整预制混凝土柱模板的垂直度;
E、预制混凝土柱模板进行混凝土浇筑;
F、养护、拆模:砼达到一定强度后,拆除钢模板。
本预制混凝土柱原位现浇施工方法合理有效,合理利用装配式与混凝土现浇相结合,省去需在绑扎钢筋和模板施工时搭设的脚手架,节省工期、节约造价。部分资源可回收利用,绑扎钢筋等工作可以在室内作业,提高施工人员作业环境,符合绿色施工要求。
Claims (1)
1.一种预制混凝土柱原位现浇施工方法,其特征在于,包括如下步骤:
A、钢筋套筒预埋:在独立基础上的短柱中,根据设计尺寸预埋钢筋套筒,再进行短柱的混凝土浇筑,使短柱设置有多个与上部预制混凝土柱模板纵向钢筋数量、位置相同的套筒通孔;
B、预制混凝土柱模板制作:在场地上事先绑扎柱钢筋,拼装钢模板和钢楞;
C、预制混凝土柱模板吊装:用起重装置将拼装好的预制混凝土柱模板吊起,通过预制混凝土柱模板下端部外伸的柱钢筋与短柱上预留的套筒通孔相连;
D、缆风绳固定、调整:在预制混凝土柱模板四周均匀对称布置缆风绳,缆风绳从预制混凝土柱模板顶部拉至地锚固定,调整预制混凝土柱模板的垂直度;
E、预制混凝土柱模板进行混凝土浇筑;
F、养护、拆模:砼达到一定强度后,拆除钢模板。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2018101477872 | 2018-02-13 | ||
CN201810147787 | 2018-02-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109487955A true CN109487955A (zh) | 2019-03-19 |
Family
ID=65692394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811232998.2A Pending CN109487955A (zh) | 2018-02-13 | 2018-10-23 | 一种预制混凝土柱原位现浇施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109487955A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206227A (zh) * | 2019-05-10 | 2019-09-06 | 中天建设集团有限公司 | 一种超高柱模板钢筋整体吊装施工方法 |
CN110984480A (zh) * | 2019-12-23 | 2020-04-10 | 浙江捷城建筑科技有限公司 | 一种预制柱主筋定位固定装置 |
CN111058622A (zh) * | 2019-12-27 | 2020-04-24 | 宁波优造建筑科技有限公司 | 一种柱钢筋采用绑扎搭接方式的大钢模现浇柱施工方法 |
CN112302255A (zh) * | 2020-10-28 | 2021-02-02 | 中建三局第二建设工程有限责任公司 | 一种框架柱倒插组合系统及施工方法 |
CN115467515A (zh) * | 2022-09-21 | 2022-12-13 | 中建七局安装工程有限公司 | 一种超高框架柱施工结构及超高框架柱施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101537660A (zh) * | 2009-04-23 | 2009-09-23 | 中国华西企业有限公司 | 一种柔性玻璃钢圆柱模板安装与拆除工艺 |
CN103225408A (zh) * | 2013-04-18 | 2013-07-31 | 成军 | 大跨度网架多桅杆独立式整体吊装施工方法 |
US9267287B1 (en) * | 2014-01-22 | 2016-02-23 | Steven James Bongiorno | Pre-fabricated threaded bar assemblies |
CN105649330A (zh) * | 2015-12-31 | 2016-06-08 | 上海欧本钢结构有限公司 | 利用钢筋笼作骨架的外挂支模系统 |
CN105735466A (zh) * | 2016-03-30 | 2016-07-06 | 上海建工二建集团有限公司 | 预制墙柱一段式钢筋连接结构及方法 |
CN206267422U (zh) * | 2016-12-09 | 2017-06-20 | 安徽建筑大学 | 一种装配式混凝土叠合柱 |
CN206487164U (zh) * | 2016-12-30 | 2017-09-12 | 青建集团股份公司 | 细长型钢混凝土柱固定支架 |
-
2018
- 2018-10-23 CN CN201811232998.2A patent/CN109487955A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101537660A (zh) * | 2009-04-23 | 2009-09-23 | 中国华西企业有限公司 | 一种柔性玻璃钢圆柱模板安装与拆除工艺 |
CN103225408A (zh) * | 2013-04-18 | 2013-07-31 | 成军 | 大跨度网架多桅杆独立式整体吊装施工方法 |
US9267287B1 (en) * | 2014-01-22 | 2016-02-23 | Steven James Bongiorno | Pre-fabricated threaded bar assemblies |
CN105649330A (zh) * | 2015-12-31 | 2016-06-08 | 上海欧本钢结构有限公司 | 利用钢筋笼作骨架的外挂支模系统 |
CN105735466A (zh) * | 2016-03-30 | 2016-07-06 | 上海建工二建集团有限公司 | 预制墙柱一段式钢筋连接结构及方法 |
CN206267422U (zh) * | 2016-12-09 | 2017-06-20 | 安徽建筑大学 | 一种装配式混凝土叠合柱 |
CN206487164U (zh) * | 2016-12-30 | 2017-09-12 | 青建集团股份公司 | 细长型钢混凝土柱固定支架 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206227A (zh) * | 2019-05-10 | 2019-09-06 | 中天建设集团有限公司 | 一种超高柱模板钢筋整体吊装施工方法 |
CN110984480A (zh) * | 2019-12-23 | 2020-04-10 | 浙江捷城建筑科技有限公司 | 一种预制柱主筋定位固定装置 |
CN110984480B (zh) * | 2019-12-23 | 2021-08-20 | 浙江捷城建筑科技有限公司 | 一种预制柱主筋定位固定装置 |
CN111058622A (zh) * | 2019-12-27 | 2020-04-24 | 宁波优造建筑科技有限公司 | 一种柱钢筋采用绑扎搭接方式的大钢模现浇柱施工方法 |
CN112302255A (zh) * | 2020-10-28 | 2021-02-02 | 中建三局第二建设工程有限责任公司 | 一种框架柱倒插组合系统及施工方法 |
CN115467515A (zh) * | 2022-09-21 | 2022-12-13 | 中建七局安装工程有限公司 | 一种超高框架柱施工结构及超高框架柱施工方法 |
CN115467515B (zh) * | 2022-09-21 | 2023-08-15 | 中建七局安装工程有限公司 | 一种超高框架柱施工结构及超高框架柱施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109487955A (zh) | 一种预制混凝土柱原位现浇施工方法 | |
CN104294753B (zh) | 一种桥梁预制空心墩柱连接结构及施工工法 | |
CN105317137A (zh) | 预制墙体、墙板及其施工方法以及预制墙板生产方法 | |
CN206267422U (zh) | 一种装配式混凝土叠合柱 | |
CN108343148B (zh) | 一种框架结构体系及其施工方法 | |
CN211572573U (zh) | 一种双向预制叠合板整体式接缝的底部模板悬吊结构 | |
CN207160585U (zh) | 超高地下室外墙贝雷架单侧支模体系结构 | |
CN105780922B (zh) | 大跨度型钢混凝土转换桁架分段吊装支模体系施工方法 | |
CN210263131U (zh) | 装配式自止水地下管廊构造 | |
CN110005200B (zh) | 水平暗梁混凝土浇筑密实的施工工艺 | |
CN205224332U (zh) | 预制墙体和预制墙板 | |
CN109252656B (zh) | 高层建筑爬升模板及组装、灌注和提升方法 | |
CN203022222U (zh) | 砖混建筑支座整浇圈梁 | |
CN103758290A (zh) | 一种移动式马凳临时支撑建筑施工方法及装置 | |
CN206956979U (zh) | 一种带顶柱的一字型剪力墙 | |
CN206769199U (zh) | 后穿式后张法竖向预应力现浇混凝土柱结构 | |
CN107100322B (zh) | 后张法竖向预应力现浇混凝土柱结构及施工方法 | |
CN102352690A (zh) | 现浇混凝土空心楼板钢管的抗浮定位系统的施工方法 | |
CN102767378A (zh) | 排架施工隧道双柱式洞门方法 | |
CN108951643A (zh) | 超高层深基坑地下室核心筒大跨度大区域换撑施工方法 | |
CN115110765A (zh) | 一种变形缝处剪力墙施工方法及装置 | |
CN212176590U (zh) | 装配式建筑免外架安全防护结构 | |
CN104562918B (zh) | 自锚式悬索桥锚固跨现浇混凝土箱梁及其施工方法 | |
CN203684687U (zh) | 一种筑墙设备 | |
CN203034790U (zh) | 地下室用基础预制砼模板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |
|
RJ01 | Rejection of invention patent application after publication |