CN108952774A CN201810601140.2A CN201810601140A CN108952774A CN 108952774 A CN108952774 A CN 108952774A CN 201810601140 A CN201810601140 A CN 201810601140A CN 108952774 A CN108952774 A CN 108952774A
Authority
CN
China
Prior art keywords
anchor bolt
construction joint
circular hole
band
fastening band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810601140.2A
Other languages
Chinese (zh)
Other versions
CN108952774B (en
Inventor
孙杰
李雷
李海宾
曲红叶
解德龙
尉鹏
江鹏
井乐雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201810601140.2A priority Critical patent/CN108952774B/en
Publication of CN108952774A publication Critical patent/CN108952774A/en
Application granted granted Critical
Publication of CN108952774B publication Critical patent/CN108952774B/en
Priority to PCT/CN2019/088493 priority patent/WO2019237908A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to tunnel underground engineering technical fields, and in particular to the method for combining punishment to a kind of tunnel double-lining construction joint leakage water blocking row.The present invention is a kind of method that stifled row combines disposition, water blockoff is carried out by anchor bolt and rubber fastening band, natural drainage is then carried out by draining approaching channel and ejectment pipe, does not change Tunnel Second Lining status structure, it is destructive small, Lining cracks are effectively prevented, do not influence tunnel safety and use, and construction procedure is simple, strong operability, it forms stifled row and combines system, realize natural drainage, economic benefit and social benefit are significant.

Description

A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment
Technical field
The present invention relates to tunnel underground engineering technical fields, and in particular to a kind of tunnel double-lining construction joint leakage water blocking row In conjunction with the method for punishment.
Background technique
During Impacts Evaluation of Urban Tunnel and other underground engineering constructions and operation, since underground utilities are intricate, complicated geology Changeable, all there is different degrees of water damage, freeze injury, concrete lining damage, lining cutting erosion in most of tunnels and underground engineerings, wherein water damage Most commonly seen, there is different degrees of leakage phenomenon in tunnel.It is wherein again most commonly seen with construction joint, deformation joint seepage water.Tunnel It leaks, the safe operation in tunnel is influenced greatly, or even jeopardize tunnel structure safety.Current treating seepage is needle mostly Simple to seepage place takes slip casting closure in hole, fluting ejectment or both to combine Systematic control, but existing water blockoff structure needs Secondary liner structure is destroyed, structure use state safety is influenced, not set stifled row combines system, and natural drainage is not implemented.
Summary of the invention
The present invention to solve the deficiencies in the prior art, provides a kind of tunnel double-lining construction joint leakage water blocking row and combines punishment Method.
The present invention is achieved by the following technical solutions:
(1) it cuts Second Lining Construction and stitches former packing material, chisel to middle buried water stop surface clears up construction joint inner surface, clearly Construction joint is carried out compacting with waterproof gasket cement after having managed to fill up, waterproof gasket cement and two side bonds of construction joint are closely knit, then again Construction seam surface is struck off with putty knife;
(2) after waterproof gasket cement reaches the intensity of requirement, then in construction joint two sides, buried water stop width is black in The range of line pop-up installation anchor bolt, then according to the anchor bolt of the pre-buried customization of the line of ink marker, anchor bolt is symmetrically embedded in construction joint two sides, two sides The spacing of anchor bolt is 150mm;
(3) it after anchor bolt is embedded, clears up the dust of anchor bolt periphery concrete surface and guarantees anchor bolt peripheral structure surfacing, It is carried out polishing processing with sanding machine if any out-of-flatness, then the brushing waterproof gasket cement on the concrete surface on anchor bolt periphery;
(4) press sleeve loads onto butyl rubber band respectively in the anchor bolt of two sides, is provided with circular hole in advance on butyl rubber band, The diameter of circular hole is equal with anchor bolt diameter, and butyl rubber band is sleeved in anchor bolt and is pressed by circular hole, makes it under The waterproof sealing glue sticking that face is brushed is secured;
(5) then the brushing waterproof gasket cement on butyl rubber band is installed rubber between the anchor bolt of construction joint two sides and is stopped Water band, two end cap of rubber fastening band are provided with circular hole, the diameter and anchor bolt of circular hole in the anchor bolt of two sides in advance on rubber water-proof band Diameter is equal, is covered rubber fastening band in anchor bolt by circular hole, and then pressing rubber fastening band seals it with butyl rubber The waterproof sealing glue sticking taken is secured, and rubber fastening band forms draining approaching channel at construction joint;
(6) after rubber fastening band installs, steel plate is covered respectively then and is pressed in the anchor bolt of two sides, steel plate is equally drilled with circle in advance The diameter in hole, circular hole is equal with anchor bolt diameter, steel plate is sleeved in anchor bolt by circular hole, steel plate further fixes rubber water-proof Steel plate, rubber fastening band are secured firmly on concrete wall by the both ends of band finally by nut;
(7) ejectment pipe finally is set at Second Lining Construction seam arch springing, ejectment pipe is connected to above-mentioned draining approaching channel, makes ejectment Pipe enters gutter, and gutter internal drainage blind pipe is connected to centre drain to be formed stifled row and combined system, realization nature ejectment.
Preferably, the waterproof gasket cement is response type waterproof gasket cement.
Further, in step (5), the rubber fastening band is 350mm wide external labeling type waterstop.
Preferably, the anchor bolt is chemical anchor bolts.
Effective control measures after occurring the present invention provides a kind of tunnel double-lining construction joint percolating water seep to eliminate as early as possible Leak restores tunnel normal use, provides effective solution method.The present invention is a kind of method that stifled row combines disposition, no Change Tunnel Second Lining status structure, it is destructive small, Lining cracks are effectively prevented, do not influence tunnel safety and use, together When improve the durability of structure, construction procedure is simple, strong operability, forms stifled row and combines system, realizes natural drainage, warp Benefit of helping and social benefit are significant.
Detailed description of the invention
Fig. 1 is the structural schematic diagram at anchor bolt of the present invention.
Fig. 2 is the structural schematic diagram of ejectment of the present invention.
In figure, 1 construction joint, 2 waterproof gasket cements, 3 anchor bolts, 4 butyl rubber bands, 5 rubber fastening bands, 6 draining approaching channels, 7 steel plates, 8 nuts, 9 ejectment pipes, 10 draining blind pipes, 11 centre drains, 12 secondary linings.
Specific embodiment
Specific embodiments of the present invention are given below, it should be noted that the invention is not limited to implement in detail below Example, all equivalent transformations made on the basis of the technical solutions of the present application each fall within protection scope of the present invention.
A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment, includes the following steps:
(1) the former packing material of 12 construction joint of secondary lining 1 is cut, chisel to middle buried water stop surface clears up table in construction joint 1 Face, will remove greasy dirt, attachment, the dust etc. of 1 gap inner surface of construction joint, guarantee the inner surface of construction joint 1 it is dry, it is smooth, Cleaning prevents poor attachment, has cleared up and then construction joint 1 is carried out compacting with waterproof gasket cement 2 and filled up, it is ensured that waterproof gasket cement 2 is closely knit with 1 liang of side bonds of construction joint, and waterproof gasket cement 2 used in the present embodiment is response type waterproof gasket cement, then again with greasy Sub- knife strikes off 1 surface of construction joint;
(2) after waterproof gasket cement 2 reaches the intensity of requirement, then in 1 two sides of construction joint, buried water stop width is used in The range of line of ink marker pop-up installation anchor bolt 3, the spacing of two sides anchor bolt 3 is 150mm, and two sides anchor bolt 3 is symmetrically distributed in 1 liang of construction joint Side, then according to the anchor bolt 3 of the pre-buried customization of the line of ink marker, the preferred anchor bolt 3 of the present embodiment is chemical anchor bolts;
(3) it after anchor bolt 3 is embedded, clears up the dust of 3 periphery concrete surface of anchor bolt and guarantees that 3 peripheral structure surface of anchor bolt is flat It is whole, 3 periphery of anchor bolt concrete surface must it is smooth, no honeycomb, without pitted skin, without thin projections etc., must if any out-of-flatness It must be carried out polishing processing with sanding machine, then the brushing waterproof gasket cement 2 on the concrete surface on 3 periphery of anchor bolt;
(4) press sleeve loads onto butyl rubber band 4 respectively in two sides anchor bolt 3, is provided with circle in advance on butyl rubber band 4 The diameter in hole, circular hole is equal with 3 diameter of anchor bolt, and butyl rubber band 4 is sleeved in anchor bolt 3 and is pressed by circular hole, is made It is be bonded with the waterproof gasket cement 2 brushed below securely, and adhesive strength, the tensile strength of butyl rubber band 4 are high, elasticity, Good extending performance for interface deformation and cracks adaptable;
(5) then the brushing waterproof gasket cement 2 on butyl rubber band 4 installs rubber between the anchor bolt 3 of 1 two sides of construction joint Glue waterstop 5, the present embodiment preferred rubber waterstop 5 use 350mm wide external labeling type waterstop, and 5 liang of end caps of rubber fastening band exist In the anchor bolt 3 of two sides, it is provided with circular hole in advance on rubber fastening band 5, it can be according to the spacing of two sides anchor bolt 3, in rubber fastening band 5 Upper to draw mark line and bore circular hole, the diameter of circular hole is equal with 3 diameter of anchor bolt, by circular hole by 5 sets of rubber fastening band in anchor bolt 3 On, then pressing is be bonded with the waterproof gasket cement 2 on butyl rubber band 4 securely, in this way, rubber fastening band 5 is in construction joint 1 Place forms draining approaching channel 6;
(6) after rubber fastening band 5 installs, steel plate 7 is covered respectively then and is pressed in two sides anchor bolt 3, steel plate 7 is equally drilled in advance The diameter of circular hole, circular hole is equal with 3 diameter of anchor bolt, steel plate 7 is sleeved in anchor bolt 3 by circular hole, steel plate 7 further fixes rubber Steel plate 7, rubber fastening band 5 are secured firmly on concrete wall by the both ends of glue waterstop 5 finally by nut 8;
(7) ejectment pipe 9 is finally set at 12 construction joint of secondary lining, 1 arch springing, ejectment pipe 9 is connected to above-mentioned draining approaching channel 6, So that ejectment pipe 9 is entered gutter, because gutter internal drainage blind pipe 10 is connected to centre drain 11, is seeped at construction joint 1 to realize The natural ejectment of leak realizes stifled row and combines.
Embodiment described above, only one kind of the present invention more preferably specific embodiment, those skilled in the art The usual variations and alternatives that member carries out within the scope of technical solution of the present invention should be all included within the scope of the present invention.

Claims (4)

1. a kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment, characterized by the following steps:
(1) the former packing material of Second Lining Construction seam (1) is cut, chisel to middle buried water stop surface clears up construction joint (1) interior table Construction joint (1) is carried out compacting with waterproof gasket cement (2) after having cleared up and filled up by face, waterproof gasket cement (2) and construction joint (1) two Side bonds are closely knit, then strike off construction joint (1) surface with putty knife again;
(2) after waterproof gasket cement (2) reaches the intensity of requirement, then in construction joint (1) two sides, the buried water stop in is wide Degree pops up the range of installation anchor bolt (3) with the line of ink marker, and then according to the anchor bolt (3) of the pre-buried customization of the line of ink marker, anchor bolt (3) is symmetrically embedded in Construction joint (1) two sides, the spacing of two sides anchor bolt (3) are 150mm;
(3) it after anchor bolt (3) is embedded, clears up the dust of anchor bolt (3) periphery concrete surface and guarantees anchor bolt (3) peripheral structure Surfacing is carried out polishing processing with sanding machine if any out-of-flatness, is then brushed on the concrete surface on anchor bolt (3) periphery anti- Watertight sealing (2);
(4) press sleeve is loaded onto butyl rubber band (4) respectively on two sides anchor bolt (3), on butyl rubber band (4) in advance It is provided with circular hole, the diameter of circular hole is equal with anchor bolt (3) diameter, and butyl rubber band (4) is sleeved on anchor bolt (3) by circular hole It goes up and presses, keep it Nian Jie with waterproof gasket cement (2) brushed below securely;
(5) the brushing waterproof gasket cement (2) on butyl rubber band (4), then construction joint (1) two sides anchor bolt (3) it Between install rubber fastening band (5), (5) two end cap of rubber fastening band in the anchor bolt (3) of two sides, on rubber fastening band (5) in advance It is provided with circular hole, the diameter of circular hole is equal with anchor bolt (3) diameter, covers rubber fastening band (5) on anchor bolt (3) by circular hole, so Pressing rubber fastening band (5) keeps it Nian Jie with waterproof gasket cement (2) on butyl rubber band (4) securely afterwards, rubber water-proof Band (5) forms draining approaching channel (6) at construction joint (1);
(6) after rubber fastening band (5) installs, steel plate (7) is covered respectively then and is pressed on two sides anchor bolt (3), steel plate (7) is same It is drilled with circular hole in advance, the diameter of circular hole is equal with anchor bolt (3) diameter, steel plate (7) is sleeved on anchor bolt (3) by circular hole, steel Plate (7) further fixes the both ends of rubber fastening band (5), finally by nut (8) by steel plate (7), rubber fastening band (5) firmly It is fixed on concrete wall;
(7) ejectment pipe (9) finally are set at secondary lining (12) construction joint (1) arch springing, ejectment pipe (9) draws with above-mentioned draining Slot (6) connection, makes ejectment pipe (9) to enter gutter, and gutter internal drainage blind pipe (10) is connected to the stifled row of formation with centre drain (11) In conjunction with system, nature ejectment is realized.
2. the method that tunnel double-lining construction joint leakage water blocking row according to claim 1 combines punishment, it is characterised in that: institute Stating waterproof gasket cement (2) is response type waterproof gasket cement.
3. the method that tunnel double-lining construction joint leakage water blocking row according to claim 1 combines punishment, it is characterised in that: In step (5), the rubber fastening band (5) is 350mm wide external labeling type waterstop.
4. the method that tunnel double-lining construction joint leakage water blocking row according to claim 1 combines punishment, it is characterised in that: institute Stating anchor bolt (3) is chemical anchor bolts.
CN201810601140.2A 2018-06-12 2018-06-12 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment Active CN108952774B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810601140.2A CN108952774B (en) 2018-06-12 2018-06-12 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment
PCT/CN2019/088493 WO2019237908A1 (en) 2018-06-12 2019-05-27 Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810601140.2A CN108952774B (en) 2018-06-12 2018-06-12 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment

Publications (2)

Publication Number Publication Date
CN108952774A true CN108952774A (en) 2018-12-07
CN108952774B CN108952774B (en) 2019-04-23

Family

ID=64488344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810601140.2A Active CN108952774B (en) 2018-06-12 2018-06-12 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment

Country Status (2)

Country Link
CN (1) CN108952774B (en)
WO (1) WO2019237908A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019237908A1 (en) * 2018-06-12 2019-12-19 济南城建集团有限公司 Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101566073A (en) * 2009-06-03 2009-10-28 中南大学 Dual-source heat-supply water-drainage antifreezing method for construction joint of tunnel in cold area
CN201433776Y (en) * 2009-05-27 2010-03-31 中南大学 Dual-source heat supply type back-pasting drainable water-stop
CN202250110U (en) * 2011-10-24 2012-05-30 中铁十七局集团第四工程有限公司 Buried waterstop fixing device in secondary tunnel liner
CN202659252U (en) * 2012-05-31 2013-01-09 中铁十局集团西北工程有限公司 Tunnel water proofing system
CN203925527U (en) * 2014-07-02 2014-11-05 山西省交通科学研究院 A kind of construction joint of tunnel percolating water punishment system
CN203939524U (en) * 2014-07-08 2014-11-12 中交第二公路勘察设计研究院有限公司 A kind of tunnel can maintenance type the device of decompression draining
CN204386650U (en) * 2014-12-31 2015-06-10 长安大学 A kind of mounted gutter for the treatment of technology for tunnel seepage water cure
CN106759521A (en) * 2017-01-11 2017-05-31 北京建工土木工程有限公司 A kind of underground project waterproof processing structure
CN206539354U (en) * 2017-03-08 2017-10-03 山西交科桥梁隧道加固维护工程有限公司 A kind of tunnel double-lining surface seep water cure structure
CN206873507U (en) * 2017-06-15 2018-01-12 中铁第四勘察设计院集团有限公司 A kind of leak stopping hermetic water-proof structure of underground-structure deformation joint
CN107587434A (en) * 2017-10-16 2018-01-16 中交路桥建设有限公司 Culvert of reinforced concrete percolating water prevention and disposition method
CN207111105U (en) * 2017-08-17 2018-03-16 四川省交通运输厅公路规划勘察设计研究院 Tunnel ring seam water seepage treatment structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150117A (en) * 2002-10-30 2004-05-27 Sumikura Kozai Kk Work execution method for anchor reinforcement for holding concrete reinforcing bar
CN204476470U (en) * 2015-01-20 2015-07-15 山西省交通科学研究院 A kind of waterproof and water drainage system of applicable tunnel project seam
CN105568928B (en) * 2015-12-30 2017-07-28 中国电建集团北京勘测设计研究院有限公司 A kind of construction method of compound geomembrane facing slab dam sealing seam
CN105804772A (en) * 2016-05-05 2016-07-27 中铁第勘察设计院集团有限公司 Active and passive combined waterproof structure for tunnel
CN105840210B (en) * 2016-06-12 2018-09-21 中铁二院工程集团有限责任公司 The compound arch tunnel lining structure in box tunnel bottom with hydrophobic function
CN106194255B (en) * 2016-08-31 2017-11-03 东南大学 Tunnel waterproof and water drainage system and its method of construction
CN108952774B (en) * 2018-06-12 2019-04-23 济南城建集团有限公司 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433776Y (en) * 2009-05-27 2010-03-31 中南大学 Dual-source heat supply type back-pasting drainable water-stop
CN101566073A (en) * 2009-06-03 2009-10-28 中南大学 Dual-source heat-supply water-drainage antifreezing method for construction joint of tunnel in cold area
CN202250110U (en) * 2011-10-24 2012-05-30 中铁十七局集团第四工程有限公司 Buried waterstop fixing device in secondary tunnel liner
CN202659252U (en) * 2012-05-31 2013-01-09 中铁十局集团西北工程有限公司 Tunnel water proofing system
CN203925527U (en) * 2014-07-02 2014-11-05 山西省交通科学研究院 A kind of construction joint of tunnel percolating water punishment system
CN203939524U (en) * 2014-07-08 2014-11-12 中交第二公路勘察设计研究院有限公司 A kind of tunnel can maintenance type the device of decompression draining
CN204386650U (en) * 2014-12-31 2015-06-10 长安大学 A kind of mounted gutter for the treatment of technology for tunnel seepage water cure
CN106759521A (en) * 2017-01-11 2017-05-31 北京建工土木工程有限公司 A kind of underground project waterproof processing structure
CN206539354U (en) * 2017-03-08 2017-10-03 山西交科桥梁隧道加固维护工程有限公司 A kind of tunnel double-lining surface seep water cure structure
CN206873507U (en) * 2017-06-15 2018-01-12 中铁第四勘察设计院集团有限公司 A kind of leak stopping hermetic water-proof structure of underground-structure deformation joint
CN207111105U (en) * 2017-08-17 2018-03-16 四川省交通运输厅公路规划勘察设计研究院 Tunnel ring seam water seepage treatment structure
CN107587434A (en) * 2017-10-16 2018-01-16 中交路桥建设有限公司 Culvert of reinforced concrete percolating water prevention and disposition method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019237908A1 (en) * 2018-06-12 2019-12-19 济南城建集团有限公司 Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel

Also Published As

Publication number Publication date
WO2019237908A1 (en) 2019-12-19
CN108952774B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN204476470U (en) A kind of waterproof and water drainage system of applicable tunnel project seam
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN109440951B (en) Waterproof structure for joint of new and old concrete structures and construction process
CN106593465B (en) A kind of structure and construction method improving tunnel-liner antidetonation shock attenuation ability
US10174462B2 (en) Method for waterproofing railway bridges and waterproofing material for carrying out said method
CN109610504A (en) A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN108930292A (en) The method that a kind of pair of new-old concrete interface carries out water-proofing treatment
CN102817382A (en) Repair constructing method of basement deformation joint leakage
CN109371861A (en) A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN107816117A (en) A kind of large-scale pressure current box culvert is not cut off the water outer restorative procedure
JP2016017357A (en) Water cut-off structure and water cut-off method
CN104846849A (en) Method for preventing basement bottom plate post-cast strip from leaking
CN108952774B (en) A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment
KR101316718B1 (en) A tunnel waterproofing construction method
CN212837861U (en) Mechanical construction tunnel segment joint anchoring type water-stopping elastic sealing gasket
CN104018858A (en) Novel water stopping structure for tunneling seam in permafrost region
CN110080796B (en) Tunnel segment repairing process
KR101326185B1 (en) Tunnel waterproofing sheet and construction method therefor
CN210660137U (en) Shield constructs end ring beam and section of jurisdiction seam crossing seepage maintenance structure
CN211898410U (en) Put compound surface course supporting construction of slope soil nail wall
CN204419202U (en) A kind of tunnel slot repair structure
CN109653764B (en) Method for repairing tunnel water seepage flow whitening
KR100386913B1 (en) Waterproof stuff for waterproofing of concrete structure and working method using the same
KR20190040582A (en) Water proof connector between tunnel segment and vertical structure
CN210439231U (en) Steel edge water-stop cover plate for repairing underwater crack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant