CN108930292A - The method that a kind of pair of new-old concrete interface carries out water-proofing treatment - Google Patents

The method that a kind of pair of new-old concrete interface carries out water-proofing treatment Download PDF

Info

Publication number
CN108930292A
CN108930292A CN201710389570.8A CN201710389570A CN108930292A CN 108930292 A CN108930292 A CN 108930292A CN 201710389570 A CN201710389570 A CN 201710389570A CN 108930292 A CN108930292 A CN 108930292A
Authority
CN
China
Prior art keywords
interface
old concrete
new
grouting pipe
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710389570.8A
Other languages
Chinese (zh)
Inventor
朱炎兵
赵星
雷崇
董俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201710389570.8A priority Critical patent/CN108930292A/en
Publication of CN108930292A publication Critical patent/CN108930292A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Abstract

The present invention relates to concrete construction waterproof construction technical field, the method for carrying out water-proofing treatment in particular to a kind of pair of new-old concrete interface.Old concrete interface is cleaned, then by its dabbing;Water expandable waterstop is installed on the old concrete interface of dabbing;Grouting pipe is arranged in old concrete interface;It builds template and pours novel concrete, grouting pipe and sealing rod are poured in novel concrete;After novel concrete is stablized, pointing is injected into grouting pipe;Waterproof sealing filleting is arranged in new, old concrete upper end in form removal and grouting pipe.Interface processing method simple process of the invention, sealed waterproof effect is good, can apply various new-old concrete connection areas, have great promotional value.

Description

The method that a kind of pair of new-old concrete interface carries out water-proofing treatment
Technical field
The present invention relates to concrete construction waterproof construction technical fields, carry out in particular to a kind of pair of new-old concrete interface The method of water-proofing treatment.
Background technique
In the underground structures such as subway, the underground space, frequently encounters newly-built structure and docked with original structure or reserving hole The problems such as need to permanently blocking.There are inevitable construction joints with the concrete newly poured for original concrete structure, so that new and old The problems such as infiltration, leak are generated between the concrete poured.Influence subway, the underground space are isostructural durable and use.
The prior art generally requires the setting waterproof sealing structure at new-old concrete joint face.Patent No. The middle promulgated by the State Council of entitled " waterproof constitution methods and structure of telescopic seam between new and old concrete building joints " of " 200510200165.4 " Bright patent, the patent describe a kind of waterproof sealing structure of new-old concrete seam crossing, this method in old concrete by connecing Seam face dabbing, then pastes sealing rod on joint face, then pours novel concrete by template face of joint face, passes through sealing rod Form waterproof sealing structure.Such structure can play the role of certain waterproof sealing, but find in actual use, in this way Structurally waterproof sealing effect it is limited, actually still there are some gaps on new-old concrete joint face, it is difficult to reach Preferable sealed waterproof effect.
Summary of the invention
Present invention aim to the waterproof sealing structure effects for the prior art for solving to mention in above-mentioned background technique General problem provides the method that a kind of pair of new-old concrete interface carries out water-proofing treatment.
The technical scheme is that:The method that a kind of pair of new-old concrete interface carries out water-proofing treatment, it is characterised in that: The method includes the following steps:
1), old concrete interface is cleaned, then by its dabbing;
2) water expandable waterstop arranged in the horizontal direction, is installed on the old concrete interface of dabbing;
3), in old concrete interface, arrangement can be to the grouting pipe of new-old concrete uniform cross injection filling material;
4) it, builds template and pours novel concrete on old concrete interface, grouting pipe and sealing rod are poured in new mixed In solidifying soil;
5), after novel concrete is stablized, pointing is injected uniformly to new-old concrete interface by grouting pipe;
6) waterproof sealing filleting is arranged in new, old concrete upper end in, form removal and grouting pipe.
In the further step 1, the method for carrying out dabbing to interface is:After the completion of the cleaning of old concrete interface, Interface is dug into toothing structure.
In the further step 2, the method for installing water expandable waterstop is:Sealing rod is glued by adhesive It is attached on the interface of old concrete, cement nail is squeezed on sealing rod, sealing rod is anchored on old concrete interface.
At least two sealings along interface length direction arrangement are installed on the interface of the further old concrete Item, thickness direction arranged for interval of the adjacent sealing rod along old concrete interface.
In the further step 3, in old concrete interface, the method for arrangement grouting pipe is:In old concrete Grouting pipe is arranged in interface, and length direction of the grouting pipe along interface is arranged, is communicated with more Grouting Pipes in grouting pipe, will The input end of Grouting Pipe reaches the top at old concrete interface.
The further grouting pipe includes nylon jacket and the hard for being used to support nylon jacket in nylon jacket Plastic core pipe;Offer multiple injected holes on the circumferential side wall of the plastic core pipe, the periphery face of plastic core pipe with Rubber grain is provided between the inside circumference face of nylon jacket.
The further grouting pipe is between adjacent sealing rod.
In the further step 5, pointing is injected uniformly to new-old concrete interface by grouting pipe Method be:Acrylate grout is injected into Grouting Pipe, salt slurries are sufficiently infiltrated by grouting pipe to new-old concrete circle The everywhere in face makes sealing rod absorb expansion plugging new-old concrete joint gap after salt slurries.
In the further step 6, it is in the method for new, old concrete upper end setting waterproof sealing filleting:? New-old concrete is cut in the upper end of new-old concrete, the U-type groove extended along interface length direction is formed, in U-type groove Filled polyurethane sealant forms sealing filleting.
In the further step 6, the method for removing grouting pipe is:Grouting Pipe is exposed above novel concrete Part cut off, complete the dismounting of grouting pipe.
Advantages of the present invention has:1, by setting rainwater expansion sealing strip, can after wash water the new and old coagulation of expansion blockage Native joint gap forms first layer hermetic water-proof structure;
2, by filling waterproof and sealing material between new-old concrete, first is that the anti-watertight of the second layer is formed after capable of agglomerating Seal structure, second is that sealing rod can be made to expand;
3, by the way that U-type groove is arranged in the upper end of new-old concrete, arrange that high modulus polyurethane sealant is formed in U-type groove Third layer hermetic water-proof structure.
New-old concrete interface processing method simple process of the invention, sealed waterproof effect is good, can be using various new Old concrete connection area has great promotional value.
Detailed description of the invention
Fig. 1:Structural schematic diagram of the invention;
Fig. 2:Sealing rod mounting structure schematic diagram of the invention;
Fig. 3:Filleting structural schematic diagram of the invention;
Fig. 4:The arragement construction schematic diagram of grouting pipe and sealing rod of the invention;
Fig. 5:The schematic cross-sectional view of grouting pipe of the invention;
Wherein:1-old concrete;2-novel concretes;3-sealing rods;4-grouting pipes;4.1-nylon jackets;4.2— Plastics hard core pipe;4.3-injected holes;4.4-rubber grains;5-Grouting Pipes;6-filletings;7-cement nails.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Such as Fig. 1~5, current embodiment require that first clearing up the interface of old concrete 1, the sundries that will be attached on interface It cleans up, then by the interface dabbing of old concrete 1, is dug into saw-tooth-type structures, increase surface area.
For the sealing rod 3 of the present embodiment as shown in Fig. 2, being fixed on the interface of dabbing by cement nail 7, sealing rod 3 is to meet Water swellable rubber water-proof item, sealing rod 3 are hemispherical dome structure.Sealing rod 3 is the first layer waterproof sealing structure of the present embodiment. At least two are equipped on the interface of old concrete 1, and along interface length direction, (length direction of the present embodiment refers to vertical view in Fig. 1 The direction of paper, up and down direction of the thickness direction into Fig. 1) arrangement sealing rod 3, adjacent sealing rod 3 is along 1 interface of old concrete Thickness direction arranged for interval.
After the completion of novel concrete 2 pours, to acrylate grout is filled between new-old concrete, acrylate grout is abundant The everywhere between new-old concrete is infiltrated, further waterproof sealing can be carried out to new-old concrete contact position gap, Acrylate grout is the second layer waterproof sealing structure of the present embodiment.In addition, acrylate grout is infiltrated to new-old concrete Between everywhere after, 3 absorbing propenoic acid salt slurries of sealing rod being capable of rapid expanding.
The present embodiment is this implementation by realizing to grouting pipe to acrylate grout is filled between new-old concrete The grouting pipe structure of example is as shown in figure 4, include the horizontally disposed grouting pipe 4 of length direction along interface, grouting pipe 4 is most It is directly cast in novel concrete 2 afterwards.
As described in figures 1 and 5, grouting pipe 4 is arranged in the horizontal direction, including nylon jacket 4.1 and be located at nylon jacket 4.1 in The rigid plastics core pipe 4.2 for being used to support nylon jacket 4.1, offer multiple slip casting on the circumferential side wall of plastic core pipe 4.2 Hole 4.3 is provided with rubber grain 4.4 between the periphery face of plastic core pipe 4.2 and the inside circumference face of nylon jacket 4.1.Third Olefin(e) acid salt slurries are flowed into the everywhere between new-old concrete from injected hole 4.3.
More Grouting Pipes 5 are communicated in grouting pipe 4,5 lower end of Grouting Pipe is connected to grouting pipe 4, and the upper end reaches The top of old concrete 1 after the completion of novel concrete 2 pours, by injecting acrylate grout into Grouting Pipe 5, makes acrylic acid Salt slurries, between new-old concrete, complete the arrangement of second layer waterproof sealing structure by the sufficiently infiltration of grouting pipe 4.
The grouting pipe 4 of the present embodiment can guarantee that all sealing rods 3 can between adjacent sealing rod 3 in this way Sufficiently acrylate grout is arrived in infiltration.
After novel concrete 2 is stablized, the upper end position by cutting equipment at interface is slotted, by new, old concrete The position of upper surface close to interface upper end is slotted, and forms U-shaped groove-like structure, the poly- ammonia of high-modulus is then filled into U-type groove Ester sealant can form third layer waterproof sealing structure in the upper end at interface.
When practice of construction, 1,1 interface of old concrete is cleaned, interface is dug into toothing structure, is increased new and old mixed Coagulate the contact area of soil;
2, water expandable waterstop 3 is installed on 1 interface of the old concrete of dabbing, now glues sealing rod 3 by adhesive It is attached on interface, sealing rod 3 is then passed through by cement nail 7, sealing rod 3 is fixed on interface;
3, grouting pipe is arranged in 1 interface of old concrete, the length direction by grouting pipe 4 along interface is horizontally disposed, The upper end of Grouting Pipe 5 reaches the top of old concrete 1;
4, it builds template and pours novel concrete 2, grouting pipe and sealing rod 3 are poured in novel concrete 2;
5, after novel concrete 2 is stablized, acrylate grout is injected into grouting pipe, soaks acrylate grout sufficiently Moisten to the everywhere between new-old concrete;
6, Grouting Pipe 5 is exposed the part on novel concrete 2 and is truncated, new, old concrete interface by form removal Upper end is cut into filleting 6, and high modulus polyurethane sealant is then injected in filleting 6, completes the processing of interface waterproof sealing.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (10)

1. the method that a kind of pair of new-old concrete interface carries out water-proofing treatment, it is characterised in that:The method includes following step Suddenly:
1), old concrete (1) interface is cleaned, then by its dabbing;
2), the water expandable waterstop (3) arranged in the horizontal direction is installed on the old concrete of dabbing (1) interface;
3), in old concrete (1) interface, arrangement can be to the grouting pipe of new-old concrete uniform cross injection filling material;
4), build template and pour novel concrete (2) on old concrete (1) interface, by grouting pipe and sealing rod (3) pour in In novel concrete (2);
5), after novel concrete (2) stablize, pointing is injected uniformly to new-old concrete interface by grouting pipe;
6) waterproof sealing filleting (6) are arranged in new, old concrete upper end in, form removal and grouting pipe.
2. the method that a kind of pair of new-old concrete interface as described in claim 1 carries out water-proofing treatment, it is characterised in that:It is described Step 1 in, to interface carry out dabbing method be:After the completion of the cleaning of old concrete (1) interface, interface is dug into toothing knot Structure.
3. the method that a kind of pair of new-old concrete interface as described in claim 1 carries out water-proofing treatment, it is characterised in that:It is described Step 2 in, installation water expandable waterstop (3) method be:Sealing rod (3) is pasted onto old concrete by adhesive (1) on interface, cement nail (7) is squeezed on sealing rod (3), sealing rod (3) is anchored on old concrete (1) interface.
4. the method that a kind of pair of new-old concrete interface as claimed in claim 3 carries out water-proofing treatment, it is characterised in that:It is described Old concrete (1) interface on be equipped at least two along interface length direction arrangement sealing rods (3), adjacent sealing rod (3) along the thickness direction arranged for interval at old concrete (1) interface.
5. the method that a kind of pair of new-old concrete interface as described in claim 1 carries out water-proofing treatment, it is characterised in that:It is described Step 3 in, old concrete (1) interface arrangement grouting pipe method be:It is arranged in old concrete (1) interface horizontal Grouting pipe (4), length direction of the grouting pipe (4) along interface is arranged, is communicated with more Grouting Pipes (5) in grouting pipe (4), The input end of Grouting Pipe (5) is reached to the top at old concrete (1) interface.
6. the method that a kind of pair of new-old concrete interface as claimed in claim 5 carries out water-proofing treatment, it is characterised in that:It is described Grouting pipe (4) include nylon jacket (4.1) and be located at nylon jacket (4.1) in be used to support nylon jacket (4.1) hard modeling Expect core pipe (4.2);Multiple injected holes (4.3), plastic core pipe are offered on the circumferential side wall of the plastic core pipe (4.2) (4.2) rubber grain (4.4) are provided between the inside circumference face in periphery face and nylon jacket (4.1).
7. the method that a kind of pair of new-old concrete interface as claimed in claim 5 carries out water-proofing treatment, it is characterised in that:It is described Grouting pipe (4) between adjacent sealing rod (3).
8. the method that a kind of pair of new-old concrete interface as described in claim 1 carries out water-proofing treatment, it is characterised in that:It is described Step 5 in, be to the method that new-old concrete interface injects uniformly pointing by grouting pipe:To Grouting Pipe (5) Interior injection acrylate grout, salt slurries are arrived the everywhere at new-old concrete interface by grouting pipe (4) sufficiently infiltration, make to stop Water bar (3) absorbs expansion plugging new-old concrete joint gap after salt slurries.
9. the method that a kind of pair of new-old concrete interface as described in claim 1 carries out water-proofing treatment, it is characterised in that:It is described Step 6 in, new, old concrete upper end setting waterproof sealing filleting (6) method be:In the upper end pair of new-old concrete New-old concrete is cut, and the U-type groove extended along interface length direction, the filled polyurethane sealant shape in U-type groove are formed At sealing filleting (6).
10. the method that a kind of pair of new-old concrete interface as described in claim 1 carries out water-proofing treatment, it is characterised in that:Institute In the step 6 stated, the method for removing grouting pipe is:The part that Grouting Pipe (5) expose above novel concrete (2) is cut off, Complete the dismounting of grouting pipe.
CN201710389570.8A 2017-05-27 2017-05-27 The method that a kind of pair of new-old concrete interface carries out water-proofing treatment Pending CN108930292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710389570.8A CN108930292A (en) 2017-05-27 2017-05-27 The method that a kind of pair of new-old concrete interface carries out water-proofing treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710389570.8A CN108930292A (en) 2017-05-27 2017-05-27 The method that a kind of pair of new-old concrete interface carries out water-proofing treatment

Publications (1)

Publication Number Publication Date
CN108930292A true CN108930292A (en) 2018-12-04

Family

ID=64451379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710389570.8A Pending CN108930292A (en) 2017-05-27 2017-05-27 The method that a kind of pair of new-old concrete interface carries out water-proofing treatment

Country Status (1)

Country Link
CN (1) CN108930292A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629845A (en) * 2019-01-11 2019-04-16 中国冶集团有限公司 Concrete structure seam areas leakage treatment device and its construction method
CN110004886A (en) * 2019-05-15 2019-07-12 中国电建集团中南勘测设计研究院有限公司 Asphaltic concrete core wall basement construction method and its structure
CN110067311A (en) * 2019-05-14 2019-07-30 长江勘测规划设计研究有限责任公司 The connection structure and method of new-old concrete component junction
CN110258649A (en) * 2019-07-12 2019-09-20 中冶天工集团有限公司 One kind, which connects, builds engineering Underground Construction seam water-tight device and construction method
CN110387887A (en) * 2019-06-28 2019-10-29 同济大学建筑设计研究院(集团)有限公司 It is oriented to the construction method of partition wall and its construction method and foundation pit enclosure structure
CN110607921A (en) * 2019-09-23 2019-12-24 周伟 Automatic repairing leakage stoppage treatment method and waterproof leakage stoppage structure
CN110778206A (en) * 2019-10-21 2020-02-11 中国建筑第八工程局有限公司 Method for reinforcing ultrahigh-brick chimney
CN111851323A (en) * 2020-07-07 2020-10-30 汕头大学 Novel concrete joint structure and construction process
CN112412131A (en) * 2020-10-30 2021-02-26 上海市政工程设计研究总院(集团)有限公司 Structure and method for constructing the same
CN112609746A (en) * 2020-12-11 2021-04-06 中国建筑第五工程局有限公司 New and old basement joint concrete waterproof component and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2869122Y (en) * 2006-01-19 2007-02-14 上海捷特防水技术有限公司 Expansion waterstop type slip casting waterstop pipe
CN103437432A (en) * 2013-06-19 2013-12-11 中国葛洲坝集团国际工程有限公司 Concrete crack surface cut groove sealing and blocking structure and method
JP2015014082A (en) * 2013-07-03 2015-01-22 征人 菅野 Water cutoff structure of concrete form support part
CN205677279U (en) * 2016-06-17 2016-11-09 中天建设集团有限公司 A kind of built-in slip casting pipe is aided with the water stop structure of water expandable waterstop

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2869122Y (en) * 2006-01-19 2007-02-14 上海捷特防水技术有限公司 Expansion waterstop type slip casting waterstop pipe
CN103437432A (en) * 2013-06-19 2013-12-11 中国葛洲坝集团国际工程有限公司 Concrete crack surface cut groove sealing and blocking structure and method
JP2015014082A (en) * 2013-07-03 2015-01-22 征人 菅野 Water cutoff structure of concrete form support part
CN205677279U (en) * 2016-06-17 2016-11-09 中天建设集团有限公司 A kind of built-in slip casting pipe is aided with the water stop structure of water expandable waterstop

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孟海峰: "北京地铁施工缝防水处理方法", 《隧道建设》 *
郭德友: "施工缝预埋注浆管防水质量控制", 《中国建筑防水》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629845A (en) * 2019-01-11 2019-04-16 中国冶集团有限公司 Concrete structure seam areas leakage treatment device and its construction method
CN110067311B (en) * 2019-05-14 2024-04-12 长江勘测规划设计研究有限责任公司 Connection structure and method for joint of new and old concrete members
CN110067311A (en) * 2019-05-14 2019-07-30 长江勘测规划设计研究有限责任公司 The connection structure and method of new-old concrete component junction
CN110004886A (en) * 2019-05-15 2019-07-12 中国电建集团中南勘测设计研究院有限公司 Asphaltic concrete core wall basement construction method and its structure
CN110387887A (en) * 2019-06-28 2019-10-29 同济大学建筑设计研究院(集团)有限公司 It is oriented to the construction method of partition wall and its construction method and foundation pit enclosure structure
CN110258649A (en) * 2019-07-12 2019-09-20 中冶天工集团有限公司 One kind, which connects, builds engineering Underground Construction seam water-tight device and construction method
CN110607921A (en) * 2019-09-23 2019-12-24 周伟 Automatic repairing leakage stoppage treatment method and waterproof leakage stoppage structure
CN110778206A (en) * 2019-10-21 2020-02-11 中国建筑第八工程局有限公司 Method for reinforcing ultrahigh-brick chimney
CN110778206B (en) * 2019-10-21 2023-02-28 中国建筑第八工程局有限公司 Method for reinforcing ultrahigh-brick chimney
CN111851323B (en) * 2020-07-07 2022-03-22 汕头大学 Construction process for manufacturing concrete joint structure
CN111851323A (en) * 2020-07-07 2020-10-30 汕头大学 Novel concrete joint structure and construction process
CN112412131A (en) * 2020-10-30 2021-02-26 上海市政工程设计研究总院(集团)有限公司 Structure and method for constructing the same
CN112609746A (en) * 2020-12-11 2021-04-06 中国建筑第五工程局有限公司 New and old basement joint concrete waterproof component and construction method thereof

Similar Documents

Publication Publication Date Title
CN108930292A (en) The method that a kind of pair of new-old concrete interface carries out water-proofing treatment
CN203847133U (en) Water stop structure for tunnel lining deformation joint
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN103774699B (en) Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN106284425A (en) Basement in high rise building roof deformation seam water proof structure construction method
CN207260344U (en) A kind of prefabricated outer wall panel horizontal joint waterproofing node
CN104652364A (en) Construction method of vertical water-sealing structure for water conservancy project
CN106930330A (en) A kind of blocking method for shaking disturbance crack in underground engineering
CN109629845A (en) Concrete structure seam areas leakage treatment device and its construction method
CN107524174A (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN104846849A (en) Method for preventing basement bottom plate post-cast strip from leaking
CN106869169B (en) A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN105780940B (en) building expansion joint anti-leakage structure
CN109339118A (en) A kind of basement bottom board leakage-resistant device and construction method
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN206956791U (en) A kind of new-old concrete interface waterproof sealing structure
CN210002429U (en) ultra-deep foundation pit enclosure water stop structure
CN107587887A (en) A kind of construction joint structure and its waterproof construction method
CN106480880B (en) Recoverable soil nailing and the construction method for using recoverable soil nail
CN109296011A (en) Underground structrue engineering concrete structure seam waterproof construction technology
CN104963364A (en) Disposing method for topdown structural slab lower side wall construction joint
CN209011307U (en) A kind of wall is equipped with the node structure of deformation joint with floorboard junction
CN108867709A (en) A kind of waterproofing for basement method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181204

RJ01 Rejection of invention patent application after publication