CN106930330A - A kind of blocking method for shaking disturbance crack in underground engineering - Google Patents

A kind of blocking method for shaking disturbance crack in underground engineering Download PDF

Info

Publication number
CN106930330A
CN106930330A CN201710217907.7A CN201710217907A CN106930330A CN 106930330 A CN106930330 A CN 106930330A CN 201710217907 A CN201710217907 A CN 201710217907A CN 106930330 A CN106930330 A CN 106930330A
Authority
CN
China
Prior art keywords
crack
grouting
rubber
iron sheet
uncured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710217907.7A
Other languages
Chinese (zh)
Inventor
吴冬
王敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Maintenance Master Technology Co Ltd
Original Assignee
Guizhou Maintenance Master Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Maintenance Master Technology Co Ltd filed Critical Guizhou Maintenance Master Technology Co Ltd
Priority to CN201710217907.7A priority Critical patent/CN106930330A/en
Publication of CN106930330A publication Critical patent/CN106930330A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Abstract

The invention discloses a kind of blocking method for shaking disturbance crack in underground engineering, pin hole method grouting leak-stopping is first carried out to percolating water with glue material, broadening crack is carried out again, the operation without pipe cavity is carried out after cleaning, it is subsequently adding the uncured grouting material of rubber of liquid, after plastic emitting, multiple supplementary grouting is carried out again, after water blocking is lived, fill plug seal glue in the concave groove reserved on crack, channel-shaped is made with iron sheet, it is fixed with setscrew, again iron sheet groove is closed with sealing compound, iron sheet groove nuzzle in fluid sealant and lining cutting surface seam, the channel-section steel of stainless steel is installed on the surface in crack.The present invention uses the construction technology of the traditional third solidifying grouting leak-stopping, again with the new uncured grouting material that closes, heated using the physical characteristic of uncured rubber, high temperature grouting and the mode of leak stopping, reach the purpose of grouting leak-stopping, plugging effect is good, eliminates the problem of channeling water, repairs the damaged problem of waterproof layer.

Description

A kind of blocking method for shaking disturbance crack in underground engineering
Technical field
It is specifically a kind of for shaking the stifled of disturbance crack in underground engineering the present invention relates to the leakage stopping technology field in crack Leakage method.
Background technology
At present, under the practical environment of anti-vibration disturbance, in the structure of tunnel, subway and underground engineering, appearance is tasted Various cracks, such as attractive joint, movement joint, subsiding crack, expansion joint, these cracks often occur the phenomenon of percolating water in the rainy day, main Wanting reason has:
1)Structure sediment or deform it is uneven cause inside and outside waterstop to be torn, and lap joint not prison welding is solid, construction when meet with Destruction Durchgangshohle, the water pressure of earth's surface there is also hidden danger too greatly beyond the design pressure that can bear of waterstop etc., such as outer waterproof and Failure, will result in movement joint, expansion joint leak.
2)The non-vibration compacting of concrete of waterstop side, can form penetrating passage around it.
3)In summer high temperature season casting concrete or when winter severe cold weather casting concrete, day and night temperature compared with The big or extraneous temperature difference is big, and attractive joint is caused due to structure both shrinks(Movement joint, subsiding crack)There is space in place waterstop side, from And penetrating passage is formed, cause attractive joint(Movement joint, subsiding crack)Leak.
At present, all there are various shortcomings in the mode for processing these cracks, therefore so far still without more perfect side Method processes the problem that these cracks are brought.
The content of the invention
It is an object of the invention to provide a kind of blocking method for shaking disturbance crack in underground engineering, with solution State the problem proposed in background technology.
To achieve the above object, the present invention provides following technical scheme:
A kind of blocking method for shaking disturbance crack in underground engineering, step is as follows:
(1)It is interim to use the resilient epoxy construction glue material of humidity low-viscosity solvent-free to the crack for having substantially infiltration flowing water Material carries out pin hole method grouting leak-stopping to percolating water, gap and space between rubber fastening band and structure is filled into adhesive, increases Plus adhesive effect, recover the adhesive strength between waterstop and structure;
(2)Artificial electric pick clears up crack both sides, cuts and is stained side to original solid basal plane, somewhat widens crack;
(3)Scum silica frost, debris are cleaned out with water under high pressure, keeps clean in crack, coordinated with high-strength quick-solidifying double-quick cement class clay Pipe is taken out along crack closure Cheng Wuguan cavitys, aquaporin and injected hole, high-strength quick-solidifying double-quick cement class glue are reserved every 50~80 cm The thickness of encapsulation of mud falls in 3~5 cm in 3~5 cm, cavity diameter on 4~6 cm, the surface of closing;
(4)Using electrical heating, the reactor of the heat conduction oil type of computer control adds the uncured grouting material of rubber, is warmed to 180 ~220 DEG C, and uniform stirring, pour out the grouting material of high temperature;
(5)Grouting pump with screw rod grouting pump or with hot type is to without irrigating completely liquefied uncured rubber in pipe cavity Glue, after adjacent hole plastic emitting, closes adjacent injected hole, then carry out multiple supplementary grouting, it is ensured that without pipe cavity, crack using gate valve Uncured rubber is completely filled out in penetrating passage, the hole of rubber fastening band;
(6)The grout hole that 2~3, interval is arrived in grouting again is in the milk, after water blocking is lived, then in the concave groove reserved on crack Filling high resilience polyurethane fluid sealant and rubber-like fluid sealant or polysulfide sealant, " W " channel-shaped is made with iron sheet, uses setscrew Iron sheet groove is fixed on the crack both sides constructed, then iron sheet groove is closed with sealing compound, iron sheet groove is nuzzled in fluid sealant and lining Build the seam on surface;
(7)The channel-section steel of stainless steel is installed on the surface in crack.
As further scheme of the invention:Described crack is attractive joint, movement joint, subsiding crack or expansion joint.
As further scheme of the invention:The step(2)The broadening condition in middle crack, depth 15~20cm is wide 6~7 cm of degree.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is applied using the traditional third solidifying grouting leak-stopping Work technique, then with the new uncured grouting material that closes, heated using the physical characteristic of uncured rubber, high temperature grouting with And the mode of leak stopping, the purpose of grouting leak-stopping is reached, plugging effect is good, eliminates the problem of channeling water, repairs waterproof layer breakage Problem.
Brief description of the drawings
Fig. 1 is the schematic diagram of punching cement injection.
Fig. 2 is the schematic diagram for irrigating humidity epoxy resin sealant.
Fig. 3 is the schematic diagram for irrigating uncured fluid sealant.
Fig. 4 is the schematic diagram fixed using setscrew.
Fig. 5 is the schematic diagram sealed with polysulfide sealant.
Fig. 6 is the overall structure diagram after left-hand thread water leg.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Embodiment
It is interim to use the resilient epoxy construction glue material of humidity low-viscosity solvent-free to the crack for having substantially infiltration flowing water Material(Meet national sector standard《Distress in concrete epoxide resin grouting material》JC/T1041-2007)The hand-manipulating of needle is entered to percolating water Hole method grouting leak-stopping.Gap and space between rubber fastening band and structure is filled into adhesive, increase adhesive effect, recover to stop Adhesive strength between water band and structure.
Artificial electric pick clears up crack both sides, cuts and is stained side to original solid basal plane, somewhat widens crack, depth 15~20cm(Thickness according to structure is adjusted), the cm of width 6~7 cleans out scum silica frost, debris, keeps crack with water under high pressure It is interior clean, coordinated with high-strength quick-solidifying double-quick cement class clay and take out tube method along crack closure Cheng Wuguan cavitys, stayed every 50~80 cm Exhalant canal and injected hole, in 3~5 cm, cavity diameter is in 4~6 cm, and the surface of closing is recessed for fast cement seal thickness high 3~5 cm are removed, using electrical heating, the reaction narrow-necked earthen jar of the heat conduction oil type of computer control adds the uncured grouting material of rubber, is warmed to 180~220 DEG C, and uniform stirring is carried out, pour out the grouting material of high temperature.
With screw rod grouting pump or the special uncured rubber asphalt grouting pump with hot type to without being irrigated in pipe cavity Through complete liquefied uncured rubber, after adjacent hole plastic emitting, adjacent injected hole is closed using gate valve, then carry out repeatedly supplement filling Slurry, it is ensured that without completely filling out the uncured rubber material of extraordinary deformation resistant in pipe cavity, crack penetrating passage, the hole of rubber fastening band Material, the grout hole that 2~3, interval is arrived in grouting again is in the milk, and equivalent to rubber fastening band is repaired, this grouting needs experienced Technician and skilled worker, equipment person together cooperate grouting, to be carried out because being high-temperature heating grouting material, when construction anti- The security protection of scald.
After water blocking is lived, then high resilience polyurethane fluid sealant is clogged in the surface groove for falling in reserved in advance of expansion joint With rubber-like fluid sealant or polysulfide sealant, " W " channel-shaped is made with iron sheet, it is fixed on setscrew constructed flexible Seam both sides, then iron sheet groove is closed with sealing compound, iron sheet groove nuzzle in fluid sealant and lining cutting surface seam, this construction purpose is Material closing intensity and degree of deformation in enhancing construction joint, last surface is again at expansion joint(Attractive joint, movement joint)Install not on surface The channel-section steel of rust steel, plays effect attractive in appearance.
The adhesive property and anti-deformation of extraordinary uncured rubber asphalt material are very excellent, there is self-healing property, Ke Yikang Deformation 300~400%.The underpass and the structure of subway station renovated using the material, typically can meet designing unit most The just design concept to structure and requirement.
This material is at normal temperatures paste, is never solidified, and has self-healing function, is just become when being heated to 200 DEG C Into semiliquid liquid state, fluidity and concrete castability increase, and are carried out using uncured rubber this special physical characteristic Grouting.The construction technology of the solidifying grouting leak-stopping of traditional third is employed, then with the new uncured grouting material that closes, is utilized The physical characteristic of uncured rubber is heated, the new technology of high temperature grouting, using the new technology of leak stopping, reaches the mesh of grouting leak-stopping 's.
Construction process of the invention is as follows:
Attractive joint, movement joint, subsiding crack, the radical cure construction of expansion joint percolating water:
At attractive joint, movement joint, subsiding crack, each 100mm in expansion joint both sides, punch and through total, then priming petock Mud, referring to Fig. 1.
At each 80mm in movement joint both sides, then punching to the waterstop back side irrigates humidity epoxy resin sealant, ginseng See Fig. 2.
Along expansion joint both sides, using cutting machine, grooving, 70~80mm of width, depth 150mm after cleaning out, are used Take out tube method and form the cavity of a 60mm, and irrigate uncured fluid sealant.Referring to Fig. 3.
To deform that seaming and cutting are wide to 150mm and to clean out with cutting machine again, with " W " steel plate, width 15cm, steel plate can be stretched Compression deformation 300%, movement joint both sides, surface of steel plate are fixed on after applying uncured fluid sealant using the steel plate back side using setscrew Closed with polysulfide sealant again, referring to Fig. 4, Fig. 5, play a part of to stitch construction Deformation waterproof and reinforce.
The deformation seam surface left-hand thread stainless steel water leg constructed again, can be pasted with polysulfide encapsulant or expansion bolt is solid It is fixed, referring to Fig. 6.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be in other specific forms realized.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires to be limited rather than described above, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as the claim involved by limitation.

Claims (3)

1. it is a kind of in underground engineering shake disturbance crack blocking method, it is characterised in that step is as follows:
(1)It is interim to use the resilient epoxy construction glue material of humidity low-viscosity solvent-free to the crack for having substantially infiltration flowing water Material carries out pin hole method grouting leak-stopping to percolating water, gap and space between rubber fastening band and structure is filled into adhesive, increases Plus adhesive effect, recover the adhesive strength between waterstop and structure;
(2)Artificial electric pick clears up crack both sides, cuts and is stained side to original solid basal plane, somewhat widens crack;
(3)Scum silica frost, debris are cleaned out with water under high pressure, keeps clean in crack, coordinated with high-strength quick-solidifying double-quick cement class clay Pipe is taken out along crack closure Cheng Wuguan cavitys, aquaporin and injected hole, high-strength quick-solidifying double-quick cement class glue are reserved every 50~80 cm The thickness of encapsulation of mud falls in 3~5 cm in 3~5 cm, cavity diameter on 4~6 cm, the surface of closing;
(4)Using electrical heating, the reactor of the heat conduction oil type of computer control adds the uncured grouting material of rubber, is warmed to 180 ~220 DEG C, and uniform stirring, pour out the grouting material of high temperature;
(5)Grouting pump with screw rod grouting pump or with hot type is to without irrigating completely liquefied uncured rubber in pipe cavity Glue, after adjacent hole plastic emitting, closes adjacent injected hole, then carry out multiple supplementary grouting, it is ensured that without pipe cavity, crack using gate valve Uncured rubber is completely filled out in penetrating passage, the hole of rubber fastening band;
(6)The grout hole that 2~3, interval is arrived in grouting again is in the milk, after water blocking is lived, then in the concave groove reserved on crack Filling high resilience polyurethane fluid sealant and rubber-like fluid sealant or polysulfide sealant, " W " channel-shaped is made with iron sheet, uses setscrew Iron sheet groove is fixed on the crack both sides constructed, then iron sheet groove is closed with sealing compound, iron sheet groove is nuzzled in fluid sealant and lining Build the seam on surface;
(7)The channel-section steel of stainless steel is installed on the surface in crack.
2. it is according to claim 1 in underground engineering shake disturbance crack blocking method, it is characterised in that it is described Crack be attractive joint, movement joint, subsiding crack or expansion joint.
3. it is according to claim 1 in underground engineering shake disturbance crack blocking method, it is characterised in that it is described Step(2)The broadening condition in middle crack, 15~20cm of depth, the cm of width 6~7.
CN201710217907.7A 2017-04-05 2017-04-05 A kind of blocking method for shaking disturbance crack in underground engineering Pending CN106930330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710217907.7A CN106930330A (en) 2017-04-05 2017-04-05 A kind of blocking method for shaking disturbance crack in underground engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710217907.7A CN106930330A (en) 2017-04-05 2017-04-05 A kind of blocking method for shaking disturbance crack in underground engineering

Publications (1)

Publication Number Publication Date
CN106930330A true CN106930330A (en) 2017-07-07

Family

ID=59425751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710217907.7A Pending CN106930330A (en) 2017-04-05 2017-04-05 A kind of blocking method for shaking disturbance crack in underground engineering

Country Status (1)

Country Link
CN (1) CN106930330A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313464A (en) * 2017-07-10 2017-11-03 江苏鼎达建筑新技术有限公司 A kind of movement joint is combined leak stopping sealing system and its construction method
CN107476596A (en) * 2017-09-20 2017-12-15 中恒建设集团有限公司 A kind of cast-in-place renovation reinforced construction method of RC floors
CN109281491A (en) * 2018-09-29 2019-01-29 杭州国电大坝安全工程有限公司 Full seam face grout construction method
CN112593726A (en) * 2020-12-18 2021-04-02 南京康泰建筑灌浆科技有限公司 Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN112663646A (en) * 2020-12-18 2021-04-16 南京康泰建筑灌浆科技有限公司 Stable in-situ reinforcing method for grouting control
CN112879041A (en) * 2021-01-23 2021-06-01 中铁二十三局集团第一工程有限公司 Construction method for treating diseases of main structure of subway
CN113062364A (en) * 2021-04-19 2021-07-02 黑龙江科顺防水堵漏技术有限公司 Novel self-heating type leaking stoppage capsule

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100994145B1 (en) * 2010-06-30 2010-11-12 (주)우암건설 Expansion joint for underground road way
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106321121A (en) * 2016-10-26 2017-01-11 盐城市康泰建筑灌浆技术有限公司 Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100994145B1 (en) * 2010-06-30 2010-11-12 (주)우암건설 Expansion joint for underground road way
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106321121A (en) * 2016-10-26 2017-01-11 盐城市康泰建筑灌浆技术有限公司 Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313464A (en) * 2017-07-10 2017-11-03 江苏鼎达建筑新技术有限公司 A kind of movement joint is combined leak stopping sealing system and its construction method
CN107476596A (en) * 2017-09-20 2017-12-15 中恒建设集团有限公司 A kind of cast-in-place renovation reinforced construction method of RC floors
CN109281491A (en) * 2018-09-29 2019-01-29 杭州国电大坝安全工程有限公司 Full seam face grout construction method
CN112593726A (en) * 2020-12-18 2021-04-02 南京康泰建筑灌浆科技有限公司 Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN112663646A (en) * 2020-12-18 2021-04-16 南京康泰建筑灌浆科技有限公司 Stable in-situ reinforcing method for grouting control
CN112879041A (en) * 2021-01-23 2021-06-01 中铁二十三局集团第一工程有限公司 Construction method for treating diseases of main structure of subway
CN113062364A (en) * 2021-04-19 2021-07-02 黑龙江科顺防水堵漏技术有限公司 Novel self-heating type leaking stoppage capsule

Similar Documents

Publication Publication Date Title
CN106930330A (en) A kind of blocking method for shaking disturbance crack in underground engineering
CN106013259B (en) Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN103015538B (en) The percolator of a kind of concrete structure deformation joint and method for treating seepage
CN107575250B (en) Operation phase duct pieces of shield tunnel seam blowby area method for blocking and radical cure method for maintaining
CN107217691A (en) For city underground leak stopping and the method for strengthening construction
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
CN105735364B (en) Concrete joint waterproof system, construction method and the protection component for the system
CN202248308U (en) Anti-seepage device for deformation joint of concrete structure
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN105297782A (en) Underground concrete structure expansion joint treatment structure and construction method thereof
CN108930292A (en) The method that a kind of pair of new-old concrete interface carries out water-proofing treatment
CN105756101A (en) Building basement, subway and tunnel expansion joint waterproof maintenance and irrigation filling construction method
CN104003673B (en) A kind of underground installation rigid-flexible composite waterproofing and leakage-stopping emulsion
CN109989490A (en) Discharge structure expansion joint surface watertight seal resistant abrasion safeguard structure and construction method
CN207904991U (en) A kind of underground engineering repairing concrete crack construction
CN203977236U (en) A kind of for the new molded breadth seam construction of high-speed railway CRTS II plate-type non-fragment orbit
CN104343246B (en) A kind of method of waterproofing and leakage-stopping
CN112593726A (en) Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN208870612U (en) A kind of cold area's water rich strata tunnel roof waterproof structure for deformation seams
CN111441311A (en) Underwater repair method for leakage of old dam structure seam
CN104712145A (en) Grouting method for middle embedded grouting water stop belt
CN208430646U (en) A kind of prefabricated concrete structure vertical member installation grouting caulking joint structure
CN105714739B (en) Preventing secondary cracking process of repairing in fluting method seepage treatment
CN112252491A (en) Seepage-proofing device for concrete structure deformation joint and construction process thereof
CN207004544U (en) A kind of roof deformation seam percolating water repairs structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707

RJ01 Rejection of invention patent application after publication