CN107217691A - For city underground leak stopping and the method for strengthening construction - Google Patents

For city underground leak stopping and the method for strengthening construction Download PDF

Info

Publication number
CN107217691A
CN107217691A CN201710622054.5A CN201710622054A CN107217691A CN 107217691 A CN107217691 A CN 107217691A CN 201710622054 A CN201710622054 A CN 201710622054A CN 107217691 A CN107217691 A CN 107217691A
Authority
CN
China
Prior art keywords
city underground
pin hole
concrete structure
grouting material
leak stopping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710622054.5A
Other languages
Chinese (zh)
Inventor
陈森森
张克芬
张雯
陈梦圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Kangtai Construction Grouting Technology Co Ltd
Original Assignee
Nanjing Kangtai Construction Grouting Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Kangtai Construction Grouting Technology Co Ltd filed Critical Nanjing Kangtai Construction Grouting Technology Co Ltd
Priority to CN201710622054.5A priority Critical patent/CN107217691A/en
Publication of CN107217691A publication Critical patent/CN107217691A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a kind of method for city underground leak stopping and strengthening construction, it is related to the technical field that seepage is repaired in construction, the method comprising the steps of one, the epoxy grouting material for leak stopping is irrigated the concrete structure of city underground using boring method;Step 2, after the completion of perfusion, as gap≤0.01mm of seepage place;To gap brushing cementitious capillary waterproofing material, the crystalline solid for making permeability strong, which is filled up, oozes the tiny penetrating passage in damp position.Epoxy grouting material for leak stopping is irrigated concrete structure by boring method, reinforcing while leak stopping recovers the compactness and concrete structure globality intensity of lining concrete.Solve in underground engineering present in prior art, tunnel and subway, concrete structure leakiness, the technical problem of voids and pits percolating water under use environment are disturbed in anti-vibration so that underground engineering operation is safer.

Description

For city underground leak stopping and the method for strengthening construction
Technical field
The present invention relates to seepage recovery technique field in construction, more particularly, to one kind be used for city underground leak stopping and The method of strengthening construction.
Background technology
Either at home or external, all there is different degrees of disease in most of underground engineerings such as tunnel, subway Evil, underground engineering disease mainly has water damage, freeze injury, lining cracking and the lining cutting to corrode, and most common of which disease form is water Evil, is embodied in underground engineering and different degrees of Seepage occurs, so-called " ten tunnels nine leak " is just reflected in underground engineering Tunnel, subway water damage it is frequent.Underground engineering occurs after seepage, and the safe operation of tunnel, subway is influenceed to increase, or even crisis And tunnel structure safety.
Subway is the operation that subway train is adapted to using non-fragment orbit solid concrete roabed technology, and subway group is logical by underground During road, there are vibrations to disturb to solid concrete roabed, underpass.Subway group can equally give car when by interval subway station The concrete structure stood brings very big vibrations disturbance, and subway station top if having vapour on municipal road surface, road surface Car by when can also there are certain vibrations to disturb to the concrete structure of subway station, subway station is in above and below the ground In the operating environment of dual vibrations disturbance.After high ferro, railway, highway, town road operation, underground pedestrian passageway (garage's culvert, People's row culvert), subterranean commercial area equally can by train and automobile by when the vibrations that produce disturb.
The concrete defect of structural plane is mainly:Being vibrated when pouring, leakiness, the heat of hydration be too high, concrete moisture content is high The factors such as isolation are caused, cause not lose and voids and pits, when extraneous hydraulic pressure is more than agent on crack resistance of concrete consolidation pressure herein, are occurred as soon as Percolating water phenomenon, is mainly shown as a seepage and face seepage.In addition, the tube head of equipment installed part, steel bar end, lacing hole etc. are pre-buried Waterproof sealing processing is bad at part, seepage also often occurs.
It is in the prior art, typically all preferential to use inorganic grouting material when carrying out underpass, subway station leak stopping, Such as superfine cement grouting and cement-silicate grouting;Sometimes organic grouting material is also used, such as acrylates, third coagulate, and Soluble polyurethane and oil soluble polyurethane grouting material carry out leak stopping;Some are then with reference to doing using concrete surface fluting draining Method.
But, with the underpass of blocking method of the prior art processing, subway station, occurred in that again after operation Seepage, is then absorbed in the result for continuing leak stopping, continuing seepage;So can not ensure in the prior art vibrations disturbance operation, The use environment Treatment Measures to Leakage of operation.
The content of the invention
It is an object of the invention to provide the method for city underground blocking construction, solve present in prior art In underground engineering, tunnel and subway, concrete structure leakiness, voids and pits percolating water under anti-vibration disturbance use environment Technical problem.
A kind of method for city underground blocking construction that the present invention is provided, comprises the following steps:
Step one, the epoxy grouting material for leak stopping is irrigated the concrete structure of city underground using boring method;
Step 2, after the completion of perfusion, as gap≤0.01mm of seepage place;To gap brushing cement-base infiltration crystallization type Waterproof material, the crystalline solid for making permeability strong, which is filled up, oozes the tiny penetrating passage in damp position.
Further, step one comprises the following steps:
Step 100, blossom type pin hole grouting method is used for pitted skin infiltration, irrigates the epoxy grouting material for leak stopping.
Further, blossom type pin hole includes multiple pin holes, and the diameter range of each pin hole is 28mm~30mm;It is adjacent The spacing range of two pin holes is 49mm~51mm;Along the vertical direction of two pin hole center lines, another pin hole is set;Pin hole is successively Set;The bottom of pin hole is 10mm~11mm with the distance range of lining cutting bottom.
Further, step one comprises the following steps:
Step 200, city underground concrete structure is irrigated using drilling sidetracking method;When percolating water is larger, priming petock Mud class grouting material carries out back fill course to concrete structure behind sealing to the water cavity of concrete structure behind, for Lining cutting supplement perfusion epoxy grouting material.
Further, step 200 is further comprising the steps of:
Step 201, cleaning:Lining cutting surface is cleared up, the situation in crack is checked, analyzes, it is determined that position, spacing and the depth of drilling Degree;
Step 202, grooving:Counterincision seam surface grooving, forms cell body, and carry out in the cell body temporary plugging;
Step 203, drilling:Intersected using boring bar tool along crack both sides and drilled, the drilling includes the first drilling With the second drilling;
Step 204, bury mouth:Grout nipple is installed in the first drilling, tightened, dead-end fracture surface;
Step 205, grouting:The repeated multiple times perfusion epoxy grouting material into grout nipple;
Step 206, tear mouth open:Grouting is finished, and is confirmed that grouting material is fully cured, is removed exposed grout nipple;
Step 207, slot processing:The temporary plugging thing in the cell body is removed, keeps drying after cleaning totally, clogs close Sealing.
Further, epoxy grouting material is set to the water-fast moisture resistance wet type modified epoxy grouting material of low-viscosity.
A kind of method for city underground strengthening construction that the present invention is provided, including for city underground blocking construction Method;
Also include Step 3: by for strengthen the cement base class of the impervious effect of concrete structure rigidly impervious mortar spraying or Scratch to concrete structural surface.
Further, rigidly impervious mortar material includes polymer mortar, cement-based penetrant agent and cement base to cement base class Shrinking-free grouting material.
Further, a kind of method for city underground strengthening construction that the present invention is provided also includes
Step 4: after the completion of for the first-class built-in fitting root leak stopping of pipe fitting, reinforcing bar in underground engineering, then slot and fill out embedding sealing Glue;
The sealing steel plate deformed upon for horizontal direction is fixedly connected with above fluid sealant.
Further, a kind of method for city underground strengthening construction for providing of the present invention is also including Step 5: by ground The concrete structure of the serious position of lower engineering leak drills through pressure release draining, new draining blind pipe is formed, by water ejectment to underground In the sump of drainage.
A kind of repetition friendship for being used for the method for city underground leak stopping and strengthening construction, passing through method and step that the present invention is provided Fork is used, and the epoxy grouting material for leak stopping is irrigated concrete structure by boring method, and reinforcing while leak stopping recovers The compactness and concrete structure globality intensity of lining concrete.After the completion of grouting, then seepage place≤0.01mm's Gap;To gap brushing cementitious capillary waterproofing material, the crystalline solid for making permeability strong fills up that to ooze damp position tiny Penetrating passage.Solve in underground engineering present in prior art, tunnel and subway, disturbed in anti-vibration mixed under use environment The technical problem of Xtah Crude Clay structure leakiness, voids and pits percolating water so that underground engineering operation is safer.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the flow chart of the method provided in an embodiment of the present invention for being used for city underground leak stopping and strengthening construction;
Fig. 2 shows for the structure provided in an embodiment of the present invention for city underground leak stopping and the grooving of the method for strengthening construction It is intended to;
The structural representation for adding temporary plugging that Fig. 3 provides for Fig. 2;
The structural representation for adding sealing material that Fig. 4 provides for Fig. 2;
Fig. 5 is the blossom type pin hole provided in an embodiment of the present invention for city underground leak stopping and the method for strengthening construction Plan;
Fig. 6 for Fig. 5 blossom type pin holes provided profile.
Icon:11- cell bodies;12- first drills;13- second drills;14- grout nipples;15- special type clay;16- fluid sealants; 17- blossom type pin holes.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify description, rather than indicate or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
The flow chart for the method for being used for city underground leak stopping and strengthening construction that Fig. 1 provides for the present embodiment;Fig. 2 is this reality The structural representation of the grooving of the method for being used for city underground leak stopping and strengthening construction of example offer is provided;Fig. 3 is adding that Fig. 2 is provided Plus the structural representation of temporary plugging;The structural representation for adding sealing material that Fig. 4 provides for Fig. 2;Fig. 5 provides for the present embodiment The method for being used for city underground leak stopping and strengthening construction blossom type pin hole plan;The blossom type pin that Fig. 6 provides for Fig. 5 The profile in hole.As shown in figs. 1 to 6, a kind of method for city underground blocking construction that the present embodiment is provided, including it is following Step:Step one, the epoxy grouting material for leak stopping is irrigated the concrete structure of city underground using boring method;Step 2, After the completion of perfusion, as gap≤0.01mm of seepage place;To gap brushing cementitious capillary waterproofing material, infiltration is allowed The strong crystalline solid of property, which is filled up, oozes the tiny penetrating passage in damp position.
Wherein, epoxy grouting material is set to the water-fast moisture resistance wet type modified epoxy grouting material of low-viscosity;It is moisture resistance that low-viscosity is water-fast Wet type modified epoxy grouting material has viscosity low, with certain elongation percentage, can reach 5%~8%, and with necessarily tough Property, can directly it irrigate in the presence of water.
The method for city underground blocking construction that the present embodiment is provided, passes through step one and the repeated overlapping of step 2 Use, the epoxy grouting material for leak stopping is irrigated concrete structure by boring method, reinforcing while leak stopping recovers lining The compactness and concrete structure globality intensity of building concrete;Solve underground engineering, tunnel and ground present in prior art In iron, concrete structure leakiness, the technical problem of voids and pits percolating water under use environment are disturbed in anti-vibration so that ground Lower engineering operation is safer.
On the basis of above-described embodiment, further, the side for city underground blocking construction that the present embodiment is provided Method, step one comprises the following steps:Step 100, blossom type pin hole grouting method is used for pitted skin infiltration, irrigated for leak stopping Epoxy grouting material.
In addition, blossom type pin hole 17 includes multiple pin holes, and the diameter range of each pin hole is 28mm~30mm;Adjacent two The spacing range of individual pin hole is 49mm~51mm;Along the vertical direction of two pin hole center lines, another pin hole is set;Pin hole is set successively Put;The bottom of pin hole is 10mm~11mm with the distance range of lining cutting bottom.
When being seeped water for pitted skin, first choice determines the leakiness area of infiltration part, so that in leakiness area interior diameter scope Interior expansion treatment region, the diameter for the treatment of region is more than the diameter in leakiness area, so as to drill through blossom type pin hole 17 in treatment region.
Wherein, when drilling through blossom type pin hole 17, it is first determined first row pin hole, the spacing range per two adjacent pin holes For 49mm~51mm, it is preferred that the spacing per two adjacent pin holes is 50mm;After the pin hole of first row has been drilled through, it is determined that The pin hole spacing of second row pin hole, second row pin hole and first row is 50mm, in addition, the pin hole of second row is respectively provided with and first row Near the center line of two neighboring pin hole, the pin hole of the 3rd row and the pin hole spacing of second row are 50mm, the pin hole of same 3rd row Near the center line for setting two pin holes adjacent with second row, it is repeated in drilling through, until completing whole pin holes, forms blossom type Pin hole 17;And the water-fast moisture resistance wet type modified epoxy grouting material of low-viscosity is irrigated in each pin hole, each pin hole interaction is complete Into after grouting, each pin hole is blocked.
The diameter range of each pin hole is 28mm~30mm;It is preferred that a diameter of 30mm of pin hole.
The bottom of pin hole is 10mm~11mm with the distance range of lining cutting bottom, it is preferred that the bottom of pin hole and lining cutting bottom The distance in portion is 10mm;That is the depth of pin hole is set to lining thickness and subtracts 10mm.
The method for city underground blocking construction that the present embodiment is provided, by determining leakiness in pitted skin infiltration part Area, so that it is determined that treatment region, and in treatment region blossom type pin hole 17 has been drilled through, so that perfusion is low glutinous in blossom type pin hole 17 Water-fast moisture resistance wet type modified epoxy grouting material is spent, due to using blossom type pin hole 17, so that each pin hole can interact, can To solve the whole leak stopping in pitted skin leakiness area infiltration gap in underground engineering present in prior art, tunnel and subway, Concrete structure leakiness, the technical problem of voids and pits percolating water under use environment are disturbed in anti-vibration so that honeycomb fiber crops All sealings inside face, the subway circulation safety more ensured.
In addition, the method and step one for city underground blocking construction that the present embodiment is provided comprises the following steps:Step 200, city underground concrete structure is irrigated using drilling sidetracking method;When percolating water is larger, cement injection class grouting material To concrete structure behind sealing, back fill course is carried out to the water cavity of concrete structure behind, supplements and irrigates for lining cutting Epoxy grouting material.
In addition, the method and step 200 for city underground blocking construction that the present embodiment is provided is further comprising the steps of:Step Rapid 201, clear up:Lining cutting surface is cleared up, the situation in crack is checked, analyzes, it is determined that position, spacing and the depth of drilling;Step 202nd, grooving:Counterincision seam surface grooving, forms cell body 11, and the progress temporary plugging in cell body 11;Step 203, drilling:Use Boring bar tool intersects along crack both sides to be drilled, and the drilling includes the first drilling 12 and the second drilling 13;Step 204, bury Mouth:Grout nipple 14 is installed in the first drilling 12, tightened, dead-end fracture surface;Step 205, grouting:Into grout nipple 14 repeatedly Repeatedly irrigate epoxy grouting material;Step 206, tear mouth open:Grouting is finished, and is confirmed that grouting material is fully cured, is removed exposed grout nipple 14;Step 207, slot processing:The temporary plugging thing in the cell body 11 is removed, keeps drying clean, fill plug seal after cleaning Glue 16.
Wherein, fluid sealant 16 can be with a variety of, for example, in polyurethane sealant, rubber-like fluid sealant or polysulfide sealant One kind.
Step 201 carries out preliminary removing surface using wire brush, recycles air compressor machine to pass through high wind after preliminary cleaning Surface is blown clean;The cross sectional shape of the cell body 11 of step 202 is " V " type;The width of cell body 11 is 20mm, and depth is 20mm; The material that step 202 carries out temporary plugging is the extraordinary material of clay 15, when being in the milk, close due to the extraordinary material of clay 15 Envelope is acted on, and grouting material can be caused persistently to infiltrate into crack depths, the effect of grouting is more ensure that;Step 203 is along crack Both sides intersect punching, the depth of the first drilling 12 and the second drilling 13 is about at 1/3~1/2;Step 205 utilizes high pressure Grouter irrigates grouting material into grout nipple 14, is kept for the time of pressure be generally 10~30 seconds, then by repeatedly filling repeatedly Slurry, with the pressure change for reaching grouting it is shallower after, stop grouting.
Pass through controlled grouting so that grouting plumpness is good, and then repair drilling to the destruction of the waterproof layer of lining cutting and original The waterproof layer effect of destroyed lining cutting, the material after grouting solidification is equivalent to the coagulation for the waterproof layer of lining cutting being cast in grouting In native, inside grout blanket of nuzzling, the problem of channeling water just is not present, the problem of just having repaired the waterproof layer breakage of lining cutting.
The method for city underground blocking construction that this example is provided, it is oblique using pin hole by the method with micro- damage Side boring method perfusion grouting material.By grooving sealing function, and by intersecting slip casting so that the depths in the crack of slurries injection, The lining concrete allowed at crack recovers to form an entirety, can prevent because vibrations disturbance deformation breakage reappears seepage again And cracking, and recover the compactness and structural integrity intensity of lining concrete.
A kind of method for city underground strengthening construction that the present embodiment is provided, including for city underground blocking construction Method;Also include Step 3: by for strengthen the cement base class of the impervious effect of concrete structure rigidly impervious mortar spraying or Scratch to concrete structural surface.
Wherein, rigidly impervious mortar material includes polymer mortar, cement-based penetrant agent and cement base without receipts to cement base class Contracting grouting material.
The method for city underground strengthening construction that the present embodiment is provided, by the way that rigidly impervious mortar sprays by cement base class Apply or scratch to concrete structural surface, the impervious effect of entirety of liner structure can be strengthened, set equivalent in lining cutting outer surface One layer of barrier film is put, waterproof, the double action reinforced is served.
On the basis of above-described embodiment, further, the side for city underground strengthening construction that the present embodiment is provided Method also includes Step 4: after the completion of for the first-class built-in fitting root leak stopping of pipe fitting, reinforcing bar in underground engineering, then slots and fill out embedding sealing Glue 16;The top of fluid sealant 16 is fixedly connected with the sealing steel plate deformed upon for horizontal direction.
Because the first-class built-in fitting root of pipe fitting, reinforcing bar and concrete junction have gap presence in underground engineering, in addition, Also it is easy to due to extraneous cracking produce gap herein, therefore after the completion of pipe fitting, the first-class built-in fitting root leak stopping of reinforcing bar, then A circular trough is opened up along root position, by filling out embedding fluid sealant 16 in circular trough, so as to seals completely pipe, steel bar end Deng built-in fitting root, then the sealing steel plate deformed upon for horizontal direction is fixedly connected with the top of fluid sealant 16 so that pre- Embedded part root is more consolidated, it is therefore prevented that deform upon to produce crack herein so that steam can enter lined internal.
In addition, the method for city underground strengthening construction that the present embodiment is provided is also including Step 5: by underground engineering The concrete structure of the serious position of leak drills through pressure release draining, new draining blind pipe is formed, by water ejectment to mole drain Sump in.
When the leak especially severe in underground engineering, the concrete structure of the serious position of leak can be drilled through first Pressure release draining, first by the water ejectment of flowing into the sump of mole drain, then by being used for city in above-described embodiment The method of subway leak stopping and strengthening construction is completed.
The method for city underground strengthening construction that the present embodiment is provided passes through the lining cutting surface spraying in grouting completion Cement base class rigidly impervious mortar, one layer of reinforced membrane of formation, and circular trough is opened up in pipe fitting, the first-class built-in fitting root of reinforcing bar, and Embedding fluid sealant 16 is filled out in circular trough;, can also be by by the concrete knot of the serious position of leak in addition, when percolating water is larger Structure drills through pressure release draining by the water ejectment of flowing into the sump of mole drain, then by being used for city in above-described embodiment The method of city's subway leak stopping and strengthening construction is completed.Solve in underground engineering present in prior art, tunnel and subway, anti- Concrete structure leakiness, the technical problem of voids and pits percolating water under vibrations disturbance use environment so that underground engineering is transported Row is safer.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of method for city underground blocking construction, it is characterised in that comprise the following steps:
Step one, the epoxy grouting material for leak stopping is irrigated the concrete structure of city underground using boring method;
Step 2, after the completion of perfusion, as gap≤0.01mm of seepage place;To gap brushing cement-base infiltration crystallization type water-proof Material, the crystalline solid for making permeability strong, which is filled up, oozes the tiny penetrating passage in damp position.
2. the method according to claim 1 for city underground blocking construction, it is characterised in that step one includes following Step:
Step 100, blossom type pin hole (17) grouting method is used for pitted skin infiltration, irrigates the epoxy grouting material for leak stopping.
3. the method according to claim 2 for city underground blocking construction, it is characterised in that the blossom type pin hole (17) multiple pin holes are included, and the diameter range of each pin hole is 28mm~30mm;The spacing range of two neighboring pin hole For 49mm~51mm;Along the vertical direction of two pin hole center lines, another pin hole is set;The pin hole is set gradually;The pin hole The distance range of bottom and lining cutting bottom is 10mm~11mm.
4. the method according to claim 1 for city underground blocking construction, it is characterised in that step one includes following Step:
Step 200, city underground concrete structure is irrigated using drilling sidetracking method;When percolating water is larger, cement injection class Grouting material carries out back fill course, for lining cutting to concrete structure behind sealing to the water cavity of concrete structure behind Supplement perfusion epoxy grouting material.
5. the method according to claim 4 for city underground blocking construction, it is characterised in that step 200 also includes Following steps:
Step 201, cleaning:Lining cutting surface is cleared up, the situation in crack is checked, analyzes, it is determined that position, spacing and the depth of drilling;
Step 202, grooving:Counterincision seam surface grooving, forms cell body (11), and the progress temporary plugging in the cell body (11);
Step 203, drilling:Intersected using boring bar tool along crack both sides and drilled, the drilling includes the first drilling (12) With the second drilling (13);
Step 204, bury mouth:Grout nipple (14) is installed in the first drilling (12), tightened, dead-end fracture surface;
Step 205, grouting:The repeated multiple times perfusion epoxy grouting material into grout nipple (14);
Step 206, tear mouth open:Grouting is finished, and is confirmed that grouting material is fully cured, is removed exposed grout nipple (14);
Step 207, slot processing:The temporary plugging thing in the cell body is removed, keeps drying clean, fill plug seal glue after cleaning (16)。
6. the method for city underground blocking construction according to claim any one of 1-5, it is characterised in that the ring Oxygen grouting material is set to the water-fast moisture resistance wet type modified epoxy grouting material of low-viscosity.
7. a kind of method for city underground strengthening construction, it is characterised in that including as described in claim any one of 1-6 Method for city underground blocking construction;
Also include Step 3: by for strengthening the cement base class of the impervious effect of concrete structure rigidly impervious mortar spraying or blade coating To concrete structural surface.
8. the method according to claim 7 for city underground strengthening construction, it is characterised in that the cement base class is firm Property impervious mortar material include polymer mortar, cement-based penetrant agent and cement base shrinking-free grouting material.
9. the method according to claim 7 for city underground strengthening construction, it is characterised in that also include
Step 4: after the completion of for the first-class built-in fitting root leak stopping of pipe fitting, reinforcing bar in underground engineering, then slot and fill out embedding fluid sealant (16);
The sealing steel plate deformed upon for horizontal direction is fixedly connected with above the fluid sealant (16).
10. the method according to claim 7 for city underground strengthening construction, it is characterised in that also including Step 5: The concrete structure of the serious position of underground engineering leak is drilled through into pressure release draining, new draining blind pipe is formed, water ejectment is arrived In the sump of mole drain.
CN201710622054.5A 2017-07-27 2017-07-27 For city underground leak stopping and the method for strengthening construction Pending CN107217691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710622054.5A CN107217691A (en) 2017-07-27 2017-07-27 For city underground leak stopping and the method for strengthening construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710622054.5A CN107217691A (en) 2017-07-27 2017-07-27 For city underground leak stopping and the method for strengthening construction

Publications (1)

Publication Number Publication Date
CN107217691A true CN107217691A (en) 2017-09-29

Family

ID=59954725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710622054.5A Pending CN107217691A (en) 2017-07-27 2017-07-27 For city underground leak stopping and the method for strengthening construction

Country Status (1)

Country Link
CN (1) CN107217691A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107575250A (en) * 2017-09-30 2018-01-12 康泰卓越(北京)建筑科技有限公司 Operation phase duct pieces of shield tunnel seam blowby area method for blocking and radical cure method for maintaining
CN108104846A (en) * 2018-01-31 2018-06-01 湖南省交通科学研究院有限公司 The supercharging reverse osmosis mechanism of cavern and supercharging reverse osmosis method are reserved for square tunnel
CN108265997A (en) * 2018-02-06 2018-07-10 黄淮学院 A kind of crystal structure self-healing grouting method
CN108999421A (en) * 2018-07-03 2018-12-14 广东碧通防水补强技术应用工程有限公司 A kind of wall body structure seepage treatment method
CN109611121A (en) * 2018-12-25 2019-04-12 中铁六局集团天津铁路建设有限公司 Tunnel leaching infiltration water hole section blocks water grouting method
CN110030021A (en) * 2019-06-04 2019-07-19 中铁九局集团第七工程有限公司 Existing railway tunnel overhaul polyurethane leak-stopping agent high-pressure grouting construction
CN111365039A (en) * 2020-03-25 2020-07-03 上海同岩土木工程科技股份有限公司 Tunnel water leakage treatment method
CN111485581A (en) * 2020-04-22 2020-08-04 中交第三航务工程局有限公司 Method for treating water leakage of underwater cable-stayed suspension tunnel
CN111502325A (en) * 2020-04-29 2020-08-07 湖南先锋防水科技有限公司 Repairing process for leakage of coating heat-insulation outer wall
CN111608684A (en) * 2020-05-08 2020-09-01 中铁三局集团第四工程有限公司 Crack reinforcing method for subway tunnel construction
CN111852510A (en) * 2020-07-21 2020-10-30 四川童燊防水工程有限公司 Leakage-stopping grouting and reinforcing construction method for tunnel and subway arch structure
CN111927505A (en) * 2020-09-25 2020-11-13 川蜀建工有限公司 Waterproof and leaking stoppage construction method for subway tunnel cracks
CN112376570A (en) * 2020-11-18 2021-02-19 湖北中建昌龙建筑技术有限公司 Grouting and leakage blocking method and grouting equipment in high-pressure flowing water state
CN112593726A (en) * 2020-12-18 2021-04-02 南京康泰建筑灌浆科技有限公司 Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN112663646A (en) * 2020-12-18 2021-04-16 南京康泰建筑灌浆科技有限公司 Stable in-situ reinforcing method for grouting control
CN112879041A (en) * 2021-01-23 2021-06-01 中铁二十三局集团第一工程有限公司 Construction method for treating diseases of main structure of subway
CN112921842A (en) * 2021-01-27 2021-06-08 天津市管道工程集团有限公司 Water-stopping and leaking-stopping construction method for concrete culvert pipe
CN113653517A (en) * 2021-08-30 2021-11-16 南京康泰建筑灌浆科技有限公司 Anti-seismic disturbance-resistant underground tunnel leakage blocking method
CN113719304A (en) * 2021-08-19 2021-11-30 苏交科集团股份有限公司 Method for treating water leakage disease of tunnel by using rigid sleeve valve pipe
CN115059057A (en) * 2022-08-01 2022-09-16 中铁一局集团有限公司 Comprehensive treatment construction method for tunnel interval track bed open joint defect

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101185808B1 (en) * 2011-11-16 2012-10-02 토양건영 주식회사 Routing construction method using magnetized ionic silicate solution
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106321121A (en) * 2016-10-26 2017-01-11 盐城市康泰建筑灌浆技术有限公司 Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN106939619A (en) * 2017-04-05 2017-07-11 贵州维修大师科技有限公司 A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101185808B1 (en) * 2011-11-16 2012-10-02 토양건영 주식회사 Routing construction method using magnetized ionic silicate solution
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106321121A (en) * 2016-10-26 2017-01-11 盐城市康泰建筑灌浆技术有限公司 Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN106939619A (en) * 2017-04-05 2017-07-11 贵州维修大师科技有限公司 A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107575250A (en) * 2017-09-30 2018-01-12 康泰卓越(北京)建筑科技有限公司 Operation phase duct pieces of shield tunnel seam blowby area method for blocking and radical cure method for maintaining
CN107575250B (en) * 2017-09-30 2018-10-23 康泰卓越(北京)建筑科技有限公司 Operation phase duct pieces of shield tunnel seam blowby area method for blocking and radical cure method for maintaining
CN108104846A (en) * 2018-01-31 2018-06-01 湖南省交通科学研究院有限公司 The supercharging reverse osmosis mechanism of cavern and supercharging reverse osmosis method are reserved for square tunnel
CN108104846B (en) * 2018-01-31 2024-06-07 湖南省交通科学研究院有限公司 Pressurizing reverse osmosis device and pressurizing reverse osmosis method for reserved cavity of square tunnel
CN108265997A (en) * 2018-02-06 2018-07-10 黄淮学院 A kind of crystal structure self-healing grouting method
CN108999421A (en) * 2018-07-03 2018-12-14 广东碧通防水补强技术应用工程有限公司 A kind of wall body structure seepage treatment method
CN109611121A (en) * 2018-12-25 2019-04-12 中铁六局集团天津铁路建设有限公司 Tunnel leaching infiltration water hole section blocks water grouting method
CN110030021A (en) * 2019-06-04 2019-07-19 中铁九局集团第七工程有限公司 Existing railway tunnel overhaul polyurethane leak-stopping agent high-pressure grouting construction
CN111365039A (en) * 2020-03-25 2020-07-03 上海同岩土木工程科技股份有限公司 Tunnel water leakage treatment method
CN111485581B (en) * 2020-04-22 2021-06-11 中交第三航务工程局有限公司 Method for treating water leakage of underwater cable-stayed suspension tunnel
CN111485581A (en) * 2020-04-22 2020-08-04 中交第三航务工程局有限公司 Method for treating water leakage of underwater cable-stayed suspension tunnel
CN111502325A (en) * 2020-04-29 2020-08-07 湖南先锋防水科技有限公司 Repairing process for leakage of coating heat-insulation outer wall
CN111608684A (en) * 2020-05-08 2020-09-01 中铁三局集团第四工程有限公司 Crack reinforcing method for subway tunnel construction
CN111852510A (en) * 2020-07-21 2020-10-30 四川童燊防水工程有限公司 Leakage-stopping grouting and reinforcing construction method for tunnel and subway arch structure
CN111927505A (en) * 2020-09-25 2020-11-13 川蜀建工有限公司 Waterproof and leaking stoppage construction method for subway tunnel cracks
CN112376570A (en) * 2020-11-18 2021-02-19 湖北中建昌龙建筑技术有限公司 Grouting and leakage blocking method and grouting equipment in high-pressure flowing water state
CN112593726A (en) * 2020-12-18 2021-04-02 南京康泰建筑灌浆科技有限公司 Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN112663646A (en) * 2020-12-18 2021-04-16 南京康泰建筑灌浆科技有限公司 Stable in-situ reinforcing method for grouting control
CN112879041A (en) * 2021-01-23 2021-06-01 中铁二十三局集团第一工程有限公司 Construction method for treating diseases of main structure of subway
CN112921842A (en) * 2021-01-27 2021-06-08 天津市管道工程集团有限公司 Water-stopping and leaking-stopping construction method for concrete culvert pipe
CN113719304A (en) * 2021-08-19 2021-11-30 苏交科集团股份有限公司 Method for treating water leakage disease of tunnel by using rigid sleeve valve pipe
CN113719304B (en) * 2021-08-19 2024-06-21 苏交科集团股份有限公司 Method for treating leakage water disease of tunnel by using rigid sleeve valve pipe
CN113653517A (en) * 2021-08-30 2021-11-16 南京康泰建筑灌浆科技有限公司 Anti-seismic disturbance-resistant underground tunnel leakage blocking method
CN115059057A (en) * 2022-08-01 2022-09-16 中铁一局集团有限公司 Comprehensive treatment construction method for tunnel interval track bed open joint defect

Similar Documents

Publication Publication Date Title
CN107217691A (en) For city underground leak stopping and the method for strengthening construction
CN106013259B (en) Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN107201910A (en) For shaking traffic tunnel fracture plugging and reinforcement means under bumpy weather
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN206539354U (en) A kind of tunnel double-lining surface seep water cure structure
CN106381840A (en) Leaking stoppage grouting method for cracks under high pressure flowing water state
CN107387123A (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece Seepage
CN105951859A (en) Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement
CN110952953B (en) Pressure-maintaining plugging device for horizontal directional drill hole and water gushing treatment method using same
CN109610504A (en) A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN207193996U (en) A kind of precipitation pipe well well-sealing device
CN107326868A (en) A kind of large reservoir concrete dam body fracture plugging method
CN109371861A (en) A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN104847365B (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel construction method
CN109208651A (en) Underground engineering super-long structural body deformation joint waterproof/drainage structure construction method and structure
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
CN109736340A (en) A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN108756955A (en) Shield tunnel gravity type sealing plugging structure and method
CN109667586B (en) Grouting method of double-layer well wall grouting system
CN208982109U (en) A kind of tunnel structure with antiseepage drain function
CN208280969U (en) Shield tunnel gravity type sealing plugging structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929