CN109371861A - A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure - Google Patents

A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure Download PDF

Info

Publication number
CN109371861A
CN109371861A CN201811413374.0A CN201811413374A CN109371861A CN 109371861 A CN109371861 A CN 109371861A CN 201811413374 A CN201811413374 A CN 201811413374A CN 109371861 A CN109371861 A CN 109371861A
Authority
CN
China
Prior art keywords
subsiding crack
culvert
reinforced concrete
groove
subsiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811413374.0A
Other languages
Chinese (zh)
Inventor
吕茂丰
韦佳沅
李奇峰
殷美俊
赵艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau, China Railway No 5 Engineering Group Co Ltd filed Critical Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
Priority to CN201811413374.0A priority Critical patent/CN109371861A/en
Publication of CN109371861A publication Critical patent/CN109371861A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Architecture (AREA)
  • Sewage (AREA)

Abstract

The present invention discloses a kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and its repairs structure, groove (6) are accomplished in the cutting of subsiding crack two sides, drilling installation Grouting Pipe (1) and slip casting at subsiding crack, the subsiding crack in (6) is laid with aqueduct (2) along groove, drainage hole (5) is opened up on aqueduct (2) and drainpipe is installed, filled layer (3) are clogged in groove (6), groove (6) surface there are waterproof layer (4).The present invention has effectively handled culvert subsiding crack seepage problem, and anti-seepage effect is obvious, easy to operate, economic and practical.

Description

A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
Technical field
The present invention relates to a kind of defects handling methods of construction quality, and in particular to a kind of culvert of reinforced concrete subsiding crack Seep water Treatment Methods.
Background technique
Highway, railway often build the safety that culvert meets roadbed when across coombe and exclusion roadbed inner side edge ditch water flow With it is continuous.Reinforced concrete cover plate is contained because lower and of less demanding to foundation stress to the depth of fill requirement of hole top, and construction is just Benefit is widely used in engineering.
To prevent differential settlement, culvert generally segmented construction sets subsiding crack between segment, fills out in subsiding crack with pitch Loose hemp fiber or other impermeable materials.In terms of engineering practice, because construction technology influences, construction joint waterproof effect is often not satisfactory, nothing Method prevents water flow in culvert and penetrates into roadbed, causes filled-up ground to generate differential settlement, or even influence subgrade stability;Or it is current Infiltration everywhere leads to current difficulty to culvert after the rain, and social influence is severe.But culvert and culvert roadbed have filled completion, nothing Method carries out water-proofing treatment in culvert lateral surface to determine the stabilization of roadbed and reduce social influence by original design.
Summary of the invention
The technical problem to be solved by the present invention is providing the infiltration restorative procedure of subsiding crack in the new culvert of one kind, it is not necessarily to Banketing on the outside of culvert roadbed is excavated, does not destroy on the basis of the main force structure of culvert, slot treatment is carried out in culvert Mode carry out reparation punishment.
The technical scheme is that
A kind of culvert of reinforced concrete subsiding crack infiltration restorative procedure comprising the steps of:
The first, it is cut with cutting machine in former culvert subsiding crack two sides, then uses electric impact drill tick slot, then be aided with artificial refine into ditch Slot;
The second, jewel hole, installation Grouting Pipe and slip casting at former culvert subsiding crack with electric drill;
Third, cleaning gap and groove, install aqueduct at former culvert subsiding crack, install drainage hole every certain spacing;
4th, filled layer is carried out in the good groove of artificial refine;
5th, with construction waterproof layer after the concrete surface layer carbide of mechanical removal subsiding crack two sides.
The size of groove is width 4-6cm, deep 6-10cm;Filled layer in groove is clogged using Bituminous hemp fiber, is used after filling Fast hard waterproof mortar smears the surface of tooled joint.
The interval 20-30cm of Grouting Pipe, hole depth 8-12cm, aperture 10-20mm;The perfusion of grouting high-pressure injection pump is water-soluble Completion is once perfused from culvert bottom toward culvert top when perfusion in the mixed liquor of property polyurethane leak-stopping agent and acetone, and grouting pressure reaches Stop slip casting after 0.5MPa, after injection slurry solidification in 1 to 2 days, removal slip casting nail blocks injected hole with leak stopping king.
Aqueduct uses the half of pvc pipe of diameter 2cm;Drainage hole uses the pvc pipe of diameter 2cm, and installation number is according to going out Water selection.
The construction of waterproof layer are as follows: after epoxy resin pastes triplex glass silk cloth, applied again after one bed boundary agent of external coating It brushes twice of BPS high strength elastic waterproof material and carries out water-proofing treatment;Surface requirements are smooth, closely knit, bubble-free, without infiltration.
A kind of culvert of reinforced concrete subsiding crack reparation structure, including subsiding crack, the cutting of subsiding crack two sides accomplish groove, sink Drilling installation Grouting Pipe and slip casting at seam are dropped, and interior subsiding crack is laid with aqueduct along groove, opens up drainage hole simultaneously on aqueduct Drainpipe is installed, clogs filled layer in groove, flute surfaces have waterproof layer.
Filled layer is Bituminous hemp fiber, triplex glass cloth surface brushing interfacial agents that waterproof layer is pasted by epoxy resin and BPS high intensity coating forms.
Drainage hole is located at the bottom of subsiding crack.
Aqueduct is half of pvc pipe, and open section is towards subsiding crack.
Beneficial effects of the present invention:
The roadbed filled is not destroyed, does not destroy the main body force structure of culvert;Water blockoff is carried out by 1 slip casting of Grouting Pipe;It is logical It crosses and buries 2 ejectment of aqueduct in former culvert subsiding crack;Filled layer 3 and construction waterproof layer 4 are clogged after expanding seam by subsiding crack, is had Effect prevents water from exosmosing.
The present invention has effectively handled culvert subsiding crack seepage problem, and anti-seepage effect is obvious, easy to operate, economic and practical.
Detailed description of the invention:
Fig. 1 is the process flow chart of Treatment Methods;
Fig. 2 is the elevational schematic view for the treatment of structures;
Fig. 3 is the floor map for the treatment of structures;
Fig. 4 is I-I sectional schematic diagram for the treatment of structures.
Specific embodiment
The embodiment of the present invention:
The first, it is cut with cutting machine in former culvert subsiding crack two sides, then uses electric impact drill tick slot, then be aided with artificial refine into ditch Slot 6;The size of groove 6 is width 5cm, deep 8cm.
The second, jewel hole, installation Grouting Pipe 1 and slip casting at former culvert subsiding crack with electric drill;The interval 25cm of Grouting Pipe 1, Hole depth is 10cm, aperture 15mm;The mixed liquor of water soluble polyurethane leak-stopping agent and acetone is perfused in grouting high-pressure injection pump, fills Completion is once perfused from culvert bottom toward culvert top when note, grouting pressure stops slip casting, injection slurry solidification in 1 ~ 2 day after reaching 0.5MPa Afterwards, removal slip casting nail blocks injected hole with leak stopping king.
Third, cleaning gap and groove 6, aqueduct 2 is installed at former culvert subsiding crack, sets draining every certain spacing Hole 5;Aqueduct 2 uses the half of pvc pipe of diameter 2cm, and section is open towards subsiding crack;Install diameter 2cm's at drainage hole 5 Pvc pipe, installation number are selected according to water yield, general only to install at one in the bottom of subsiding crack.
4th, filled layer 3 is carried out in the good groove 6 of artificial refine;Filled layer 3 in groove 6 is filled out using Bituminous hemp fiber Plug smears the surface of tooled joint with fast hard waterproof mortar after filling.
5th, with construction waterproof layer 4 after the concrete surface layer carbide of mechanical removal subsiding crack two sides.The construction of waterproof layer 4 After pasting triplex glass silk cloth for epoxy resin, it is anti-to brush twice of BPS high strength elastic again after one bed boundary agent of external coating Water material carries out water-proofing treatment;It is required that surfacing, closely knit, bubble-free, without infiltration.
The cargo handling operation of this method is combined using anti-unimpeded, is closed by grouting for water blocking, pipe laying ejectment, construction waterproof layer Mode carry out infiltration punishment.

Claims (9)

  1. The Treatment Methods 1. a kind of culvert of reinforced concrete subsiding crack seeps water, it is characterised in that comprise the steps of:
    The first, it is cut with cutting machine in former culvert subsiding crack two sides, then uses electric impact drill tick slot, then be aided with artificial refine into ditch Slot (6);
    The second, jewel hole, installation Grouting Pipe (1) and slip casting at former culvert subsiding crack with electric drill;
    Third, cleaning gap and groove, install aqueduct (2) at former culvert subsiding crack, install draining every certain spacing Hole (5);
    4th, filled layer (3) are carried out the good groove of artificial refine (6) is inner;
    5th, with construction waterproof layer (4) after the concrete surface layer carbide of mechanical removal subsiding crack two sides.
  2. The Treatment Methods 2. culvert of reinforced concrete subsiding crack according to claim 1 seeps water, it is characterised in that: groove (6) Size be width 4-6cm, deep 6-10cm;The inner filled layer (3) of groove (6) is clogged using Bituminous hemp fiber, with fast hard anti-after filling Water sand starches the surface for smearing tooled joint.
  3. The Treatment Methods 3. culvert of reinforced concrete subsiding crack according to claim 1 seeps water, it is characterised in that: Grouting Pipe (1) interval 20-30cm, hole depth 8-12cm, aperture 10-20mm;Soluble polyurethane is perfused in grouting high-pressure injection pump Completion is once perfused from culvert bottom toward culvert top when perfusion, after grouting pressure reaches 0.5MPa in the mixed liquor of sealing agent and acetone Stop slip casting, after injection slurry solidification, removal slip casting nail blocks injected hole with leak stopping king.
  4. The Treatment Methods 4. culvert of reinforced concrete subsiding crack according to claim 1 seeps water, it is characterised in that: aqueduct (2) the half of pvc pipe of diameter 2cm is used;Drainage hole (5) uses the pvc pipe of diameter 2cm, and installation number is selected according to water yield.
  5. The Treatment Methods 5. culvert of reinforced concrete subsiding crack according to claim 1 seeps water, it is characterised in that: waterproof layer (4) construction are as follows: after epoxy resin pastes triplex glass silk cloth, brush twice of BPS high again after one bed boundary agent of external coating Strength, elastic waterproof material carries out water-proofing treatment;Surface requirements are smooth, closely knit, bubble-free, without infiltration.
  6. 6. a kind of culvert of reinforced concrete subsiding crack repairs structure, including subsiding crack, it is characterised in that: the cutting of subsiding crack two sides is repaired At groove (6), Grouting Pipe (1) and slip casting are installed in drilling at subsiding crack, and the subsiding crack in (6) is laid with aqueduct (2) along groove, Drainage hole (5) is opened up on aqueduct (2) and drainpipe is installed, and clogs filled layer (3) in groove (6), there is waterproof on groove (6) surface Layer (4).
  7. 7. culvert of reinforced concrete subsiding crack according to claim 6 repairs structure, it is characterised in that: filled layer (3) is Bituminous hemp fiber, triplex glass cloth surface brushing interfacial agents and BPS high intensity coating that waterproof layer (4) is pasted by epoxy resin and At.
  8. 8. culvert of reinforced concrete subsiding crack according to claim 6 repairs structure, it is characterised in that: drainage hole (5) position In the bottom of subsiding crack.
  9. 9. culvert of reinforced concrete subsiding crack according to claim 6 repairs structure, it is characterised in that: aqueduct (2) is Half of pvc pipe, open section is towards subsiding crack.
CN201811413374.0A 2018-11-26 2018-11-26 A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure Pending CN109371861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811413374.0A CN109371861A (en) 2018-11-26 2018-11-26 A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811413374.0A CN109371861A (en) 2018-11-26 2018-11-26 A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure

Publications (1)

Publication Number Publication Date
CN109371861A true CN109371861A (en) 2019-02-22

Family

ID=65383401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811413374.0A Pending CN109371861A (en) 2018-11-26 2018-11-26 A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure

Country Status (1)

Country Link
CN (1) CN109371861A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779287A (en) * 2019-03-06 2019-05-21 青岛海川建设集团有限公司 Microdilatancy water-proof emulsion construction technology
CN110158666A (en) * 2019-06-18 2019-08-23 四川童燊防水工程有限公司 Building basement top plate subsiding crack plugging structure and its construction method
CN110410112A (en) * 2019-07-26 2019-11-05 大禹伟业(北京)国际科技有限公司 A kind of tunnel project seam waterproof construction method
CN112647435A (en) * 2019-10-11 2021-04-13 上海友为工程设计有限公司 Improved plugging method for through-dike culvert
CN113622326A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert deformation joint water leakage guiding and draining structure and method for repairing deformation joint
CN113622327A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert settlement joint water seepage repairing structure and method for repairing settlement joint
CN113981946A (en) * 2021-10-11 2022-01-28 陕西聚博德新材料科技有限公司 Method for remedying railway culvert diseases

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1982541A (en) * 2005-12-14 2007-06-20 李应芝 Underground channel of hydroelectric station and cavity group waterproofing and leakage-stopping construction
KR20140122103A (en) * 2013-04-09 2014-10-17 장영미 In-site Concrete Culverts with assembled Partial Precast Concrete and In-Site Molding Apparatus for manufacturing it
CN105756101A (en) * 2016-03-01 2016-07-13 上海东方雨虹防水工程有限公司 Building basement, subway and tunnel expansion joint waterproof maintenance and irrigation filling construction method
KR20160128478A (en) * 2015-04-28 2016-11-08 동아대학교 산학협력단 Rotary waterjet injection system for improving production of petroleum and gas
CN206070599U (en) * 2016-08-30 2017-04-05 中国一冶集团有限公司 The water guide structure of basement subsiding crack infiltration mending-leakage
CN107587434A (en) * 2017-10-16 2018-01-16 中交路桥建设有限公司 Culvert of reinforced concrete percolating water prevention and disposition method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1982541A (en) * 2005-12-14 2007-06-20 李应芝 Underground channel of hydroelectric station and cavity group waterproofing and leakage-stopping construction
KR20140122103A (en) * 2013-04-09 2014-10-17 장영미 In-site Concrete Culverts with assembled Partial Precast Concrete and In-Site Molding Apparatus for manufacturing it
KR20160128478A (en) * 2015-04-28 2016-11-08 동아대학교 산학협력단 Rotary waterjet injection system for improving production of petroleum and gas
CN105756101A (en) * 2016-03-01 2016-07-13 上海东方雨虹防水工程有限公司 Building basement, subway and tunnel expansion joint waterproof maintenance and irrigation filling construction method
CN206070599U (en) * 2016-08-30 2017-04-05 中国一冶集团有限公司 The water guide structure of basement subsiding crack infiltration mending-leakage
CN107587434A (en) * 2017-10-16 2018-01-16 中交路桥建设有限公司 Culvert of reinforced concrete percolating water prevention and disposition method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张莹等: "浅谈涵洞的防水层、沉降缝、缺口填土及进出水口", 《黑龙江交通科技》 *
马建伟等: "水工混凝土建筑物裂缝处理技术概述", 《北京水务》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779287A (en) * 2019-03-06 2019-05-21 青岛海川建设集团有限公司 Microdilatancy water-proof emulsion construction technology
CN110158666A (en) * 2019-06-18 2019-08-23 四川童燊防水工程有限公司 Building basement top plate subsiding crack plugging structure and its construction method
CN110410112A (en) * 2019-07-26 2019-11-05 大禹伟业(北京)国际科技有限公司 A kind of tunnel project seam waterproof construction method
CN112647435A (en) * 2019-10-11 2021-04-13 上海友为工程设计有限公司 Improved plugging method for through-dike culvert
CN113622326A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert deformation joint water leakage guiding and draining structure and method for repairing deformation joint
CN113622327A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert settlement joint water seepage repairing structure and method for repairing settlement joint
CN113622327B (en) * 2021-08-03 2022-12-20 中铁十九局集团第五工程有限公司 Culvert settlement joint water seepage repairing structure and method for repairing settlement joint
WO2023010771A1 (en) * 2021-08-03 2023-02-09 中铁十九局集团第五工程有限公司 Drainage structure for leakage water in culvert deformation joint and method for repairing deformation joint
CN113981946A (en) * 2021-10-11 2022-01-28 陕西聚博德新材料科技有限公司 Method for remedying railway culvert diseases

Similar Documents

Publication Publication Date Title
CN109371861A (en) A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN111485922B (en) Method for treating water leakage, block falling and slurry turning of ELF railway tunnel
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN102296507B (en) Treatment method of subgrade cracks
CN109162152B (en) Method for remedying slurry pumping disease of ballastless track bed of high-speed rail
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN204476470U (en) A kind of waterproof and water drainage system of applicable tunnel project seam
CN107217691A (en) For city underground leak stopping and the method for strengthening construction
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN202788022U (en) Wall crack combined type repair structure
CN107575250B (en) Operation phase duct pieces of shield tunnel seam blowby area method for blocking and radical cure method for maintaining
CN206539354U (en) A kind of tunnel double-lining surface seep water cure structure
CN202787329U (en) Large leakage treatment structure for underground continuous wall
CN104988815A (en) Method for treating post-construction settlement disease of railroad bed
CN104343077A (en) Asphalt concrete pavement reflection crack treatment method
CN109915180A (en) A kind of Tunnel Second Lining cracking method for treating seepage
CN109610504A (en) A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN106381840A (en) Leaking stoppage grouting method for cracks under high pressure flowing water state
CN110486053A (en) A kind of urban track traffic shallow tunnel fault of construction treatment construction method
CN206143827U (en) Underground works crack repairing structure
CN109208651A (en) Underground engineering super-long structural body deformation joint waterproof/drainage structure construction method and structure
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN109667607A (en) A kind of tunnel partitioning waterproofing construction technology
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 550003 No. 23, jujube Road, Yunyan District, Guizhou, Guiyang

Applicant after: CHINA RAILWAY NO.5 ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY NO.5 ENGINEERING GROUP MECHANICAL ENGINEERING CO.,LTD.

Address before: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Applicant before: CHINA RAILWAY NO.5 ENGINEERING GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY NO.5 ENGINEERING GROUP MECHANICAL ENGINEERING CO.,LTD.

CB02 Change of applicant information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222

RJ01 Rejection of invention patent application after publication