WO2023010771A1 - Drainage structure for leakage water in culvert deformation joint and method for repairing deformation joint - Google Patents

Drainage structure for leakage water in culvert deformation joint and method for repairing deformation joint Download PDF

Info

Publication number
WO2023010771A1
WO2023010771A1 PCT/CN2021/140987 CN2021140987W WO2023010771A1 WO 2023010771 A1 WO2023010771 A1 WO 2023010771A1 CN 2021140987 W CN2021140987 W CN 2021140987W WO 2023010771 A1 WO2023010771 A1 WO 2023010771A1
Authority
WO
WIPO (PCT)
Prior art keywords
groove
drainage
preset
culvert
deformation
Prior art date
Application number
PCT/CN2021/140987
Other languages
French (fr)
Chinese (zh)
Inventor
赵立财
Original Assignee
中铁十九局集团第五工程有限公司
中铁十九局集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁十九局集团第五工程有限公司, 中铁十九局集团有限公司 filed Critical 中铁十九局集团第五工程有限公司
Publication of WO2023010771A1 publication Critical patent/WO2023010771A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Definitions

  • the present disclosure relates to the technical field of construction engineering, in particular to a water diversion structure for leakage of deformation joints in a culvert and a method for repairing the deformation joints.
  • the culvert refers to the drainage channel (water passage) under the roadbed and built below the road surface in order to make the road pass through the canal smoothly and not hinder the traffic in the construction of the road. Through this structure, the surface water along the road can be quickly removed. , to ensure roadbed safety.
  • Culverts usually include reserved deformation joints to adapt to temperature deformation, foundation settlement, earthquakes, etc. Deformation joints are the general term for expansion joints, settlement joints and earthquake-proof joints. However, deformation joints are often the weakest link in the entire culvert. Leakage occurs due to various factors.
  • the technical problem to be solved by the present disclosure is to solve the problems that the existing deformation joint leakage water repair structure is prone to repeated leakage and has poor anti-seepage effect.
  • an embodiment of the present disclosure provides a leakage drainage structure for deformation joints of culverts, including: a first preset groove and a second preset groove set on the inner surface of the culvert wall;
  • the extension direction of the first preset groove on the inner surface of the culvert wall body is the same as the extension direction of the deformation joint on the inner surface of the culvert wall body, and the two groove walls of the first preset groove are respectively arranged On both sides of the deformation seam, the groove bottom of the first predetermined groove communicates with the deformation seam; the second predetermined groove is opened at the notch of the first predetermined groove, And the groove width of the second preset groove is greater than the groove width of the first preset groove, the bottom end of the second preset groove is flush with the bottom of the deformation seam, the second preset groove The position of the top of the predetermined groove is lower than the position of the top of the first predetermined groove;
  • a drainage structure is provided between the notch of the first preset groove and the deformation joint, and the drainage structure has a drainage channel for draining the seepage water on the wall of the culvert, and the drainage channel It communicates with the deformation joint;
  • the first predetermined groove is filled with a waterproof structure for sealing the first predetermined groove, and the second predetermined groove is filled with a reinforcing structure, so One side of the reinforcement structure is connected to the waterproof structure, and the other side of the reinforcement structure is flush with the inner surface of the culvert wall.
  • the drainage structure includes a first waterproof layer, a water seepage plate and a rubber waterstop; the first waterproof layer is arranged on the inner wall of the first preset groove, and the rubber waterstop is connected to the The first preset groove is matched and arranged in the first preset groove, and there is an accommodation cavity between the rubber waterstop and the groove bottom of the first preset groove, and the water seepage Boards are filled in the accommodating cavity.
  • the rubber waterstop and the seepage plate are fixed on the bottom of the first predetermined groove by at least two fasteners.
  • the drainage structure includes a drainage tube with openings at both ends, the side wall of the drainage tube is provided with a drainage port, and the drainage port is opened along the axial direction of the drainage tube, and the drainage tube is sandwiched between the The side of the deformation seam close to the predetermined groove, the drainage port is located in the deformation seam, and the drainage pipe is formed as the drainage channel.
  • the waterproof structure includes asphalt ointment; the asphalt ointment is filled between the notch of the first predetermined groove and the drainage structure, and the asphalt ointment is far away from the drainage structure One side is flush with the notch of the first preset groove.
  • the reinforcing structure includes a glass cloth and a second waterproof layer; one side of the glass cloth is connected to the waterproof structure, the other side of the glass cloth is connected to the second waterproof layer, and the second waterproof The side of the layer away from the glass cloth is flush with the inner surface of the culvert wall.
  • the top of the first predetermined groove is located between 3/4 of the height of the deformation seam and the top of the deformation seam.
  • first preset groove and the second preset groove are arranged symmetrically along the center line of the deformation joint.
  • a drainage structure communicating with the deformation joint is provided between the notch of the first preset groove and the deformation joint, wherein the leakage water on the wall of the culvert is discharged through the drainage structure;
  • a drainage structure communicating with the deformation joint is set between the notch of the first preset groove and the deformation joint, wherein the seepage water on the wall of the culvert is discharged through the drainage structure Before the step, the method also includes:
  • At least two grouting pipes are arranged at intervals in the direction from the bottom end to the top end of the settlement joint;
  • Water-soluble polyurethane or a mixed solution comprising water-soluble polyurethane is poured into the joint between the culvert wall body and the roadbed through the grouting pipe.
  • the first preset groove and the second preset groove are arranged on the inner surface of the culvert wall, and the first preset The extension direction of the groove on the inner surface of the culvert wall is the same as the extension direction of the deformation joint on the inner surface of the culvert wall.
  • the two groove walls of the first predetermined groove are respectively arranged on both sides of the deformation joint.
  • the first predetermined groove The bottom of the groove communicates with the deformation seam; the second preset groove is opened at the notch of the first preset groove, and the groove width of the second preset groove is greater than the groove width of the first preset groove, and the second preset groove
  • the bottom of the preset groove is flush with the bottom of the deformation joint, and the top of the second preset groove is located lower than the top of the first preset groove.
  • a drainage structure is arranged between the notch of the first preset groove and the deformation joint, and the drainage structure has a drainage channel for draining the seepage water on the culvert wall, and the drainage channel is connected with the deformation joint; the first preset groove
  • the groove is filled with a waterproof structure for sealing the first preset groove, and the second preset groove is filled with a reinforcement structure.
  • One side of the reinforcement structure is connected to the waterproof structure, and the other side of the reinforcement structure is connected to the wall of the culvert. The inner surface is flush.
  • the first preset groove and drainage structure are set at the deformation joints that have seeped water, so that the leakage water can be discharged through the drainage channel, effectively avoiding the re-erosion damage of the leakage water to the culvert wall,
  • the first preset groove is filled with a waterproof structure, on the one hand, the drainage channel can be reliably fixed between the first preset groove and the deformation joint, and on the other hand, the waterproof performance can be improved.
  • the reinforcement structure in the groove can play the role of reinforcement.
  • the leakage water drainage structure of the culvert deformation joint provided by the present disclosure can drain the leakage water without repeated maintenance, and has a good anti-seepage effect, which improves the structural strength, durability and serviceability of the culvert wall to a certain extent. life.
  • FIG. 1 is a front view of a leakage water diversion structure of a culvert deformation joint provided by an embodiment of the present disclosure
  • Fig. 2 is a side sectional view of Fig. 1;
  • Fig. 3 is an enlarged view of part A in Fig. 2;
  • Fig. 4 is a front view of a leakage water diversion structure of a culvert deformation joint provided by another embodiment of the present disclosure
  • Fig. 5 is a side sectional view of Fig. 4;
  • Fig. 6 is a front view of the leakage water drainage structure of the culvert deformation joint provided by the embodiment of the present disclosure
  • Fig. 7 is a side sectional view of Fig. 6;
  • Fig. 8 is a schematic flowchart of a construction method of a leakage water diversion and drainage structure of a culvert deformation joint provided by an embodiment of the present disclosure.
  • First preset groove 20. Drainage channel; 201. Drainage tube; 202. First waterproof layer; 203. Rubber waterstop; 204. Water seepage board; 30. Waterproof structure; 301. Bitumen ointment ;40. Fasteners; 401. Expansion bolts; 402. Flat steel; ;50. Second preset groove; 60. Strengthening structure; 70. Deformation joint; 81. Culvert wall; pulp tube.
  • the present embodiment provides a leakage drainage structure of culvert deformation joints, including a first preset groove 10 and a second preset groove set on the inner surface of the culvert wall body 81 50.
  • the extension direction of the first preset groove 10 on the inner surface of the culvert wall body is the same as that of the deformation joint on the inner surface of the culvert wall body, and the two groove walls of the first preset groove 10 are respectively arranged on both sides of the deformation joint , the groove bottom of the first preset groove 10 communicates with the deformation seam; the second preset groove is opened at the notch of the first preset groove 10, and the groove width of the second preset groove is larger than that of the first preset groove.
  • Set the groove width of the groove 10, the bottom of the second predetermined groove is flush with the bottom of the deformation joint, and the position of the top of the second predetermined groove is lower than the position of the top of the first predetermined groove 10 .
  • a second preset groove 50 is provided at the notch of the first preset groove 10, and the second preset groove 50 is also opened on the culvert wall.
  • the two groove walls of the second predetermined groove 50 are respectively arranged on both sides of the deformation joint 70, and the groove width of the second predetermined groove 50 is greater than the groove width of the first predetermined groove 10, and the second The bottom of the preset groove 50 is flush with the bottom of the deformation slit 70 , and the top of the second preset groove 50 is located lower than the top of the first preset groove 10 .
  • the second preset groove 50 is set at the notch of the first preset groove 10 and is set near the bottom end of the deformation seam 70, and the groove height of the second preset groove 50 is smaller than that of the first preset groove.
  • the groove height of the groove 10 that is to say, the bottom end of the second preset groove 50 is flush with the bottom end of the deformation seam 70, and the top of the second preset groove 50 is smaller than that of the first preset groove 10.
  • Top that is, the groove height of the second preset groove 50 is less than the groove height of the first preset groove 10, and the groove width of the second preset groove 50 is greater than the groove width of the first preset groove 10 .
  • a corresponding first preset groove 10 is opened near the deformation joint 70, that is, according to the water seepage of the culvert wall body 81, for the water seepage deformation joint 70 such as expansion joint, settlement joint and shockproof
  • the seam is expanded to a preset size to form the first preset groove 10 .
  • the corresponding preset dimensions of the first preset groove 10 opened at the deformation joint 70 are different.
  • the groove width of the first predetermined groove 10 is 15 cm, and the groove depth is 5 cm.
  • the groove width of the first predetermined groove 10 is 5 cm, and the groove depth is 8 cm.
  • the groove width of the first predetermined groove 10 is 5cm, and the groove depth is 6cm.
  • a drainage structure is provided between the notch of the first preset groove 10 and the deformation joint 70, and the drainage structure has a drainage channel 20 for draining the seepage water on the culvert wall body 81, and the drainage
  • the channel 20 communicates with the deformation seam 70;
  • the first predetermined groove 10 is filled with a waterproof structure 30 for sealing the first predetermined groove 10,
  • the second predetermined groove 50 is filled with a reinforcing structure 60 to strengthen One side of the structure 60 is connected to the waterproof structure 30 , and the other side of the reinforcing structure 60 is flush with the inner surface of the culvert wall body 81 .
  • the drainage structure may be any suitable structure that can drain the seepage water so that the seepage water can be discharged out of the culvert wall 81 along the drainage channel 20 .
  • the drainage outlet of the drainage channel 20 is connected with the drainage channel of the culvert wall body 81.
  • the drainage channel 20 can be connected through a connecting pipe Just be connected with the drain of the culvert wall body 81.
  • the connecting pipe is roughly perpendicular to the drainage channel 20 , one end of the connecting pipe communicates with the drain, and the other end of the connecting pipe communicates with the bottom end of the drainage channel 20 .
  • the drain outlet of the drainage channel 20 can be directly extended into the wall drain pipe below the culvert wall body 81.
  • only the bottom of the drainage channel 20 needs to be The end extends to the outside of the first preset groove 10 and extends into the wall drain pipe below the culvert wall 81.
  • the waterproof structure 30 is filled in the first predetermined groove 10, and the part of the first predetermined groove 10 except the drainage channel 20 is filled, so that the drainage channel 20 can be reinforced and supplemented on the one hand. Strong, on the other hand can improve the anti-seepage effect of deformation joint 70.
  • the second preset groove 50 is filled with a reinforcement structure 60 , one side of the reinforcement structure 60 is flush with the inner surface of the culvert wall body 81 , and the other side of the reinforcement structure 60 is connected with the waterproof structure 30 .
  • a reinforcing structure 60 is provided near the bottom of the deformation joint 70 to strengthen the structure. 60 may have multiple implementation methods, as long as it can play a role of reinforcement and reinforcement, there is no excessive limitation here.
  • the leakage water drainage structure of the culvert deformation joint and the method for repairing the deformation joint provided in this embodiment, through the first preset groove 10 and the second preset groove 10 arranged on the inner surface of the culvert wall body 81 Groove 50, the extension direction of the first preset groove 10 on the inner surface of the culvert wall body is the same as the extension direction of the deformation joint on the inner surface of the culvert wall body, and the two groove walls of the first preset groove 10 are respectively arranged on the deformation joint On both sides, the groove bottom of the first predetermined groove 10 communicates with the deformation joint; the second predetermined groove is opened at the notch of the first predetermined groove 10, and the groove width of the second predetermined groove is larger than that of the first predetermined groove.
  • a drainage structure is arranged between the notch of the first predetermined groove 10 and the deformation joint 70, and the drainage structure has a drainage channel 20 for draining the seepage water on the culvert wall body 81, and the drainage channel 20 and the deformation joint 70 Connected; the first preset groove 10 is filled with a waterproof structure 30 for blocking the first preset groove 10, the second preset groove 50 is filled with a reinforcement structure 60, and one side of the reinforcement structure 60 is connected to the waterproof structure.
  • the structure 30 is connected, and the other side of the reinforcement structure 60 is flush with the inner surface of the culvert wall body 81 .
  • the drainage channel 20 can be reliably fixed between the first preset groove 10 and the deformation seam 70, on the other hand, it can improve Waterproof performance, at the same time, the reinforcement structure 60 located in the second preset groove 50 can play the role of reinforcement.
  • the leakage water drainage structure of the culvert deformation joint provided by the present disclosure can drain the leakage water without repeated maintenance, and has a good anti-seepage effect, which improves the structural strength, durability and serviceability of the culvert wall to a certain extent. life.
  • the drainage structure when severe water seepage occurs in the culvert wall body 81, the drainage structure includes a first waterproof layer 202, a seepage plate 204 and a rubber water stop 203; the first The waterproof layer 202 is arranged on the inner wall of the first preset groove 10, the rubber waterstop 203 is matched with the first preset groove 10 and is arranged in the first preset groove 10, and the rubber waterstop 203 is matched with the first preset groove 10.
  • There is an accommodating cavity between the groove bottoms of the first predetermined groove 10 and the seepage plate 204 is filled in the accommodating cavity, and the water seepage plate 204 forms the drainage channel 20 .
  • the first waterproof layer 202 is coated on the inner wall of the first preset groove 10, that is, the first waterproof layer is coated on the bottom of the first preset groove 10 and on both groove walls. 202. Since the first preset groove 10 is set on the concrete wall of the culvert wall body 81, the first waterproof layer 202 can fill up the concrete gap on the inner wall of the first preset groove 10 on the one hand, so as to achieve waterproof performance; On the other hand, the first waterproof layer 202 can also play the role of reinforcement, thereby helping to improve the impermeability, earthquake resistance and corrosion resistance of the culvert wall body 81 .
  • the first waterproof layer 202 may be epoxy mortar, epoxy cement or the like.
  • the rubber waterstop 203 matches the shape of the first preset groove 10, and the rubber waterstop 203 is arranged on the side of the first preset groove 10 close to the notch, and is aligned with the first preset groove 10. There is a gap between the groove bottoms of the grooves 10, so that the rubber waterstop 203 can seal the first preset groove 10, and surround the first waterproof layer 202 to form a drainage channel 20 for discharging leakage water
  • the drainage channel 20 formed by the rubber waterstop 203 and the first waterproof layer 202 maximizes the use of the space of the first preset groove 10, so that the seepage water with a large flow rate is discharged through the drainage channel 20, avoiding Seepage water erodes the culvert wall body 81 here.
  • the water seepage board 204 may be any suitable material with a water seepage gap, such as a black silk board.
  • the first waterproof layer 202 such as annular mortar can also be set on the inner wall of the first preset groove 10, and the first preset groove A rubber waterstop 203 is arranged inside the groove 10 , and a seepage plate 204 is filled between the rubber waterstop 203 and the bottom of the first preset groove 10 , so that the water seepage plate 204 forms a drainage channel 20 .
  • the rubber waterstop 203 and the seepage plate 204 are fixed on the groove bottom of the first predetermined groove 10 by at least two fasteners 40 .
  • each group of mounting holes includes two symmetrically located deformation joints 70.
  • Two sub-mounting holes on the side. Install expansion bolts 401 in each sub-mounting hole, respectively set avoidance holes for avoiding expansion bolts 401 at the corresponding positions of rubber waterstop 203, water seepage plate 204 and flat steel, and connect rubber waterstop 203 and water seepage plate 204 runs through the expansion bolts 401 in each sub-installation hole, and the flat steel is pressed against the outer surface of the rubber waterstop 203 and connected together through the nuts that cooperate with the expansion bolts 401.
  • the connection is reliable and firm, and the seepage and waterproof effect is good. good.
  • the expansion bolt 401 or the pre-embedded screw and the flat steel can be plated with an anti-corrosion layer, such as chrome plating, galvanization and the like.
  • the drainage structure when slight water seepage or moderate water seepage occurs in the culvert wall body 81, the drainage structure includes a drainage tube 201 with both ends open, and the side of the drainage tube 201 The wall is provided with a drainage port, and the drainage port is opened along the axial direction of the drainage tube 201, and the drainage tube 201 is sandwiched on the side of the deformation joint 70 close to the preset groove, and the drainage port is located in the deformation joint 70, and the drainage tube 201 is formed as The drainage channel 20 has low cost and good economy.
  • both ends of the drainage tube 201 are open, wherein the upper opening of the drainage tube 201 is the drainage inlet, and the lower opening of the drainage tube 201 is the drainage outlet.
  • the drainage tube 201 may be made of any suitable material with high strength and excellent corrosion resistance, such as PVC tube, GBF tube and the like.
  • the drainage tube 201 communicates with the deformation seam 70 through the drainage port, so that the leaking water in the corresponding water-seeped deformation seam 70 can be collected in the drainage pipe 201 and discharged.
  • the drainage port is opened on the side wall of the drainage tube 201 along the axial direction of the drainage tube 201 , and the drainage port is opened towards the deformation seam 70 .
  • a plurality of drainage ports may be provided at intervals along the axial direction of the drainage tube 201 .
  • only one larger drainage port can be provided along the axial direction of the drainage tube 201.
  • the axial opening size of the drainage port is the same as that of the drainage tube 201, and the circumferential opening size of the drainage port is smaller than that of the drainage tube 201.
  • the drainage tube 201 is an open drainage tube 201 with a gap in the radial section, so as to facilitate the diversion of the leakage water in the deformation seam 70 .
  • the extension direction of the drainage tube 201 is consistent with the extension direction of the deformation seam 70, the drainage pipe 201 can be directly clamped on the side of the deformation seam 70 close to the first preset groove 10, and the drainage port faces the deformation seam 70 The side away from the first preset groove 10, of course, the drainage tube 201 can also be fixed in the first preset groove 10, as long as the drainage port of the drainage tube 201 is arranged in the deformation seam 70, so as to facilitate the leakage Leakage is diverted to concentrate discharge.
  • the waterproof structure 30 includes asphalt ointment 301; the notch and drainage structure of the first predetermined groove 10 are filled with asphalt ointment 301 between, and the side of the asphalt grease 301 away from the drainage structure is flush with the notch of the first preset groove 10 , so as to seal the notch of the first preset groove 10 .
  • the first predetermined trench 10 is filled with asphalt ointment 301 , wherein the side of the asphalt ointment 301 away from the drainage structure is flush with the inner surface of the culvert wall 81 .
  • the asphalt ointment 301 can be used to fix the drainage structure; on the other hand, the asphalt ointment has good waterproof performance, which helps to improve the waterproof and anti-seepage performance of the culvert wall body 81 .
  • the reinforcing structure 60 includes a glass silk cloth and a second waterproof layer; one side of the glass silk cloth is connected to the waterproof structure 30, the other side of the glass silk cloth is connected to the second waterproof layer, and the side of the second waterproof layer away from the glass silk cloth is connected to the culvert.
  • the inner surface of the wall body 81 is even, that is, the reinforcing structure 60 includes a glass cloth arranged on the waterproof structure 30 and a second waterproof layer arranged on the glass cloth.
  • the glass cloth can be one layer, also can be multi-layer, when the glass cloth is multi-layer, any two adjacent glass cloths of the multi-layer glass cloth are bonded together by epoxy resin;
  • the second waterproof layer can be any suitable high-strength elastic waterproof material coated on the glass cloth, such as BPS, which has good waterproof performance.
  • the top of the first preset groove 10 is located between 3/4 of the height of the deformation seam 70 and the top of the deformation seam 70, that is, the top of the first preset groove 10
  • whether and how high a gap needs to be reserved between the top of the first preset groove 10 and the top of the deformation joint 70 can be set arbitrarily according to the water seepage of the culvert wall 81 .
  • the position where the top of the first preset groove 10 is located is 3/4 of the height of the deformation slit 70 .
  • the top of the first preset groove 10 is flush with the top of the deformation joint 70;
  • the top of the drainage tube 201 can extend out of the first predetermined groove 10 and be flush with the top of the deformation slit 70 .
  • the first preset groove 10 and the second preset groove 50 are arranged symmetrically along the center line of the deformation joint 70.
  • the first preset groove 10, the drainage tube 201, the second The preset grooves 50 are arranged symmetrically along the deformation joints 70, which is convenient for construction, stable in structure, good in appearance and good in waterproof performance.
  • an embodiment of the present disclosure also provides a method for repairing deformation joints by using the above-mentioned leakage water drainage structure for deformation joints in culverts, the method including:
  • a drainage structure communicating with the deformation joint 70 is provided between the notch of the first predetermined groove 10 and the deformation joint 70, wherein the seepage water on the culvert wall body 81 is discharged through the drainage structure;
  • step S103 the method also includes:
  • At least two grouting pipes 90 are arranged at intervals in the direction from the bottom to the top of the deformation joint 70, the grouting pipes 90 are approximately perpendicular to the deformation joint 70, and pass through the grouting pipes 90 to the culvert wall body 81.
  • Water-soluble polyurethane or a mixed solution containing water-soluble polyurethane is poured into the joint with the roadbed 82 to seal the holes in the filler of the roadbed 82, thereby preventing the seepage water on the culvert wall body 81 from penetrating into the filler of the roadbed 82, thereby making the The leaking water is diverted to the diversion structure for discharge.
  • the part of the grouting pipe 90 located at the deformation joint 70 is cut off, and the opening of the grouting pipe 90 is blocked with plugging king or cement.
  • the deformation joints need to be grouted first, for example, water-soluble polyurethane is used for plugging.
  • the construction is simple, the waterproof and anti-seepage performance is good, and the fixing speed is fast.
  • water-soluble polyurethane grout can permeate around the gap while pouring into the concrete gap, and continue to penetrate into the concrete gap, and finally form a network structure, becoming a low-density, water-containing elastic body, with Good ability to adapt to deformation, good water stop.
  • the leakage water diversion structure of the culvert deformation joint provided by the present disclosure and the method for repairing the deformation joint can drain the leakage water through the drainage channel, effectively avoid the re-erosion damage of the leakage water to the culvert wall, and prevent water seepage
  • the effect is good and has strong industrial applicability.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Sewage (AREA)

Abstract

A drainage structure for leakage water in a culvert deformation joint and a method for repairing a deformation joint. The drainage structure for leakage water in a culvert deformation joint comprises a first preset trench (10) provided on an inner surface of a culvert wall body (81) and a second preset trench (50) provided at a notch of the first preset trench (10). The extension direction of the first preset trench (10) is the same as that of a deformation joint, two trench walls of the first preset trench (10) are provided on both sides of the deformation joint, and the trench bottom of the first preset trench (10) communicates with the deformation joint. The trench width of the second preset trench (50) is larger than the trench width of the first preset trench (10) and the bottom end thereof is flush with the bottom end of the deformation joint. A drainage structure is provided between the notch of the first preset trench (10) and the deformation joint, the drainage structure has a drainage channel (20) for draining out leakage water on the culvert wall body (81). The first preset trench (10) and the second preset trench (50) are internally filled with a waterproof structure (30) and a reinforcing structure (60), respectively. The present drainage structure for leakage water in a culvert deformation joint can drain out leakage water, and the anti-leakage effect is good.

Description

涵洞变形缝渗漏水引排结构及对变形缝进行修复的方法Culvert Deformation Joint Leakage Drainage Structure and Method for Repairing Deformation Joint
本公开要求于2021年08月03日提交中国专利局、申请号为2021108869602、发明名称为“涵洞变形缝渗漏水引排结构及对变形缝进行修复的方法”的中国专利申请的优先权,其全部内容通过引用结合在本公开中。This disclosure claims the priority of the Chinese patent application submitted to the China Patent Office on August 3, 2021, with the application number 2021108869602, and the title of the invention is "Culvert Deformation Joint Leakage Water Drainage Structure and Method for Repairing Deformation Joint". The entire contents are incorporated by reference in this disclosure.
技术领域technical field
本公开涉及建筑工程技术领域,尤其涉及一种涵洞变形缝渗漏水引排结构及对变形缝进行修复的方法。The present disclosure relates to the technical field of construction engineering, in particular to a water diversion structure for leakage of deformation joints in a culvert and a method for repairing the deformation joints.
背景技术Background technique
在涵洞是指在公路工程建设中,为了使公路顺利通过水渠不妨碍交通,设于路基下、修筑于路面以下的排水孔道(过水通道),通过这种结构可以迅速排除公路沿线的地表水,保证路基安全。涵洞通常包括预留的用于适应温度变形、地基沉降、地震等的变形缝,变形缝是伸缩缝、沉降缝和防震缝的总称,然而变形缝往往也是整个涵洞最薄弱的环节,常由于多种因素而发生渗漏。The culvert refers to the drainage channel (water passage) under the roadbed and built below the road surface in order to make the road pass through the canal smoothly and not hinder the traffic in the construction of the road. Through this structure, the surface water along the road can be quickly removed. , to ensure roadbed safety. Culverts usually include reserved deformation joints to adapt to temperature deformation, foundation settlement, earthquakes, etc. Deformation joints are the general term for expansion joints, settlement joints and earthquake-proof joints. However, deformation joints are often the weakest link in the entire culvert. Leakage occurs due to various factors.
然而,传统的变形缝渗漏水修复结构通常是用沥青麻絮或水泥将渗水部位直接封住,虽然操作简单,但往往破坏了变形缝原有的柔性结构,且后续容易反复出现渗漏,防渗水效果差,维修成本高,严重的甚至会影响涵洞的使用寿命。However, the traditional water leakage repair structure of deformation joints usually uses asphalt wadding or cement to directly seal the seepage parts. Although the operation is simple, it often destroys the original flexible structure of deformation joints, and subsequent leakage is easy to occur repeatedly. The anti-seepage effect is poor, the maintenance cost is high, and even seriously affects the service life of the culvert.
发明内容Contents of the invention
(一)要解决的技术问题(1) Technical problems to be solved
本公开要解决的技术问题是解决现有的变形缝渗漏水修复结构容易反复出现渗漏,防渗水效果差的问题。The technical problem to be solved by the present disclosure is to solve the problems that the existing deformation joint leakage water repair structure is prone to repeated leakage and has poor anti-seepage effect.
(二)技术方案(2) Technical solution
为了解决上述技术问题,本公开实施例提供了一种涵洞变形缝渗 漏水引排结构,包括:包括开设在涵洞墙身内表面上的第一预设沟槽以及第二预设沟槽;In order to solve the above technical problems, an embodiment of the present disclosure provides a leakage drainage structure for deformation joints of culverts, including: a first preset groove and a second preset groove set on the inner surface of the culvert wall;
所述第一预设沟槽在所述涵洞墙身内表面上的延伸方向与所述变形缝在所述涵洞墙身内表面上的延伸方向相同,所述第一预设沟槽的两槽壁分设在所述变形缝的两侧,所述第一预设沟槽的槽底与所述变形缝连通;所述第二预设沟槽开设在所述第一预设沟槽的槽口处,且所述第二预设沟槽的槽宽大于所述第一预设沟槽的槽宽,所述第二预设沟槽的底端与所述变形缝的底部平齐,所述第二预设沟槽的顶端所在的位置低于所述第一预设沟槽的顶端所在的位置;The extension direction of the first preset groove on the inner surface of the culvert wall body is the same as the extension direction of the deformation joint on the inner surface of the culvert wall body, and the two groove walls of the first preset groove are respectively arranged On both sides of the deformation seam, the groove bottom of the first predetermined groove communicates with the deformation seam; the second predetermined groove is opened at the notch of the first predetermined groove, And the groove width of the second preset groove is greater than the groove width of the first preset groove, the bottom end of the second preset groove is flush with the bottom of the deformation seam, the second preset groove The position of the top of the predetermined groove is lower than the position of the top of the first predetermined groove;
所述第一预设沟槽的槽口和所述变形缝之间设置有引流结构,所述引流结构具有用于将所述涵洞墙身上的渗漏水引流排出的引流通道,所述引流通道与所述变形缝连通;所述第一预设沟槽内填充有用于对所述第一预设沟槽进行封堵的防水结构,所述第二预设沟槽内填充有加强结构,所述加强结构的一面与所述防水结构连接,所述加强结构的另一面与所述涵洞墙身的内表面平齐。A drainage structure is provided between the notch of the first preset groove and the deformation joint, and the drainage structure has a drainage channel for draining the seepage water on the wall of the culvert, and the drainage channel It communicates with the deformation joint; the first predetermined groove is filled with a waterproof structure for sealing the first predetermined groove, and the second predetermined groove is filled with a reinforcing structure, so One side of the reinforcement structure is connected to the waterproof structure, and the other side of the reinforcement structure is flush with the inner surface of the culvert wall.
进一步地,所述引流结构包括第一防水层、渗水板和橡胶止水带;所述第一防水层设置在所述第一预设沟槽的内壁上,所述橡胶止水带与所述第一预设沟槽相匹配并设置在所述第一预设沟槽内,且所述橡胶止水带与所述第一预设沟槽的槽底之间具有容置腔,所述渗水板填充在所述容置腔内。Further, the drainage structure includes a first waterproof layer, a water seepage plate and a rubber waterstop; the first waterproof layer is arranged on the inner wall of the first preset groove, and the rubber waterstop is connected to the The first preset groove is matched and arranged in the first preset groove, and there is an accommodation cavity between the rubber waterstop and the groove bottom of the first preset groove, and the water seepage Boards are filled in the accommodating cavity.
进一步地,所述橡胶止水带和所述渗水板通过至少两个紧固件固定在所述第一预设沟槽的槽底上。Further, the rubber waterstop and the seepage plate are fixed on the bottom of the first predetermined groove by at least two fasteners.
进一步地,所述引流结构包括两端开口的引流管,所述引流管的侧壁开设有引流口,所述引流口沿所述引流管的轴向开设,所述引流管夹设在所述变形缝的靠近所述预设沟槽的一侧,且所述引流口位于所述变形缝内,所述引流管形成为所述引流通道。Further, the drainage structure includes a drainage tube with openings at both ends, the side wall of the drainage tube is provided with a drainage port, and the drainage port is opened along the axial direction of the drainage tube, and the drainage tube is sandwiched between the The side of the deformation seam close to the predetermined groove, the drainage port is located in the deformation seam, and the drainage pipe is formed as the drainage channel.
进一步地,所述防水结构包括沥青油膏;所述沥青油膏填充在所述第一预设沟槽的槽口和所述引流结构之间,且所述沥青油膏的远离 所述引流结构的一面与所述第一预设沟槽的槽口平齐。Further, the waterproof structure includes asphalt ointment; the asphalt ointment is filled between the notch of the first predetermined groove and the drainage structure, and the asphalt ointment is far away from the drainage structure One side is flush with the notch of the first preset groove.
进一步地,所述加强结构包括玻璃丝布和第二防水层;所述玻璃丝布的一面与所述防水结构连接,所述玻璃丝布的另一面与所述第二防水层连接,所述第二防水层的远离所述玻璃丝布的一面与所述涵洞墙身的内表面平齐。Further, the reinforcing structure includes a glass cloth and a second waterproof layer; one side of the glass cloth is connected to the waterproof structure, the other side of the glass cloth is connected to the second waterproof layer, and the second waterproof The side of the layer away from the glass cloth is flush with the inner surface of the culvert wall.
进一步地,所述第一预设沟槽的顶端位于所述变形缝高度的3/4处和所述变形缝的顶端之间。Further, the top of the first predetermined groove is located between 3/4 of the height of the deformation seam and the top of the deformation seam.
进一步地,所述第一预设沟槽以及所述第二预设沟槽均沿所述变形缝的中心线对称设置。Further, the first preset groove and the second preset groove are arranged symmetrically along the center line of the deformation joint.
第二方面,还提供一种利用上述的涵洞变形缝渗漏水引排结构对变形缝进行修复的方法,所述方法包括:In the second aspect, there is also provided a method for repairing deformation joints by using the above-mentioned leakage water diversion structure for deformation joints of culverts, the method comprising:
在涵洞墙身的内表面上,对变形缝进行第一次扩缝,以在变形缝处形成第一预设沟槽;On the inner surface of the culvert wall body, expand the deformation joint for the first time to form a first preset groove at the deformation joint;
对所述第一预设沟槽的槽口底端进行第二次扩缝,以在所述第一预设沟槽的槽口底端处形成第二预设沟槽;performing second expansion on the notch bottom end of the first predetermined groove to form a second predetermined groove at the notch bottom end of the first predetermined groove;
在所述第一预设沟槽的槽口和所述变形缝之间设置与变形缝连通的引流结构,其中,所述涵洞墙身上的渗漏水通过所述引流结构排出;A drainage structure communicating with the deformation joint is provided between the notch of the first preset groove and the deformation joint, wherein the leakage water on the wall of the culvert is discharged through the drainage structure;
在所述第一预设沟槽内填充防水结构,以使所述防水结构将所述第一预设沟槽封堵;Filling the first predetermined groove with a waterproof structure, so that the waterproof structure blocks the first predetermined groove;
在所述第二预设沟槽内填充加强结构,以使所述加强结构将所述第二预设沟槽封堵,其中,所述加强结构的一面与所述防水结构连接,所述加强结构的另一面与所述涵洞墙身的内表面平齐。Fill the reinforcing structure in the second predetermined groove, so that the reinforcing structure blocks the second predetermined groove, wherein, one side of the reinforcing structure is connected with the waterproof structure, and the reinforcing structure The other side of the structure is flush with the inner surface of the culvert wall.
进一步地,所述在所述第一预设沟槽的槽口和所述变形缝之间设置与变形缝连通的引流结构,其中,所述涵洞墙身上的渗漏水通过所述引流结构排出的步骤之前,所述方法还包括:Further, a drainage structure communicating with the deformation joint is set between the notch of the first preset groove and the deformation joint, wherein the seepage water on the wall of the culvert is discharged through the drainage structure Before the step, the method also includes:
在所述沉降缝的底端至顶端的方向上间隔布置至少两个注浆管;At least two grouting pipes are arranged at intervals in the direction from the bottom end to the top end of the settlement joint;
通过所述注浆管向所述涵洞墙身与路基的连接处灌注水溶性聚氨 酯或包含水溶性聚氨酯的混合液。Water-soluble polyurethane or a mixed solution comprising water-soluble polyurethane is poured into the joint between the culvert wall body and the roadbed through the grouting pipe.
(三)有益效果(3) Beneficial effects
本公开实施例提供的上述技术方案与现有技术相比具有如下优点:Compared with the prior art, the above-mentioned technical solution provided by the embodiments of the present disclosure has the following advantages:
本公开实施例提供的该涵洞变形缝渗漏水引排结构及对变形缝进行修复的方法,通过设置在涵洞墙身内表面上的第一预设沟槽以及第二预设沟槽,第一预设沟槽在涵洞墙身内表面上的延伸方向与变形缝在涵洞墙身内表面上的延伸方向相同,第一预设沟槽的两槽壁分设在变形缝的两侧,第一预设沟槽的槽底与变形缝连通;第二预设沟槽开设在第一预设沟槽的槽口处,且第二预设沟槽的槽宽大于第一预设沟槽的槽宽,第二预设沟槽的底端与变形缝的底部平齐,第二预设沟槽的顶端所在的位置低于第一预设沟槽的顶端所在的位置。第一预设沟槽的槽口和变形缝之间设置有引流结构,引流结构具有用于将涵洞墙身上的渗漏水引流排出的引流通道,引流通道与变形缝连通;第一预设沟槽内填充有用于对第一预设沟槽进行封堵的防水结构,第二预设沟槽内填充有加强结构,加强结构的一面与防水结构连接,加强结构的另一面与涵洞墙身的内表面平齐。具体实现时,通过在已渗水的变形缝处开设第一预设沟槽并设置引流结构,从而使渗漏水能够通过引流通道排出,有效避免了渗漏水对涵洞墙身的再次侵蚀损害,同时在第一预设沟槽内填充有防水结构,一方面能够将引流通道可靠地固定在第一预设沟槽和变形缝之间,另一方面可以提高防水性能,同时,位于第二预设沟槽内的加强结构可以起到加固补强的作用。基于此,本公开提供的涵洞变形缝渗漏水引排结构能够将渗漏水引流排出,不用反复维修,防渗水效果好,在一定程度上提高了涵洞墙身的结构强度、耐久性和使用寿命。In the culvert deformation joint leaking water diversion structure and the method for repairing the deformation joint provided by the embodiments of the present disclosure, the first preset groove and the second preset groove are arranged on the inner surface of the culvert wall, and the first preset The extension direction of the groove on the inner surface of the culvert wall is the same as the extension direction of the deformation joint on the inner surface of the culvert wall. The two groove walls of the first predetermined groove are respectively arranged on both sides of the deformation joint. The first predetermined groove The bottom of the groove communicates with the deformation seam; the second preset groove is opened at the notch of the first preset groove, and the groove width of the second preset groove is greater than the groove width of the first preset groove, and the second preset groove The bottom of the preset groove is flush with the bottom of the deformation joint, and the top of the second preset groove is located lower than the top of the first preset groove. A drainage structure is arranged between the notch of the first preset groove and the deformation joint, and the drainage structure has a drainage channel for draining the seepage water on the culvert wall, and the drainage channel is connected with the deformation joint; the first preset groove The groove is filled with a waterproof structure for sealing the first preset groove, and the second preset groove is filled with a reinforcement structure. One side of the reinforcement structure is connected to the waterproof structure, and the other side of the reinforcement structure is connected to the wall of the culvert. The inner surface is flush. In actual implementation, the first preset groove and drainage structure are set at the deformation joints that have seeped water, so that the leakage water can be discharged through the drainage channel, effectively avoiding the re-erosion damage of the leakage water to the culvert wall, At the same time, the first preset groove is filled with a waterproof structure, on the one hand, the drainage channel can be reliably fixed between the first preset groove and the deformation joint, and on the other hand, the waterproof performance can be improved. The reinforcement structure in the groove can play the role of reinforcement. Based on this, the leakage water drainage structure of the culvert deformation joint provided by the present disclosure can drain the leakage water without repeated maintenance, and has a good anti-seepage effect, which improves the structural strength, durability and serviceability of the culvert wall to a certain extent. life.
应当理解的是,以上的一般描述和后文的细节描述仅是示例性和解释性的,并不能限制本公开。It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure.
附图说明Description of drawings
此处的附图被并入说明书中并构成本说明书的一部分,示出了符合本公开的实施例,并与说明书一起用于解释本公开的原理。The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the disclosure and together with the description serve to explain the principles of the disclosure.
为了更清楚地说明本公开实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员而言,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art, In other words, other drawings can also be obtained from these drawings without paying creative labor.
图1为本公开实施例提供的涵洞变形缝渗漏水引排结构的主视图;FIG. 1 is a front view of a leakage water diversion structure of a culvert deformation joint provided by an embodiment of the present disclosure;
图2为图1的侧面剖视图;Fig. 2 is a side sectional view of Fig. 1;
图3为图2中A部的放大图;Fig. 3 is an enlarged view of part A in Fig. 2;
图4为本公开另一实施例提供的涵洞变形缝渗漏水引排结构的主视图;Fig. 4 is a front view of a leakage water diversion structure of a culvert deformation joint provided by another embodiment of the present disclosure;
图5为图4的侧面剖视图;Fig. 5 is a side sectional view of Fig. 4;
图6为本公开实施例提供的涵洞变形缝渗漏水引排结构的主视图;Fig. 6 is a front view of the leakage water drainage structure of the culvert deformation joint provided by the embodiment of the present disclosure;
图7为图6的侧面剖视图;Fig. 7 is a side sectional view of Fig. 6;
图8为本公开实施例提供的涵洞变形缝渗漏水引排结构的施工方法的流程示意图。Fig. 8 is a schematic flowchart of a construction method of a leakage water diversion and drainage structure of a culvert deformation joint provided by an embodiment of the present disclosure.
其中,10、第一预设沟槽;20、引流通道;201、引流管;202、第一防水层;203、橡胶止水带;204、渗水板;30、防水结构;301、沥青油膏;40、紧固件;401、膨胀螺栓;402、扁钢;;50、第二预设沟槽;60、加强结构;70、变形缝;81、涵洞墙身;82、路基;90、注浆管。Among them, 10. First preset groove; 20. Drainage channel; 201. Drainage tube; 202. First waterproof layer; 203. Rubber waterstop; 204. Water seepage board; 30. Waterproof structure; 301. Bitumen ointment ;40. Fasteners; 401. Expansion bolts; 402. Flat steel; ;50. Second preset groove; 60. Strengthening structure; 70. Deformation joint; 81. Culvert wall; pulp tube.
具体实施方式Detailed ways
为使本公开实施例的目的、技术方案和优点更加清楚,下面将对本公开实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本公开的一部分实施例,而不是全部的实施例。基于本公开中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本公开保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present disclosure clearer, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present disclosure, rather than Full examples. Based on the embodiments in the present disclosure, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present disclosure.
实施例一Embodiment one
参考图1至图7中所示,本实施例提供一种涵洞变形缝渗漏水引排结构,包括开设在涵洞墙身81内表面上的第一预设沟槽10以及第 二预设沟槽50,第一预设沟槽10在涵洞墙身内表面上的延伸方向与变形缝在涵洞墙身内表面上的延伸方向相同,第一预设沟槽10的两槽壁分设在变形缝的两侧,第一预设沟槽10的槽底与变形缝连通;第二预设沟槽开设在第一预设沟槽10的槽口处,且第二预设沟槽的槽宽大于第一预设沟槽10的槽宽,第二预设沟槽的底端与变形缝的底部平齐,第二预设沟槽的顶端所在的位置低于第一预设沟槽10的顶端所在的位置。Referring to Fig. 1 to Fig. 7, the present embodiment provides a leakage drainage structure of culvert deformation joints, including a first preset groove 10 and a second preset groove set on the inner surface of the culvert wall body 81 50. The extension direction of the first preset groove 10 on the inner surface of the culvert wall body is the same as that of the deformation joint on the inner surface of the culvert wall body, and the two groove walls of the first preset groove 10 are respectively arranged on both sides of the deformation joint , the groove bottom of the first preset groove 10 communicates with the deformation seam; the second preset groove is opened at the notch of the first preset groove 10, and the groove width of the second preset groove is larger than that of the first preset groove. Set the groove width of the groove 10, the bottom of the second predetermined groove is flush with the bottom of the deformation joint, and the position of the top of the second predetermined groove is lower than the position of the top of the first predetermined groove 10 .
在本实施例中,参考图1至图7中所示,在第一预设沟槽10的槽口处开设有第二预设沟槽50,第二预设沟槽50也开设在涵洞墙身81内表面上;第二预设沟槽50的两槽壁分设在变形缝70的两侧,第二预设沟槽50的槽宽大于第一预设沟槽10的槽宽,第二预设沟槽50的底端与变形缝70的底端平齐,第二预设沟槽50的顶端所在的位置低于第一预设沟槽10的顶端所在的位置。In this embodiment, as shown in FIGS. 1 to 7, a second preset groove 50 is provided at the notch of the first preset groove 10, and the second preset groove 50 is also opened on the culvert wall. On the inner surface of the body 81; the two groove walls of the second predetermined groove 50 are respectively arranged on both sides of the deformation joint 70, and the groove width of the second predetermined groove 50 is greater than the groove width of the first predetermined groove 10, and the second The bottom of the preset groove 50 is flush with the bottom of the deformation slit 70 , and the top of the second preset groove 50 is located lower than the top of the first preset groove 10 .
具体实现时,第二预设沟槽50开设在第一预设沟槽10的槽口处且靠近变形缝70的底端设置,第二预设沟槽50的槽高小于第一预设沟槽10的槽高,也就是说,第二预设沟槽50的底端与所述变形缝70的底端平齐,第二预设沟槽50的顶端小于第一预设沟槽10的顶端,即,第二预设沟槽50的槽高小于第一预设沟槽10的槽高,且第二预设沟槽50的槽宽大于所述第一预设沟槽10的槽宽。During specific implementation, the second preset groove 50 is set at the notch of the first preset groove 10 and is set near the bottom end of the deformation seam 70, and the groove height of the second preset groove 50 is smaller than that of the first preset groove. The groove height of the groove 10, that is to say, the bottom end of the second preset groove 50 is flush with the bottom end of the deformation seam 70, and the top of the second preset groove 50 is smaller than that of the first preset groove 10. Top, that is, the groove height of the second preset groove 50 is less than the groove height of the first preset groove 10, and the groove width of the second preset groove 50 is greater than the groove width of the first preset groove 10 .
在本实施例中,靠近变形缝70处开设对应的第一预设沟槽10,也就是说,根据涵洞墙身81的渗水情况,对已渗水的变形缝70例如伸缩缝、沉降缝和防震缝进行扩缝,并扩缝至预设尺寸以形成第一预设沟槽10。In this embodiment, a corresponding first preset groove 10 is opened near the deformation joint 70, that is, according to the water seepage of the culvert wall body 81, for the water seepage deformation joint 70 such as expansion joint, settlement joint and shockproof The seam is expanded to a preset size to form the first preset groove 10 .
在此需要说明的是,根据涵洞墙身81的渗水情况,在变形缝70处开设的第一预设沟槽10对应的预设尺寸并不相同。示例性地,当涵洞墙身81发生严重渗水时,参考图1和图2中所示,第一预设沟槽10的槽宽为15cm,槽深为5cm。当涵洞墙身81发生中度渗水时,参考图4和图5中所示,第一预设沟槽10的槽宽为5cm,槽深为8cm。当 涵洞墙身81发生轻微渗水时,参考图6和图7中所示,第一预设沟槽10的槽宽为5cm,槽深为6cm。It should be noted here that, according to the water seepage of the culvert wall body 81 , the corresponding preset dimensions of the first preset groove 10 opened at the deformation joint 70 are different. Exemplarily, when severe water seepage occurs in the culvert wall body 81 , as shown in FIG. 1 and FIG. 2 , the groove width of the first predetermined groove 10 is 15 cm, and the groove depth is 5 cm. When moderate water seepage occurs in the culvert wall body 81 , as shown in FIG. 4 and FIG. 5 , the groove width of the first predetermined groove 10 is 5 cm, and the groove depth is 8 cm. When slight water seepage occurs in the culvert wall body 81, as shown in Fig. 6 and Fig. 7, the groove width of the first predetermined groove 10 is 5cm, and the groove depth is 6cm.
在本实施例中,第一预设沟槽10的槽口和变形缝70之间设置有引流结构,引流结构具有用于将涵洞墙身81上的渗漏水引流排出的引流通道20,引流通道20与变形缝70连通;第一预设沟槽10内填充有用于对第一预设沟槽10进行封堵的防水结构30,第二预设沟槽50内填充有加强结构60,加强结构60的一面与防水结构30连接,加强结构60的另一面与涵洞墙身81的内表面平齐。In this embodiment, a drainage structure is provided between the notch of the first preset groove 10 and the deformation joint 70, and the drainage structure has a drainage channel 20 for draining the seepage water on the culvert wall body 81, and the drainage The channel 20 communicates with the deformation seam 70; the first predetermined groove 10 is filled with a waterproof structure 30 for sealing the first predetermined groove 10, and the second predetermined groove 50 is filled with a reinforcing structure 60 to strengthen One side of the structure 60 is connected to the waterproof structure 30 , and the other side of the reinforcing structure 60 is flush with the inner surface of the culvert wall body 81 .
在本实施例中,引流结构可以是任何合适的结构,能够对渗漏水进行引流,以使渗漏水沿引流通道20能够排出至涵洞墙身81外即可。In this embodiment, the drainage structure may be any suitable structure that can drain the seepage water so that the seepage water can be discharged out of the culvert wall 81 along the drainage channel 20 .
当涵洞墙身81发生中度渗水和严重渗水时,引流通道20的排水口与涵洞墙身81的排水渠连通,此时参考图2和图5中所示,可以通过连接管将引流通道20与涵洞墙身81的排水渠连通即可。连接管大致与引流通道20垂直,连接管的一端与排水渠连通,连接管的另一端与引流通道20的底端连通。当涵洞墙身81发生轻微渗水时,引流通道20的排水口可以直接伸入至涵洞墙身81下方的墙身排水管中,此时参考图6中所示,只需要将引流通道20的底端延伸至第一预设沟槽10外并伸入至涵洞墙身81下方的墙身排水管中即可.When moderate water seepage and severe water seepage occur in the culvert wall body 81, the drainage outlet of the drainage channel 20 is connected with the drainage channel of the culvert wall body 81. At this time, referring to Fig. 2 and Fig. 5, the drainage channel 20 can be connected through a connecting pipe Just be connected with the drain of the culvert wall body 81. The connecting pipe is roughly perpendicular to the drainage channel 20 , one end of the connecting pipe communicates with the drain, and the other end of the connecting pipe communicates with the bottom end of the drainage channel 20 . When slight water seepage occurs in the culvert wall body 81, the drain outlet of the drainage channel 20 can be directly extended into the wall drain pipe below the culvert wall body 81. At this time, referring to FIG. 6, only the bottom of the drainage channel 20 needs to be The end extends to the outside of the first preset groove 10 and extends into the wall drain pipe below the culvert wall 81.
在本实施例中,防水结构30填充在第一预设沟槽10内,并将第一预设沟槽10内除去引流通道20的部分填充满,从而一方面能够对引流通道20进行加固补强,另一方面能够提高变形缝70处的防渗水作用。In this embodiment, the waterproof structure 30 is filled in the first predetermined groove 10, and the part of the first predetermined groove 10 except the drainage channel 20 is filled, so that the drainage channel 20 can be reinforced and supplemented on the one hand. Strong, on the other hand can improve the anti-seepage effect of deformation joint 70.
进一步地,第二预设沟槽50内填充有加强结构60,加强结构60的一面与涵洞墙身81的内表面平齐,加强结构60的另一面与防水结构30连接。具体使用时,涵洞内侧容易有积水,而涵洞在变形缝70处的结构较薄弱,为了防止积水侵蚀涵洞墙身81,在靠近变形缝70底端的位置处设置有加强结构60,加强结构60可以具有多种实现方式,只要能够起到补强加固的作用即可,在此不做过多限制。Further, the second preset groove 50 is filled with a reinforcement structure 60 , one side of the reinforcement structure 60 is flush with the inner surface of the culvert wall body 81 , and the other side of the reinforcement structure 60 is connected with the waterproof structure 30 . During specific use, there is easy to accumulate water inside the culvert, and the structure of the culvert at the deformation joint 70 is relatively weak. In order to prevent the accumulation of water from eroding the culvert wall body 81, a reinforcing structure 60 is provided near the bottom of the deformation joint 70 to strengthen the structure. 60 may have multiple implementation methods, as long as it can play a role of reinforcement and reinforcement, there is no excessive limitation here.
通过上述技术方案,本实施例提供的涵洞变形缝渗漏水引排结构及对变形缝进行修复的方法,通过设置在涵洞墙身81内表面上的第一预设沟槽10以及第二预设沟槽50,第一预设沟槽10在涵洞墙身内表面上的延伸方向与变形缝在涵洞墙身内表面上的延伸方向相同,第一预设沟槽10的两槽壁分设在变形缝的两侧,第一预设沟槽10的槽底与变形缝连通;第二预设沟槽开设在第一预设沟槽10的槽口处,且第二预设沟槽的槽宽大于第一预设沟槽10的槽宽,第二预设沟槽的底端与变形缝的底部平齐,第二预设沟槽的顶端所在的位置低于第一预设沟槽10的顶端所在的位置。第一预设沟槽10的槽口和变形缝70之间设置有引流结构,引流结构具有用于将涵洞墙身81上的渗漏水引流排出的引流通道20,引流通道20与变形缝70连通;第一预设沟槽10内填充有用于对第一预设沟槽10进行封堵的防水结构30,第二预设沟槽50内填充有加强结构60,加强结构60的一面与防水结构30连接,加强结构60的另一面与涵洞墙身81的内表面平齐。具体实现时,通过在已渗水的变形缝70处开设第一预设沟槽10并设置引流结构,从而使渗漏水能够通过引流通道20排出,有效避免了渗漏水对涵洞墙身81的再次侵蚀损害,同时在第一预设沟槽10内填充有防水结构30,一方面能够将引流通道20可靠地固定在第一预设沟槽10和变形缝70之间,另一方面可以提高防水性能,同时,位于第二预设沟槽50内的加强结构60可以起到加固补强的作用。基于此,本公开提供的涵洞变形缝渗漏水引排结构能够将渗漏水引流排出,不用反复维修,防渗水效果好,在一定程度上提高了涵洞墙身的结构强度、耐久性和使用寿命。Through the above-mentioned technical solution, the leakage water drainage structure of the culvert deformation joint and the method for repairing the deformation joint provided in this embodiment, through the first preset groove 10 and the second preset groove 10 arranged on the inner surface of the culvert wall body 81 Groove 50, the extension direction of the first preset groove 10 on the inner surface of the culvert wall body is the same as the extension direction of the deformation joint on the inner surface of the culvert wall body, and the two groove walls of the first preset groove 10 are respectively arranged on the deformation joint On both sides, the groove bottom of the first predetermined groove 10 communicates with the deformation joint; the second predetermined groove is opened at the notch of the first predetermined groove 10, and the groove width of the second predetermined groove is larger than that of the first predetermined groove. The groove width of a preset groove 10, the bottom of the second preset groove is flush with the bottom of the deformation joint, and the top of the second preset groove is lower than the top of the first preset groove 10. s position. A drainage structure is arranged between the notch of the first predetermined groove 10 and the deformation joint 70, and the drainage structure has a drainage channel 20 for draining the seepage water on the culvert wall body 81, and the drainage channel 20 and the deformation joint 70 Connected; the first preset groove 10 is filled with a waterproof structure 30 for blocking the first preset groove 10, the second preset groove 50 is filled with a reinforcement structure 60, and one side of the reinforcement structure 60 is connected to the waterproof structure. The structure 30 is connected, and the other side of the reinforcement structure 60 is flush with the inner surface of the culvert wall body 81 . During specific implementation, by opening the first preset groove 10 at the deformation joint 70 that has seeped water and setting the drainage structure, so that the seepage water can be discharged through the drainage channel 20, effectively avoiding the impact of the seepage water on the culvert wall body 81 Corrosion damage again, while filling the waterproof structure 30 in the first preset groove 10, on the one hand, the drainage channel 20 can be reliably fixed between the first preset groove 10 and the deformation seam 70, on the other hand, it can improve Waterproof performance, at the same time, the reinforcement structure 60 located in the second preset groove 50 can play the role of reinforcement. Based on this, the leakage water drainage structure of the culvert deformation joint provided by the present disclosure can drain the leakage water without repeated maintenance, and has a good anti-seepage effect, which improves the structural strength, durability and serviceability of the culvert wall to a certain extent. life.
参考图1和图2中所示,作为一种可选的实施方式,当涵洞墙身81发生严重渗水时,引流结构包括第一防水层202、渗水板204和橡胶止水带203;第一防水层202设置在第一预设沟槽10的内壁上,橡胶止水带203与第一预设沟槽10相匹配并设置在第一预设沟槽10内,且橡胶止水带203与第一预设沟槽10的槽底之间具有容置腔,渗水板 204填充在容置腔内,渗水板204形成引流通道20。Referring to Fig. 1 and Fig. 2, as an optional embodiment, when severe water seepage occurs in the culvert wall body 81, the drainage structure includes a first waterproof layer 202, a seepage plate 204 and a rubber water stop 203; the first The waterproof layer 202 is arranged on the inner wall of the first preset groove 10, the rubber waterstop 203 is matched with the first preset groove 10 and is arranged in the first preset groove 10, and the rubber waterstop 203 is matched with the first preset groove 10. There is an accommodating cavity between the groove bottoms of the first predetermined groove 10 , and the seepage plate 204 is filled in the accommodating cavity, and the water seepage plate 204 forms the drainage channel 20 .
在本实施例中,第一防水层202涂设在第一预设沟槽10的内壁上,即在第一预设沟槽10的槽底和两槽壁上均涂设有第一防水层202。由于第一预设沟槽10是开设在涵洞墙身81的混凝土墙体上的,第一防水层202一方面可以将第一预设沟槽10内壁的混凝土缝隙填平,起到防水性能;另一方面,第一防水层202还可以起到补强加固的作用,从而有助于提高涵洞墙身81的抗渗、抗震以及耐腐蚀性能。In this embodiment, the first waterproof layer 202 is coated on the inner wall of the first preset groove 10, that is, the first waterproof layer is coated on the bottom of the first preset groove 10 and on both groove walls. 202. Since the first preset groove 10 is set on the concrete wall of the culvert wall body 81, the first waterproof layer 202 can fill up the concrete gap on the inner wall of the first preset groove 10 on the one hand, so as to achieve waterproof performance; On the other hand, the first waterproof layer 202 can also play the role of reinforcement, thereby helping to improve the impermeability, earthquake resistance and corrosion resistance of the culvert wall body 81 .
其中,第一防水层202可以是环氧砂浆、环氧胶泥等。Wherein, the first waterproof layer 202 may be epoxy mortar, epoxy cement or the like.
具体实现时,橡胶止水带203与第一预设沟槽10的形状相匹配,橡胶止水带203设置在第一预设沟槽10的靠近槽口的一侧,并与第一预设沟槽10的槽底之间具有间隙,从而使橡胶止水带203能够将第一预设沟槽10封堵,并与第一防水层202围合形成用于排放渗漏水的引流通道20,橡胶止水带203与第一防水层202围合形成的引流通道20最大化地利用了第一预设沟槽10的空间,从而使流量较多的渗漏水通过引流通道20排出,避免渗漏水在此侵蚀涵洞墙身81。During specific implementation, the rubber waterstop 203 matches the shape of the first preset groove 10, and the rubber waterstop 203 is arranged on the side of the first preset groove 10 close to the notch, and is aligned with the first preset groove 10. There is a gap between the groove bottoms of the grooves 10, so that the rubber waterstop 203 can seal the first preset groove 10, and surround the first waterproof layer 202 to form a drainage channel 20 for discharging leakage water The drainage channel 20 formed by the rubber waterstop 203 and the first waterproof layer 202 maximizes the use of the space of the first preset groove 10, so that the seepage water with a large flow rate is discharged through the drainage channel 20, avoiding Seepage water erodes the culvert wall body 81 here.
在本实施例中,渗水板204可以是任意合适的材质制成的具有过水间隙的渗水板204,例如青丝板等。In this embodiment, the water seepage board 204 may be any suitable material with a water seepage gap, such as a black silk board.
根据一些实施例,当涵洞墙身81发生轻微渗水或中度渗水时,也可以在第一预设沟槽10的内壁上设置第一防水层202例如环形砂浆,并在第一预设沟槽10内设置橡胶止水带203,且在橡胶止水带203和第一预设沟槽10的槽底之间填充渗水板204,从而使渗水板204形成引流通道20。According to some embodiments, when slight water seepage or moderate water seepage occurs in the culvert wall body 81, the first waterproof layer 202 such as annular mortar can also be set on the inner wall of the first preset groove 10, and the first preset groove A rubber waterstop 203 is arranged inside the groove 10 , and a seepage plate 204 is filled between the rubber waterstop 203 and the bottom of the first preset groove 10 , so that the water seepage plate 204 forms a drainage channel 20 .
进一步地,参考图1中所示,橡胶止水带203和渗水板204通过至少两个紧固件40固定在第一预设沟槽10的槽底上。Further, referring to FIG. 1 , the rubber waterstop 203 and the seepage plate 204 are fixed on the groove bottom of the first predetermined groove 10 by at least two fasteners 40 .
具体实现时,沿第一预设沟槽10的延伸方向,在第一预设沟槽10槽底的混凝土上间隔开设至少两组安装孔,各组安装孔均包括对称分设在变形缝70两侧的两个子安装孔。在各子安装孔内分别安装膨胀螺栓401,在橡胶止水带203、渗水板204和扁钢的对应位置处分别开设 有用于避让膨胀螺栓401的避让孔,将橡胶止水带203和渗水板204贯穿在各子安装孔内的膨胀螺栓401上,将扁钢抵顶在橡胶止水带203的外表面并通过与膨胀螺栓401配合的螺帽连接在一起,连接可靠牢固,防渗防水效果好。During specific implementation, along the extension direction of the first predetermined groove 10, at least two groups of mounting holes are provided at intervals on the concrete at the bottom of the first predetermined groove 10, and each group of mounting holes includes two symmetrically located deformation joints 70. Two sub-mounting holes on the side. Install expansion bolts 401 in each sub-mounting hole, respectively set avoidance holes for avoiding expansion bolts 401 at the corresponding positions of rubber waterstop 203, water seepage plate 204 and flat steel, and connect rubber waterstop 203 and water seepage plate 204 runs through the expansion bolts 401 in each sub-installation hole, and the flat steel is pressed against the outer surface of the rubber waterstop 203 and connected together through the nuts that cooperate with the expansion bolts 401. The connection is reliable and firm, and the seepage and waterproof effect is good. good.
其中,膨胀螺栓401或预埋螺杆以及扁钢上可以镀设有防腐层,例如镀铬、镀锌等。Wherein, the expansion bolt 401 or the pre-embedded screw and the flat steel can be plated with an anti-corrosion layer, such as chrome plating, galvanization and the like.
参考图4和图6中所示,作为另一种可选的实施方式,当涵洞墙身81发生轻微渗水或中度渗水时,引流结构包括两端开口的引流管201,引流管201的侧壁开设有引流口,引流口沿引流管201的轴向开设,引流管201夹设在变形缝70的靠近预设沟槽的一侧,且引流口位于变形缝70内,引流管201形成为引流通道20,成本低,经济性好。Referring to Fig. 4 and Fig. 6, as another optional embodiment, when slight water seepage or moderate water seepage occurs in the culvert wall body 81, the drainage structure includes a drainage tube 201 with both ends open, and the side of the drainage tube 201 The wall is provided with a drainage port, and the drainage port is opened along the axial direction of the drainage tube 201, and the drainage tube 201 is sandwiched on the side of the deformation joint 70 close to the preset groove, and the drainage port is located in the deformation joint 70, and the drainage tube 201 is formed as The drainage channel 20 has low cost and good economy.
本领域技术人员容易理解的是,引流管201的两端均开口,其中,引流管201的上端开口为引流入口,引流管201的下端开口为引流出口。Those skilled in the art can easily understand that both ends of the drainage tube 201 are open, wherein the upper opening of the drainage tube 201 is the drainage inlet, and the lower opening of the drainage tube 201 is the drainage outlet.
在本实施例中,引流管201可以是以任意合适的材质制成的引流管201,强度高,耐腐蚀性能优良即可,例如PVC管、GBF管等。In this embodiment, the drainage tube 201 may be made of any suitable material with high strength and excellent corrosion resistance, such as PVC tube, GBF tube and the like.
具体使用时,引流管201通过引流口与变形缝70连通,从而方便对应的已渗水的变形缝70内的渗漏水集中到引流管201内排出。In specific use, the drainage tube 201 communicates with the deformation seam 70 through the drainage port, so that the leaking water in the corresponding water-seeped deformation seam 70 can be collected in the drainage pipe 201 and discharged.
其中,引流口沿引流管201的轴向开设在引流管201的侧壁上,且引流口朝向变形缝70开设。沿引流管201的轴向可以间隔开设多个引流口。当然,沿引流管201的轴向也可以仅设置一个较大的引流口,此时引流口的轴向开口尺寸与引流管201的轴向尺寸相同,引流口的周向开口尺寸小于引流管201的周向尺寸,也就是说,引流管201是径向剖面具有缺口的开放型引流管201,从而方便对变形缝70内的渗漏水进行导流。Wherein, the drainage port is opened on the side wall of the drainage tube 201 along the axial direction of the drainage tube 201 , and the drainage port is opened towards the deformation seam 70 . A plurality of drainage ports may be provided at intervals along the axial direction of the drainage tube 201 . Of course, only one larger drainage port can be provided along the axial direction of the drainage tube 201. At this time, the axial opening size of the drainage port is the same as that of the drainage tube 201, and the circumferential opening size of the drainage port is smaller than that of the drainage tube 201. In other words, the drainage tube 201 is an open drainage tube 201 with a gap in the radial section, so as to facilitate the diversion of the leakage water in the deformation seam 70 .
另外,引流管201的延伸方向与变形缝70的延伸方向一致,引流管201可以直接夹设在变形缝70的靠近第一预设沟槽10的一侧,并使引流口朝向变形缝70的远离第一预设沟槽10的一侧,当然,引流 管201也可以固定在第一预设沟槽10内,只要引流管201的引流口布置在变形缝70内即可,以方便对渗漏水进行导流以集中排出。In addition, the extension direction of the drainage tube 201 is consistent with the extension direction of the deformation seam 70, the drainage pipe 201 can be directly clamped on the side of the deformation seam 70 close to the first preset groove 10, and the drainage port faces the deformation seam 70 The side away from the first preset groove 10, of course, the drainage tube 201 can also be fixed in the first preset groove 10, as long as the drainage port of the drainage tube 201 is arranged in the deformation seam 70, so as to facilitate the leakage Leakage is diverted to concentrate discharge.
在本实施例中,参加图2、图3、图5和图7中所示,防水结构30包括沥青油膏301;沥青油膏301填充在第一预设沟槽10的槽口和引流结构之间,且沥青油膏301的远离引流结构的一面与第一预设沟槽10的槽口平齐,以将第一预设沟槽10的槽口封堵。In this embodiment, referring to Fig. 2, Fig. 3, Fig. 5 and Fig. 7, the waterproof structure 30 includes asphalt ointment 301; the notch and drainage structure of the first predetermined groove 10 are filled with asphalt ointment 301 between, and the side of the asphalt grease 301 away from the drainage structure is flush with the notch of the first preset groove 10 , so as to seal the notch of the first preset groove 10 .
具体实现时,使用沥青油膏301填平第一预设沟槽10,其中,沥青油膏301的远离引流结构的一面与涵洞墙身81的内表面平齐。一方面可以通过沥青油膏301将引流结构固定好,另一方面,沥青油膏具有很好的防水性能,有助于提高涵洞墙身81的防水防渗性。During specific implementation, the first predetermined trench 10 is filled with asphalt ointment 301 , wherein the side of the asphalt ointment 301 away from the drainage structure is flush with the inner surface of the culvert wall 81 . On the one hand, the asphalt ointment 301 can be used to fix the drainage structure; on the other hand, the asphalt ointment has good waterproof performance, which helps to improve the waterproof and anti-seepage performance of the culvert wall body 81 .
具体实现时,加强结构60包括玻璃丝布和第二防水层;玻璃丝布的一面与防水结构30连接,玻璃丝布的另一面与第二防水层连接,第二防水层的远离玻璃丝布的一面与涵洞墙身81的内表面平齐,即加强结构60包括设置在防水结构30上的玻璃丝布以及设置在玻璃丝布上的第二防水层。During specific implementation, the reinforcing structure 60 includes a glass silk cloth and a second waterproof layer; one side of the glass silk cloth is connected to the waterproof structure 30, the other side of the glass silk cloth is connected to the second waterproof layer, and the side of the second waterproof layer away from the glass silk cloth is connected to the culvert. The inner surface of the wall body 81 is even, that is, the reinforcing structure 60 includes a glass cloth arranged on the waterproof structure 30 and a second waterproof layer arranged on the glass cloth.
其中,玻璃丝布可以是一层,也可以是多层,当玻璃丝布是多层时,多层玻璃丝布的任意两个相邻的玻璃丝布通过环氧树脂粘接在一起;Wherein, the glass cloth can be one layer, also can be multi-layer, when the glass cloth is multi-layer, any two adjacent glass cloths of the multi-layer glass cloth are bonded together by epoxy resin;
另外,第二防水层可以是涂设在玻璃丝布上的任意合适的高强度弹性防水材料,例如BPS,防水性能好。In addition, the second waterproof layer can be any suitable high-strength elastic waterproof material coated on the glass cloth, such as BPS, which has good waterproof performance.
进一步地,参考图1至图6中所示,第一预设沟槽10的顶端位于变形缝70高度的3/4处和变形缝70的顶端之间,即第一预设沟槽10的顶端至变形缝70的顶端之间具有0至变形缝70高度的1/4的预留空间,也就是说,具体操作时,沿从下之上的方向,只需将变形缝70的3/4的高度或者整个变形缝70进行扩缝。Further, referring to FIGS. 1 to 6, the top of the first preset groove 10 is located between 3/4 of the height of the deformation seam 70 and the top of the deformation seam 70, that is, the top of the first preset groove 10 There is a reserved space from 0 to 1/4 of the height of the deformation seam 70 between the top end and the top end of the deformation seam 70, that is to say, during the specific operation, along the direction from bottom to top, only 3/4 4 height or the entire deformation seam 70 is expanded.
其中,第一预设沟槽10的顶端至变形缝70的顶端之间是否需要预留间隙以及预留多高的间隙可以根据涵洞墙身81的渗水情况任意设置。示例性地,当涵洞墙身81发生中度渗水和严重渗水时,参考图1、 图2、图4和图5中所示,第一预设沟槽10的顶端位于变形缝70高度的3/4处,即第一预设沟槽10顶端所在的位置为变形缝70高度的3/4处。当涵洞墙身81发生轻微渗水时,参考图6和图7中所示,第一预设沟槽10的顶端与变形缝70的顶端平齐;Wherein, whether and how high a gap needs to be reserved between the top of the first preset groove 10 and the top of the deformation joint 70 can be set arbitrarily according to the water seepage of the culvert wall 81 . Exemplarily, when moderate water seepage and severe water seepage occur in the culvert wall body 81, as shown in Fig. 1, Fig. 2, Fig. 4 and Fig. /4, that is, the position where the top of the first preset groove 10 is located is 3/4 of the height of the deformation slit 70 . When slight water seepage occurs in the culvert wall body 81, as shown in FIG. 6 and FIG. 7, the top of the first preset groove 10 is flush with the top of the deformation joint 70;
另外,如果引流管201夹设在变形缝70内,引流管201的顶端可以延伸至第一预设沟槽10外并与变形缝70的顶端平齐。In addition, if the drainage tube 201 is clamped in the deformation slit 70 , the top of the drainage tube 201 can extend out of the first predetermined groove 10 and be flush with the top of the deformation slit 70 .
在本实施例中,第一预设沟槽10以及第二预设沟槽50均沿变形缝70的中心线对称设置,具体实现时,第一预设沟槽10、引流管201、第二预设沟槽50均沿变形缝70对称设置,方便施工,结构稳定,美观性好,防水性能好。In this embodiment, the first preset groove 10 and the second preset groove 50 are arranged symmetrically along the center line of the deformation joint 70. In specific implementation, the first preset groove 10, the drainage tube 201, the second The preset grooves 50 are arranged symmetrically along the deformation joints 70, which is convenient for construction, stable in structure, good in appearance and good in waterproof performance.
实施例二Embodiment two
参考图8中所示,本公开实施例还提供一种利用上述的的涵洞变形缝渗漏水引排结构对变形缝进行修复的方法,该方法包括:Referring to FIG. 8 , an embodiment of the present disclosure also provides a method for repairing deformation joints by using the above-mentioned leakage water drainage structure for deformation joints in culverts, the method including:
S101、在涵洞墙身81的内表面上,对变形缝70进行第一次扩缝,以在变形缝70处形成第一预设沟槽10;S101. On the inner surface of the culvert wall body 81, expand the deformation joint 70 for the first time, so as to form the first preset groove 10 at the deformation joint 70;
S102、对所述第一预设沟槽10的槽口底端进行第二次扩缝,以在所述第一预设沟槽10的槽口底端处形成第二预设沟槽50;S102. Perform second expansion on the bottom end of the notch of the first predetermined groove 10 to form a second predetermined groove 50 at the bottom end of the notch of the first predetermined groove 10;
S103、在第一预设沟槽10的槽口和变形缝70之间设置与变形缝70连通的引流结构,其中,涵洞墙身81上的渗漏水通过引流结构排出;S103. A drainage structure communicating with the deformation joint 70 is provided between the notch of the first predetermined groove 10 and the deformation joint 70, wherein the seepage water on the culvert wall body 81 is discharged through the drainage structure;
S104、在第一预设沟槽10内填充防水结构30,以使防水结构30将第一预设沟槽10封堵;S104, filling the waterproof structure 30 in the first predetermined groove 10, so that the waterproof structure 30 blocks the first predetermined groove 10;
S105、在第二预设沟槽50内填充加强结构60,以使加强结构60将第二预设沟槽50封堵,其中,加强结构60的一面与防水结构30连接,加强结构60的另一面与涵洞墙身81的内表面平齐。S105. Fill the reinforcement structure 60 in the second preset groove 50, so that the reinforcement structure 60 blocks the second preset groove 50, wherein, one side of the reinforcement structure 60 is connected to the waterproof structure 30, and the other side of the reinforcement structure 60 One side is flush with the inner surface of the culvert wall body 81 .
进一步地,在步骤S103之前,该方法还包括:Further, before step S103, the method also includes:
参考图5中所示,在变形缝70的底端至顶端的方向上间隔布置至少两个注浆管90,注浆管90大致与变形缝70垂直,通过注浆管90 向涵洞墙身81与路基82的连接处灌注水溶性聚氨酯或包含水溶性聚氨酯的混合液,以使路基82填料内的孔洞密封,从而可以避免涵洞墙身81上的渗漏水渗入至路基82填料内,进而使渗漏水导流至导流结构内排出。Referring to Fig. 5, at least two grouting pipes 90 are arranged at intervals in the direction from the bottom to the top of the deformation joint 70, the grouting pipes 90 are approximately perpendicular to the deformation joint 70, and pass through the grouting pipes 90 to the culvert wall body 81. Water-soluble polyurethane or a mixed solution containing water-soluble polyurethane is poured into the joint with the roadbed 82 to seal the holes in the filler of the roadbed 82, thereby preventing the seepage water on the culvert wall body 81 from penetrating into the filler of the roadbed 82, thereby making the The leaking water is diverted to the diversion structure for discharge.
注浆结构后,将注浆管90的位于变形缝70的部分切割掉,并用堵漏王或者水泥将注浆管90的开口封堵上。After the grouting structure, the part of the grouting pipe 90 located at the deformation joint 70 is cut off, and the opening of the grouting pipe 90 is blocked with plugging king or cement.
进一步地,在施工的过程中,需要先对变形缝进行注浆处理,例如采用水溶性聚氨酯堵漏,施工简单,防水防渗性能好,固话速度快。注浆时,在压力作用下,水溶性聚氨酯浆液在灌入混凝土缝隙的同时,可以向缝隙的周围渗透,继续渗入混凝土缝隙中,最终形成网状结构,成为密度小、含水的弹性体,具有良好的适应变形能力,止水性好。Furthermore, during the construction process, the deformation joints need to be grouted first, for example, water-soluble polyurethane is used for plugging. The construction is simple, the waterproof and anti-seepage performance is good, and the fixing speed is fast. During grouting, under the action of pressure, water-soluble polyurethane grout can permeate around the gap while pouring into the concrete gap, and continue to penetrate into the concrete gap, and finally form a network structure, becoming a low-density, water-containing elastic body, with Good ability to adapt to deformation, good water stop.
具体的技术特征与上述实施例相同,并能带来相同或者类似的技术效果,在此不再一一赘述。具体可参照上述实施例的描述。The specific technical features are the same as those of the above-mentioned embodiments, and can bring about the same or similar technical effects, which will not be repeated here. For details, reference may be made to the description of the foregoing embodiments.
需要说明的是,在本文中,诸如“第一”和“第二”等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relative terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply these No such actual relationship or order exists between entities or operations. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.
以上所述仅是本公开的具体实施方式,使本领域技术人员能够理解或实现本公开。对这些实施例的多种修改对本领域的技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本公开的精神或范围的情况下,在其它实施例中实现。因此,本公开将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above descriptions are only specific implementation manners of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
工业实用性Industrial Applicability
本公开提供的涵洞变形缝渗漏水引排结构及对变形缝进行修复的方法,能够将渗漏水通过引流通道引流排出,有效避免了渗漏水对涵洞墙身的再次侵蚀损害,防渗水效果好,具有很强的工业实用性。The leakage water diversion structure of the culvert deformation joint provided by the present disclosure and the method for repairing the deformation joint can drain the leakage water through the drainage channel, effectively avoid the re-erosion damage of the leakage water to the culvert wall, and prevent water seepage The effect is good and has strong industrial applicability.

Claims (10)

  1. 一种涵洞变形缝渗漏水引排结构,其特征在于,包括开设在涵洞墙身(81)内表面上的第一预设沟槽(10)以及第二预设沟槽(50);A culvert deformation joint leakage water diversion structure, characterized in that it includes a first predetermined groove (10) and a second predetermined groove (50) provided on the inner surface of the culvert wall body (81);
    所述第一预设沟槽(10)在所述涵洞墙身(81)内表面上的延伸方向与所述变形缝(70)在所述涵洞墙身(81)内表面上的延伸方向相同,所述第一预设沟槽(10)的两槽壁分设在所述变形缝(70)的两侧,所述第一预设沟槽(10)的槽底与所述变形缝(70)连通;所述第二预设沟槽(50)开设在所述第一预设沟槽(10)的槽口处,且所述第二预设沟槽(50)的槽宽大于所述第一预设沟槽(10)的槽宽,所述第二预设沟槽(50)的底端与所述变形缝(70)的底部平齐,所述第二预设沟槽(50)的顶端所在的位置低于所述第一预设沟槽(10)的顶端所在的位置;The extension direction of the first preset groove (10) on the inner surface of the culvert wall (81) is the same as the extension direction of the deformation joint (70) on the inner surface of the culvert wall (81) , the two groove walls of the first predetermined groove (10) are respectively arranged on both sides of the deformation joint (70), and the groove bottom of the first predetermined groove (10) is connected to the deformation joint (70) ) is connected; the second preset groove (50) is set at the notch of the first preset groove (10), and the groove width of the second preset groove (50) is larger than the The groove width of the first preset groove (10), the bottom end of the second preset groove (50) is flush with the bottom of the deformation seam (70), and the second preset groove (50) ) is located at a position lower than that of the top of the first preset groove (10);
    所述第一预设沟槽(10)和所述变形缝(70)之间设置有引流结构,所述引流结构具有用于将所述涵洞墙身(81)上的渗漏水引流排出的引流通道(20),所述引流通道(20)与所述变形缝(70)连通;所述第一预设沟槽(10)内填充有用于对所述第一预设沟槽(10)进行封堵的防水结构(30),所述第二预设沟槽(50)内填充有加强结构(60),所述加强结构(60)的一面与所述防水结构(30)连接,所述加强结构(60)的另一面与所述涵洞墙身(81)的内表面平齐。A drainage structure is provided between the first preset groove (10) and the deformation joint (70), and the drainage structure has a drainage structure for draining the seepage water on the culvert wall (81). A drainage channel (20), the drainage channel (20) is in communication with the deformation seam (70); the first preset groove (10) is filled with A waterproof structure (30) for sealing, the second preset groove (50) is filled with a reinforcement structure (60), one side of the reinforcement structure (60) is connected to the waterproof structure (30), the The other side of the reinforcing structure (60) is flush with the inner surface of the culvert wall (81).
  2. 根据权利要求1所述的涵洞变形缝渗漏水引排结构,其特征在于,所述引流结构包括第一防水层(202)、渗水板(204)和橡胶止水带(203);The leakage water drainage structure of culvert deformation joints according to claim 1, characterized in that, the drainage structure comprises a first waterproof layer (202), a seepage plate (204) and a rubber waterstop (203);
    所述第一防水层(202)设置在所述第一预设沟槽(10)的内壁上,所述橡胶止水带(203)与所述第一预设沟槽(10)相匹配并设置在所述第一预设沟槽(10)内,且所述橡胶止水带(203)与所述第一预设沟槽(10)的槽底之间具有容置腔,所述渗水板(204)填充在所述容置腔内。The first waterproof layer (202) is arranged on the inner wall of the first preset groove (10), and the rubber waterstop (203) is matched with the first preset groove (10) and It is arranged in the first predetermined groove (10), and there is an accommodating cavity between the rubber waterstop (203) and the groove bottom of the first predetermined groove (10), and the water seepage Plates (204) are filled in the accommodating cavity.
  3. 根据权利要求2所述的涵洞变形缝渗漏水引排结构,其特征在 于,所述橡胶止水带(203)和所述渗水板(204)通过至少两个紧固件(40)固定在所述第一预设沟槽(10)的槽底上。According to claim 2, the leakage water diversion structure of culvert deformation joints is characterized in that, the rubber waterstop (203) and the seepage plate (204) are fixed on the said water seepage plate (204) by at least two fasteners (40). on the groove bottom of the first preset groove (10).
  4. 根据权利要求1所述的涵洞变形缝渗漏水引排结构,其特征在于,所述引流结构包括两端开口的引流管(201),所述引流管(201)的侧壁开设有引流口,所述引流口沿所述引流管(201)的轴向开设,所述引流管(201)夹设在所述变形缝(70)的靠近所述预设沟槽的一侧,且所述引流口位于所述变形缝(70)内,所述引流管(201)形成为所述引流通道(20)。The leakage water drainage structure of culvert deformation joints according to claim 1, characterized in that, the drainage structure comprises a drainage pipe (201) with two ends open, and a drainage port is opened on the side wall of the drainage pipe (201), The drainage port is opened along the axial direction of the drainage tube (201), and the drainage tube (201) is sandwiched on the side of the deformation seam (70) close to the preset groove, and the drainage The mouth is located in the deformation seam (70), and the drainage tube (201) is formed as the drainage channel (20).
  5. 根据权利要求1所述的涵洞变形缝渗漏水引排结构,其特征在于,所述防水结构(30)包括沥青油膏(301);The leakage water drainage structure of culvert deformation joints according to claim 1, characterized in that, the waterproof structure (30) comprises asphalt ointment (301);
    所述沥青油膏(301)填充在所述第一预设沟槽(10)的槽口和所述引流结构之间,且所述沥青油膏(301)的远离所述引流结构的一面与所述第一预设沟槽(10)的槽口平齐。The asphalt ointment (301) is filled between the notch of the first preset groove (10) and the drainage structure, and the side of the asphalt ointment (301) away from the drainage structure is in contact with the drainage structure. The notches of the first preset grooves (10) are flush.
  6. 根据权利要求1所述的涵洞变形缝渗漏水引排结构,其特征在于,所述加强结构(60)包括玻璃丝布和第二防水层;The leakage water drainage structure of culvert deformation joints according to claim 1, characterized in that, the reinforcement structure (60) comprises glass cloth and a second waterproof layer;
    所述玻璃丝布的一面与所述防水结构(30)连接,所述玻璃丝布的另一面与所述第二防水层连接,所述第二防水层的远离所述玻璃丝布的一面与所述涵洞墙身(81)的内表面平齐。One side of the glass cloth is connected to the waterproof structure (30), the other side of the glass cloth is connected to the second waterproof layer, and the side of the second waterproof layer away from the glass cloth is connected to the culvert The inner surface of the wall body (81) is even.
  7. 根据权利要求1至6中任一项所述的涵洞变形缝渗漏水引排结构,其特征在于,所述第一预设沟槽(10)的顶端位于所述变形缝(70)高度的3/4处和所述变形缝(70)的顶端之间。The leakage water drainage structure of culvert deformation joints according to any one of claims 1 to 6, characterized in that, the top of the first preset groove (10) is located at 3 times the height of the deformation joints (70) /4 and the top of the deformation seam (70).
  8. 根据权利要求1至6中任一项所述的涵洞变形缝渗漏水引排结构,其特征在于,所述第一预设沟槽(10)以及所述第二预设沟槽(50)均沿所述变形缝(70)的中心线对称设置。The leakage water drainage structure of culvert deformation joints according to any one of claims 1 to 6, characterized in that, the first preset groove (10) and the second preset groove (50) are both It is arranged symmetrically along the center line of the deformation seam (70).
  9. 一种利用如权利要求1至8中任一项所述的涵洞变形缝渗漏水引排结构对变形缝进行修复的方法,其特征在于,所述方法包括:A method for repairing deformation joints by using the leakage water diversion structure of culvert deformation joints according to any one of claims 1 to 8, characterized in that the method comprises:
    在涵洞墙身(81)的内表面上,对变形缝(70)进行第一次扩缝,以在变形缝(70)处形成第一预设沟槽(10);On the inner surface of the culvert wall (81), expand the deformation joint (70) for the first time, so as to form the first preset groove (10) at the deformation joint (70);
    对所述第一预设沟槽(10)的槽口底端进行第二次扩缝,以在所述第一预设沟槽(10)的槽口底端处形成第二预设沟槽(50);performing second expansion on the notch bottom end of the first preset groove (10) to form a second preset groove at the notch bottom end of the first preset groove (10) (50);
    在所述第一预设沟槽(10)的槽口和所述变形缝(70)之间设置与变形缝(70)连通的引流结构,其中,所述涵洞墙身(81)上的渗漏水通过所述引流结构排出;A drainage structure communicating with the deformation joint (70) is provided between the notch of the first preset groove (10) and the deformation joint (70), wherein the seepage on the culvert wall (81) leaking water is discharged through the drainage structure;
    在所述第一预设沟槽(10)内填充防水结构(30),以使所述防水结构(30)将所述第一预设沟槽(10)封堵;Filling the first predetermined groove (10) with a waterproof structure (30), so that the waterproof structure (30) blocks the first predetermined groove (10);
    在所述第二预设沟槽(50)内填充加强结构(60),以使所述加强结构(60)将所述第二预设沟槽(50)封堵,其中,所述加强结构(60)的一面与所述防水结构(30)连接,所述加强结构(60)的另一面与所述涵洞墙身(81)的内表面平齐。Filling the reinforcement structure (60) in the second preset groove (50), so that the reinforcement structure (60) blocks the second preset groove (50), wherein the reinforcement structure One side of (60) is connected with the waterproof structure (30), and the other side of the reinforcement structure (60) is flush with the inner surface of the culvert wall (81).
  10. 根据权利要求9所述的方法,其特征在于,所述在所述第一预设沟槽(10)的槽口和所述变形缝(70)之间设置与变形缝(70)连通的引流结构,其中,所述涵洞墙身(81)上的渗漏水通过所述引流结构排出的步骤之前,所述方法还包括:The method according to claim 9, characterized in that, between the notch of the first predetermined groove (10) and the deformation seam (70), a drainage connected to the deformation seam (70) is provided. structure, wherein, before the step of discharging the seepage water on the culvert wall body (81) through the drainage structure, the method further includes:
    在所述沉降缝(70)的底端至顶端的方向上间隔布置至少两个注浆管(90);Arranging at least two grouting pipes (90) at intervals in the direction from the bottom end to the top end of the settlement joint (70);
    通过所述注浆管(90)向所述涵洞墙身(81)与路基(82)的连接处灌注水溶性聚氨酯或包含水溶性聚氨酯的混合液。Water-soluble polyurethane or a mixed solution containing water-soluble polyurethane is poured into the joint between the culvert wall body (81) and the roadbed (82) through the grouting pipe (90).
PCT/CN2021/140987 2021-08-03 2021-12-23 Drainage structure for leakage water in culvert deformation joint and method for repairing deformation joint WO2023010771A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110886960.2A CN113622326B (en) 2021-08-03 2021-08-03 Culvert deformation joint water leakage leading and draining structure and deformation joint repairing method
CN202110886960.2 2021-08-03

Publications (1)

Publication Number Publication Date
WO2023010771A1 true WO2023010771A1 (en) 2023-02-09

Family

ID=78382545

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/140987 WO2023010771A1 (en) 2021-08-03 2021-12-23 Drainage structure for leakage water in culvert deformation joint and method for repairing deformation joint

Country Status (2)

Country Link
CN (1) CN113622326B (en)
WO (1) WO2023010771A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622326B (en) * 2021-08-03 2022-12-20 中铁十九局集团第五工程有限公司 Culvert deformation joint water leakage leading and draining structure and deformation joint repairing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003003797A (en) * 2001-06-26 2003-01-08 Kumagai Gumi Co Ltd Draining method for use in extra-thin lining method
CN206873507U (en) * 2017-06-15 2018-01-12 中铁第四勘察设计院集团有限公司 A kind of leak stopping hermetic water-proof structure of underground-structure deformation joint
CN207392242U (en) * 2017-11-07 2018-05-22 江苏燕宁建设工程有限公司 Piping lane waterproof structure for deformation seams and piping lane
CN109371861A (en) * 2018-11-26 2019-02-22 中铁五局集团有限公司 A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN110410112A (en) * 2019-07-26 2019-11-05 大禹伟业(北京)国际科技有限公司 A kind of tunnel project seam waterproof construction method
CN113622326A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert deformation joint water leakage guiding and draining structure and method for repairing deformation joint
CN113622327A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert settlement joint water seepage repairing structure and method for repairing settlement joint

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003003797A (en) * 2001-06-26 2003-01-08 Kumagai Gumi Co Ltd Draining method for use in extra-thin lining method
CN206873507U (en) * 2017-06-15 2018-01-12 中铁第四勘察设计院集团有限公司 A kind of leak stopping hermetic water-proof structure of underground-structure deformation joint
CN207392242U (en) * 2017-11-07 2018-05-22 江苏燕宁建设工程有限公司 Piping lane waterproof structure for deformation seams and piping lane
CN109371861A (en) * 2018-11-26 2019-02-22 中铁五局集团有限公司 A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN110410112A (en) * 2019-07-26 2019-11-05 大禹伟业(北京)国际科技有限公司 A kind of tunnel project seam waterproof construction method
CN113622326A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert deformation joint water leakage guiding and draining structure and method for repairing deformation joint
CN113622327A (en) * 2021-08-03 2021-11-09 中铁十九局集团第五工程有限公司 Culvert settlement joint water seepage repairing structure and method for repairing settlement joint

Also Published As

Publication number Publication date
CN113622326B (en) 2022-12-20
CN113622326A (en) 2021-11-09

Similar Documents

Publication Publication Date Title
WO2023010771A1 (en) Drainage structure for leakage water in culvert deformation joint and method for repairing deformation joint
CN108301466A (en) Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN216131506U (en) Hydraulic engineering prefabricated inspection shaft and drain pipe connection structure
CN113622327B (en) Culvert settlement joint water seepage repairing structure and method for repairing settlement joint
CN205557323U (en) Hinge joint drainage structures
CN211057870U (en) Post-cast strip waterproof construction
CN110747763A (en) Box culvert settlement joint waterproof structure and construction method thereof
CN107023146A (en) Toilet warterproof plate and its manufacture method
LU506299B1 (en) Culvert deformation joint leakage water discharge structure and method for repairing deformation joint
CN212896179U (en) Drainage stopping structure for transverse joint between adjacent seepage-proof panels on near-water surface of concrete gravity dam
CN211735307U (en) Prefabricated assembled water-saving canal body and canal device thereof
CN113445470A (en) Water seepage blocking structure for settlement joint of flood wall and construction process
CN201512836U (en) Water accumulation and drainage device
CN217325939U (en) Prefabricated shear wall structure with good water-proof effects
CN215367071U (en) Flood prevention wall subsiding crack infiltration blocks up structure
CN215759689U (en) Deformation joint waterproof construction
CN216664237U (en) Connection structure of new and old concrete handing-over department that lid method of digging construction foundation ditch was used
CN216107888U (en) Post-cast strip anti-seepage device and municipal road engineering structure
CN219430841U (en) Waterproof structure for upstream surface of underground diaphragm wall
CN218117051U (en) Waterproof ground structure of assembled
CN221798323U (en) Water stop device for flood control dike
CN114232671B (en) Dam edge waterproof connecting body and construction method thereof
CN219588296U (en) Tunnel sleeve type through-wall waterproof structure
CN219793837U (en) Water-stopping and dislocation deformation-preventing structure for side wall joint of bottom-first-wall-last-wall assembled type canal
CN219862984U (en) Tower crane foundation construction joint waterproof construction

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21952634

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21952634

Country of ref document: EP

Kind code of ref document: A1