CN103774699B - Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same - Google Patents

Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same Download PDF

Info

Publication number
CN103774699B
CN103774699B CN201410072297.2A CN201410072297A CN103774699B CN 103774699 B CN103774699 B CN 103774699B CN 201410072297 A CN201410072297 A CN 201410072297A CN 103774699 B CN103774699 B CN 103774699B
Authority
CN
China
Prior art keywords
concrete
section
channel
section steel
vertical water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410072297.2A
Other languages
Chinese (zh)
Other versions
CN103774699A (en
Inventor
杨国
丛福祥
叶国松
黄国辉
叶闽
刘木火
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jiuding Construction Engineering Co Ltd
Original Assignee
Fujian Jiuding Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Jiuding Construction Engineering Co Ltd filed Critical Fujian Jiuding Construction Engineering Co Ltd
Priority to CN201410072297.2A priority Critical patent/CN103774699B/en
Priority to CN201510094543.9A priority patent/CN104631514B/en
Publication of CN103774699A publication Critical patent/CN103774699A/en
Application granted granted Critical
Publication of CN103774699B publication Critical patent/CN103774699B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to an underground (underwater) building waterproof device, and in particular to a vertical water-stop structure for a concrete engineering expansion joint as well as a manufacturing and construction methods for the same. The vertical water-stop structure comprises a deformation sheet and channel steel, and is characterized in that the deformation sheet is longitudinally arranged, one half is pre-buried in first-stage concrete, the other half is bulged out of a concrete section and externally arranged in a rectangular channel steel opening, and the channel steel is provided with a fixing element and filled with maltha; the surface of the channel steel opening and the section of the first-stage concrete are provided with asphalt felts at the both sides of the deformation sheet, the exposed fixing element is detached after asphalt is cooled, and then second-stage concrete is arranged. According to the vertical water-stop structure disclosed by the invention, the problem of water seepage of a water conservancy project due to the differential settlement or diastrophism of a stratum can be solved, and moreover, labour can be saved and construction period can be shortened.

Description

The vertical water-stopping structure in concrete work shrinkage joint
Technical field
The present invention relates to a kind of underground (under water) buildings waterproof device, particularly the vertical water-stopping structure in a kind of concrete work shrinkage joint.
Background technology
In existing concrete structure, such as checkdam, reservoir, subway, culvert, sluice, in the underground constructions such as tunnel, due to can not continuous placing or the distortion due to foundation settlement (earthquake), or the reason such as to expand with heat and contract with cold of the concrete component to cause due to the change of temperature, often deformation joint is left building, constuction joint, anti-seep measure will be taked in these gaps, prevent outside water or ground water seepage in structure space, present usual way is, between fist stage concrete and second stage concrete, concrete pit is set, maltha and copper sheet or rubber water-proof sheet is established in groove, but, this method needs concrete soil box in advance, can combine closely to make concrete pit and second stage concrete, need to carry out dabbing process to peripheral 3 faces of concrete pit, the duration will be extended like this and increase artificial, simultaneously because the general every segment length (highly) of concrete pit only has 50-100cm, flexible gap will be connected and composed by multiple concrete pit, therefore many transverse slots can be produced, and the irregular deformation of multiple concrete pit, phenomenon is emitted in the race that postorder can be caused to pour into maltha, and be difficult to cleaning.
Summary of the invention
In order to solve the problem, the invention provides the vertical water-stopping structure in a kind of concrete work shrinkage joint, the present invention can meet multiple ground condition/stratum differential settlement or the changing of the relative positions, adopts expense and the reductions of erection time such as the present invention can save manually, machinery, mould material.
For achieving the above object, the invention provides following technical scheme:
The vertical water-stopping structure in a kind of concrete work shrinkage joint, comprise distortion sheet, channel-section steel, it is characterized in that: described distortion sheet is longitudinally arranged, half is embedded in fist stage concrete, second half protrudes from outside concrete cross section is located in rectangular channel steel opening, described channel-section steel is provided with fixture, is provided with maltha in channel-section steel; Described channel-section steel opening surface and the both sides that fist stage concrete section is being out of shape sheet are provided with asphaltic felt.
Further, described distortion sheet is rectangular panel body, width 30-60cm, length is with concrete cross section height, pour into concrete while be provided with fin, fin is semicircle, for the plate body in semicircular opening is to side bending 90 ° formation, length according to distortion sheet arranges several fin, and distortion sheet is longitudinally arranged in the middle of concrete cross section width.
Further, described channel-section steel is rectangle section bar, thickness 2-4mm, the length of side is 1/2 of distortion sheet width, and length, with concrete cross section height, is provided with opening along its length in the middle part of its any surface, A/F 1-2cm, described channel-section steel is longitudinally arranged, and its opening is to concrete cross section and be arranged in channel-section steel by protrusion at the distortion sheet of concrete cross section, and described channel-section steel is provided with fixture.
Further, described fixture comprises U-shaped embedded fixing component, screw rod and band iron, described U-shaped embedded fixing component is that bending reinforcement becomes U-shaped structure, and two of U-shaped embedded fixing component terminations are respectively equipped with the hook of upwards bending, U-shaped embedded fixing component is parallel to be embedded in fist stage concrete, and the hook of two terminations upwards bending protrudes concrete cross section; One end of described screw rod is provided with annulus, and the other end is provided with screw thread and nut, and the annulus of two screw rods is enclosed within hook respectively; Described band iron is rectangle, its one end is provided with the circular hole supporting with screw rod, the other end is provided with elongated hole, two described screw rods are each passed through circular hole and the elongated hole of band iron, channel-section steel is fixed on fist stage concrete section by clamp nut, arrange array fixture according to channel-section steel length, two groups of fastening devicess are between the upper and lower every 1-2m.
Further, described asphaltic felt is bituminous felt, thickness 5-10mm, asphaltic felt and concrete cross section contour, width be its 1/2.
The invention also discloses the manufacture method of the vertical water-stopping structure in a kind of concrete work shrinkage joint, its feature comprises following technology and step:
1) be out of shape sheet to make: copper plate or the corrosion resistant plate of choosing thickness 1-3mm, cut into rectangle, width 30-60cm, length is equal with supporting concrete cross section height, at a side isolated edge 2-5cm punching press semicircle and by semi-circular plate bending 90 ° formation fin, fin height 3-5cm, arranges several fin according to distortion leaf length, two fin interval 50-100cm, for subsequent use;
2) channel-section steel makes: channel-section steel is rectangle section bar, and the length of side is 1/2, thickness 2-4mm of 20-40cm or supporting distortion sheet width, length with supporting concrete cross section height, opening along its length in the middle part of its any surface, A/F 1-2cm; Or make the channel-section steel with opening with rectangular steel plates bending, for subsequent use;
3) asphaltic felt makes: asphaltic felt is bituminous felt, one deck pitched paper one deck pitch is adopted successively to thicken laying, here No. 30 building asphalt melt coating are selected, gross thickness 5-10mm, asphaltic felt is 2, width is respectively 1/2 of concrete cross section width, highly equals concrete cross section height, for subsequent use;
4) fixture makes: fixture comprises U-shaped embedded fixing component, screw rod and band iron, described U-shaped embedded fixing component is that bending reinforcement becomes U-shaped structure, bar diameter 8-10mm, length 50-100cm, width is greater than supporting channel-section steel width 10-20cm, and two of U-shaped structure terminations are linked up with respectively to upper bending 90 °; Be welded and fixed annulus in one end of described screw rod, screw diameter 8-10mm, length 25-45cm, internal radius 10-15mm, height 20-40mm, the screw rod other end arranges screw thread and the nut supporting with screw thread, and the annulus of two screw rods is enclosed within hook respectively; Described band iron is rectangle, band iron width 4-8cm, thickness 1-1.5cm, and length is greater than the channel-section steel width 10-20cm supporting with it, and its one end arranges the circular hole supporting with screw rod, and the other end arranges elongated hole, aperture 10-15mm, elongated hole length 20-50cm; Arrange array fixture according to channel-section steel length, two groups of fixtures are between the upper and lower every 1-2m.
The invention also discloses the construction method of the vertical water-stopping structure in a kind of concrete work shrinkage joint, its feature comprises following technology and step:
1) fist stage concrete is built, one side of fin and U-shaped embedded fixing component is had to be arranged on concrete cross section place distortion sheet, distortion sheet is longitudinally arranged at the centre of concrete cross section width, U-shaped embedded fixing component feet on parallel lines is arranged on distortion sheet both sides, the hook of two terminations upwards bending protrudes concrete cross section, fixture array is set according to concrete cross section height, the spacing 1-2m of two groups of fixtures, concreting;
2) fist stage concrete solidifies more than 7 days temperature more than 20 DEG C, arranges bituminous felt respectively in concrete broken facial disfigurement sheet both sides;
3) channel-section steel is set again, the distortion sheet of protrusion to concrete cross section, and is arranged in channel-section steel opening by channel-section steel opening, and the hook of channel-section steel both sides overlaps annulus, the screw rod fixing with annulus arranges band iron, and channel-section steel is fixed on concrete cross section by fastening nut;
4) in channel-section steel, fill melting No. 30 building asphalts, cooling, according to the environment temperature of job site, cool time not etc., general winter 1-3 hour, summer 10-24 hour;
5) unscrew nut after pitch cooling, take off screw rod and band iron, collection recycles;
6) second stage concrete is built;
7) next preset slot repeats above-mentioned 1-6 step.
Beneficial effect of the present invention
1. can solve the leakage problems of the permanent seam in the underground constructions such as checkdam, reservoir, subway, culvert, sluice, tunnel;
2., because it does not need concrete soil box, the expenses such as artificial, mechanical, the template needed for concrete soil box can be reduced;
3. save the installation procedure of concrete pit, reduce the duration;
4. solve and to construct easy seepage with the construct liquid asphalt that causes of concrete soil box, be difficult to the problem of clearing up;
5. adopt channel-section steel to save dabbing operation than concrete prefabricated groove, every square metre of concrete cross section saves 1 manually;
6. the seepage that the reason such as to expand with heat and contract with cold of the concrete component that can meet multiple ground condition/stratum differential settlement or cause due to the change of temperature causes;
7. can prevent the section interface changing of the relative positions because the natural calamities such as earthquake cause, be out of shape the seepage caused.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram after the tunnel wall construction of the vertical water-stopping structure in a kind of concrete work of the present invention shrinkage joint;
Fig. 2 is the perspective view of the vertical water-stopping structure in concrete work shrinkage joint of the present invention when watering maltha;
Fig. 3 is the perspective view of removing channel-section steel fixture after asphalting;
Fig. 4 is Fig. 2 plan structure schematic diagram;
Fig. 5 is the perspective structure schematic diagram of Fig. 4;
Fig. 6 is the perspective view of Fig. 5, wherein lower fixture annulus and hook not-connected status;
Fig. 7 is the screw rod of fixture and the perspective view of band iron;
Fig. 8 is the perspective view of the U-shaped embedded fixing component of fixture;
Fig. 9 is the plan structure schematic diagram of fixture;
Figure 10 is the perspective view of channel-section steel;
Figure 11 is the perspective view of distortion sheet;
Figure 12 is plan structure schematic diagram after the construction of conventional telescopic seam water-stopping structure.
Wherein, 1-is out of shape sheet, 2-channel-section steel, 3-asphaltic felt, 4-fist stage concrete, 5-second stage concrete, 6-maltha, 7-band iron, 8-screw rod, 9-elongated hole, and 10-links up with, 11-annulus, 12-embedded fixing component, 13-fin, 14-channel-section steel opening, 15-concrete pit.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention will be further described.
Embodiment, with reference to accompanying drawing: the vertical water-stopping structure in a kind of concrete work shrinkage joint, comprise distortion sheet 1, channel-section steel 2, described distortion sheet 1 is longitudinally arranged, half is embedded in fist stage concrete 4, second half protrudes from outside concrete cross section is located in rectangular channel steel opening 14, and described channel-section steel 2 is provided with fixture, is provided with maltha 6 in channel-section steel 2; Described channel-section steel opening 14 is provided with asphaltic felt 3 with fist stage concrete 4 section in the both sides being out of shape sheet 1.
Further, the rectangular plate body of described distortion sheet 1, width 30-60cm, length is with concrete cross section height, pour into concrete while be provided with fin 13, fin 13 is semicircle, for the plate body in semicircular opening is to side bending 90 ° formation, length according to distortion sheet 1 arranges several fin 13, and distortion sheet 1 is longitudinally arranged in the middle of fist stage concrete 4 section width.
Further, described channel-section steel 2 is rectangle section bar, thickness 2-4mm, the length of side is 1/2 of distortion sheet 1 width, and length, with fist stage concrete 4 profile height, is provided with opening along its length in the middle part of its any surface, channel-section steel opening 14 width 1-2cm, described channel-section steel 2 is longitudinally arranged, and its channel-section steel opening 14 is to fist stage concrete 4 section and be arranged in channel-section steel 2 by the distortion sheet 1 protruded outside concrete cross section, and described channel-section steel 2 is provided with fixture.
Further, described fixture comprises U-shaped embedded fixing component 12, screw rod 8 and band iron 7, described U-shaped embedded fixing component 12 becomes U-shaped structure for bending reinforcement, and two of U-shaped embedded fixing component 12 terminations are respectively equipped with the hook 10 of upwards bending, U-shaped embedded fixing component 12 is parallel to be embedded in fist stage concrete 4, and the hook 10 of two terminations upwards bending protrudes concrete cross section; One end of described screw rod 8 is provided with annulus 11, and the other end is provided with screw thread and nut, and the annulus 11 of two screw rods 8 is enclosed within hook 10 respectively; Described band iron 8 is rectangle, its one end is provided with the circular hole supporting with screw rod 8, the other end is provided with elongated hole 9, two described screw rods 8 are each passed through circular hole and the elongated hole 9 of band iron 7, channel-section steel 2 is fixed on fist stage concrete 4 section by clamp nut, arrange array fixture according to channel-section steel 2 length, two groups of fastening devicess are between the upper and lower every 1-2m.
Further, described asphaltic felt 3 is bituminous felt 3, thickness 5-10mm, and asphaltic felt 3 is contour with concrete cross section, width be its 1/2.
The present embodiment also discloses the manufacture method of the vertical water-stopping structure in a kind of concrete work shrinkage joint, and its feature comprises following technology and step:
2) be out of shape sheet 1 to make: copper plate or the corrosion resistant plate of choosing thickness 1-3mm, cut into rectangle, width 30-60cm, length is equal with supporting concrete cross section height, at a side isolated edge 2-5cm punching press semicircle and by semi-circular plate bending 90 ° formation fin 13, fin 13 height 3-5cm, arranges several fin 13 according to distortion sheet 1 long (height) degree, two fin 13 interval 50-100cm, for subsequent use;
2) channel-section steel 2 makes: channel-section steel 2 is rectangle section bar, and the length of side is 1/2 of 20-40cm or supporting distortion sheet width, thickness 2-4mm, length with supporting concrete cross section height, opening along its length in the middle part of its any surface, channel-section steel opening 14 width 1-2cm; Or make the channel-section steel 2 with opening with rectangular steel plates bending, for subsequent use;
3) asphaltic felt 3 makes: asphaltic felt 3 is bituminous felt 3, one deck pitched paper one deck pitch is adopted successively to thicken laying, here No. 30 building asphalt melt coating are selected, gross thickness 5-10mm, asphaltic felt 3 is 2, width is respectively 1/2 of concrete cross section width, highly equals concrete cross section height, for subsequent use;
4) fixture makes: fixture comprises U-shaped embedded fixing component 12, screw rod 8 and band iron 7, described U-shaped embedded fixing component 12 becomes U-shaped structure for bending reinforcement, bar diameter 8-10mm, length 50-100cm, width is greater than supporting channel-section steel 2 width 10-20cm, and hook 10 is made respectively to upper bending 90 ° in two of U-shaped structure terminations; Annulus 11 is welded and fixed, screw rod 8 diameter 8-10mm, length 25-45cm in one end of described screw rod 8, annulus 11 internal diameter 10-15mm, height 20-40mm, screw rod 8 other end arranges screw thread and the nut supporting with screw thread, and the annulus 11 of two screw rods 8 is enclosed within hook 10 respectively; Described band iron 7 is rectangle, band iron 7 width 4-8cm, thickness 1-1.5cm, and length is greater than the channel-section steel 2 width 10-20cm supporting with it, and its one end arranges the circular hole supporting with screw rod 8, and the other end arranges elongated hole 9, aperture 10-15mm, elongated hole 9 length 20-50cm; Arrange array fixture according to channel-section steel 2 length, two groups of fixtures are between the upper and lower every 1-2m.
The present embodiment also discloses the construction method of the vertical water-stopping structure in a kind of concrete work shrinkage joint, and its feature comprises following technology and step:
1) fist stage concrete 4 is built, one side of fin 13 and U-shaped embedded fixing component 12 is had to be arranged on concrete cross section place distortion sheet 1, distortion sheet 1 is longitudinally arranged at the centre of concrete cross section width, U-shaped embedded fixing component 12 feet on parallel lines is arranged on distortion sheet 1 both sides, the hook 10 of two terminations upwards bending protrudes concrete cross section, according to concrete cross section height, fixture array is set, the spacing 1-2m of two groups of fixtures, concreting, the displacement of distortion preventing sheet 1 and U-shaped embedded fixing component 12;
2) fist stage concrete 4 needs to solidify more than 7 days temperature more than 20 DEG C, arranges bituminous felt 3 respectively in concrete broken facial disfigurement sheet 1 both sides;
3) channel-section steel 2 is set again, the distortion sheet 1 of protrusion to concrete cross section, and is arranged in channel-section steel opening 14 by channel-section steel opening 14, and the hook 10 of channel-section steel 2 both sides overlaps annulus 11, the screw rod 8 fixing with annulus 11 arranges band iron 7, and channel-section steel 2 is fixed on concrete cross section by fastening nut;
4) in channel-section steel 2, fill No. 30, melting building maltha 6, cooling, according to the environment temperature of job site, cool time not etc., general winter 1-3 hour, summer 10-24 hour;
5) unscrew nut after pitch cooling, take off all screw rods 8 and band iron 7, collection recycles;
6) second stage concrete is built;
7) next preset slot repeats above-mentioned 1-6 step.
The present invention does not need concrete soil box 13, can reduction of erection time 20-30 days; Because adopting channel-section steel 2 not need dabbing, every meter of concrete cross section can save 1 artificial expense; Can be used as the construction of the box dam such as checkdam, reservoir retaining wall, also can be used for the construction of the sidewall of the underground constructions such as subway, culvert, sluice, tunnel, shrinkage joint is neatly non-leakage; The seepage that the reason such as to expand with heat and contract with cold of the concrete component adopting this technology can meet multiple ground condition/stratum differential settlement or to cause due to the change of temperature causes; The section interface changing of the relative positions because the natural calamities such as earthquake cause can be prevented, be out of shape the seepage caused.
Above-described is only the preferred embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, and without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (5)

1. the vertical water-stopping structure in concrete work shrinkage joint, comprise distortion sheet, channel-section steel, it is characterized in that: described distortion sheet is longitudinally arranged, half is embedded in fist stage concrete, second half protrudes from outside concrete cross section is located in rectangular channel steel opening, described channel-section steel is provided with fixture, is provided with maltha in channel-section steel; Described channel-section steel opening surface and the both sides that fist stage concrete section is being out of shape sheet are provided with bituminous felt, asphaltic felt and concrete cross section contour.
2. the vertical water-stopping structure in concrete work shrinkage joint according to claim 1, it is characterized in that: described distortion sheet is rectangular panel body, width 30-60cm, length is with concrete cross section height, pour into concrete while be provided with fin, fin is semicircle, for the plate body of semicircular opening is to side bending 90 ° formation, length according to distortion sheet arranges several fin, and distortion sheet is longitudinally arranged in the middle of concrete cross section width.
3. the vertical water-stopping structure in concrete work shrinkage joint according to claim 1, it is characterized in that: described channel-section steel is rectangle section bar, thickness 2-4mm, the length of side is 1/2 of distortion sheet width, and length, with concrete cross section height, is provided with opening along its length in the middle part of its any surface, A/F 1-2cm, described channel-section steel is longitudinally arranged, and protrusion to concrete cross section, and is arranged in channel-section steel at the distortion sheet of concrete cross section by its opening.
4. the vertical water-stopping structure in concrete work shrinkage joint according to claim 3, it is characterized in that: described fixture comprises U-shaped embedded fixing component, screw rod and band iron, described U-shaped embedded fixing component is that bending reinforcement becomes U-shaped structure, and two of U-shaped embedded fixing component terminations are respectively equipped with the hook of upwards bending, U-shaped embedded fixing component is parallel to be embedded in fist stage concrete, and the hook of two terminations upwards bending protrudes concrete cross section; One end of described screw rod is provided with annulus, and the other end is provided with screw thread and nut, and the annulus of two screw rods is enclosed within hook respectively; Described band iron is rectangle, its one end is provided with the circular hole supporting with screw rod, the other end is provided with elongated hole, two described screw rods are each passed through circular hole and the elongated hole of band iron, channel-section steel is fixed on fist stage concrete section by clamp nut, arrange array fixture according to channel-section steel length, two groups of fastening devicess are between the upper and lower every 1-2m.
5. the vertical water-stopping structure in concrete work shrinkage joint according to claim 1, it is characterized in that: described bituminous felt thickness is 5-10mm, width is 1/2 of concrete cross section.
CN201410072297.2A 2014-03-02 2014-03-02 Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same Expired - Fee Related CN103774699B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410072297.2A CN103774699B (en) 2014-03-02 2014-03-02 Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN201510094543.9A CN104631514B (en) 2014-03-02 2014-03-02 The construction method of the vertical water sealing structure in concrete works expansion joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410072297.2A CN103774699B (en) 2014-03-02 2014-03-02 Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201510094543.9A Division CN104631514B (en) 2014-03-02 2014-03-02 The construction method of the vertical water sealing structure in concrete works expansion joint
CN201510094410.1A Division CN104631389B (en) 2014-03-02 2014-03-02 The manufacture method of the vertical water sealing structure in concrete works expansion joint

Publications (2)

Publication Number Publication Date
CN103774699A CN103774699A (en) 2014-05-07
CN103774699B true CN103774699B (en) 2015-07-15

Family

ID=50567410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410072297.2A Expired - Fee Related CN103774699B (en) 2014-03-02 2014-03-02 Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same

Country Status (1)

Country Link
CN (1) CN103774699B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951678B (en) * 2014-11-10 2017-12-22 南京市水利规划设计院股份有限公司 A kind of vertical sealing swaging die of concrete works movement joint with projection
CN105370032B (en) * 2014-11-10 2017-05-03 王东华 Construction method for air bag type concrete project deformation joint water stop cavity mold
CN105951890B (en) * 2014-11-10 2018-03-13 李纳新 A kind of application method of concrete works swaging die air bag
CN106522167B (en) * 2014-11-10 2019-01-04 浙江永和建材有限公司 The construction method of water-bag type concrete works sealing swaging die with protrusion
CN105484201B (en) * 2014-11-10 2017-05-31 发达控股集团有限公司 A kind of manufacture method of concrete works swaging die skeleton
CN105370034B (en) * 2014-11-10 2018-05-18 葛洲坝武汉道路材料有限公司 The construction method of detachable concrete deformation joint sealing swaging die
CN105569090B (en) * 2014-11-10 2017-05-31 河南利水工程咨询有限公司 The construction method of collapsible deformed concrete crack sealing swaging die
CN105370033B (en) * 2014-11-10 2017-05-24 江苏泰建建设集团有限公司 Construction method of supporting type concrete deformation joint water-stop cavity die
CN105297925B (en) * 2015-11-13 2017-10-13 上海隧道工程有限公司 Embedded waterstop pre-buried structure and its construction method
CN106988237A (en) * 2017-02-14 2017-07-28 中国葛洲坝集团第工程有限公司 Conveyance Box Culvert bottom plate waterstop reinforces stopping means and construction method
CN110130405B (en) * 2019-05-28 2020-12-04 中铁一局集团有限公司 Waterproof construction method for underground structure staged construction structural joint
CN112112294A (en) * 2020-10-26 2020-12-22 中建四局第三建设有限公司 Construction method and device based on assembled waterproof construction joint water stop

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008045333A (en) * 2006-08-16 2008-02-28 Bridgestone Corp Water stop material and water cut-off structure of elastic joint
JP4335367B2 (en) * 1999-07-19 2009-09-30 清水建設株式会社 Water stop method and structure for joints in underground concrete structures
CN201473974U (en) * 2009-06-17 2010-05-19 福建省第五建筑工程公司 Novel steel plate water stopper
CN202706233U (en) * 2012-07-17 2013-01-30 叶香菲 Waterproof structure for expansion joint of basement
CN203200792U (en) * 2013-04-27 2013-09-18 王晓野 Waterproof structure for construction joint of basement concrete wall
CN203270627U (en) * 2013-05-21 2013-11-06 中建四局第三建筑工程有限公司 Construction joint structure of shear wall
CN203808113U (en) * 2014-03-02 2014-09-03 杨玉霞 Concrete engineering expansion joint vertical water-stop structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4335367B2 (en) * 1999-07-19 2009-09-30 清水建設株式会社 Water stop method and structure for joints in underground concrete structures
JP2008045333A (en) * 2006-08-16 2008-02-28 Bridgestone Corp Water stop material and water cut-off structure of elastic joint
CN201473974U (en) * 2009-06-17 2010-05-19 福建省第五建筑工程公司 Novel steel plate water stopper
CN202706233U (en) * 2012-07-17 2013-01-30 叶香菲 Waterproof structure for expansion joint of basement
CN203200792U (en) * 2013-04-27 2013-09-18 王晓野 Waterproof structure for construction joint of basement concrete wall
CN203270627U (en) * 2013-05-21 2013-11-06 中建四局第三建筑工程有限公司 Construction joint structure of shear wall
CN203808113U (en) * 2014-03-02 2014-09-03 杨玉霞 Concrete engineering expansion joint vertical water-stop structure

Also Published As

Publication number Publication date
CN103774699A (en) 2014-05-07

Similar Documents

Publication Publication Date Title
CN103774699B (en) Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN103790182B (en) A kind of hydraulic engineering vertical water stopping structure and manufacture thereof and construction method
CN103821180B (en) The two water-stopping structure of a kind of concrete extension joint
CN203808113U (en) Concrete engineering expansion joint vertical water-stop structure
CN206538788U (en) Prefabricated piping lane
CN107059946A (en) A kind of basement drain plate and its construction
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
CN104727276B (en) The manufacture method of the double; two water sealing structure of concrete extension joint
CN104314104B (en) Deformation joint setting method for oblique crossing with underground box culvert
CN103774620B (en) The vertical water-stopping structure fixture in a kind of concrete work shrinkage joint
CN104631514B (en) The construction method of the vertical water sealing structure in concrete works expansion joint
CN203808114U (en) Concrete expansion joint double-waterstop structure
CN104631389B (en) The manufacture method of the vertical water sealing structure in concrete works expansion joint
CN104727348B (en) A kind of construction method of the double water sealing structure of concrete extension joint
CN104727275A (en) Method for application of concrete work expansion joint vertical water sealing structure fixing element
CN203768870U (en) Fixing piece of vertical waterstop structure of expansion joint of concrete works
CN205000290U (en) Bottom of reservior pitch thoughtlessly congeals panel and storehouse slope concrete panel connection structure
CN104727349B (en) The double water sealing structure fixture of a kind of concrete extension joint
CN104727277B (en) A kind of manufacture method of the double water sealing structure fixture of concrete extension joint
CN104727350A (en) Manufacturing method of concrete expansion joint double-sealing-up structure
CN208633159U (en) A kind of underground pipe gallery waterproof structure for deformation seams
JP6979642B2 (en) How to expand the capacity of drainage ditches
CN203487563U (en) Water stop with positioning holes
CN217327418U (en) Special current-collecting drainage device for treating water damage of underground roadway
CN103924616A (en) Super-deep underground continuous wall pre-buried shear-force groove manufacturing and installing construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: FUJIAN JIUDING CONSTRUCTION ENGINEERING CO., LTD.

Free format text: FORMER OWNER: ZHANG CHAOLI

Effective date: 20150611

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Guo

Inventor after: Cong Fuxiang

Inventor after: Ye Guosong

Inventor after: Huang Guohui

Inventor after: Ye Min

Inventor after: Liu Muhuo

Inventor before: Zhang Chaoli

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG CHAOLI TO: YANG GUO CONG FUXIANG YE GUOSONG HUANG GUOHUI YE MIN LIU MUHUO

TA01 Transfer of patent application right

Effective date of registration: 20150611

Address after: Minqing County, Huang Zhen Xi Bin Lu Fuzhou City, Fujian province 350814 No. 1

Applicant after: FUJIAN JIUDING CONSTRUCTION ENGINEERING CO., LTD.

Address before: Sudai road Suzhou City, Jiangsu province 215000 Xiangcheng District Huangqiao No. 20

Applicant before: Zhang Chaoli

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20160302

CF01 Termination of patent right due to non-payment of annual fee