CN105370033B CN201510918769.6A CN201510918769A CN105370033B CN 105370033 B CN105370033 B CN 105370033B CN 201510918769 A CN201510918769 A CN 201510918769A CN 105370033 B CN105370033 B CN 105370033B
Authority
CN
China
Prior art keywords
concrete
swaging die
support
construction method
activity box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510918769.6A
Other languages
Chinese (zh)
Other versions
CN105370033A (en
Inventor
刘荣
余燕君
施驰
任启明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Gaohang Intellectual Property Operation Co ltd
Jiangsu Taijian Construction Group Co ltd
Original Assignee
Jiangsu Tai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tai Construction Group Co Ltd filed Critical Jiangsu Tai Construction Group Co Ltd
Priority to CN201510918769.6A priority Critical patent/CN105370033B/en
Publication of CN105370033A publication Critical patent/CN105370033A/en
Application granted granted Critical
Publication of CN105370033B publication Critical patent/CN105370033B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Abstract

The invention relates to a construction method of a supporting type concrete deformation joint water-stop cavity die. The cavity die comprises a movable frame and a support. The support is arranged in the movable frame and fixed to the movable frame into a whole through a fastener. When the cavity die is applied, the opening face of the cavity die is in butt joint with and is embedded in a water-stop piece at the first-stage concrete section. The water-stop piece is arranged in the middle of the support. When second-stage concrete is poured, after second-stage concrete is initially set, the fastener is detached, and after the support and the movable frame are hoisted out, a cavity for injecting molten asphalt is formed in the second-stage concrete.

Description

The construction method of brace type deformed concrete crack sealing swaging die
Technical field
The present invention relates to a kind of underground/submerged structure water-tight device, more particularly to a kind of brace type deformed concrete crack stops The construction method of water swaging die.
Background technology
In existing concrete structure, such as underground such as checkdam, cistern, subway, culvert, sluice, tunnel, under water In engineering, due to being unable to continuous placing or the deformation due to settlement of foundation (earthquake), or the coagulation caused due to the change of temperature The reason such as expand with heat and contract with cold of native component, movement joint, construction joint are deliberately left pouring often, and these gaps will take antiseep to arrange Apply, in preventing external water or underground water from leaking into structure space, present usual way is, in fist stage concrete and the second stage of coagulation Concrete pit is set between soil, maltha and copper sheet or rubber water-proof piece are set in groove, however, this method needs advance precast concrete Groove, in order that concrete pit and second stage concrete can combine closely, it is necessary to carry out dabbing treatment to 3 faces of concrete pit periphery, this Sample will extend the duration and increase artificial, simultaneously because concrete pit is general to only have 50-100cm per segment length (height), deform Gap will be connected and composed by multiple concrete pits, therefore can produce a plurality of transverse slot, and multiple concrete pit is irregular Deformation, the race that postorder can be caused to irrigate maltha emits phenomenon, and is difficult to clean up;And use number of patent application 2014100489253 With channel-section steel replace concrete pit technology, although than former construction method can save expense and shortening the duration, but due to groove Steel will be deposited in dam body, it is not possible to reused, and still cause to waste, therefore urgent need one kind can be in second stage concrete section Precast the equipment for putting the die cavity for holding pitch.
The content of the invention
In order to solve the above problems, the present invention provides a kind of construction party of brace type deformed concrete crack sealing swaging die Method, swaging die of the invention can second stage concrete section it is preset go out a rectangle mold cavity, pour into pitch, and type Chamber mould can be repeatedly used using rear taking-up, and various ground condition/ground can be met using the vertical water sealing structure of this swaging die Layer differential settlement or the changing of the relative positions, telescopic displacement etc., with material-saving expense and can shorten the duration.
To achieve the above object, the present invention provides following technical scheme:
A kind of brace type deformed concrete crack sealing swaging die, it is characterised in that it includes activity box and support, the branch Support is arranged on inside activity box, is integrally fixed with fastener, and in the application swaging die, the docking of swaging die opening surface is pre-buried In the sealing piece of fist stage concrete section part, the sealing piece is arranged on support middle part, second stage concrete is poured, in the second stage of coagulation After native initial set, the fastener is removed, after hanging out support and activity box, formed in second stage concrete and be available for injection melting drip Blue or green die cavity.
More preferred, described sealing piece is rectangle copper sheet, and its pre- side being embedded in fist stage concrete longitudinally sets There are 90 ° of knuckles, middle part protruding preseting length of the opposite side from fist stage concrete section.
More preferred, the activity box section is U-shaped, and its left plate, right plate are respectively with back side panel with articulate It is hinged.
It is more preferred, keeper is respectively equipped with inside the left plate of the activity box, right plate lower end, and described Left plate, right plate upper end are respectively equipped with fastener screw and lifting hole(eyelet).
More preferred, the back side panel bosom of the activity box is provided with M shape bearings.
More preferred, the left plate of the activity box, the front of right plate are arranged to semicircle.
More preferred, described supporting section is V-arrangement, is respectively arranged on the left side and the right side tightly in described V-arrangement support upper end Firmware and hanging bar.
More preferred, described fastener is bolt, and the corresponding left and right side plate of the bolt is provided with supporting screw.
The invention also discloses a kind of manufacture method of brace type deformed concrete crack sealing swaging die, it is characterised in that bag Include following steps:
1) making of activity box:The section of activity box is U-shaped, and its left plate, right plate are cut with scissors with back side panel with hinge respectively Connect;Keeper is respectively provided with inside left plate, right plate lower end, left plate, right plate upper end are respectively provided with fastener screw And lifting hole(eyelet);In the longitudinally disposed M shapes bearing of back side panel bosom;Left plate, the front of right plate are arranged to semicircle.
2) making of support:The section of support is V-arrangement angle iron, is respectively provided with the upper end left and right sides of V-arrangement angle iron Fastener, described fastener selects bolt, and a hanging bar for transverse direction is set in the upper end of V-arrangement angle iron.
3) assembling of swaging die:Will be in support insertion activity box, the angle of support and the M shapes for being located at back side panel bosom Bearing coordinates, and V-arrangement angle iron support lower end is stuck on left plate, the keeper inside right plate lower end, supports the fastening of upper end Part bolt is fixed with the screw of corresponding left and right side plate respectively.
The invention also discloses a kind of construction method of brace type deformed concrete crack sealing swaging die, it is characterised in that bag Include following steps:
1) sealing piece is set:One side that sealing piece has knuckle is preset in the section part of deformed concrete crack, sealing piece edge The centre of concrete cross section width is longitudinally disposed at, and sealing piece side in the width direction is partly embedded into concrete, Fixed form and sealing piece after-pouring fist stage concrete.
2) setting of swaging die:After fist stage concrete solidification, the docking of swaging die opening surface is embedded in fist stage concrete and is broken On sealing piece at face, sealing piece is arranged on support middle part, is set on the both sides concrete cross section of the front openings of swaging die Bituminous felt.
3) second stage concrete is poured:After setting swaging die and template, second stage concrete is poured according to highl stratification, every time Every layer of 50cm or so, pours last layer, until reaching the height of needs again after waiting lower floor's initial set to have certain degree of hardness.
4) die cavity is formed:After second stage concrete initial set, the fastener bolt of support upper end of dismantling hooks support with hook The hanging bar of upper end, hangs out support;After left and right side plate to be rapped demoulding displacement respectively inwards again, back plate raps forward the demoulding, Suspension hook is set in the lifting hole(eyelet) of left and right side plate, activity box is hung out, rectangle mold cavity is formed in second stage concrete section part.
5) asphalt reperfusion:Molten asphalt is filled in rectangle shape die cavity, is cooled down.
6) when multiple movement joints are set, repeat the above steps 1-5, and pitch does and once irrigate or irrigate for several times;Hang out Support and activity box should in time be cleared up, maintained, storage, be reused with profit.
Beneficial effects of the present invention
1. use swaging die preset mode of the invention so that one, second stage concrete pour conveniently, section is neat.
2. swaging die hangs out second stage concrete after and can reuse, and the reduction that can economize on resources is wasted.
3. the permanent seam in the undergrounds such as checkdam, cistern, subway, culvert, sluice, tunnel, Underwater Engineering can be solved Leakage problems.
4. compare with conventional construction method, because it is not required to concrete soil box, it is possible to reduce needed for concrete soil box Manually, the expense such as machinery, template.
5. metal material consumption is saved because being not required to reserved channel-section steel internally again.
6. working procedure in the past on critical circuits is changed into using this method construction by non-key circuit operation, saved Duration, generate very big economic benefit and social benefit.
7. the technology of the present invention can solve the coagulation that various ground condition/stratum differential settlement or the change due to temperature cause The deformation joint seepage problem that the reason such as expand with heat and contract with cold of native component causes;Can also prevent because of breaking that the natural calamities such as earthquake cause Leakage problems caused by the changing of the relative positions of face interface, deformation.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of swaging die of the invention, wherein the support of visible V-arrangement is arranged in U-shaped activity box.
Fig. 2 is the dimensional structure diagram of the swaging die opening surface of Fig. 1, it is seen that support is highly identical with activity box, support Lower end is stuck in fixture rear side.
Fig. 3 is the dimensional structure diagram of the activity box of swaging die of the invention, it is seen that left and right sides plate and back side panel It is hinged state.
Fig. 4 is the support dimensional structure diagram of swaging die of the invention, it is seen that support upper end is provided with fastener and hanging Bar.
Fig. 5 is the overlooking the structure diagram that swaging die of the invention is arranged on fist stage concrete section, it is seen that sealing piece sets Put in the middle part of support.
Fig. 6 is dimensional structure diagram before Fig. 5, wherein to be higher by fist stage concrete top certain on visible swaging die top Distance, is typically higher by 20-40cm, with conveniently stripped.
Fig. 7 is overlooking the structure diagram of the swaging die of the invention after second stage concrete, wherein visible swaging die stands in In second stage concrete, bituminous felt is provided between the both sides one of the front openings of swaging die, second stage concrete section.
Fig. 8 is that the swaging die of Fig. 7 removes the overlooking the structure diagram after support, wherein visible left and right side plate is moved inward The state of the demoulding.
Fig. 9 is the top perspective structural representation hung out after activity box of Fig. 8, it is seen that it is mixed that sealing piece half is arranged on a phase In solidifying soil, half is stood in rectangle mold cavity.
Figure 10 is of the invention overlooking the structure diagram after pitch to be filled in die cavity, it is seen that sealing piece half is arranged on one In phase concrete, half is arranged in pitch.
Sequence number in figure:1- activity box, 1a- left plates, 1b- right plates, 1c- back side panels, 2- supports, 3- hanging bars, 4- hinges Chain, 5- keepers, 6- fasteners, 7- bearings, 8- lifting hole(eyelet)s, 9- fist stage concretes, 10- sealing pieces, 11- bituminized papers, the 12- second phases are mixed Solidifying soil, 13- die cavities, 14- pitches.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Embodiment 1, refer to the attached drawing:A kind of brace type deformed concrete crack sealing swaging die, it includes activity box 1 and support 2, support 2 is arranged on inside activity box 1, is integrally fixed with fastener 6, in the application swaging die, swaging die opening surface Docking is embedded in the sealing piece 10 of the section part of fist stage concrete 9, and the sealing piece 10 is arranged on the middle part of support 2, pours the second phase mixed Solidifying soil 12, after the initial set of second stage concrete 12, the fastener 6 is removed, after hanging out support 2 and activity box 1, in the second stage of coagulation The die cavity 13 for being available for injecting molten asphalt 14 is formed in soil 12.
More preferred, described sealing piece 10 is rectangle copper sheet, its pre- side longitudinal direction being embedded in fist stage concrete 9 It is provided with 90 ° of knuckles, middle part protruding preseting length of the opposite side from the section of fist stage concrete 9.
More preferred, the section of the activity box 1 is U-shaped, and its left plate 1a, right plate 1b are respectively with back side panel 1c cutting with scissors Chain 4 is movably hinged.
It is more preferred, it is respectively equipped with keeper 5 inside the left plate 1a of the activity box 1, right plate 1b lower ends, and Described left plate 1a, right plate 1b upper ends are respectively equipped with the screw of fastener 6 and lifting hole(eyelet) 8.
More preferred, the back side panel 1c bosoms of the activity box 1 are provided with M shapes bearing 7.
More preferred, the left plate 1a of the activity box 1, the front of right plate 1b are arranged to semicircle.
More preferred, the described section of support 2 is V-arrangement, supports 2 upper ends to be respectively arranged on the left side and the right side in described V-arrangement Fastener 6 and hanging bar 3.
More preferred, described fastener 6 is bolt, and the corresponding left and right side plate of the bolt is provided with supporting screw.
The present embodiment also discloses a kind of manufacture method of brace type deformed concrete crack sealing swaging die, it is characterised in that Comprise the following steps:
1) making of activity box:The section of activity box 1 be U-shaped, its left plate 1a, right plate 1b respectively with back side panel 1c with Hinge 4 is hinged;Keeper 5, left plate 1a, right plate 1b upper ends point are respectively provided with inside left plate 1a, right plate 1b lower ends She Zhi not the screw of fastener 6 and lifting hole(eyelet) 8;In the longitudinally disposed M shapes bearing 7 of back side panel 1c bosoms;Left plate 1a, right plate 1b Front be arranged to semicircle.
2) making of support:The section of support 2 is V-arrangement angle iron, is respectively provided with the upper end left and right sides of V-arrangement angle iron Fastener 6, described fastener 6 selects bolt, and a hanging bar 3 for transverse direction is set in the upper end of V-arrangement angle iron.
3) assembling of swaging die:Support 2 is inserted in activity box 1,2 angle is supported and is located at back side panel 1c bosoms M shapes bearing 7 coordinate, V-arrangement angle iron supports 2 lower ends to be stuck on left plate 1a, the keeper 5 inside right plate 1b lower ends, branch The bolt of fastener 6 for supportting 2 upper ends is fixed with the screw of corresponding left and right side plate respectively.
The present embodiment also discloses a kind of construction method of brace type deformed concrete crack sealing swaging die, it is characterised in that Comprise the following steps:
1) sealing piece is set:One side that sealing piece 10 has knuckle is preset in the section part of deformed concrete crack, sealing piece The 10 longitudinally disposed centres in concrete cross section width, and the side in the width direction of the sealing piece 10 is partly embedded into coagulation In native, fixed form and the after-pouring fist stage concrete 9 of sealing piece 10.
2) setting of swaging die:After fist stage concrete 9 solidifies, the docking of swaging die opening surface is embedded in fist stage concrete 9 On the sealing piece 10 of section part, sealing piece 10 is arranged on the middle part of support 2, in the both sides concrete cross section of the front openings of swaging die Upper setting bituminized paper 11.
3) second stage concrete is poured:After setting swaging die and template, second stage concrete 12 is poured according to highl stratification, often Secondary every layer of 50cm or so, pours last layer, until reaching the height of needs again after waiting lower floor's initial set to have certain degree of hardness.
4) die cavity is formed:After the initial set of second stage concrete 12, the bolt of fastener 6 of 2 upper ends of support of dismantling is hooked with hook The hanging bar 3 of 2 upper ends is supported, support 2 is hung out;After left and right side plate to be rapped demoulding displacement respectively inwards again, back side panel 1c is forward The demoulding is rapped, suspension hook is set in the lifting hole(eyelet) 8 of left and right side plate, hang out activity box 1, square is formed in the section part of second stage concrete 12 Shape die cavity 13.
5) asphalt reperfusion:Molten asphalt 14 is filled in rectangle mold cavity, is cooled down.
6) when multiple movement joints are set, repeat the above steps 1-5, and pitch 14 does and once irrigate or irrigate for several times;Hang out Support 2 and activity box 1 should in time clear up, maintain, store, with profit reuse.
Swaging die of the invention is highly generally 2.5M, and each frame film can pour 2.0M concrete walls, and such as wall exceedes 2.0M, after form removal, improves 2.0M, foregoing construction method is repeated, until meeting wall highly;The red copper sealing piece 10 and level are stopped Water piece is connected by Site Welding.
The present invention is not required to concrete soil box, can shorten 20-30 days duration;Swaging die can be reused;Can be The construction of the box dam such as checkdam, cistern retaining wall, can also be used for undergrounds such as subway, culvert, sluice, tunnel, various mixed under water etc. The application of solidifying geotechnique's journey movement joint sealing, movement joint is neatly non-leakage;Stratum differential settlement can be solved using this technology to lead The deformation joint seepage water problems of cause, or the concrete component caused by the change of environment temperature the caused movement joint that expands with heat and contract with cold Leakage problems;Can also prevent to cause because of deformation such as the changing of the relative positions of movement joint section interface, displacement that the natural calamities such as earthquake cause etc. Leakage problems.

Claims (8)

1. a kind of construction method of brace type deformed concrete crack sealing swaging die, swaging die includes activity box and support, described Support is arranged on inside activity box, is integrally fixed with fastener, and in the application swaging die, the docking of swaging die opening surface is pre- The sealing piece of fist stage concrete section part is embedded in, the sealing piece is arranged on support middle part, pours second stage concrete, mixed in the second phase After solidifying soil initial set, the fastener is removed, after hanging out support and activity box, formed in second stage concrete and be available for injection to melt The die cavity of pitch;
The concrete construction method of described brace type deformed concrete crack sealing swaging die:It is characterized in that comprising the following steps:
1)Sealing piece is set:One side that sealing piece has knuckle is preset in the section part of deformed concrete crack, sealing piece is along longitudinal direction The centre of concrete cross section width is arranged at, and sealing piece side in the width direction is partly embedded into concrete, it is fixed Template and sealing piece after-pouring fist stage concrete;
2)The setting of swaging die:After fist stage concrete solidification, the docking of swaging die opening surface is embedded in fist stage concrete section part Sealing piece on, sealing piece be arranged on support middle part, pitch is set on the both sides concrete cross section of the front openings of swaging die Asphalt felt;
3)Second stage concrete is poured:After setting swaging die and template, second stage concrete is poured according to highl stratification, every layer every time 50cm or so, pours last layer, until reaching the height of needs again after waiting lower floor's initial set to have certain degree of hardness;
4)Die cavity is formed:After second stage concrete initial set, the fastener bolt of support upper end of dismantling hooks support upper end with hook Hanging bar, hang out support;After left and right side plate to be rapped demoulding displacement respectively inwards again, back plate raps forward the demoulding, it is left, Suspension hook is set in the lifting hole(eyelet) of right plate, activity box is hung out, rectangle mold cavity is formed in second stage concrete section part;
5)Asphalt reperfusion:Molten asphalt is filled in rectangle shape die cavity, is cooled down;
6)When multiple movement joints are set, repeat the above steps 1-5, and pitch does and once irrigate or irrigate for several times;The support for hanging out Should in time be cleared up with activity box, maintained, stored, reused with profit.
2. the construction method of brace type deformed concrete crack sealing swaging die according to claim 1, it is characterised in that institute The sealing piece stated is rectangle copper sheet, and its pre- side being embedded in fist stage concrete is longitudinally provided with 90 ° of knuckles, and opposite side is from a phase The protruding preseting length in middle part of concrete cross section.
3. the construction method of brace type deformed concrete crack sealing swaging die according to claim 1, it is characterised in that institute The activity box section stated is U-shaped, and its left plate, right plate are hinged with back side panel with articulate respectively.
4. the construction method of brace type deformed concrete crack sealing swaging die according to claim 3, it is characterised in that institute State the left plate of activity box, be respectively equipped with keeper inside right plate lower end, and distinguish in described left plate, right plate upper end It is provided with fastener screw and lifting hole(eyelet).
5. the construction method of brace type deformed concrete crack sealing swaging die according to claim 3, it is characterised in that institute The back side panel bosom for stating activity box is provided with M shape bearings.
6. the construction method of brace type deformed concrete crack sealing swaging die according to claim 3, it is characterised in that institute State the left plate of activity box, the front of right plate and be arranged to semicircle.
7. the construction method of brace type deformed concrete crack sealing swaging die according to claim 1, it is characterised in that institute The supporting section stated is V-arrangement, and fastener and hanging bar are respectively arranged on the left side and the right side in described support upper end.
8. the construction method of brace type deformed concrete crack sealing swaging die according to claim 7, it is characterised in that institute The fastener stated is bolt, and the corresponding left and right side plate of the bolt is provided with supporting screw.
CN201510918769.6A 2014-11-10 2014-11-10 Construction method of supporting type concrete deformation joint water-stop cavity die Expired - Fee Related CN105370033B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510918769.6A CN105370033B (en) 2014-11-10 2014-11-10 Construction method of supporting type concrete deformation joint water-stop cavity die

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510918769.6A CN105370033B (en) 2014-11-10 2014-11-10 Construction method of supporting type concrete deformation joint water-stop cavity die
CN201410628504.8A CN104328804B (en) 2014-11-10 2014-11-10 Brace type deformed concrete crack sealing swaging die

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410628504.8A Division CN104328804B (en) 2014-11-10 2014-11-10 Brace type deformed concrete crack sealing swaging die

Publications (2)

Publication Number Publication Date
CN105370033A CN105370033A (en) 2016-03-02
CN105370033B true CN105370033B (en) 2017-05-24

Family

ID=52403604

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201410628504.8A Active CN104328804B (en) 2014-11-10 2014-11-10 Brace type deformed concrete crack sealing swaging die
CN201510918769.6A Expired - Fee Related CN105370033B (en) 2014-11-10 2014-11-10 Construction method of supporting type concrete deformation joint water-stop cavity die
CN201510915747.4A Expired - Fee Related CN105350492B8 (en) 2014-11-10 2014-11-10 The manufacture method of brace type deformed concrete crack sealing swaging die

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410628504.8A Active CN104328804B (en) 2014-11-10 2014-11-10 Brace type deformed concrete crack sealing swaging die

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201510915747.4A Expired - Fee Related CN105350492B8 (en) 2014-11-10 2014-11-10 The manufacture method of brace type deformed concrete crack sealing swaging die

Country Status (1)

Country Link
CN (3) CN104328804B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111828056B (en) * 2020-07-28 2022-04-15 中建七局安装工程有限公司 Shallow-buried underground excavation tunnel waterproof construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809019Y (en) * 2005-08-05 2006-08-23 上海市隧道工程轨道交通设计研究院 Inner mounting structure for stainless steel water stop
CN201095865Y (en) * 2007-06-28 2008-08-06 唐巧凤 Drawable hollow fitting
CN201241476Y (en) * 2008-03-18 2009-05-20 杨进方 Combined square box core mould
CN102555042A (en) * 2012-02-23 2012-07-11 彭代汉 Die mandrel for hollow gypsum building block
EP2110486A3 (en) * 2008-04-16 2012-10-03 Ankaba Ankertechnik und Bauhandel AG Anchor point for a lift assembly
CN102995894A (en) * 2012-12-12 2013-03-27 杨中平 Air bag type concrete hole pre-burying device and manufacturing method thereof
CN103821180A (en) * 2014-03-02 2014-05-28 张朝利 Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure
CN203808113U (en) * 2014-03-02 2014-09-03 杨玉霞 Concrete engineering expansion joint vertical water-stop structure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202626940U (en) * 2012-06-25 2012-12-26 中国水电顾问集团中南勘测设计研究院 Joint water stopping structure
CN202989959U (en) * 2012-12-24 2013-06-12 中建海峡建设发展有限公司 Concrete construction joint anti-seepage template
KR101416329B1 (en) * 2013-04-10 2014-07-09 장영미 Connecting Apparatus for obstructing water used in a combining section for the connected Concrete Members
CN103603376A (en) * 2013-12-03 2014-02-26 深圳市城市优筑科技有限公司 Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
CN103774699B (en) * 2014-03-02 2015-07-15 福建九鼎建设集团有限公司 Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809019Y (en) * 2005-08-05 2006-08-23 上海市隧道工程轨道交通设计研究院 Inner mounting structure for stainless steel water stop
CN201095865Y (en) * 2007-06-28 2008-08-06 唐巧凤 Drawable hollow fitting
CN201241476Y (en) * 2008-03-18 2009-05-20 杨进方 Combined square box core mould
EP2110486A3 (en) * 2008-04-16 2012-10-03 Ankaba Ankertechnik und Bauhandel AG Anchor point for a lift assembly
CN102555042A (en) * 2012-02-23 2012-07-11 彭代汉 Die mandrel for hollow gypsum building block
CN102995894A (en) * 2012-12-12 2013-03-27 杨中平 Air bag type concrete hole pre-burying device and manufacturing method thereof
CN103821180A (en) * 2014-03-02 2014-05-28 张朝利 Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure
CN203808113U (en) * 2014-03-02 2014-09-03 杨玉霞 Concrete engineering expansion joint vertical water-stop structure

Also Published As

Publication number Publication date
CN104328804B (en) 2016-03-23
CN104328804A (en) 2015-02-04
CN105370033A (en) 2016-03-02
CN105350492B (en) 2017-04-05
CN105350492B8 (en) 2017-05-31
CN105350492A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105926538B (en) A kind of vertical sealing swaging die of concrete works movement joint with reinforcing fiber
CN105951679B (en) A kind of manufacture method of concrete works swaging die air bag
CN105370033B (en) Construction method of supporting type concrete deformation joint water-stop cavity die
CN105569090B (en) The construction method of collapsible deformed concrete crack sealing swaging die
CN105484202B (en) Manufacturing method for detachable type water-stop cavity die of concrete deformation joint
CN204266165U (en) The vertical water-stopping structure of a kind of concrete work deformation joint
CN105484201B (en) A kind of manufacture method of concrete works swaging die skeleton
CN105568927A (en) Construction method of water bag type concrete engineering deformation joint water stop cavity die
CN204326115U (en) Brace type deformed concrete crack sealing swaging die
CN204266253U (en) Detachable concrete deformation joint sealing swaging die
CN204326012U (en) Collapsible deformed concrete crack sealing swaging die
CN204326013U (en) Water-bag type concrete work deformation joint sealing swaging die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Rong

Inventor after: Yu Yanjun

Inventor after: Shi Chi

Inventor after: Ren Qiming

Inventor before: Zhang Chaoli

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170420

Address after: 225300 Jiangsu city of Taizhou Province in Agricultural Development Zone, Road No. 9

Applicant after: Jiangsu Taijian Construction Group Co.,Ltd.

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20170420

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: 215000 Xiangcheng District, Jiangsu, Huangqiao Street headquarters economic Park

Applicant before: SUZHOU DUOGU ENGINEERING DESIGN Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20201110

CF01 Termination of patent right due to non-payment of annual fee