CN203925527U - A kind of construction joint of tunnel percolating water punishment system - Google Patents
A kind of construction joint of tunnel percolating water punishment system Download PDFInfo
- Publication number
- CN203925527U CN203925527U CN201420363504.5U CN201420363504U CN203925527U CN 203925527 U CN203925527 U CN 203925527U CN 201420363504 U CN201420363504 U CN 201420363504U CN 203925527 U CN203925527 U CN 203925527U
- Authority
- CN
- China
- Prior art keywords
- groove
- raggle
- layer
- tunnel
- percolating water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of construction joint of tunnel percolating water punishment system.It comprises groove, raggle, capillary penetrating drainage band, loss circulation material layer, waterproof cement mortar layer, waterproof coating layer, transverse wave pipe, and described groove is the groove of widening towards country rock direction centered by constuction joint on tunnel lining surface; Described raggle is the groove of deeply cutting a hole towards country rock direction centered by constuction joint under groove; Described capillary penetrating drainage band is altogether two-layer, be located in raggle, each layer respectively with upstream face towards the two side of raggle, its lower end is connected with transverse wave pipe; Described loss circulation material layer, waterproof cement mortar layer and surface with waterproof coating layer by inner from outward successively full-filling on groove.Compared with prior art, the utility model both utilized capillary penetrating drainage band have anti-clogging, strong without soil losses, anti-pressure ability, promote draining, easy working advantage, take full advantage of again the advantage that the transverse wave pipe in former drainage system carries out central drainage.
Description
Technical field
The utility model belongs to tunnel and underground engineering field, specifically, relates to a kind of construction joint of tunnel percolating water punishment system.
Background technology
Along with the development of China's transport development cause, the situation such as hydrogeology that speedway highway tunnel faces, country rock type, topography and geomorphology becomes increasingly complex, and Tunnel Water Leakage disease has become one of main problem that construction of tunnel faces.Especially in the eighties in last century, the construction experiences deficiency of highway tunnel at that time, design concept and construction method are indiscriminately imitated the experience of railway tunnel, because highway tunnel section is large, construct according to Design of Railway Tunnel method, in construction method and structure, produced certain defect, leakage problem is very serious.
At present, conventional construction joint of tunnel percolating water Treatment Methods is the outer row's method of PVC semicanal, it is by raggle on constuction joint, PVC semicanal to be installed to drain constuction joint infiltration, and it is mainly for forming the larger situations of water amount of seepage such as water clock, line leak, gush in constuction joint.A kind of leakage water treatment node structure of tunnel construction joints as disclosed in Chinese patent (CN201020520837), comprise the groove that is arranged on constuction joint place, described groove extends to tunnel drainage passage from the position more than EXIT POINT of percolating water, in described groove, semi-circular tube is installed, the lower end of described semi-circular tube is connected with tunnel drainage passage by bend pipe, the outer wall of described semi-circular tube scribbles silica gel, on described silica gel, is coated with mortar.This utility model can play good effect to the punishment of construction joint of tunnel percolating water, can detect the punishment effect of percolating water, and can be at any time to its maintenance.But in some area, because its lithic drainage is undeveloped, rainfall is less, in construction joint of tunnel, water percolating capacity is less, be the state that oozes slowly, adopt the punishment effect of the outer row's method of PVC semicanal poor, percolating water prolonged stay, in constuction joint, produces oxide etch effect to lining concrete.
Summary of the invention
For solving the problems of the technologies described above, the utility model provides a kind of and has been applicable to little, the slow seepage of water amount of seepage, easily punished system by the construction joint of tunnel percolating water under sand grains blocked state.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, comprise groove 41, raggle 42, capillary penetrating drainage band 5, loss circulation material layer 6, waterproof cement mortar layer 7, waterproof coating layer 8, transverse wave pipe 11, described groove 41 is grooves of widening towards country rock 1 direction centered by constuction joint 4 on tunnel lining surface; Described raggle 42 is grooves of deeply cutting a hole towards country rock 1 direction centered by constuction joint 4 for 41 times at groove; Described capillary penetrating drainage band 5 is two-layer altogether, be located in raggle 42, each layer respectively with upstream face towards the two side of raggle 42, its lower end is connected with transverse wave pipe 11; Described loss circulation material layer 6, waterproof cement mortar layer 7 and surface with waterproof coating layer 8 by inner from outward successively full-filling on groove 41.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, the dark 10cm of described groove 41, wide 5cm.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, described raggle 42 is deep to canvas cloth 2, width is 8mm.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, described capillary penetrating drainage band 5 comprises pore 9 and groove 10.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, large outer little in described pore 9 designs are upper, groove 10 water inlet width 0.3mm.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, reserved hole between described capillary penetrating drainage band 5 bilayers.
A kind of construction joint of tunnel percolating water punishment system described in the utility model, described loss circulation material layer 6 and waterproof cement mortar layer 7 are thick is 5cm.
When operation, carry out in accordance with the following steps: 1) construction joint of tunnel place raggle: for the construction joint of tunnel that percolating water occurs, cut the above suitable position of its percolating water EXIT POINT to interior old waterproofing materials and the loose concrete losing efficacy of tunnel bottom section, brush scum silica frost with wire brush, and water is rinsed well, raggle should run through two linings, and its width should be 8mm, tries not to destroy canvas cloth in raggle process; 2) lay capillary penetrating drainage band: in raggle, establish two-layer capillary penetrating drainage band, using its groove separately as upstream face and towards the raggle wall of this side; 3) capillary penetrating drainage band is connected with transverse wave pipe: the end of the transverse wave pipe in former drainage system cuts out the groove of wide 10mm, long 60cm, by the groove of capillary penetrating drainage band lower end access transverse wave pipe; 4) constuction joint outside punishment: centered by constuction joint, dig out the groove of dark 10cm, wide 5cm in tunnel lining, with loss circulation material and waterproof cement mortar, groove shutoff is filled and led up, groove surfaces is punished with water-repellent paint.
Compared with prior art, construction joint of tunnel percolating water described in the utility model punishment system both utilized capillary penetrating drainage band have anti-clogging, strong without soil losses, anti-pressure ability, promote draining, easy working advantage, take full advantage of again the advantage that the transverse wave pipe in former drainage system carries out central drainage.Therefore this utility model little for water amount of seepage, be the state that oozes slowly, easily the constuction joint percolating water punishment effect stopped up by sand grains is better, and the construction sequence of this structural shape is simple, workable, working security is high, the feature of environmental protection is strong, economic benefit and social benefit higher.
Brief description of the drawings
Fig. 1: construction joint of tunnel percolating water punishment system top view; Fig. 2: construction joint of tunnel percolating water punishment system cross section; Fig. 3: capillary penetrating drainage band constructional drawing; 1-country rock, 2-canvas cloth, 3-bis-serve as a contrast, 4-constuction joint, 41-groove, 42-raggle, 5-capillary penetrating drainage band, 6-loss circulation material layer, 7-waterproof cement mortar layer, 8-waterproof coating layer, 9-pore, 10-groove, 11-transverse wave pipe.
Detailed description of the invention
Below in conjunction with specific embodiment, construction joint of tunnel percolating water punishment system described in the utility model is described further, but protection domain of the present utility model is not limited to this.
Embodiment 1
Certain highway tunnel is built to be open to traffic more than ten years, has occurred at present the diseases such as lining cutting is ftractureed, peeled off, percolating water, and wherein Portal Section Construction seam place percolating water phenomenon is more serious.Find by Field Research, this constuction joint percolating water is earth surface water source supplying type, and water percolating capacity is little, constuction joint is wet stain shape outward, but long-term tax of percolating water is stored in constuction joint, and tunnel lining is produced to oxide etch effect, causes constuction joint place concrete cracking, peels off.Therefore should adopt construction joint of tunnel percolating water punishment system described in the utility model processing, described system comprises groove 41, raggle 42, capillary penetrating drainage band 5, loss circulation material layer 6, waterproof cement mortar layer 7, waterproof coating layer 8, transverse wave pipe 11, and described groove 41 is grooves of widening towards country rock 1 direction centered by constuction joint 4 on tunnel lining surface; The groove that described raggle 42 is deeply cut a hole towards country rock 1 direction for 41 times at groove centered by constuction joint 4; Described capillary penetrating drainage band 5 is two-layer altogether, be located in raggle 42, each layer respectively with upstream face towards the two side of raggle 42, its lower end is connected with transverse wave pipe 11; Described loss circulation material layer 6, waterproof cement mortar layer 7 and surface with waterproof coating layer 8 by inner from outward successively full-filling on groove 41; The dark 10cm of described groove 41, wide 5cm; Described raggle 42 is deep to canvas cloth 2, width is 8mm; Described capillary penetrating drainage band 5 comprises pore 9 and groove 10; Reserved hole between described capillary penetrating drainage band 5 bilayers.
When enforcement, carry out in accordance with the following steps: 1) construction joint of tunnel place raggle: from 10cm position, constuction joint percolating water EXIT POINT top to tunnel bottom section, cut old waterproofing materials and the loose concrete of its internal failure, in raggle process, should guarantee that groove width is 8mm, and try not to destroy original canvas cloth, finally brush scum silica frost with wire brush, and water is rinsed well; 2) lay capillary penetrating drainage band: in raggle, lay two-layer capillary penetrating drainage band, using capillary penetrating drainage with a side of groove as upstream face and towards the raggle wall of this side; 3) capillary penetrating drainage band is connected with transverse wave pipe: the end of the transverse wave pipe in former drainage system cuts out the groove of wide 10mm, long 60cm, by the groove of capillary penetrating drainage band lower end access transverse wave pipe; 4) constuction joint outside punishment: in tunnel lining centered by constuction joint, dig out the groove of dark 10cm, wide 5cm, with loss circulation material and waterproof cement mortar, groove shutoff is filled and led up, loss circulation material and waterproof cement mortar bed thickness are all 5cm, and groove surfaces is punished with water-repellent paint.
In the utility model, capillary penetrating drainage band is little outside greatly in pore design, groove water inlet width 0.3mm, and than pore diameter, 1mm is narrow, has very strong anti-blockage capability; And central drainage is carried out in transverse wave pipe, central row ditch that the utility model can make full use of in original drainage system.Therefore, better for the constuction joint percolating water situation punishment effect of oozing slowly state, can drain in time constuction joint internal water accumulation, avoid further developing of lining cutting cracking, water leakage defect, its construction sequence is simple, workable, the feature of environmental protection is strong, economic benefit and social benefit higher.
Claims (7)
1. a construction joint of tunnel percolating water punishment system, it is characterized in that, described system comprises groove (41), raggle (42), capillary penetrating drainage band (5), loss circulation material layer (6), waterproof cement mortar layer (7), waterproof coating layer (8), transverse wave pipe (11); Described groove (41) is the groove of widening towards country rock (1) direction centered by constuction joint (4) on tunnel lining surface; Described raggle (42) is the groove of deeply cutting a hole towards country rock (1) direction centered by constuction joint (4) under groove (41); Described capillary penetrating drainage band (5) is altogether two-layer, be located in raggle (42), each layer respectively with upstream face towards the two side of raggle (42), its lower end is connected with transverse wave pipe (11); Described loss circulation material layer (6), waterproof cement mortar layer (7) and surface with waterproof coating layer (8) by inner from outward successively full-filling on groove (41).
2. a kind of construction joint of tunnel percolating water punishment system according to claim 1, is characterized in that described groove (41) dark 10cm, wide 5cm.
3. a kind of construction joint of tunnel percolating water punishment system according to claim 1, is characterized in that, described raggle (42) is deep to canvas cloth (2), width is 8mm.
4. a kind of construction joint of tunnel percolating water punishment system according to claim 1, is characterized in that, described capillary penetrating drainage band (5) comprises pore (9) and groove (10).
5. a kind of construction joint of tunnel percolating water punishment system according to claim 1, is characterized in that, interior large outer little in described pore (9) design, groove (10) water inlet width 0.3mm.
6. a kind of construction joint of tunnel percolating water punishment system according to claim 1, is characterized in that reserved hole between described capillary penetrating drainage band (5) bilayer.
7. a kind of construction joint of tunnel percolating water punishment system according to claim 1, is characterized in that, described loss circulation material layer (6) and waterproof cement mortar layer (7) are thick is 5cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420363504.5U CN203925527U (en) | 2014-07-02 | 2014-07-02 | A kind of construction joint of tunnel percolating water punishment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420363504.5U CN203925527U (en) | 2014-07-02 | 2014-07-02 | A kind of construction joint of tunnel percolating water punishment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203925527U true CN203925527U (en) | 2014-11-05 |
Family
ID=51821356
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420363504.5U Expired - Fee Related CN203925527U (en) | 2014-07-02 | 2014-07-02 | A kind of construction joint of tunnel percolating water punishment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203925527U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105114106A (en) * | 2015-09-08 | 2015-12-02 | 温州信达交通工程试验检测有限公司 | Tunnel leakage treatment device |
CN106522990A (en) * | 2016-11-03 | 2017-03-22 | 铁道第三勘察设计院集团有限公司 | Tunnel lining end template structure with waterproofing and drainage functions |
CN106640154A (en) * | 2017-01-13 | 2017-05-10 | 中交四公局第工程有限公司 | Treatment method and structure for water seepage of tunnel lining circular construction joint crack |
CN108952774A (en) * | 2018-06-12 | 2018-12-07 | 济南城建集团有限公司 | A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment |
CN109113768A (en) * | 2018-11-06 | 2019-01-01 | 中南大学 | A kind of lining construction seam waterproof construction and waterproof method |
-
2014
- 2014-07-02 CN CN201420363504.5U patent/CN203925527U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105114106A (en) * | 2015-09-08 | 2015-12-02 | 温州信达交通工程试验检测有限公司 | Tunnel leakage treatment device |
CN106522990A (en) * | 2016-11-03 | 2017-03-22 | 铁道第三勘察设计院集团有限公司 | Tunnel lining end template structure with waterproofing and drainage functions |
CN106640154A (en) * | 2017-01-13 | 2017-05-10 | 中交四公局第工程有限公司 | Treatment method and structure for water seepage of tunnel lining circular construction joint crack |
CN108952774A (en) * | 2018-06-12 | 2018-12-07 | 济南城建集团有限公司 | A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment |
CN109113768A (en) * | 2018-11-06 | 2019-01-01 | 中南大学 | A kind of lining construction seam waterproof construction and waterproof method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203925527U (en) | A kind of construction joint of tunnel percolating water punishment system | |
CN203947484U (en) | A kind of drainage of foundation pit and circulating water utilization system | |
CN205276099U (en) | Drainage formula brick that permeates water | |
CN212690047U (en) | Tunnel fault broken zone excavation outline line edge curtain slip casting body structure | |
CN102644288A (en) | Method for constructing saving, clean and safe anhydrous tailings pond | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN204715426U (en) | A kind of water burst drainage system for closed deep foundation ditch exploratory hole | |
CN206801581U (en) | A kind of tunnel lining structure defect reinforcing device | |
CN104234089B (en) | The construction method that a kind of basement guarded drainage combines | |
CN205653871U (en) | Drain pipe convenient to rain water leakage | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN206220998U (en) | A kind of discharge structure on the outside of tunnel inverted arch | |
CN205804423U (en) | A kind of discharge structure of basement | |
CN203716064U (en) | Roadbed sewer convenient for dredging | |
CN113153365A (en) | Cross tunneling rapid construction method suitable for water-rich ventilation inclined shaft | |
CN108571342A (en) | A kind of Middle Wall of Multi-Arch Highway Tunnel top waterproof/drainage structure and its construction method | |
CN208619166U (en) | Tunnel roof waterproof flow guiding structure | |
CN206279547U (en) | Base pit dewatering well structure | |
CN103031849A (en) | Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well | |
CN206279548U (en) | A kind of base pit dewatering well crosses water pipe safeguard structure | |
CN105386471A (en) | Wall brushing device for constructing seams of H-section steel of underground diaphragm wall | |
CN207362974U (en) | A kind of urban road rain water collecting system | |
CN207211173U (en) | CFRD reverse drainage system | |
CN206736654U (en) | A kind of four chain water-permeable bricks of leaf half bore | |
CN206189236U (en) | Underground water drainage pipeline way based on sponge city |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 Termination date: 20190702 |
|
CF01 | Termination of patent right due to non-payment of annual fee |