CN203939524U - A kind of tunnel can maintenance type the device of decompression draining - Google Patents

A kind of tunnel can maintenance type the device of decompression draining Download PDF

Info

Publication number
CN203939524U
CN203939524U CN201420379628.2U CN201420379628U CN203939524U CN 203939524 U CN203939524 U CN 203939524U CN 201420379628 U CN201420379628 U CN 201420379628U CN 203939524 U CN203939524 U CN 203939524U
Authority
CN
China
Prior art keywords
semi
circular tube
rhone
tunnel
catch basin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420379628.2U
Other languages
Chinese (zh)
Inventor
郭小红
刘继国
李波
程勇
拓勇飞
魏龙海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Highway Consultants Co Ltd
Original Assignee
CCCC Second Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Highway Consultants Co Ltd filed Critical CCCC Second Highway Consultants Co Ltd
Priority to CN201420379628.2U priority Critical patent/CN203939524U/en
Application granted granted Critical
Publication of CN203939524U publication Critical patent/CN203939524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel for Fu Shui stratum can maintenance type the device of decompression draining, rhone is set on cable channel cover plate, choose the semi-circular tube that length is greater than rhone, in rhone, be provided with semi-circular tube, in rhone, to the equidistant priming hole that performs of country rock direction one side, priming hole is tilted to, and penetrates just lining and enters country rock, semi-circular tube is wrapped up in to the splash guard with nonwoven outward, and splash guard both sides are fixed on semi-circular tube on draining cell wall by nailing; At the reserved catch basin in semi-circular tube bottom, catch basin connects semi-circular tube by bellows, and gutter is connected with catch basin; Semi-circular tube outside seals by polyurethane material, and polyurethane material and draining cell wall break joint gap seal by poly-sulphur sealing compound; Draining cell wall outermost pastes one deck double side zinc coating steel plate, is anchored at two is lining with self-tapping screw.Simple in structure, easy to operate, drainage effect is good, has solved that tunnel drainage system stops up and the problem of the percolating water that causes.

Description

A kind of tunnel can maintenance type the device of decompression draining
Technical field
The utility model relates to tunnel drainage technical field, more specifically relate to a kind of tunnel can maintenance type the device of decompression draining, it is applicable to rich water formation tunnel design and occurs the improvement in percolating water tunnel.
Background technology
The drainage system in tunnel be tunnel construction, normally use and safe operation process in important step, tunnel occurs that the regulation problem after percolating water is also the technical barrier that domestic and international project interface is faced.Particularly, in outstanding stratum, high-water-pressure stratum and seabed tunnel of underground water, drainage system is particularly important, the performance that it is directly connected to the success or failure of tunnel construction and uses function.
The tunnel of building is in the past due to all relatively backward at aspects such as draining theory, adrainage material, drainage technology and equipment, therefore drainage system often there will be following point: the fine grained in country rock is easy to enter into drainage system, owing to there is no effective removal measure, so often cause drainage system to stop up, affect liner structure safety; In addition, percolating water is very large on the safe operation impact in tunnel, the percolating water in tunnel mainly occurs in constuction joint or the deformation joint of liner structure, and after tunnel, frigid plateau region generation water leakage defect, not only percolating water can affect normal use and the life-span of equipment in tunnel, and the concrete at percolating water place is after thawing circulation, intensity significantly reduces, and even Local Cracking, can bring great hidden danger to structural safety, flowing water, icy on road, has a strong impact on traffic safety simultaneously.
Summary of the invention
The purpose of this utility model be to provide a kind of tunnel can maintenance type the device of decompression draining, simple in structure, easy to operate, maintainable strong, solved that tunnel drainage system stops up and the problem of the percolating water that causes.
To achieve these goals, the technical solution adopted in the utility model is:
Tunnel can maintenance type the device of decompression draining, it comprises deformation joint (constuction joint), rhone, semi-circular tube, priming hole, splash guard, nailing, catch basin, bellows, gutter, cable channel cover plate, RPUF, the poly-sulphur sealing compound of two component, galvanized steel plain sheet, self-tapping screw, screw hole, country rock, just lining, two linings.Its annexation is: on cable channel cover plate, within the scope of 4-5m lining cutting, along tunnel deformation joint (constuction joint), be arranged circumferentially rhone, measure the length of described rhone, rhone is 4.2 ~ 5.2m approximately, choose the semi-circular tube that a length is greater than rhone 20 ~ 40cm, in rhone, be provided with semi-circular tube, in rhone, to country rock direction one side is equidistant, perform 4-8 priming hole; Priming hole construction direction should be tilted to, and at the beginning of penetrating, lining enters country rock, to guarantee in country rock endoporus upper water introduction hole; Semi-circular tube is wrapped up in to the splash guard with nonwoven outward, and splash guard both sides are fixed on semi-circular tube on draining cell wall by nailing; At the reserved catch basin in semi-circular tube bottom, catch basin connects semi-circular tube by bellows, and gutter is connected with catch basin, and water is incorporated in gutter, discharges outside hole; Semi-circular tube outside seals by polyurethane material, and polyurethane material and draining cell wall break joint gap seal by poly-sulphur sealing compound; Draining cell wall outermost pastes one deck double side zinc coating steel plate, and with self-tapping screw, be anchored at two and be lining with, screw hole ovalize, double side zinc coating steel plate is processed according to dimensional requirement, can level to meet steel plate, the vertical direction changing of the relative positions.
The utility model compared with prior art, has the following advantages and effect:
(1) adopting the maintainable tunnel on highly permeable provided by the utility model stratum to draw water discharge method is that the gutter of the permeable hole, gutter, catch basin and the both sides, road surface that utilize constuction joint or deformation joint is collected respectively the percolating water that tunnel vault, bottom occur, and be pooled in tunnel gutter way or central row ditch, then together drain into outside tunnel, this method is difficult for stopping up, and drainage effect is good;
(2) can effectively lower water pressure after lining cutting and two backings;
(3) can carry out later maintenance to the tunnel that uses decompression provided by the utility model can maintenance type to draw water discharge method, thereby avoid again digging the normal operation that lining cutting affects tunnel;
(4) what adopt that the maintainable tunnel on highly permeable provided by the utility model stratum draws water discharge method draws drainage position at deformation joint, constuction joint place, and the leakage problem at deformation joint, constuction joint place is solved;
(5) shape of galvanized steel plain sheet can adapt to the longitudinal and vertical distortion in tunnel.
Accompanying drawing explanation
Fig. 1 be a kind of tunnel can maintenance type the tunnel lateral direction cross-sectional view of decompression water discharge method.
Fig. 2 be a kind of tunnel can maintenance type boring sites in curing partial structurtes schematic diagram in decompression water discharge method.
Fig. 3 be a kind of tunnel can maintenance type catch basin position partial structurtes schematic diagram in decompression water discharge method.
Fig. 4 be a kind of tunnel can maintenance type rhone position partial structurtes schematic diagram in decompression water discharge method.
Fig. 5 be a kind of tunnel can maintenance type galvanized steel plain sheet schematic diagram in decompression water discharge method.
1-deformation joint (constuction joint) wherein; 2-rhone; 3-semi-circular tube; 4-priming hole; 5-splash guard; 6-nailing; 7-catch basin; 8-bellows; 9-gutter; 10-cable channel cover plate; 11-RPUF (market is purchased); The poly-sulphur sealing compound (market is purchased) of the two components of 12-; 13-galvanized steel plain sheet; 14-self-tapping screw; 15-screw hole; 16-country rock; 17-just serves as a contrast; 18-bis-linings.
The specific embodiment
Embodiment 1:
Known according to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, tunnel can maintenance type the device of decompression draining, it comprises deformation joint (constuction joint) 1, rhone 2, semi-circular tube 3, priming hole 4(10), splash guard 5, nailing 6, catch basin 7, bellows 8, gutter 9, cable channel cover plate 10, RPUF 11(market purchase), the poly-sulphur sealing compound 12(of two component market purchases), galvanized steel plain sheet 13, self-tapping screw 14, screw hole 15, country rock 16, just serve as a contrast 17, two linings 18.Its annexation is: on cable channel cover plate 10 4 or 5m lining cutting within the scope of along tunnel deformation joint (constuction joint) 1, be arranged circumferentially rhone 2, measure the length of described rhone 2, rhone 2 approximately 4.2 or 4.5 or 4.8 or 5.0 or 5.2m, choose a length and be greater than rhone 20 or 25 or 30 or 35 or the semi-circular tube 3 of 40cm, in rhone 2, be provided with semi-circular tube 3, to country rock 16 direction one sides are equidistant, perform 5 priming holes 4 rhone 2 is interior, priming hole 4 construction directions should be tilted to, and at the beginning of penetrating, lining 17 enters country rock 16; To outside semi-circular tube 3, wrap up in the splash guard 5 with nonwoven, splash guard 5 both sides are fixed on semi-circular tube 3 on rhone 2 walls by nailing 6; A reserved catch basin 7 in semi-circular tube 3 bottoms, catch basin 7 connects semi-circular tube 3 by bellows 8, and gutter 9 is connected with catch basin 7; Semi-circular tube 3 outsides seal by polyurethane material 11, and 2 gaps of polyurethane material 11 and draining cell wall seal by poly-sulphur sealing compound 12; Rhone 2 wall outermosts paste one deck double side zinc coating steel plate 13, with self-tapping screw 14, are anchored on two linings 18, and screw hole 15 ovalizes that galvanized steel plain sheet 13 both sides are arranged, galvanized steel plain sheet 13 can the vertical direction changing of the relative positions.
Described polyurethane material 11: polyurethane is the abbreviation of polyurethanes, and English name is polyurethane, it is a kind of macromolecular material.Polyurethane is a kind of emerging high-molecular organic material, is described as " the fifth-largest plastics ", because its remarkable performance is widely used in national economy various fields.
Described poly-sulphur sealing compound 12: poly-sulphur sealing compound be take liquid polysulphide rubber can the crosslinked poly-sulphur sealing compound of autovulcanization under the formulated normal temperature of base-material, the materials such as metal and concrete are had that good cementability is continuous flexible, keep good tightness and water proofing property under vibration and variations in temperature, and oil resistant, resistance to solvent, durability are excellent.
Described deformation joint (constuction joint) 1 is positioned at the central authorities of rhone 2.When temperature is when changing for-20 ℃ or-10 or 0 or 5 or 12 or 20 ℃, deformation joint (constuction joint) 1 is flexible, the semi-circular tube 3 setting within it is had to certain stretching, when described deformation joint (constuction joint) 1 is positioned at rhone 2 central, can carry out Uniform Tension to semi-circular tube 3, can make extend to some extent the application life of semi-circular tube.
Described double side zinc coating steel plate 13 is processed according to dimensional requirement.When temperature is when changing for-20 ℃ or-15 or-9 or-1 or-8 or 15 or 20 ℃, deformation joint (constuction joint) 1 is flexible; While there is differential settlement, deformation joint (constuction joint) changing of the relative positions Shang Xia 1.To being arranged on the galvanized steel plain sheet 13 of rhone 2 outsides, there is certain stretching.As shown in Figure 4,5, by being set, can deal with such galvanized steel plain sheet the changing of the relative positions of level, vertical direction.
The tunnel for Fu Shui stratum that the utility model provides can maintenance type decompression water discharge method be that the underground water of country rock is holed and entered the draining semicanal in rhone by diversion, is then drained to tunnel drainage ditch, finally water is discharged outside hole.
The above; it is only preferred embodiment of the present utility model; not the utility model is imposed any restrictions, every any simple modification, change and equivalent transformation of above embodiment being done according to the utility model technical spirit, all still belongs in the protection domain of technical solutions of the utility model.

Claims (2)

  1. Tunnel can maintenance type the device of decompression draining, it comprises deformation joint (1), rhone (2), semi-circular tube (3), splash guard (5), catch basin (7), bellows (8), gutter (9), cable channel cover plate (10), galvanized steel plain sheet (13), country rock (16), just serve as a contrast (17), two linings (18), it is characterized in that: within the scope of cable channel cover plate (10) upper 4 or 5m lining cutting, along tunnel deformation joint (1), be arranged circumferentially rhone (2), rhone (2) 4.2 ~ 5.2m, choose the semi-circular tube (3) that a length is greater than rhone (2) 20 ~ 40cm, in rhone (2), be provided with semi-circular tube (3), in rhone (2) to equidistant 4-8 the priming hole (4) that perform of country rock (16) direction one side, priming hole (4) is tilted to, penetrate just lining (17) and enter country rock (16), splash guard (5) with nonwoven will be wrapped up in outside semi-circular tube (3), splash guard (5) both sides are fixed on semi-circular tube (3) on rhone (2) wall by nailing (6), at the reserved catch basin (7) in semi-circular tube (3) bottom, catch basin (7) connects semi-circular tube (3) by bellows (8), and gutter (9) are connected with catch basin (7), semi-circular tube (3) outside seals by polyurethane material (11), and between polyurethane material (11) and rhone (2) wall, gap seals by poly-sulphur sealing compound (12), rhone (2) wall outermost pastes one deck double side zinc coating steel plate (13), with self-tapping screw (14), is anchored on two linings (18).
  2. A kind of tunnel according to claim 1 can maintenance type the device of decompression draining, it is characterized in that: screw hole (15) ovalize that described galvanized steel plain sheet (13) both sides are arranged, galvanized steel plain sheet (13) the vertical direction changing of the relative positions.
CN201420379628.2U 2014-07-08 2014-07-08 A kind of tunnel can maintenance type the device of decompression draining Active CN203939524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420379628.2U CN203939524U (en) 2014-07-08 2014-07-08 A kind of tunnel can maintenance type the device of decompression draining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420379628.2U CN203939524U (en) 2014-07-08 2014-07-08 A kind of tunnel can maintenance type the device of decompression draining

Publications (1)

Publication Number Publication Date
CN203939524U true CN203939524U (en) 2014-11-12

Family

ID=51858847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420379628.2U Active CN203939524U (en) 2014-07-08 2014-07-08 A kind of tunnel can maintenance type the device of decompression draining

Country Status (1)

Country Link
CN (1) CN203939524U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484773A (en) * 2015-12-25 2016-04-13 武汉市政工程设计研究院有限责任公司 System plugging and draining structure for tunnel leakage treatment
CN105781614A (en) * 2016-04-29 2016-07-20 广东华路交通科技有限公司 Novel visual operation highway tunnel side wall foot drainage system
CN108035770A (en) * 2017-12-10 2018-05-15 成都隶盈科技有限公司 A kind of power tunnel construction method
CN108661674A (en) * 2018-07-19 2018-10-16 中国铁路设计集团有限公司 A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device
CN108868883A (en) * 2018-07-26 2018-11-23 中铁十九局集团第六工程有限公司 Tunnel and its construction method
CN108952774A (en) * 2018-06-12 2018-12-07 济南城建集团有限公司 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment
CN108999635A (en) * 2018-08-14 2018-12-14 湖南科技大学 A kind of pilot drainage arrangement and construction method for the weak cementing roadway surrounding rock of rich water
CN111485921A (en) * 2020-04-16 2020-08-04 吴文旭 Water accumulation preventing system for underground engineering construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484773A (en) * 2015-12-25 2016-04-13 武汉市政工程设计研究院有限责任公司 System plugging and draining structure for tunnel leakage treatment
CN105781614A (en) * 2016-04-29 2016-07-20 广东华路交通科技有限公司 Novel visual operation highway tunnel side wall foot drainage system
CN108035770A (en) * 2017-12-10 2018-05-15 成都隶盈科技有限公司 A kind of power tunnel construction method
CN108952774A (en) * 2018-06-12 2018-12-07 济南城建集团有限公司 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment
CN108661674A (en) * 2018-07-19 2018-10-16 中国铁路设计集团有限公司 A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device
CN108868883A (en) * 2018-07-26 2018-11-23 中铁十九局集团第六工程有限公司 Tunnel and its construction method
CN108999635A (en) * 2018-08-14 2018-12-14 湖南科技大学 A kind of pilot drainage arrangement and construction method for the weak cementing roadway surrounding rock of rich water
CN111485921A (en) * 2020-04-16 2020-08-04 吴文旭 Water accumulation preventing system for underground engineering construction

Similar Documents

Publication Publication Date Title
CN203939524U (en) A kind of tunnel can maintenance type the device of decompression draining
CN104061017A (en) Tunnel maintainable type pressure reducing and water draining method and device for water rich stratum
CN204357485U (en) The drainage system of anti-tunnel double-lining behind ponding crossfire
CN204098937U (en) Tunnel deformation joint waterproof construction and constructing tunnel structure
CN101798939B (en) Maintainable tunnel drainage system
CN204716291U (en) Dewatering installation is drawn in tunnel pressure release
CN105297743B (en) A kind of ground-connecting-wall defect seepage stops discharge structure and its construction method
CN206874310U (en) One kind is applied to high pressure water enrichment tunnel decompression drainage arrangement
CN204266220U (en) A kind of plugging device of precipitation well in foundation pit
CN103526724B (en) The anchoring leakage preventing structure that a kind of reservoir bottom geomembrane is connected with storehouse week collector drain periphery fissure
CN210768835U (en) Waterproof reinforced structure of pipe jacking construction entrance to a cave
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN213867881U (en) Ground wall seepage emergency system
CN203684179U (en) Hidden drainage system in pipe network of power station stilling pool
CN103061351B (en) Prevent the device that basement bottom board swells, seeps water
CN205654378U (en) Novel visual operation highway tunnel side wall foot of a wall drainage system
CN206737950U (en) A kind of stainless steel floral tube structure of tunnel arch foot draining
CN107975153A (en) A kind of roof deformation stitches processing structure
CN205205831U (en) Ground even wall defect seepage ends drainage structures
CN203113385U (en) Waterproof structure between foundation pit support underground continuous wall and basement structural exterior wall
CN212200511U (en) Deep foundation pit plugging device
CN206928311U (en) A kind of bottom plate water draw-off
CN114151131A (en) Tunnel drainage system suitable for strong water-rich stratum and construction method
CN218324896U (en) Steel arch frame structure assembly suitable for water-rich tunnel
CN219299367U (en) Vertical shaft combined type waterproof and drainage system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant