CN108035770A - A kind of power tunnel construction method - Google Patents

A kind of power tunnel construction method Download PDF

Info

Publication number
CN108035770A
CN108035770A CN201711300819.XA CN201711300819A CN108035770A CN 108035770 A CN108035770 A CN 108035770A CN 201711300819 A CN201711300819 A CN 201711300819A CN 108035770 A CN108035770 A CN 108035770A
Authority
CN
China
Prior art keywords
power tunnel
electric power
pumping channel
construction method
drainage ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711300819.XA
Other languages
Chinese (zh)
Other versions
CN108035770B (en
Inventor
邓佳美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yajuxuan Art Co ltd
Original Assignee
Chengdu Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Science And Technology Co Ltd filed Critical Chengdu Science And Technology Co Ltd
Priority to CN201711300819.XA priority Critical patent/CN108035770B/en
Publication of CN108035770A publication Critical patent/CN108035770A/en
Application granted granted Critical
Publication of CN108035770B publication Critical patent/CN108035770B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Abstract

The present invention provides a kind of power tunnel construction method, belong to field of electricity construction, comprise the following steps:Main body construction;Excavate drainage ditch:Drainage ditch is excavated in the bottom of electric power tunnel;Pumping channel is set:Pumping channel is excavated on ground, and the bottom of pumping channel is connected the inside of electric power tunnel from above the side of electric power tunnel;It is laid with supporting structure:Supporting block is laid with electric power tunnel inner wall and forms supporting structure, and exposes the port of drainage ditch and pumping channel;At the top of drainage ditch, double-edged fine-toothed comb is set.The electric power tunnel obtained by this construction method has the characteristics that reasonable in design, drainage efficiency is high.The effect of Quick drainage can be played by being arranged on the drainage ditch of electric power tunnel bottom, assisted drainage can be carried out when drainage ditch is filled and has little time draining by being arranged on the pumping channel at the top of electric power tunnel, ensure that electric power tunnel internal water accumulation is quickly discharged, make power pipe that there is good working environment.

Description

A kind of power tunnel construction method
Technical field
The present invention relates to field of electricity construction, in particular to a kind of power tunnel construction method.
Background technology
Power engineering is one of foundation engineering important at present.Electric power tunnel is that a kind of important electric power passes in power engineering Defeated approach, electric power tunnel have efficiency of transmission height, the effect of transmission safety and stability.
Need to consider drainage problem in some rainy regional electric power tunnel work progress, in the prior art electric power tunnel With certain discharge structure, but structure is relatively simple, and drainage effect is general, and electric power tunnel inner product may be caused when raining heavyly by running into Water.
The content of the invention
The present invention provides a kind of power tunnel construction method, it is intended to solves the above problem of the prior art.
What the present invention was realized in:
A kind of power tunnel construction method, comprises the following steps:
Main body construction:The construction of electric power tunnel main body is carried out using shield method;
Excavate drainage ditch:Drainage ditch is excavated in the bottom of electric power tunnel;
Pumping channel is set:Pumping channel is excavated on ground, and the bottom of pumping channel is connected from above the side of electric power tunnel The inside of electric power tunnel;
It is laid with supporting structure:Supporting block is laid with electric power tunnel inner wall and forms supporting structure, and exposes drainage ditch and pumping channel Port;
At the top of drainage ditch, double-edged fine-toothed comb is set.
More preferably, adapter is set in the bottom nozzle of pumping channel, the side wall of adapter is fixedly connected with supporting block, And set at adapter and be detachably connected with it and the plug of sealing can be will take over.
More preferably, the side wall after laying supporting structure in electric power tunnel is set along the extending direction interval of electric power tunnel Put multiple supporting items;Supporting item includes substrate and multiple support plates, and substrate is arc, and substrate is vertically connected in supporting block, Support plate is slab construction, and each support plate is horizontally set on substrate, and multiple support plates are vertically arranged at intervals, and support plate Set towards the middle part of electric power tunnel and perpendicular to the axis of electric power tunnel;
Side wall after setting supporting item in electric power tunnel sets sliding equipment, and sliding equipment includes slide and sliding block, and slide is set Set in supporting block and along the extending direction of electric power tunnel, and slide is arranged on the top of multiple supporting items, and in slide Portion is close to the plug;Sliding block is slidably disposed on slide, and the sidepiece of sliding block is provided with connecting seat, is provided with connecting seat Connector, connecting cantilever on connector, the end connection pipe fitting of cantilever;The connector is rotatablely connected with connecting seat so that connecting Connector can be rotated around vertical axis, and the cantilever enables cantilever to turn around horizontal axis with connector rotation connection It is dynamic, on the pipe fitting can connecting pipe, the length of the cantilever is more than the length of the support plate.
More preferably, the pipe fitting is connected with cantilever flexural pivot.
More preferably, the pipe fitting includes the intermediate plate of two arcs, and at least one intermediate plate being capable of activity.
More preferably, the intermediate plate forms for sheet metal bending.
More preferably, the pumping channel causes the top of pumping channel to deviate the bottom of pumping channel for incline structure End.
More preferably, the top of the pumping channel is connected with the end cap being detachably connected with it.
Power tunnel construction method provided by the invention, the electric power tunnel obtained by this construction method are set with structure The characteristics of meter is rationally, drainage efficiency is high.The effect of Quick drainage can be played by being arranged on the drainage ditch of electric power tunnel bottom, be set Pumping channel at the top of electric power tunnel can carry out assisted drainage when drainage ditch is filled and has little time draining, it is ensured that electric power Tunnel internal water accumulation is quickly discharged, and power pipe is had good working environment.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the schematic cross-sectional view of the obtained electric power tunnel of power tunnel construction method provided in an embodiment of the present invention;
Fig. 2 is the structure diagram of the obtained electric power tunnel of power tunnel construction method provided in an embodiment of the present invention, at this time Cantilever is vertical;
Fig. 3 is the structure diagram of the obtained electric power tunnel of power tunnel construction method provided in an embodiment of the present invention, at this time Cantilever basic horizontal;
Fig. 4 is that cantilever is connected with pipe fitting in the obtained electric power tunnel of power tunnel construction method provided in an embodiment of the present invention Structure diagram.
Reference numeral collects:Electric power tunnel 11, drainage ditch 12, pumping channel 13, supporting structure 14, supporting block 15, double-edged fine-toothed comb 16, connect Pipe 17, plug 18, supporting item 19, substrate 20, support plate 21, slide 22, sliding block 23, connecting seat 24, connector 25, cantilever 26, Pipe fitting 27, intermediate plate 28, end cap 29.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
Embodiment, please refers to Fig.1-4.
A kind of power tunnel construction method is present embodiments provided, the electric power tunnel 11 obtained by this construction method has There is the characteristics of reasonable in design, drainage efficiency is high.Quick row can be played by being arranged on the drainage ditch 12 of 11 bottom of electric power tunnel The effect of water, be arranged on the top of electric power tunnel 11 pumping channel 13 can drainage ditch 12 be filled have little time draining when Carry out assisted drainage, it is ensured that 11 internal water accumulation of electric power tunnel is quickly discharged, and power pipe is had good working environment.
As shown in Figure 1, this power tunnel construction method, comprises the following steps:
Main body construction:The construction of 11 main body of electric power tunnel is carried out using shield method;
Excavate drainage ditch 12:Drainage ditch 12 is excavated in the bottom of electric power tunnel 11;
Pumping channel 13 is set:Pumping channel 13 is excavated on ground, and makes the bottom of pumping channel 13 from the side of electric power tunnel 11 Top connects the inside of electric power tunnel 11;
It is laid with supporting structure 14:Supporting block 15 is laid with 11 inner wall of electric power tunnel and forms supporting structure 14, and exposes drainage ditch 12 And the port of pumping channel 13;
At the top of drainage ditch 12, double-edged fine-toothed comb 16 is set.
The construction of 11 agent structure of electric power tunnel can be rapidly completed by shield method.And the quality of electric power tunnel 11 compared with Height, straightness are good.Drainage ditch 12 is arranged on the bottom of electric power tunnel 11, extends along the extending direction of electric power tunnel 11, and set Drainage ditch 12 will not be blocked by putting 14 rear support structure 14 of supporting structure, the ponding in electric power tunnel 11 is discharged into drainage ditch 12, set double-edged fine-toothed comb 16 that personnel are easily walked in electric power tunnel 11 at the top of drainage ditch 12.
Pumping channel 13 has the effect of assisted drainage, can be quickly by electric power tunnel 11 with reference to the use of drainage ditch 12 Ponding discharge.Pumping channel 13 is excavated from ground, is constructed with the mode of rotary digging, and the bottom of pumping channel 13 connects after construction Inside logical electric power tunnel 11, pumping equipment is set on ground, and pipeline is taken out certainly when alloing 11 internal water accumulation of electric power tunnel serious Aquaporin 13 is stretched into electric power tunnel 11, quickly can be drained ponding by pumping equipment, it is ensured that electric power in electric power tunnel 11 The safety of equipment.
Supporting block 15 is arcuate structure, and the side wall for being fixed on electric power tunnel 11 forms supporting structure 14 so that electric power tunnel Road 11 is more firm, and power equipment can have good protecting effect.
The electric power tunnel 11 obtained by this construction method has the characteristics that reasonable in design, drainage efficiency is high.If The effect of Quick drainage can be played by putting the drainage ditch 12 in 11 bottom of electric power tunnel, be arranged on drawing water for the top of electric power tunnel 11 Passage 13 can carry out assisted drainage when drainage ditch 12 is filled and has little time draining, it is ensured that 11 internal water accumulation of electric power tunnel is quick Discharge, makes power pipe have good working environment.
As shown in Figure 1, the bottom nozzle in pumping channel 13 sets adapter 17, the side wall and supporting block 15 for making adapter 17 are fixed Connection, and set at adapter 17 and be detachably connected with it and the plug 18 of 17 sealings can be will take over.
The setting of adapter 17 facilitates drinking-water pipe to stretch into inside electric power tunnel 11, and plug 18 is set at adapter 17, makes plug 18, which will take over 17 ports, blocks, without using when impurity is not entered inside electric power tunnel 11 out of pumping channel 13.
As shown in Figures 2 and 3, it is laid with after supporting structure 14 in extension side of the side wall along electric power tunnel 11 of electric power tunnel 11 To the multiple supporting items 19 of interval setting;Supporting item 19 includes substrate 20 and multiple support plates 21, and substrate 20 is arc, 20 edge of substrate Vertically it is connected in supporting block 15, support plate 21 is slab construction, and each support plate 21 is horizontally disposed on the base plate 20, Duo Gezhi Fagging 21 is vertically arranged at intervals, and support plate 21 is set towards the middle part of electric power tunnel 11 and perpendicular to the axis of electric power tunnel 11 Put;
Side wall after setting supporting item 19 in electric power tunnel 11 sets sliding equipment, and sliding equipment includes slide 22 and sliding block 23, Slide 22 is arranged in supporting block 15 and is set along the extending direction of electric power tunnel 11, and slide 22 is arranged on multiple supporting items 19 Top, and the middle part of slide 22 is close to the plug 18;Sliding block 23 is slidably disposed on slide 22, the sidepiece of sliding block 23 Connecting seat 24 is provided with, is provided with connector 25 on connecting seat 24, connecting cantilever 26 on connector 25, the end connection of cantilever 26 17 connector of pipe;The connector 25 is rotatablely connected with connecting seat 24 enables connector 25 to be rotated around vertical axis, described Cantilever 26 is rotatablely connected with connector 25 enables cantilever 26 to be rotated around horizontal axis, can be connected on the pipe fitting 27 Pipe 17, the length of the cantilever 26 are more than the length of the support plate 21.
Set supporting item 19 power pipe is laid with along support plate 21, make to be laid with electric power tunnel 11 More power pipes, while enable ground of the power pipe away from electric power tunnel 11, away from ponding;Skate machine is set at the same time Structure enables drinking-water pipe conveniently to connect, work progress of conveniently drawing water, while the structure setting of sliding equipment is not so as to Influenced, can normally be worked by multiple supporting items 19 that the inside of electric power tunnel 11 is set.
Multiple support plates 21 are set on each supporting item 19, multiple supporting items 19 complement each other to form Multi-layer supporting layer, Make that more power pipes can be accommodated inside electric power tunnel 11.The substrate 20 of arc is conveniently connected to the supporting block 15 of arcuate structure On, the support plate 21 of slab construction facilitates the placement of pipeline.
Sliding equipment is arranged on the top of supporting item 19, and sliding block 23 can be slided relative to slide 22.The middle part of slide 22 Close to plug 18, sliding block 23 is easier have wider array of moving range close to drinking-water pipe, drinking-water pipe when making to draw water, and draw water operation model Enclose bigger.
When in use, drinking-water pipe is extended to inside electric power tunnel 11 from pumping channel 13, and the end of drinking-water pipe is connected On pipe fitting 27.Connecting seat 24 is used to connect miscellaneous part, and connector 25 can rotate, and cantilever 26 can be driven to rotate And changing the direction of cantilever 26, cantilever 26 enables 26 end position of cantilever to change with the rotation connection of connector 25.
When needing mobile sliding block 23 and then changing drinking-water pipe end position, rotate cantilever 26 and be at horizontal level, Cantilever 26 during the slip of sliding block 23 is set not influenced by horizontally disposed support plate 21.Rotation connection first 25 makes cantilever 26 at the same time End makes cantilever 26 consistent with the direction of support plate 21, since 26 length of cantilever is more than towards the center of electric power tunnel 11 21 length of support plate, makes the position of pipe fitting 27 and drinking-water pipe and the position of support plate 21 non-interference, is moved through in sliding block 23 It will not influence each other between each component in journey.Rotation connection first 25 and cantilever 26 make to draw water after sliding block 23 is moved to suitable position Pipe is towards ponding position and carries out work of drawing water.
Ponding is not easy to flow when ponding is shallower, by setting sliding equipment quickly and easily to change drinking-water pipe Position, so as to provide guaranteeing role for Quick drainage, staff is reduced the underground construction activity duration, be also work The health for making personnel provides guarantee.
The pipe fitting 27 is connected with 26 flexural pivot of cantilever.Flexural pivot connection relation enable pipe fitting 27 direction more Optionally rotate.
As shown in figure 4, the pipe fitting 27 includes the intermediate plate 28 of two arcs, at least one intermediate plate 28 being capable of activity.It is logical The setting for crossing this structure enables pipe fitting 27 is more convenient to be quickly clamped drinking-water pipe, and quickly changes drinking-water pipe The direction of end.
The intermediate plate 28 forms for sheet metal bending.
The pumping channel 13 causes the top of pumping channel 13 to deviate the bottom of pumping channel 13 for incline structure.Tilt The pumping channel 13 of setting enables the structure of electric power tunnel 11 to keep more firm, and the water extracted out is not easily penetrated into electricity In power tunnel 11.
The top of the pumping channel 13 is connected with the end cap 29 being detachably connected with it.End cap 29 coordinates plug 18, makes Impurity is not easily accessed in electric power tunnel 11.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and the principles and novel features disclosed herein phase one The most wide scope caused.

Claims (8)

1. a kind of power tunnel construction method, it is characterised in that comprise the following steps:
Main body construction:The construction of electric power tunnel main body is carried out using shield method;
Excavate drainage ditch:Drainage ditch is excavated in the bottom of electric power tunnel;
Pumping channel is set:Pumping channel is excavated on ground, and the bottom of pumping channel is connected from above the side of electric power tunnel The inside of electric power tunnel;
It is laid with supporting structure:Supporting block is laid with electric power tunnel inner wall and forms supporting structure, and exposes drainage ditch and pumping channel Port;
At the top of drainage ditch, double-edged fine-toothed comb is set.
2. power tunnel construction method according to claim 1, it is characterised in that set and connect in the bottom nozzle of pumping channel Pipe, makes the side wall of adapter be fixedly connected with supporting block, and is set at adapter and be detachably connected with it and can will take over sealing Plug.
3. power tunnel construction method according to claim 2, it is characterised in that be laid with after supporting structure in electric power tunnel Side wall be arranged at intervals multiple supporting items along the extending direction of electric power tunnel;Supporting item includes substrate and multiple support plates, substrate For arc, substrate is vertically connected in supporting block, and support plate is slab construction, and each support plate is horizontally set on substrate, Multiple support plates are vertically arranged at intervals, and support plate is set towards the middle part of electric power tunnel and perpendicular to the axis of electric power tunnel Put;
Side wall after setting supporting item in electric power tunnel sets sliding equipment, and sliding equipment includes slide and sliding block, and slide is set Set in supporting block and along the extending direction of electric power tunnel, and slide is arranged on the top of multiple supporting items, and in slide Portion is close to the plug;Sliding block is slidably disposed on slide, and the sidepiece of sliding block is provided with connecting seat, is provided with connecting seat Connector, connecting cantilever on connector, the end connection pipe fitting of cantilever;The connector is rotatablely connected with connecting seat so that connecting Connector can be rotated around vertical axis, and the cantilever enables cantilever to turn around horizontal axis with connector rotation connection It is dynamic, on the pipe fitting can connecting pipe, the length of the cantilever is more than the length of the support plate.
4. power tunnel construction method according to claim 3, it is characterised in that the pipe fitting connects with cantilever flexural pivot Connect.
5. power tunnel construction method according to claim 4, it is characterised in that the pipe fitting includes two arcs Intermediate plate, at least one intermediate plate being capable of activities.
6. power tunnel construction method according to claim 5, it is characterised in that the intermediate plate for sheet metal bend and Into.
7. power tunnel construction method according to claim 6, it is characterised in that the pumping channel makes for incline structure Deviate the bottom of pumping channel in the top for obtaining pumping channel.
8. power tunnel construction method according to claim 7, it is characterised in that the top of the pumping channel is connected with The end cap being detachably connected with it.
CN201711300819.XA 2017-12-10 2017-12-10 A kind of power tunnel construction method Active CN108035770B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711300819.XA CN108035770B (en) 2017-12-10 2017-12-10 A kind of power tunnel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711300819.XA CN108035770B (en) 2017-12-10 2017-12-10 A kind of power tunnel construction method

Publications (2)

Publication Number Publication Date
CN108035770A true CN108035770A (en) 2018-05-15
CN108035770B CN108035770B (en) 2019-11-26

Family

ID=62101880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711300819.XA Active CN108035770B (en) 2017-12-10 2017-12-10 A kind of power tunnel construction method

Country Status (1)

Country Link
CN (1) CN108035770B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441489A (en) * 2018-12-29 2019-03-08 中国铁路设计集团有限公司 A kind of buried Central drain supporting construction in tunnel and construction method for supporting
CN112431632A (en) * 2020-11-30 2021-03-02 北京元洋鑫胜电力工程有限公司 Construction method of electric power tunnel

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2667759Y (en) * 2003-11-03 2004-12-29 刘鹏 Flameproof electric cable tunnel
CN101725369A (en) * 2008-10-16 2010-06-09 牡丹江电业局 Automatic drainage system for cable tunnel
CN203412598U (en) * 2013-06-20 2014-01-29 沈阳电力勘测设计院 Cable-tunnel composite lining waterproof structure
CN203488208U (en) * 2013-09-28 2014-03-19 中铁二十局集团第二工程有限公司 Drainage system in tunnel hole
CN104061017A (en) * 2014-07-08 2014-09-24 中交第二公路勘察设计研究院有限公司 Tunnel maintainable type pressure reducing and water draining method and device for water rich stratum
CN203939524U (en) * 2014-07-08 2014-11-12 中交第二公路勘察设计研究院有限公司 A kind of tunnel can maintenance type the device of decompression draining
CN105545355A (en) * 2016-01-19 2016-05-04 西南交通大学 Drainage structure suitable for tunnel bottom in water-rich rock stratum
CN106499437A (en) * 2017-01-07 2017-03-15 中铁十五局集团第五工程有限公司 A kind of bored tunnel base plate drainage processing method and its structure
CN106761920A (en) * 2017-02-16 2017-05-31 重庆国翔新材料有限公司 A kind of device for preventing to be crystallized in tunneling drain by magnetic field
CN206506259U (en) * 2017-02-28 2017-09-19 张令东 A kind of electric power tunnel structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2667759Y (en) * 2003-11-03 2004-12-29 刘鹏 Flameproof electric cable tunnel
CN101725369A (en) * 2008-10-16 2010-06-09 牡丹江电业局 Automatic drainage system for cable tunnel
CN203412598U (en) * 2013-06-20 2014-01-29 沈阳电力勘测设计院 Cable-tunnel composite lining waterproof structure
CN203488208U (en) * 2013-09-28 2014-03-19 中铁二十局集团第二工程有限公司 Drainage system in tunnel hole
CN104061017A (en) * 2014-07-08 2014-09-24 中交第二公路勘察设计研究院有限公司 Tunnel maintainable type pressure reducing and water draining method and device for water rich stratum
CN203939524U (en) * 2014-07-08 2014-11-12 中交第二公路勘察设计研究院有限公司 A kind of tunnel can maintenance type the device of decompression draining
CN105545355A (en) * 2016-01-19 2016-05-04 西南交通大学 Drainage structure suitable for tunnel bottom in water-rich rock stratum
CN106499437A (en) * 2017-01-07 2017-03-15 中铁十五局集团第五工程有限公司 A kind of bored tunnel base plate drainage processing method and its structure
CN106761920A (en) * 2017-02-16 2017-05-31 重庆国翔新材料有限公司 A kind of device for preventing to be crystallized in tunneling drain by magnetic field
CN206506259U (en) * 2017-02-28 2017-09-19 张令东 A kind of electric power tunnel structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441489A (en) * 2018-12-29 2019-03-08 中国铁路设计集团有限公司 A kind of buried Central drain supporting construction in tunnel and construction method for supporting
CN109441489B (en) * 2018-12-29 2024-04-05 中国铁路设计集团有限公司 Tunnel deep-buried central ditch supporting structure and supporting construction method
CN112431632A (en) * 2020-11-30 2021-03-02 北京元洋鑫胜电力工程有限公司 Construction method of electric power tunnel

Also Published As

Publication number Publication date
CN108035770B (en) 2019-11-26

Similar Documents

Publication Publication Date Title
CN104806272B (en) Tunnel shunting combined type guarded drainage integrated system and construction method and using method
CN104577364B (en) Small-resistance-value grounding grid of large device and design construction method
CN108035770A (en) A kind of power tunnel construction method
CN204572015U (en) A kind of tunnel shunting combined type waterproof and water drainage system
CN106758800A (en) A kind of overpass system for reclaiming rainwater and its construction method
CN108166526A (en) Municipal integrated comprehensive lays the construction technology of pipeline
CN110889163A (en) Method for treating coal mining collapse wide and large cracks in loess hilly area
CN214997441U (en) Horizontal directional drilling machine
CN112112212B (en) Ditch moss cleaning device for hydraulic engineering
CN109183802A (en) A kind of construction method for protecting municipal pipeline
CN210509282U (en) Reverse slope tunnel construction drainage system
CN206647135U (en) Dredge discharge structure in a kind of tunnel
CN212614870U (en) TBM tunnel construction landing stage drainage system
CN208513258U (en) A kind of construction inner wall of the pipe dredging cleaning plant
CN207121911U (en) A kind of foundation ditch horizontal tube precipitation system
CN214993751U (en) Novel embedded sleeve milling joint
CN216277721U (en) Accurate perforating device of peripheral eye
CN214169122U (en) Interim plugging device of precipitation well
CN213709619U (en) Hydraulic engineering retaining wall drainage structures
CN105638387A (en) Water-saving irrigation construction method through water pump
CN206895422U (en) A kind of rainer on the large-scale water channel greening slope of movable type
CN207620014U (en) A kind of Novel underground room seepage treatment structure
CN211446809U (en) Seepage-proofing channel installation device
CN214597968U (en) Municipal building engineering foundation pit dust device
CN219181154U (en) Underground pipeline laying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191025

Address after: 311800 No. 372, Xizhou village, Lingbei Town, Zhuji City, Shaoxing City, Zhejiang Province

Applicant after: Zhou Tie

Address before: 610041 No. 39 Jinfeng Street, Wuhou District, Chengdu City, Sichuan Province, with No. 11

Applicant before: CHENGDU LIYING TECHNOLOGY CO.,LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220621

Address after: 311800 Datang Jie Dao Yang Jia Lou Cun Xin Zhai natural village, Zhuji City, Shaoxing City, Zhejiang Province

Patentee after: Zhejiang yajuxuan Art Co.,Ltd.

Address before: No. 372, Xizhou village, Lingbei Town, Zhuji City, Shaoxing City, Zhejiang Province, 311800

Patentee before: Zhou Tie

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method of power tunnel

Effective date of registration: 20220621

Granted publication date: 20191126

Pledgee: Shaoxing Bank Co.,Ltd. Zhuji sub branch

Pledgor: Zhejiang yajuxuan Art Co.,Ltd.

Registration number: Y2022980008391