WO2019237908A1 - Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel - Google Patents

Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel Download PDF

Info

Publication number
WO2019237908A1
WO2019237908A1 PCT/CN2019/088493 CN2019088493W WO2019237908A1 WO 2019237908 A1 WO2019237908 A1 WO 2019237908A1 CN 2019088493 W CN2019088493 W CN 2019088493W WO 2019237908 A1 WO2019237908 A1 WO 2019237908A1
Authority
WO
WIPO (PCT)
Prior art keywords
drainage
construction joint
anchor bolt
sides
water stop
Prior art date
Application number
PCT/CN2019/088493
Other languages
French (fr)
Chinese (zh)
Inventor
孙杰
李雷
李海宾
曲红叶
解德龙
尉鹏
江鹏
井乐雨
Original Assignee
济南城建集团有限公司
山东汇通建设集团有限公司
山东汇友市政园林集团有限公司
山东易方达建设项目管理有限公司
济南城建设计研究院有限责任公司
山东泉建工程检测有限公司
济南市市政工程建设集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 济南城建集团有限公司, 山东汇通建设集团有限公司, 山东汇友市政园林集团有限公司, 山东易方达建设项目管理有限公司, 济南城建设计研究院有限责任公司, 山东泉建工程检测有限公司, 济南市市政工程建设集团有限公司 filed Critical 济南城建集团有限公司
Publication of WO2019237908A1 publication Critical patent/WO2019237908A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Definitions

  • the invention relates to the technical field of tunnel underground engineering, and in particular relates to a method for combined treatment of leakage, plugging and drainage of a tunnel's two-line construction joint.
  • the present invention provides a method for combined treatment of leakage, plugging, and drainage of a tunnel's secondary lining construction joint.
  • the butyl rubber sealing tape is provided with a circular hole in advance.
  • the diameter of the circular hole is equal to the diameter of the anchor bolt.
  • the butyl rubber sealing tape is passed through the circular hole. Put it on the anchor bolt and press it to make it adhere firmly with the waterproof sealant painted below;
  • a drainage pipe is set at the foot of the secondary lining construction joint.
  • the drainage pipe communicates with the drainage drainage groove mentioned above, so that the drainage pipe enters the side ditch, and the blind drainage pipe in the side ditch communicates with the central drainage ditch to form a block.
  • the waterproof sealant is a reactive waterproof sealant.
  • the rubber water stop is a 350 mm wide external type water stop.
  • the anchor bolt is a chemical anchor bolt.
  • the invention provides an effective treatment measure after the water leakage of the tunnel's second lining construction joint occurs, and provides an effective solution to eliminate the water leakage as soon as possible and restore the normal use of the tunnel.
  • the invention is a method for combined treatment of blocking and discharging, which does not change the current structure of the secondary lining of the tunnel, is less destructive, effectively avoids cracking of the lining, does not affect the safety and use of the tunnel, and improves the durability of the structure. It has strong operability and forms a plugging and drainage combination system to achieve natural drainage, with significant economic and social benefits.
  • FIG. 1 is a schematic structural diagram of an anchor bolt according to the present invention.
  • FIG. 2 is a schematic structural diagram of a lead row according to the present invention.
  • a method for combined treatment of leakage, plugging and drainage of a tunnel's second lining construction joint including the following steps:
  • the range of the anchor bolts 3 is popped up with ink lines on the sides of the construction joint 1 according to the width of the buried waterstop.
  • the anchor bolts 3 on both sides have a distance of 150 mm.
  • the side anchor bolts 3 are symmetrically distributed on both sides of the construction joint 1, and then the customized anchor bolts 3 are embedded according to the ink line.
  • the preferred anchor bolts 3 are chemical anchor bolts;
  • the butyl rubber sealing tape 4 has a round hole in advance. The diameter of the round hole is equal to the diameter of the anchor bolt 3.
  • the base rubber sealing tape 4 is set on the anchor bolt 3 and pressed to make it adhere firmly to the waterproof sealant 2 painted below.
  • the butyl rubber sealing tape 4 has high bonding strength, tensile strength, good elasticity and elongation. Strong adaptability to interface deformation and cracking;
  • the rubber water stop 5 is preferably 350 mm wide in this embodiment. Outside water stop, rubber water stop 5 is sleeved on the anchor bolts 3 on both sides.
  • the rubber water stop 5 has round holes in advance, and the rubber water stop can be made according to the distance between the anchor bolts 3 on both sides. Mark the line on the belt 5 and drill a circular hole. The diameter of the circular hole is equal to the diameter of the anchor bolt 3.
  • the rubber water stop 5 is set on the anchor bolt 3 through the circular hole, and then the water-proof tape on the butyl rubber sealing band 4 is pressed.
  • the sealant 2 is firmly bonded, so that the rubber water stop 5 forms a drainage channel 6 at the construction joint 1;
  • the steel plate 7 is sleeved on the anchor bolts 3 on both sides.
  • the steel plate 7 is also drilled with a round hole in advance. The diameter of the round hole is equal to the diameter of the anchor bolt 3.
  • the steel plate 7 is set on the anchor bolt 3, and the steel plate 7 further fixes the two ends of the rubber water stop 5; finally, the steel plate 7 and the rubber water stop 5 can be firmly fixed on the concrete wall through the nut 8.
  • a drainage pipe 9 is set at the arch joint 1 of the secondary lining 12, and the drainage pipe 9 communicates with the drainage channel 6 described above, so that the drainage pipe 9 enters the side ditch. 10 communicates with the central drainage ditch 11, thereby realizing the natural drainage of water leakage at one construction joint, and the combination of blocking and drainage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Disclosed is a blocking and drainage combined treatment method for water leakage at a construction joint of a secondary lining of a tunnel. According to the method, water is blocked by means of an anchor bolt (3) and a rubber waterstop (5), and the water is then naturally drained via a drainage channel (6) and a drainage pipe (9). The method does not change the current structure of the secondary lining (12) of the tunnel and is not very destructive, thereby effectively preventing the cracking of a lining and not influencing the safety and usage of a tunnel. Moreover, the construction steps of the method are simple and have high operability, and a blocking and drainage combined system is formed to realize natural drainage.

Description

一种隧道二衬施工缝渗漏水堵排结合处治的方法Method for treating leakage, blocking and discharging combined treatment of tunnel secondary lining construction joint 技术领域Technical field
本发明涉及隧道地下工程技术领域,具体涉及到一种隧道二衬施工缝渗漏水堵排结合处治的方法。The invention relates to the technical field of tunnel underground engineering, and in particular relates to a method for combined treatment of leakage, plugging and drainage of a tunnel's two-line construction joint.
背景技术Background technique
城市地下道路及其他地下工程施工及运营过程中,由于地下管线错综复杂,地质复杂多变,大多数隧道及地下工程都存在不同程度的水害、冻害、衬砌破损、衬砌侵蚀,其中水害最为常见,隧道出现不同程度的渗漏现象。其中又以施工缝、变形缝渗漏水最为常见。隧道发生渗漏,对隧道的安全运营影响极大,甚至危及隧道结构安全。目前的渗漏治理大多是针对渗漏部位单纯的采取洞内注浆封堵、开槽引排或两者结合系统治理,但现有堵水结构需破坏二次衬砌结构,影响结构使用状态安全性,未设置堵排结合系统,未实现自然排水。During the construction and operation of urban underground roads and other underground projects, due to the complexity of underground pipelines and the geological complexity, most tunnels and underground projects have varying degrees of water damage, freezing damage, lining damage, and lining erosion. Among them, water damage is the most common. Tunnels Leakage occurs to varying degrees. Among them, the leakage of construction joints and deformation joints is the most common. Leakage in the tunnel has a great impact on the safe operation of the tunnel and even endangers the safety of the tunnel structure. At present, most of the leakage treatment is based on the treatment of the leakage site simply by grouting in the cave, slotted drainage, or a combination of the two. However, the existing water blocking structure needs to destroy the secondary lining structure and affect the safety of the structure's use status. It is not equipped with a plugging and drainage combination system and does not achieve natural drainage.
发明内容Summary of the Invention
本发明为解决现有技术的不足,提供一种隧道二衬施工缝渗漏水堵排结合处治的方法。In order to solve the shortcomings of the prior art, the present invention provides a method for combined treatment of leakage, plugging, and drainage of a tunnel's secondary lining construction joint.
本发明是通过以下技术方案实现的:The present invention is achieved through the following technical solutions:
(1)凿除二次衬砌施工缝原填充材料,凿至中埋式止水带表面,清理施工缝内表面,清理完后用防水密封胶将施工缝进行压实填满,防水密封胶与施工缝两侧粘接密实,然后再用腻子刀刮平施工缝表面;(1) Chisel the original filling material of the secondary lining construction joint, cut to the surface of the middle-buried waterstop, and clean the inner surface of the construction joint. After cleaning, use a waterproof sealant to compact and fill the construction joint. The two sides of the construction joint are densely bonded, and then the surface of the construction joint is scraped with a putty knife;
(2)待防水密封胶达到要求的强度后,然后在施工缝两侧根据中埋式止水带宽度用墨线弹出安装锚栓的范围,然后根据墨线预埋定制的锚栓,锚栓对称预埋在施工缝两侧,两侧锚栓的间距为150mm;(2) After the waterproof sealant reaches the required strength, then the range of anchor bolts is popped up with ink lines according to the width of the buried waterstop on both sides of the construction joint, and then the customized anchor bolts are embedded according to the ink lines. Buried on both sides of the construction joint, the distance between the anchor bolts on both sides is 150mm;
(3)锚栓埋设完毕后,清理锚栓周边混凝土表面的灰尘并保证锚栓周边结构表面平整,如有不平整用磨光机进行磨平处理,然后在锚栓周边的混凝土表面上涂刷防水密封胶;(3) After the anchor bolt is buried, clean the dust on the concrete surface around the anchor bolt and ensure that the surface structure around the anchor bolt is flat. If there is unevenness, smooth it with a polisher, and then paint on the concrete surface around the anchor bolt. Waterproof sealant
(4)在两侧锚栓上分别按压套装上丁基橡胶密封带,丁基橡胶密封带上提前开有圆孔,圆孔的直径与锚栓直径相等,通过圆孔将丁基橡胶密封带套装在锚栓上并按压,使其与下面涂刷的防水密封胶粘接牢固;(4) Press the butyl rubber sealing tape on the anchor bolts on both sides respectively. The butyl rubber sealing tape is provided with a circular hole in advance. The diameter of the circular hole is equal to the diameter of the anchor bolt. The butyl rubber sealing tape is passed through the circular hole. Put it on the anchor bolt and press it to make it adhere firmly with the waterproof sealant painted below;
(5)在丁基橡胶密封带上涂刷防水密封胶,然后在施工缝两侧的锚栓之间安装橡胶止水带,橡胶止水带两端套在两侧的锚栓上,橡胶止水带上提前开有圆孔,圆孔的直径与锚栓直径相等,通过圆孔将橡胶止水带套在锚栓上,然后按压橡胶止水带使其与丁基橡胶密封带上 的防水密封胶粘接牢固,橡胶止水带在施工缝处形成排水引槽;(5) Apply a waterproof sealant to the butyl rubber sealing tape, and then install rubber waterstops between the anchor bolts on both sides of the construction joint. The two ends of the rubber waterstops are sleeved on the anchor bolts on both sides. A round hole is opened in advance on the water hose. The diameter of the round hole is equal to the diameter of the anchor bolt. The rubber water stop tape is placed on the anchor bolt through the round hole, and then the rubber water stop tape is pressed to make it waterproof with the butyl rubber sealing tape. The sealant is firmly bonded, and the rubber water stop forms a drainage channel at the construction joint;
(6)橡胶止水带安装好后,然后将钢板分别套压在两侧锚栓上,钢板同样提前钻有圆孔,圆孔的直径与锚栓直径相等,通过圆孔将钢板套装在锚栓上,钢板进一步固定橡胶止水带的两端,最后通过螺母将钢板、橡胶止水带牢牢固定在混凝土壁上即可;(6) After the rubber water stop is installed, press the steel plate on the anchor bolts on both sides. The steel plate is also drilled with circular holes in advance. The diameter of the circular hole is equal to the diameter of the anchor bolt. The steel plate is sleeved on the anchor through the circular hole. On the bolt, the steel plate further fixes the two ends of the rubber waterstop, and finally the steel plate and the rubber waterstop can be firmly fixed on the concrete wall by a nut;
(7)最后在二次衬砌施工缝拱脚处设置引排管,引排管与上述的排水引槽连通,使引排管进入边沟,边沟内排水盲管与中央排水沟连通形成堵排结合系统,实现自然引排。(7) Finally, a drainage pipe is set at the foot of the secondary lining construction joint. The drainage pipe communicates with the drainage drainage groove mentioned above, so that the drainage pipe enters the side ditch, and the blind drainage pipe in the side ditch communicates with the central drainage ditch to form a block. Combined drainage system to achieve natural drainage.
优选的,所述防水密封胶为反应型防水密封胶。Preferably, the waterproof sealant is a reactive waterproof sealant.
进一步的,在步骤(5)中,所述橡胶止水带为350mm宽外贴式止水带。Further, in step (5), the rubber water stop is a 350 mm wide external type water stop.
优选的,所述锚栓为化学锚栓。Preferably, the anchor bolt is a chemical anchor bolt.
本发明提供了一种隧道二衬施工缝渗漏水发生后有效的治理措施,为尽快消除渗漏水,恢复隧道正常使用,提供了有效的解决方法。本发明是一种堵排结合处置的方法,不改变隧道二次衬砌现状结构,破坏性小,有效避免了衬砌开裂,不影响隧道安全和使用,同时提高了结构的耐久性,施工步骤简单,可操作性强,形成堵排结合系统,实现自然排水,经济效益和社会效益显著。The invention provides an effective treatment measure after the water leakage of the tunnel's second lining construction joint occurs, and provides an effective solution to eliminate the water leakage as soon as possible and restore the normal use of the tunnel. The invention is a method for combined treatment of blocking and discharging, which does not change the current structure of the secondary lining of the tunnel, is less destructive, effectively avoids cracking of the lining, does not affect the safety and use of the tunnel, and improves the durability of the structure. It has strong operability and forms a plugging and drainage combination system to achieve natural drainage, with significant economic and social benefits.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本发明锚栓处的结构示意图。FIG. 1 is a schematic structural diagram of an anchor bolt according to the present invention.
图2为本发明引排的结构示意图。FIG. 2 is a schematic structural diagram of a lead row according to the present invention.
图中,1施工缝,2防水密封胶,3锚栓,4丁基橡胶密封带,5橡胶止水带,6排水引槽,7钢板,8螺母,9引排管,10排水盲管,11中央排水沟,12二次衬砌。In the picture, 1 construction joint, 2 waterproof sealant, 3 anchor bolts, 4 butyl rubber sealing tape, 5 rubber water stop, 6 drainage channel, 7 steel plate, 8 nut, 9 drainage pipe, 10 drainage blind pipe, 11 central drainage ditch, 12 secondary lining.
具体实施方式detailed description
以下给出本发明的具体实施例,需要说明的是本发明并不局限于以下具体实施例,凡在本申请技术方案基础上做的等同变换均落入本发明的保护范围。Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and any equivalent transformations made on the basis of the technical solution of the present application fall into the protection scope of the present invention.
一种隧道二衬施工缝渗漏水堵排结合处治的方法,包括如下步骤:A method for combined treatment of leakage, plugging and drainage of a tunnel's second lining construction joint, including the following steps:
(1)凿除二次衬砌12施工缝1原填充材料,凿至中埋式止水带表面,清理施工缝1内表面,要除去施工缝1缝隙内表面的油污、附着物、灰尘等,保证施工缝1的内表面干燥、平整、洁净,防止粘接不良,清理完然后用防水密封胶2将施工缝1进行压实填满,确保防水密封胶2与施工缝1两侧粘接密实,本实施例所用的防水密封胶2为反应型防水密封胶,然后再用腻子刀刮平施工缝1表面;(1) Chisel the original filling material of the construction lining 1 of the secondary lining 12 to the surface of the middle-buried waterstop to clean the interior surface of the construction crevice 1. To remove the oil stains, attachments, dust, etc. on the interior surface of the construction crevice 1, Ensure that the inner surface of construction joint 1 is dry, flat and clean to prevent poor adhesion. After cleaning, use waterproof sealant 2 to compact and fill the construction joint 1 to ensure that the waterproof sealant 2 and the construction joint 1 are densely bonded on both sides. The waterproof sealant 2 used in this embodiment is a reactive waterproof sealant, and then the surface of the construction joint 1 is scraped with a putty knife;
(2)待防水密封胶2达到要求的强度后,然后在施工缝1两侧根据中埋式止水带宽度用墨线弹出安装锚栓3的范围,两侧锚栓3的间距为150mm,两侧锚栓3对称的分布在施工缝1 两侧,然后根据墨线预埋定制的锚栓3,本实施例优选锚栓3为化学锚栓;(2) After the waterproof sealant 2 reaches the required strength, then the range of the anchor bolts 3 is popped up with ink lines on the sides of the construction joint 1 according to the width of the buried waterstop. The anchor bolts 3 on both sides have a distance of 150 mm. The side anchor bolts 3 are symmetrically distributed on both sides of the construction joint 1, and then the customized anchor bolts 3 are embedded according to the ink line. In this embodiment, the preferred anchor bolts 3 are chemical anchor bolts;
(3)锚栓3埋设完毕后,清理锚栓3周边混凝土表面的灰尘并保证锚栓3周边结构表面平整,在锚栓3周边的混凝土表面必须平整,无蜂窝、无麻面、无尖锐突出物等,如有不平整必须用磨光机进行磨平处理,然后在锚栓3周边的混凝土表面上涂刷防水密封胶2;(3) After the anchor bolt 3 is buried, clean up the dust on the concrete surface around the anchor bolt 3 and ensure that the structure surface around the anchor bolt 3 is flat. The concrete surface around the anchor bolt 3 must be flat, no honeycomb, no pitted surface, and no sharp protrusions. Materials, etc., if there is unevenness, it must be smoothed with a sander, and then the waterproof sealant 2 is painted on the concrete surface around the anchor 3;
(4)在两侧锚栓3上分别按压套装上丁基橡胶密封带4,丁基橡胶密封带4上提前开有圆孔,圆孔的直径与锚栓3直径相等,通过圆孔将丁基橡胶密封带4套装在锚栓3上并按压,使其与下面涂刷的防水密封胶2粘接牢固,丁基橡胶密封带4的粘接强度、抗拉强度高,弹性、延伸性能好,对于界面形变和开裂适应性强;(4) Press the butyl rubber sealing tape 4 on the anchor bolts 3 on both sides, respectively. The butyl rubber sealing tape 4 has a round hole in advance. The diameter of the round hole is equal to the diameter of the anchor bolt 3. The base rubber sealing tape 4 is set on the anchor bolt 3 and pressed to make it adhere firmly to the waterproof sealant 2 painted below. The butyl rubber sealing tape 4 has high bonding strength, tensile strength, good elasticity and elongation. Strong adaptability to interface deformation and cracking;
(5)在丁基橡胶密封带4上涂刷防水密封胶2,然后在施工缝1两侧的锚栓3之间安装橡胶止水带5,本实施例优选橡胶止水带5采用350mm宽外贴式止水带,橡胶止水带5两端套在两侧的锚栓3上,橡胶止水带5上提前开有圆孔,可以根据两侧锚栓3的间距,在橡胶止水带5上划记号线并钻圆孔,圆孔的直径与锚栓3直径相等,通过圆孔将橡胶止水带5套在锚栓3上,然后按压与丁基橡胶密封带4上的防水密封胶2粘接牢固,如此,橡胶止水带5在施工缝1处形成排水引槽6;(5) Apply the waterproof sealant 2 to the butyl rubber sealing tape 4, and then install a rubber water stop 5 between the anchors 3 on both sides of the construction joint 1. The rubber water stop 5 is preferably 350 mm wide in this embodiment. Outside water stop, rubber water stop 5 is sleeved on the anchor bolts 3 on both sides. The rubber water stop 5 has round holes in advance, and the rubber water stop can be made according to the distance between the anchor bolts 3 on both sides. Mark the line on the belt 5 and drill a circular hole. The diameter of the circular hole is equal to the diameter of the anchor bolt 3. The rubber water stop 5 is set on the anchor bolt 3 through the circular hole, and then the water-proof tape on the butyl rubber sealing band 4 is pressed. The sealant 2 is firmly bonded, so that the rubber water stop 5 forms a drainage channel 6 at the construction joint 1;
(6)橡胶止水带5安装好后,然后将钢板7分别套压在两侧锚栓3上,钢板7同样提前钻有圆孔,圆孔的直径与锚栓3直径相等,通过圆孔将钢板7套装在锚栓3上,钢板7进一步固定橡胶止水带5的两端,最后通过螺母8,将钢板7、橡胶止水带5牢牢固定在混凝土壁上即可;(6) After the rubber water stop 5 is installed, the steel plate 7 is sleeved on the anchor bolts 3 on both sides. The steel plate 7 is also drilled with a round hole in advance. The diameter of the round hole is equal to the diameter of the anchor bolt 3. The steel plate 7 is set on the anchor bolt 3, and the steel plate 7 further fixes the two ends of the rubber water stop 5; finally, the steel plate 7 and the rubber water stop 5 can be firmly fixed on the concrete wall through the nut 8.
(7)最后在二次衬砌12施工缝1拱脚处设置引排管9,引排管9与上述的排水引槽6连通,使引排管9进入边沟,因边沟内排水盲管10与中央排水沟11连通,从而实现了施工缝1处渗漏水的自然引排,实现了堵排结合。(7) Finally, a drainage pipe 9 is set at the arch joint 1 of the secondary lining 12, and the drainage pipe 9 communicates with the drainage channel 6 described above, so that the drainage pipe 9 enters the side ditch. 10 communicates with the central drainage ditch 11, thereby realizing the natural drainage of water leakage at one construction joint, and the combination of blocking and drainage.
以上所述的实施例,只是本发明较优选的具体实施方式的一种,本领域的技术人员在本发明技术方案范围内进行的通常变化和替换都应包含在本发明的保护范围内。The above-mentioned embodiment is only one of the more preferred specific implementation manners of the present invention, and ordinary changes and substitutions made by those skilled in the art within the scope of the technical solution of the present invention should be included in the protection scope of the present invention.

Claims (4)

  1. 一种隧道二衬施工缝渗漏水堵排结合处治的方法,其特征在于:包括如下步骤:A method for combined treatment of leakage, water blocking and drainage of a tunnel's second lining construction joint, which is characterized by comprising the following steps:
    (1)凿除二次衬砌施工缝(1)原填充材料,凿至中埋式止水带表面,清理施工缝(1)内表面,清理完后用防水密封胶(2)将施工缝(1)进行压实填满,防水密封胶(2)与施工缝(1)两侧粘接密实,然后再用腻子刀刮平施工缝(1)表面;(1) Cut out the secondary lining construction joint (1) The original filling material, cut to the surface of the middle-buried waterstop, clean the construction joint (1), and clean the construction joint with waterproof sealant (2) after cleaning ( 1) Compaction and filling, waterproof sealant (2) and two sides of the construction joint (1) are tightly bonded, and then the surface of the construction joint (1) is smoothed with a putty knife;
    (2)待防水密封胶(2)达到要求的强度后,然后在施工缝(1)两侧根据中埋式止水带宽度用墨线弹出安装锚栓(3)的范围,然后根据墨线预埋定制的锚栓(3),锚栓(3)对称预埋在施工缝(1)两侧,两侧锚栓(3)的间距为150mm;(2) After the waterproof sealant (2) reaches the required strength, then populate the area of the anchor bolt (3) with ink lines on the sides of the construction joint (1) according to the width of the buried waterstop, and then embed them according to the ink lines. Customized anchor bolts (3), the anchor bolts (3) are symmetrically embedded on both sides of the construction joint (1), and the distance between the anchor bolts (3) on both sides is 150 mm;
    (3)锚栓(3)埋设完毕后,清理锚栓(3)周边混凝土表面的灰尘并保证锚栓(3)周边结构表面平整,如有不平整用磨光机进行磨平处理,然后在锚栓(3)周边的混凝土表面上涂刷防水密封胶(2);(3) After the anchor bolt (3) is buried, clean the dust around the anchor bolt (3) and ensure the surface of the anchor bolt (3) is flat. If there is unevenness, use a sander to smooth it, and then Paint the waterproof sealant (2) on the concrete surface around the anchor (3);
    (4)在两侧锚栓(3)上分别按压套装上丁基橡胶密封带(4),丁基橡胶密封带(4)上提前开有圆孔,圆孔的直径与锚栓(3)直径相等,通过圆孔将丁基橡胶密封带(4)套装在锚栓(3)上并按压,使其与下面涂刷的防水密封胶(2)粘接牢固;(4) Press the butyl rubber sealing tape (4) on the anchor bolts (3) on both sides, respectively. The butyl rubber sealing tape (4) has a round hole in advance. The diameter of the round hole and the anchor bolt (3) The diameter is equal, and the butyl rubber sealing tape (4) is set on the anchor bolt (3) through the round hole and pressed to make it firmly adhere to the waterproof sealant (2) painted below;
    (5)在丁基橡胶密封带(4)上涂刷防水密封胶(2),然后在施工缝(1)两侧的锚栓(3)之间安装橡胶止水带(5),橡胶止水带(5)两端套在两侧的锚栓(3)上,橡胶止水带(5) Apply the waterproof sealant (2) to the butyl rubber sealing tape (4), and then install the rubber water stop (5) between the anchor bolts (3) on both sides of the construction joint (1). Both ends of the water hose (5) are sleeved on the anchor bolts (3) on both sides, rubber water stop
    (5)上提前开有圆孔,圆孔的直径与锚栓(3)直径相等,通过圆孔将橡胶止水带(5)套在锚栓(3)上,然后按压橡胶止水带(5)使其与丁基橡胶密封带(4)上的防水密封胶(2)粘接牢固,橡胶止水带(5)在施工缝(1)处形成排水引槽(6);(5) A circular hole is opened in advance, and the diameter of the circular hole is equal to the diameter of the anchor bolt (3). The rubber water stop band (5) is sleeved on the anchor bolt (3) through the round hole, and then the rubber water stop band ( 5) It is firmly adhered to the waterproof sealant (2) on the butyl rubber sealing tape (4), and the rubber water stop (5) forms a drainage drainage groove (6) at the construction joint (1);
    (6)橡胶止水带(5)安装好后,然后将钢板(7)分别套压在两侧锚栓(3)上,钢板(6) After the rubber water stop (5) is installed, press the steel plate (7) on the anchor bolts (3) on both sides.
    (7)同样提前钻有圆孔,圆孔的直径与锚栓(3)直径相等,通过圆孔将钢板(7)套装在锚栓(3)上,钢板(7)进一步固定橡胶止水带(5)的两端,最后通过螺母(8)将钢板(7)、橡胶止水带(5)牢牢固定在混凝土壁上即可;(7) A circular hole is also drilled in advance. The diameter of the circular hole is equal to the diameter of the anchor bolt (3). The steel plate (7) is set on the anchor bolt (3) through the circular hole. The steel plate (7) further fixes the rubber water stop. (5) both ends of the steel plate (7) and the rubber water stop (5) can be firmly fixed on the concrete wall through the nut (8);
    (7)最后在二次衬砌(12)施工缝(1)拱脚处设置引排管(9),引排管(9)与上述的排水引槽(6)连通,使引排管(9)进入边沟,边沟内排水盲管(10)与中央排水沟(11)连通形成堵排结合系统,实现自然引排。(7) Finally, a drainage pipe (9) is provided at the arch foot of the secondary lining (12) construction joint (1), and the drainage pipe (9) communicates with the drainage drainage groove (6) described above, so that the drainage pipe (9) ) Enter the side ditch, and the blind drainage pipe (10) in the side ditch communicates with the central drainage ditch (11) to form a plugging and drainage combination system to achieve natural drainage.
  2. 根据权利要求1所述的隧道二衬施工缝渗漏水堵排结合处治的方法,其特征在于:所述防水密封胶(2)为反应型防水密封胶。The method according to claim 1, wherein the waterproof sealant (2) is a reactive waterproof sealant.
  3. 根据权利要求1所述的隧道二衬施工缝渗漏水堵排结合处治的方法,其特征在于:在步骤(5)中,所述橡胶止水带(5)为350mm宽外贴式止水带。The method for combined treatment of seepage, drainage, and drainage of a tunnel's two-line construction joint according to claim 1, characterized in that in step (5), the rubber waterstop (5) is a 350mm wide external stick-type waterstop band.
  4. 根据权利要求1所述的隧道二衬施工缝渗漏水堵排结合处治的方法,其特征在于:所述 锚栓(3)为化学锚栓。The method according to claim 1, wherein the anchor bolt (3) is a chemical anchor bolt.
PCT/CN2019/088493 2018-06-12 2019-05-27 Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel WO2019237908A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810601140.2A CN108952774B (en) 2018-06-12 2018-06-12 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment
CN201810601140.2 2018-06-12

Publications (1)

Publication Number Publication Date
WO2019237908A1 true WO2019237908A1 (en) 2019-12-19

Family

ID=64488344

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/088493 WO2019237908A1 (en) 2018-06-12 2019-05-27 Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel

Country Status (2)

Country Link
CN (1) CN108952774B (en)
WO (1) WO2019237908A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952774B (en) * 2018-06-12 2019-04-23 济南城建集团有限公司 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150117A (en) * 2002-10-30 2004-05-27 Sumikura Kozai Kk Work execution method for anchor reinforcement for holding concrete reinforcing bar
CN204476470U (en) * 2015-01-20 2015-07-15 山西省交通科学研究院 A kind of waterproof and water drainage system of applicable tunnel project seam
CN105568928A (en) * 2015-12-30 2016-05-11 中国电建集团北京勘测设计研究院有限公司 Construction method of sealed joint of composite geomembrane face dam
CN105804772A (en) * 2016-05-05 2016-07-27 中铁第勘察设计院集团有限公司 Active and passive combined waterproof structure for tunnel
CN105840210A (en) * 2016-06-12 2016-08-10 中铁二院工程集团有限责任公司 Box type tunnel-bottom composite arched tunnel lining structure with water drain function
CN106194255A (en) * 2016-08-31 2016-12-07 东南大学 Tunnel waterproof and water drainage system and method for construction thereof
CN108952774A (en) * 2018-06-12 2018-12-07 济南城建集团有限公司 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433776Y (en) * 2009-05-27 2010-03-31 中南大学 Dual-source heat supply type back-pasting drainable water-stop
CN101566073B (en) * 2009-06-03 2011-12-14 中南大学 Dual-source heat-supply water-drainage antifreezing method for construction joint of tunnel in cold area
CN202250110U (en) * 2011-10-24 2012-05-30 中铁十七局集团第四工程有限公司 Buried waterstop fixing device in secondary tunnel liner
CN202659252U (en) * 2012-05-31 2013-01-09 中铁十局集团西北工程有限公司 Tunnel water proofing system
CN203925527U (en) * 2014-07-02 2014-11-05 山西省交通科学研究院 A kind of construction joint of tunnel percolating water punishment system
CN203939524U (en) * 2014-07-08 2014-11-12 中交第二公路勘察设计研究院有限公司 A kind of tunnel can maintenance type the device of decompression draining
CN204386650U (en) * 2014-12-31 2015-06-10 长安大学 A kind of mounted gutter for the treatment of technology for tunnel seepage water cure
CN106759521B (en) * 2017-01-11 2018-09-21 北京建工土木工程有限公司 A kind of underground project waterproof processing structure
CN206539354U (en) * 2017-03-08 2017-10-03 山西交科桥梁隧道加固维护工程有限公司 A kind of tunnel double-lining surface seep water cure structure
CN206873507U (en) * 2017-06-15 2018-01-12 中铁第四勘察设计院集团有限公司 A kind of leak stopping hermetic water-proof structure of underground-structure deformation joint
CN207111105U (en) * 2017-08-17 2018-03-16 四川省交通运输厅公路规划勘察设计研究院 Tunnel ring seam water seepage treatment structure
CN107587434A (en) * 2017-10-16 2018-01-16 中交路桥建设有限公司 Culvert of reinforced concrete percolating water prevention and disposition method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150117A (en) * 2002-10-30 2004-05-27 Sumikura Kozai Kk Work execution method for anchor reinforcement for holding concrete reinforcing bar
CN204476470U (en) * 2015-01-20 2015-07-15 山西省交通科学研究院 A kind of waterproof and water drainage system of applicable tunnel project seam
CN105568928A (en) * 2015-12-30 2016-05-11 中国电建集团北京勘测设计研究院有限公司 Construction method of sealed joint of composite geomembrane face dam
CN105804772A (en) * 2016-05-05 2016-07-27 中铁第勘察设计院集团有限公司 Active and passive combined waterproof structure for tunnel
CN105840210A (en) * 2016-06-12 2016-08-10 中铁二院工程集团有限责任公司 Box type tunnel-bottom composite arched tunnel lining structure with water drain function
CN106194255A (en) * 2016-08-31 2016-12-07 东南大学 Tunnel waterproof and water drainage system and method for construction thereof
CN108952774A (en) * 2018-06-12 2018-12-07 济南城建集团有限公司 A kind of method that tunnel double-lining construction joint leakage water blocking row combines punishment

Also Published As

Publication number Publication date
CN108952774A (en) 2018-12-07
CN108952774B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN207131424U (en) A kind of lining construction stitches waterproof construction
CN110805455A (en) Tunnel disease comprehensive treatment method
CN206319910U (en) Infiltration disposal system is reinforced in a kind of tunnel-liner
CN108442412A (en) Deformation joint seepage waterproof construction method
CN109208651B (en) Construction method and structure of deformation joint water-drainage-preventing structure of underground engineering super-long structure body
CN102817382A (en) Repair constructing method of basement deformation joint leakage
CN111005743A (en) Comprehensive treatment method for secondary lining water leakage
CN112832826A (en) Tunnel deformation joint plugging construction process
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
WO2019237908A1 (en) Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel
KR101316718B1 (en) A tunnel waterproofing construction method
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN110080796B (en) Tunnel segment repairing process
CN112593726A (en) Anti-frost heaving leaking stoppage and reinforcement method for cold region
CN112211230A (en) Steel plate mortar brick composite structure and method for repairing leakage of concrete structure by using same
CN109779287A (en) Microdilatancy water-proof emulsion construction technology
CN204419202U (en) A kind of tunnel slot repair structure
CN112982497A (en) High-performance connecting structure for joint parts of new concrete and old concrete and construction method
JP7061931B2 (en) Waterproof structure of tunnel connection and its construction method
CN104975623A (en) Non-excavation leaking inspection well repairing method and repairing structure
CN214883899U (en) New and old concrete joint position high performance connection structure
CN110528593A (en) The heat insulating and water proof structure and construction method of station main body and accessory structure top plate seam

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19819437

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19819437

Country of ref document: EP

Kind code of ref document: A1