- CN108643057B CN108643057B CN201810669015.5A CN201810669015A CN108643057B CN 108643057 B CN108643057 B CN 108643057B CN 201810669015 A CN201810669015 A CN 201810669015A CN 108643057 B CN108643057 B CN 108643057B
- Authority
- CN
- China
- Prior art keywords
- end bay
- main push
- towing rope
- anchor cable
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
Abstract
本发明提供了一种悬索桥主梁架设过程中的临时锚索平衡施工法,属于桥梁工程技术领域。先在靠近锚碇处搭建支架并在支架上安装第一节段主梁,在该主梁上安装临时锚索,与边跨主缆相连接,然后吊装中跨梁段,随着中跨梁段的重量逐渐转移到中跨主缆上的同时,安装在第一节段主梁上的临时锚索会自动绷紧,相当于同时在边跨也对主缆施加荷载,平衡中跨因为梁段重量太大引起主缆力的大幅度增加;接下来在边跨吊装梁段,边跨主缆向下产生较大位移,已经绷紧的临时锚索会自动放松,边跨主缆力的增加幅度也会相应减小,减小因为吊装施工引起索塔的不平衡力。本发明具有自动平衡了悬索桥主跨和边跨主缆力的能力,可以减小索塔的弯矩,使得桥塔受力更加安全。
Description
技术领域
本发明属于桥梁施工技术领域,具体涉及到一种悬索桥主梁架设过程中的临时锚索平衡施工法。
背景技术
在现有的悬索桥施工中,常采用中跨和边跨交替吊装主梁节段并结合索鞍顶推的施工方法,当主跨和边跨主缆产生的不平衡力超出索塔能够承担的容许值时,通过顶推索鞍来释放不平衡力,以减小索塔的弯矩。
随着施工技术的进步和吊装设备的发展,单个梁段的重量越来越大。按照传统的施工方法,在中跨吊装梁段时,因为单个梁段的重量太大,使中跨主缆力增加量也大大超出边跨主缆力的增加量,使索塔无法承受。一般的解决办法是:(1)顶推索鞍,(2)边跨加平衡配重。但这两种方法的缺点是:无法在吊装梁段的同时顶推索鞍或者增加平衡配重;如果采用这两种方法施工,接下来在边跨进行吊装时,边跨的配重或者索鞍顶推对于边跨吊装就更加不利了。
发明内容
本发明提出了一种悬索桥主梁架设过程中的临时锚索平衡施工法。
本发明的技术方案:
一种悬索桥主梁架设过程中的临时锚索平衡施工法,靠近锚碇1处的边跨第一节段主梁5在支架4上先安装就位,并安装临时锚索2,该临时锚索2为柔性吊索,只承受拉力,受压时弯曲;然后吊装中跨正在吊装的梁段10,随着中跨正在吊装的梁段10的重量逐渐转移到中跨主缆7上的同时,安装在第一节段主梁5上的临时锚索2自动绷紧,相当于同时在边跨也对边跨主缆3施加荷载,平衡中跨梁段重量太大引起主缆力的大幅度增加;接下来在边跨正在吊装的梁段11,当边跨正在吊装的梁段11的重量逐渐转移到边跨主缆3上的同时,边跨主缆3向下产生较大位移,已经绷紧的临时锚索2自动放松,相当于同时对边跨主缆3卸载,边跨主缆力的增加幅度也相应减小,因此,减小吊装施工引起索塔6的不平衡力。
本发明的效果和益处:
1)用于平衡主缆力的吊杆和临时锚索具有只能承受拉力,不能承受压力的特性,在中跨吊装梁段时,临时锚索受拉,索力自动增加,而边跨吊装梁段时,索力自动减小,直到减小到零,不会产生压力。
2)吊装中跨梁段时,临时锚索会自动绷紧,相当于同时在边跨也对主缆施加荷载,可以平衡中跨因为梁段重量太大引起主缆力的大幅度增加。
3)当吊装边跨梁段时,临时锚索会自动放松,相当于同时对边跨主缆卸载,边跨主缆力的增加幅度也会相应减小,这样就可以减小因为吊装施工引起索塔的不平衡力。
4)本发明具有自动平衡了悬索桥主跨和边跨主缆力的能力,可以减小索塔的弯矩,使得桥塔受力更加安全。
附图说明
图1是悬索桥中跨主梁架设过程中临时锚索平衡施工法示意图;
图2是悬索桥边跨主梁架设过程中临时锚索平衡施工法示意图。
图中:1锚碇;2临时锚索;3边跨主缆;4支架;5边跨第一节段主梁;6索塔;7中跨主缆;8索鞍;9中跨已经吊装完成的梁段;10中跨正在吊装的梁段;11边跨正在吊装的梁段。
具体实施方式
以下结合技术方案和附图详细叙述本发明的具体实施方式。
一座主跨400m,边跨150m的地锚式悬索桥,每个梁段的重量600吨,采用本发明的方法实施如下:
1)在靠近锚碇1处的边跨第一节段主梁5在支架4上先安装就位,并安装临时锚索2,对称施工另外一侧锚碇1处的支架4和边跨第一节段主梁5,并安装临时锚索2,临时锚索2只需绷直,无需张拉索力;
2)吊装中跨正在吊装的梁段10,随着中跨正在吊装的梁段10的重量逐渐转移到中跨主缆7上的同时,安装在边跨第一节段主梁5上的临时锚索2会自动绷紧,相当于同时在边跨也对边跨主缆3施加荷载,可以平衡中跨因为梁段重量太大引起主缆力的大幅度增加;
3)在边跨正在吊装的梁段11,当边跨正在吊装的梁段11的重量逐渐转移到边跨主缆3上的同时,边跨主缆3向下产生较大位移,已经绷紧的临时锚索2会自动放松,相当于同时对边跨主缆3卸载,因此边跨主缆力的增加幅度也会相应减小,这样就可以减小因为吊装施工引起索塔6的不平衡力。
4)重复步骤2)步和3),分别在中跨和边跨吊装其他梁段,必要时顶推索鞍8,当中跨主梁节段增加到5个以上,由于索塔轴力已经足够大,吊装不平衡力引起的弯矩对索塔不能造成危害时,可以拆除临时锚索2,回归到传统施工方法就可以完成吊装施工了。
Claims (1)
1.一种悬索桥主梁架设过程中的临时锚索平衡施工法,其特征在于,靠近锚碇(1)处的边跨第一节段主梁(5)在支架(4)上先安装就位,并在边跨第一节段主梁(5)上安装临时锚索(2),该临时锚索(2)为柔性吊索,只承受拉力,受压时弯曲;然后吊装中跨正在吊装的梁段(10),随着中跨正在吊装的梁段(10)的重量逐渐转移到中跨主缆(7)上的同时,安装在第一节段主梁(5)上的临时锚索(2)自动绷紧,相当于同时在边跨也对边跨主缆(3)施加荷载,平衡中跨梁段重量太大引起主缆力的大幅度增加;接下来吊装边跨正在吊装的梁段(11),当边跨正在吊装的梁段(11)的重量逐渐转移到边跨主缆(3)上的同时,边跨主缆(3)向下产生较大位移,已经绷紧的临时锚索(2)自动放松,相当于同时对边跨主缆(3)卸载,边跨主缆力的增加幅度也相应减小,因此,减小吊装施工引起索塔(6)的不平衡力。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810669015.5A CN108643057B (zh) | 2018-06-20 | 2018-06-20 | 一种悬索桥主梁架设过程中的临时锚索平衡施工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810669015.5A CN108643057B (zh) | 2018-06-20 | 2018-06-20 | 一种悬索桥主梁架设过程中的临时锚索平衡施工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108643057A CN108643057A (zh) | 2018-10-12 |
CN108643057B true CN108643057B (zh) | 2019-08-20 |
Family
ID=63753682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810669015.5A Active CN108643057B (zh) | 2018-06-20 | 2018-06-20 | 一种悬索桥主梁架设过程中的临时锚索平衡施工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108643057B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111455862B (zh) * | 2020-04-30 | 2022-03-25 | 中铁大桥科学研究院有限公司 | 一种连续加劲梁悬索桥的施工方法 |
CN112853992B (zh) * | 2021-01-18 | 2023-01-06 | 长沙理工大学 | 一种大跨度悬索桥拼装施工方法 |
CN112853993B (zh) * | 2021-01-18 | 2022-11-22 | 长沙理工大学 | 一种大跨度悬索桥拼装施工方法 |
CN113202025A (zh) * | 2021-03-24 | 2021-08-03 | 中交第二航务工程局有限公司 | 一种钢桁梁悬索桥主梁多工位安装方法 |
CN113186798B (zh) * | 2021-03-30 | 2022-05-20 | 中交第二航务工程局有限公司 | 一种先缆后梁悬索桥无支架施工过程中主缆滑移控制方法 |
CN113512946B (zh) * | 2021-04-21 | 2022-05-20 | 招商局重庆交通科研设计院有限公司 | 一种悬索桥主塔偏位误差控制方法 |
CN113308997A (zh) * | 2021-05-07 | 2021-08-27 | 中交路桥华南工程有限公司 | 用于斜拉桥主梁安装的三跨缆索吊机及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0617171B1 (en) * | 1993-03-26 | 1996-11-20 | P.G. Brown Ltd. | Method for erecting a suspension bridge and device therefor |
CN101177931B (zh) * | 2007-12-05 | 2011-08-10 | 中铁大桥局股份有限公司 | 大跨度悬索桥主缆架设门架式小循环牵引系统 |
CN205421022U (zh) * | 2015-11-26 | 2016-08-03 | 中建钢构有限公司 | 一种悬索桥加劲梁滑移架设装置 |
CN107190627B (zh) * | 2017-06-13 | 2022-02-18 | 同济大学 | 部分地锚式悬索桥及其施工方法 |
CN107447665B (zh) * | 2017-08-16 | 2019-01-22 | 中国十七冶集团有限公司 | 一种自锚式悬索桥施工用猫道承载索的敷设方法 |
-
2018
- 2018-06-20 CN CN201810669015.5A patent/CN108643057B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN108643057A (zh) | 2018-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643057B (zh) | 一种悬索桥主梁架设过程中的临时锚索平衡施工法 | |
CN102444086B (zh) | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 | |
CN101284628B (zh) | 大吨位压力机架的吊装方法 | |
CN103883129B (zh) | 一种钢结构屋面梁安装方法 | |
CN102659043B (zh) | 一种改进的塔式起重机扶墙杆拆卸装置 | |
CN109537476B (zh) | 销耳式双临时索自平衡拽拉式悬索桥吊索更换托换装置 | |
CN114180456A (zh) | 一种巨型侧斜桁架结构的吊装姿态调整方法 | |
CN106012841A (zh) | 缆索吊机及其安装方法 | |
CN105645275B (zh) | 缆索吊起重机及其施工方法 | |
CN102061681B (zh) | 固定双吊点悬臂轨道式桁吊安装方法 | |
CN111364365A (zh) | 螺旋钢管桩组合支架拆除方法 | |
CN109629402B (zh) | 一种三塔四跨悬索桥主梁的施工方法 | |
CN209194361U (zh) | 一种悬索桥梁段吊装起吊平台的固定结构 | |
CN112709137B (zh) | 一种悬索桥加劲梁的吊装施工方法 | |
CN107201726B (zh) | 节段拼装全焊钢结构桥梁消除残余应力的施工方法 | |
CN104652276B (zh) | 一种悬索桥主缆ppws施工索股原位架设方法 | |
CN210505201U (zh) | 一种钢筋批量吊装的设备 | |
CN203767902U (zh) | 斜拉桥钢箱梁合拢块的抬吊吊机结构 | |
CN209584872U (zh) | 销耳式双临时索自平衡拽拉式悬索桥吊索更换托换装置 | |
CN209052274U (zh) | Pc预制楼板滑轮吊具 | |
JPH0220709A (ja) | アーチ橋の斜吊り架設工法 | |
CN101457516B (zh) | 多层水平拉索的挂设方法 | |
CN208517821U (zh) | 一种拆除箱梁贝雷片的简易起重装置 | |
CN202358822U (zh) | 一种油田橇块吊装结构 | |
CN104860209B (zh) | 动臂塔机高空变臂方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |