CN102444086B - 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 - Google Patents
一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 Download PDFInfo
- Publication number
- CN102444086B CN102444086B CN201110310425.9A CN201110310425A CN102444086B CN 102444086 B CN102444086 B CN 102444086B CN 201110310425 A CN201110310425 A CN 201110310425A CN 102444086 B CN102444086 B CN 102444086B
- Authority
- CN
- China
- Prior art keywords
- cable
- hung
- suspension
- bridge
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110310425.9A CN102444086B (zh) | 2011-10-14 | 2011-10-14 | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110310425.9A CN102444086B (zh) | 2011-10-14 | 2011-10-14 | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102444086A CN102444086A (zh) | 2012-05-09 |
CN102444086B true CN102444086B (zh) | 2014-04-02 |
Family
ID=46006997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110310425.9A Active CN102444086B (zh) | 2011-10-14 | 2011-10-14 | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102444086B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149928A (zh) * | 2017-12-21 | 2018-06-12 | 中交路桥华南工程有限公司 | 斜拉索的塔端安装方法 |
Families Citing this family (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102995565B (zh) * | 2012-12-17 | 2014-11-26 | 柳州欧维姆机械股份有限公司 | 斜拉索锚链式软牵引装置 |
CN103147404B (zh) * | 2013-04-02 | 2015-02-11 | 中铁大桥局集团有限公司 | 限高斜拉桥塔端斜拉索的挂设系统及方法 |
CN103741601B (zh) * | 2013-06-28 | 2017-02-01 | 中交第三航务工程局有限公司 | 一种塔、梁以及索同步成桥工艺 |
CN104452594B (zh) * | 2014-11-05 | 2016-08-10 | 武汉二航路桥特种工程有限责任公司 | 多支点导索法换索装置 |
CN104762880B (zh) * | 2015-05-03 | 2016-08-31 | 朱玉新 | 一种改进的桥梁拉索结构及其挂设方法 |
CN105155426B (zh) * | 2015-09-30 | 2017-01-25 | 中铁港航局集团有限公司 | 一种空间受限条件下斜拉索桥面与空中相结合的展索方法 |
CN105401523B (zh) * | 2015-09-30 | 2017-03-22 | 中铁港航局集团有限公司 | 一种空间受限条件下的长重斜拉索挂设安装方法 |
CN105442458B (zh) * | 2016-01-29 | 2017-01-11 | 中铁大桥(郑州)缆索有限公司 | 一种斜拉桥异形塔柱的斜拉索挂设安装方法 |
CN106087760A (zh) * | 2016-08-09 | 2016-11-09 | 中铁大桥局集团有限公司 | 一种自升式挂索平台装置 |
CN106284073B (zh) * | 2016-08-25 | 2018-03-30 | 中铁大桥局集团有限公司 | 一种斜拉索梁端挂索设备 |
CN106592441A (zh) * | 2017-01-16 | 2017-04-26 | 中交路桥华南工程有限公司 | 斜拉桥斜拉索的安装方法 |
CN107761572B (zh) * | 2017-11-24 | 2024-02-23 | 中交路桥华南工程有限公司 | 斜拉索挂索系统及其系统的安装方法 |
CN109898422B (zh) * | 2019-03-11 | 2021-01-15 | 中建三局第一建设工程有限责任公司 | 一种异型钢桥塔塔间索快速安装方法 |
CN109853393A (zh) * | 2019-03-19 | 2019-06-07 | 湖南联智智能科技有限公司 | 一种主塔竖转斜拉桥的挂索施工系统及其施工方法 |
CN110184930B (zh) * | 2019-05-27 | 2021-11-02 | 法尔胜泓昇集团有限公司 | 矮塔斜拉桥的斜拉索施工方法 |
CN110512529B (zh) * | 2019-09-02 | 2021-03-09 | 山西路桥市政工程有限公司 | 一种应用于桥梁拉索安装装置的拉伸机构及其拉伸方法 |
CN110485306B (zh) * | 2019-09-02 | 2021-05-28 | 青岛巨源建工集团有限公司 | 一种应用于桥梁拉索安装装置的行走机构及其行走方法 |
CN111101448B (zh) * | 2020-01-08 | 2024-08-23 | 中铁大桥(郑州)缆索有限公司 | 一种斜拉索梁端卷扬机快速牵引装备及其牵引方法 |
CN113789720A (zh) * | 2020-10-10 | 2021-12-14 | 江苏法尔胜缆索有限公司 | 一种碳纤维拉索的施工方法 |
CN112575691B (zh) * | 2020-12-29 | 2024-05-31 | 中交二公局第二工程有限公司 | 一种独柱式钢索塔斜拉桥挂索系统和方法 |
CN113123240A (zh) * | 2021-04-12 | 2021-07-16 | 中国建筑第八工程局有限公司 | 异型斜塔的斜拉索用的安装装置及其施工方法 |
CN114436116B (zh) * | 2022-02-10 | 2023-11-24 | 中铁广州工程局集团有限公司 | 一种超长超重钢绞线斜拉索挂设方法 |
CN114525739B (zh) * | 2022-03-10 | 2023-10-13 | 中铁十二局集团有限公司 | 一种桥下展索多点吊挂的长重索挂设安装方法 |
CN114673101B (zh) * | 2022-04-24 | 2023-09-29 | 中铁十四局集团第三工程有限公司 | 一种用于长期服役钢斜拉桥斜拉索更换的施工方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2103192A1 (de) * | 1971-01-23 | 1972-12-07 | Hein, Lehmann AG, 4000 Düsseldrof | Verfahren und Vorrichtung zur Montage eines Kabels |
-
2011
- 2011-10-14 CN CN201110310425.9A patent/CN102444086B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2103192A1 (de) * | 1971-01-23 | 1972-12-07 | Hein, Lehmann AG, 4000 Düsseldrof | Verfahren und Vorrichtung zur Montage eines Kabels |
Non-Patent Citations (2)
Title |
---|
单索面斜拉桥斜拉索施工技术;喻修正;《工程实录》;20090831;3.2,4.1,4.2节,图1-5 * |
喻修正.单索面斜拉桥斜拉索施工技术.《工程实录》.2009,3.2,4.1,4.2节,图1-5. |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149928A (zh) * | 2017-12-21 | 2018-06-12 | 中交路桥华南工程有限公司 | 斜拉索的塔端安装方法 |
CN108149928B (zh) * | 2017-12-21 | 2020-05-19 | 中交路桥华南工程有限公司 | 斜拉索的塔端安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102444086A (zh) | 2012-05-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444086B (zh) | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 | |
CN201458596U (zh) | 一种带有自拆卸装置的起重机 | |
CN104278637B (zh) | 一种悬索桥主缆索股无猫道的索道架设方法 | |
CN101967796B (zh) | 一种平行钢丝斜拉索的安装方法 | |
CN105442458B (zh) | 一种斜拉桥异形塔柱的斜拉索挂设安装方法 | |
CN104631329B (zh) | 一种悬索桥连续式猫道整体线形调整方法 | |
CN104495632A (zh) | 一种扩大型悬索式起重吊装系统 | |
CN109973130B (zh) | 一种主缆索股实现超长隧道锚窄空间一次牵引到位的施工系统及方法 | |
CN105113803A (zh) | 一种山区廊道桁架高空滑移吊装装置及其实现方法 | |
CN210003305U (zh) | 一种实现超长隧道锚窄空间一次牵引到位的施工系统 | |
CN109853393A (zh) | 一种主塔竖转斜拉桥的挂索施工系统及其施工方法 | |
CN201376848Y (zh) | 双塔桅巨型自升降起重设备 | |
CN212670303U (zh) | 一种斜拉索梁端安装结构 | |
CN109680616B (zh) | 利用缆载吊机协同倒提升设备吊装主梁的施工方法 | |
CN100580182C (zh) | 斜拉索软、硬组合三级牵引工艺及连接装置 | |
CN205637622U (zh) | 垂直单元式玻璃幕墙吊装系统 | |
CN209779465U (zh) | 一种主塔竖转斜拉桥的挂索施工系统 | |
CN105645275A (zh) | 缆索吊起重机及其施工方法 | |
CN204983693U (zh) | 一种山区廊道桁架高空滑移吊装装置 | |
CN102237654B (zh) | 使用双角钢挂点更换跳线串的工具来更换跳线串的方法 | |
CN204675726U (zh) | 檩条吊装辅助装置 | |
CN215160260U (zh) | 一种用于吊装桥塔横梁下方装饰件的吊装结构 | |
CN201171147Y (zh) | 超高层电缆垂直吊装夹具 | |
CN206769526U (zh) | 自升式多功能爬行扒杆 | |
CN212318045U (zh) | 一种隧道锚狭窄空间预应力钢束下滑安装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150211 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150211 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20190419 Address after: 400020 No.1-1, No.2-1, No.3-1, No.4-1, No.6 East Ring Road, Gangcheng City, Jiangbei District, Chongqing Patentee after: The 8th Engineering Co., MBEC Address before: 430050 Hanyang Avenue, Hanyang District, Wuhan, Hubei Province, No. 38 Patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau |
|
TR01 | Transfer of patent right |