CN111364365A - 螺旋钢管桩组合支架拆除方法 - Google Patents
螺旋钢管桩组合支架拆除方法 Download PDFInfo
- Publication number
- CN111364365A CN111364365A CN202010206538.3A CN202010206538A CN111364365A CN 111364365 A CN111364365 A CN 111364365A CN 202010206538 A CN202010206538 A CN 202010206538A CN 111364365 A CN111364365 A CN 111364365A
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- steel pipe
- pipe pile
- dismantling
- spiral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
本发明提供了一种螺旋钢管桩组合支架拆除方法,包括以下步骤:A、拆除满堂盘扣架;B、将多台卷扬机固定在箱梁上,并将卷扬机的拉绳的自由端固定在下工字钢梁上,利用卷扬机将下工字钢梁拉住,下工字钢梁支撑住贝雷梁;C、拆除螺纹钢管梁和螺旋钢管桩;D、控制卷扬机同步运行,对拉绳进行放卷,下工字钢梁和贝雷梁随着拉绳向下移动,直到下工字钢梁到达地面;E、将拉绳从下工字钢梁上拆下,完成螺旋钢管桩组合支架的拆除。本发明拆除速度快,避免了人工高空拆分贝雷梁,提高安全性,保证了贝雷梁的整体性,下次施工时可直接使用,有利于提高施工效率。此外,卷扬机与其他拆除设备相比,体积小,适用于各种地形,应用广泛。
Description
技术领域
本发明涉及桥梁施工技术领域,尤其是一种螺旋钢管桩组合支架拆除方法。
背景技术
伴随我国基础设施的不断建设,现浇连续箱梁技术在市政桥梁、公路桥梁工程中的应用越来越广泛,施工地形比较复杂时,一般是采用螺旋钢管桩组合支架作为桥梁的支撑,现有螺旋钢管桩组合支架如图1所示,包括多根竖直的螺旋钢管桩60,螺旋钢管桩60之间通过水平的螺纹钢管梁70相连,螺旋钢管桩60的顶部固定设置水平的下工字钢梁40,下工字钢梁40上设置贝雷梁30,贝雷梁30顶部设置,上工字钢梁50上设置满堂盘扣架20,满堂盘扣架20直接支撑箱梁10。施工时,先搭设螺旋钢管桩组合支架,然后进行箱梁10的施工,箱梁10施工完成后,需要拆除螺旋钢管桩组合支架,常规的拆除方式为:利用汽车吊依次拆除满堂盘扣架20、上工字钢梁50、贝雷梁30、下工字钢梁40、螺纹钢管梁70以及螺旋钢管桩60,但由于贝雷梁30和满堂盘扣架20位于箱梁10底部,可能会出现净空不满足汽车吊拆除所需安全操作距离的情况,导致无法拆除贝雷梁30,此时,只能够手动将贝雷梁30进行拆分,由于贝雷梁30是由多根板材、管材等组装而成,导致拆除效率低下,拆下的材料容易掉落,且后面再次使用时又要重新组装,影响施工效率。
发明内容
本发明所要解决的技术问题是提供一种螺旋钢管桩组合支架拆除方法,不需要使用汽车吊也能够快速、安全地拆除贝雷梁。
本发明解决其技术问题所采用的技术方案是:螺旋钢管桩组合支架拆除方法,包括以下步骤:
A、拆除满堂盘扣架;
B、将多台卷扬机固定在箱梁上,并将卷扬机的拉绳的自由端固定在下工字钢梁上,利用卷扬机将下工字钢梁拉住,下工字钢梁支撑住贝雷梁;
C、拆除螺纹钢管梁和螺旋钢管桩;
D、控制卷扬机同步运行,对拉绳进行放卷,下工字钢梁和贝雷梁随着拉绳向下移动,直到下工字钢梁到达地面;
E、将拉绳从下工字钢梁上拆下,完成螺旋钢管桩组合支架的拆除。
进一步地,步骤A中,拆下的满堂盘扣架放在上工字钢梁上;步骤D中,满堂盘扣架随着下工字钢梁和贝雷梁同步向下移动;步骤E中,将满堂盘扣架、上工字钢梁、贝雷梁和下工字钢梁分离。
进一步地,步骤C中,先利用汽车吊拆除螺纹钢管梁,再利用汽车吊拆除螺旋钢管桩。
进一步地,步骤B中,每一段下工字钢梁由4台卷扬机共同拉住。
进一步地,步骤B中,卷扬机通过工字钢固定在箱梁上。
进一步地,步骤B中,拉绳为直径大于或等于21.5mm的钢绳。
本发明的有益效果是:利用卷扬机将高处的贝雷梁吊起来,然后拆除贝雷梁下方的螺纹钢管梁以及螺旋钢管桩,最后将贝雷梁下放至地面上,拆除速度快,避免了人工高空拆分贝雷梁,提高安全性,,保证了贝雷梁的整体性,下次施工时可直接使用,有利于提高施工效率。此外,卷扬机与其他拆除设备相比,体积小,适用于各种地形,应用广泛。
附图说明
图1是螺旋钢管桩组合支架的示意图;
图2是卷扬机的安装示意图;
图3是拆除螺旋钢管桩和螺纹钢管梁的示意图;
图4是将贝雷梁下放至地面上时的示意图;
附图标记:10—箱梁;20—满堂盘扣架;30—贝雷梁;40—下工字钢梁;50—上工字钢梁;60—螺旋钢管桩;70—螺纹钢管梁;80—卷扬机;90—拉绳;100—汽车吊。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
本发明的螺旋钢管桩组合支架拆除方法,包括以下步骤:
A、拆除满堂盘扣架20。人工手动拆除满堂盘扣架20,拆下的满堂盘扣架20可通过升降设备、输送设备等下放至地面上,为了提高拆除效率,拆下的满堂盘扣架20放在上工字钢梁50上,摆放要整齐,后续拆除过程中,可将满堂盘扣架20和贝雷梁30同步下放至地面上。
B、如图2所示(图中未画出上工字钢梁50上的满堂盘扣架20),将多台卷扬机80固定在箱梁10上,卷扬机80可采用15t卷扬机,通过工字钢固定在箱梁10上。将卷扬机80的拉绳90的自由端固定在下工字钢梁40上,利用卷扬机80将下工字钢梁40拉住,下工字钢梁40支撑住贝雷梁30,利用卷扬机80承受下工字钢梁40、贝雷梁30、满堂盘扣架20和上工字钢梁50的重量后,螺旋钢管桩60不再受到压力,可以快速地被拆除。
贝雷梁30、上工字钢梁50和下工字钢梁40为多段,为了保证卷扬机80能够稳定地拉住下工字钢梁40,每一段下工字钢梁40由4台卷扬机80共同拉住,4台卷扬机80中,两台位于箱梁10的一侧,拉住下工字钢梁40的一端,另外两台位于箱梁10的另一侧,拉住下工字钢梁40的另一端,使拉力分布均匀,保证下工字钢梁40的稳定。拉绳90为直径大于或等于21.5mm的钢绳,具有足够的抗拉强度,不会出现拉绳90断裂的情况。
C、如图3所示,拆除螺纹钢管梁70和螺旋钢管桩60,具体地,先利用汽车吊100拆除螺纹钢管梁70,再利用汽车吊100拆除螺旋钢管桩60。
D、控制各个卷扬机80同步运行,卷扬机80对拉绳90进行放卷,下工字钢梁40和贝雷梁30随着拉绳90向下移动,直到下工字钢梁40到达地面。在这个过程中,满堂盘扣架20随着下工字钢梁40和贝雷梁30同步向下移动,如图4所示,这样一次性就能够将满堂盘扣架20、贝雷梁30、下工字钢梁40和上工字钢梁50全部下放到地面上,节省拆除时间,提高效率。
E、将拉绳90从下工字钢梁40上拆下,将满堂盘扣架20、上工字钢梁50、贝雷梁30和下工字钢梁40分离,完成螺旋钢管桩组合支架的拆除。在地面上操作方便,且避免高空作业,安全性较高。
综上,本发明利用卷扬机80将高处的贝雷梁30吊起来,然后拆除贝雷梁30下方的螺纹钢管梁70以及螺旋钢管桩60,最后将贝雷梁30下放至地面上,拆除速度快,避免了人工高空拆分贝雷梁30,提高安全性,且保证了各段贝雷梁30的整体性,下次施工时可直接使用,有利于提高施工效率。此外,卷扬机80与其他拆除设备相比,体积小,适用于各种地形,应用不受限制。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (6)
1.螺旋钢管桩组合支架拆除方法,其特征在于,包括以下步骤:
A、拆除满堂盘扣架(20);
B、将多台卷扬机(80)固定在箱梁(10)上,并将卷扬机(80)的拉绳(90)的自由端固定在下工字钢梁(40)上,利用卷扬机(80)将下工字钢梁(40)拉住,下工字钢梁(40)支撑住贝雷梁(30);
C、拆除螺纹钢管梁(70)和螺旋钢管桩(60);
D、控制卷扬机(80)同步运行,对拉绳(90)进行放卷,下工字钢梁(40)和贝雷梁(30)随着拉绳向下移动,直到下工字钢梁(40)到达地面;
E、将拉绳(90)从下工字钢梁(40)上拆下,完成螺旋钢管桩组合支架的拆除。
2.如权利要求1所述的螺旋钢管桩组合支架拆除方法,其特征在于:步骤A中,拆下的满堂盘扣架(20)放在上工字钢梁(50)上;步骤D中,满堂盘扣架(20)随着下工字钢梁(40)和贝雷梁(30)同步向下移动;步骤E中,将满堂盘扣架(20)、上工字钢梁(50)、贝雷梁(30)和下工字钢梁(40)分离。
3.如权利要求1所述的螺旋钢管桩组合支架拆除方法,其特征在于:步骤C中,先利用汽车吊(100)拆除螺纹钢管梁(70),再利用汽车吊(100)拆除螺旋钢管桩(60)。
4.如权利要求1所述的螺旋钢管桩组合支架拆除方法,其特征在于:步骤B中,每一段下工字钢梁(40)由4台卷扬机(80)共同拉住。
5.如权利要求1所述的螺旋钢管桩组合支架拆除方法,其特征在于:步骤B中,卷扬机(80)通过工字钢固定在箱梁(10)上。
6.如权利要求1所述的螺旋钢管桩组合支架拆除方法,其特征在于:步骤B中,拉绳(90)为直径大于或等于21.5mm的钢绳。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010206538.3A CN111364365A (zh) | 2020-03-23 | 2020-03-23 | 螺旋钢管桩组合支架拆除方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010206538.3A CN111364365A (zh) | 2020-03-23 | 2020-03-23 | 螺旋钢管桩组合支架拆除方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111364365A true CN111364365A (zh) | 2020-07-03 |
Family
ID=71210580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010206538.3A Pending CN111364365A (zh) | 2020-03-23 | 2020-03-23 | 螺旋钢管桩组合支架拆除方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111364365A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827119A (zh) * | 2020-07-15 | 2020-10-27 | 中国建筑土木建设有限公司 | 一种现浇变截面梁体模板的连接结构及其施工方法 |
CN113216023A (zh) * | 2021-05-28 | 2021-08-06 | 中交路桥建设有限公司 | π字形斜拉桥梁小空间支架拆除方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007191893A (ja) * | 2006-01-18 | 2007-08-02 | Shidagumi:Kk | 橋梁の撤去方法 |
CN105926455A (zh) * | 2016-05-25 | 2016-09-07 | 中交第航务工程局有限公司 | 一种箱梁底模整体拆除方法 |
CN106758846A (zh) * | 2017-01-12 | 2017-05-31 | 江苏省交通技师学院 | 现浇箱梁支架及施工方法 |
CN107988913A (zh) * | 2017-12-12 | 2018-05-04 | 中交公局第二工程有限公司 | 一种桥梁双层箱梁上层模板拆除方法 |
CN108611981A (zh) * | 2018-05-22 | 2018-10-02 | 江苏省交通工程集团有限公司 | 一种简单拆除的门洞支架及其拆除方法 |
CN110629674A (zh) * | 2019-06-30 | 2019-12-31 | 中国一冶集团有限公司 | 公路施工过程中现浇箱梁贝雷支架体系整体落架拆除方法 |
-
2020
- 2020-03-23 CN CN202010206538.3A patent/CN111364365A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007191893A (ja) * | 2006-01-18 | 2007-08-02 | Shidagumi:Kk | 橋梁の撤去方法 |
CN105926455A (zh) * | 2016-05-25 | 2016-09-07 | 中交第航务工程局有限公司 | 一种箱梁底模整体拆除方法 |
CN106758846A (zh) * | 2017-01-12 | 2017-05-31 | 江苏省交通技师学院 | 现浇箱梁支架及施工方法 |
CN107988913A (zh) * | 2017-12-12 | 2018-05-04 | 中交公局第二工程有限公司 | 一种桥梁双层箱梁上层模板拆除方法 |
CN108611981A (zh) * | 2018-05-22 | 2018-10-02 | 江苏省交通工程集团有限公司 | 一种简单拆除的门洞支架及其拆除方法 |
CN110629674A (zh) * | 2019-06-30 | 2019-12-31 | 中国一冶集团有限公司 | 公路施工过程中现浇箱梁贝雷支架体系整体落架拆除方法 |
Non-Patent Citations (2)
Title |
---|
王东生: "《岩溶高原湖盆区城市快速路施工新技术 哨关路工程施工实践》", 30 April 2018 * |
胡晓军: "现浇桥梁膺架架体整体拆除技术研究", 《高速铁路技术》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827119A (zh) * | 2020-07-15 | 2020-10-27 | 中国建筑土木建设有限公司 | 一种现浇变截面梁体模板的连接结构及其施工方法 |
CN111827119B (zh) * | 2020-07-15 | 2022-05-17 | 中国建筑土木建设有限公司 | 一种现浇变截面梁体模板的连接结构及其施工方法 |
CN113216023A (zh) * | 2021-05-28 | 2021-08-06 | 中交路桥建设有限公司 | π字形斜拉桥梁小空间支架拆除方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476410B (zh) | 混凝土筒仓的顶板模板支撑平台的安装和拆卸方法 | |
CN111042540A (zh) | 超大跨度预应力管桁架地面挂索空中对接的施工方法 | |
CN201458596U (zh) | 一种带有自拆卸装置的起重机 | |
CN102444086B (zh) | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 | |
CN102212630B (zh) | 利用活动吊盘的方式更换高炉冷却壁的施工方法 | |
CN106012852B (zh) | 支架整体落架施工方法 | |
CN108643057B (zh) | 一种悬索桥主梁架设过程中的临时锚索平衡施工法 | |
CN109162209B (zh) | 中承式及下承式拱桥吊杆的快速更换施工方法 | |
CN111364365A (zh) | 螺旋钢管桩组合支架拆除方法 | |
CN102409838A (zh) | 移动操作平台及利用移动操作平台的屋面吊顶施工方法 | |
CN101446074B (zh) | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 | |
CN107059637A (zh) | 大跨径自锚式悬索桥体系转换方法 | |
CN209797332U (zh) | 复杂空间重型管道设备吊装系统 | |
CN204401995U (zh) | 一种用于穹顶结构安装的中心悬挑支撑系统 | |
CN102061681B (zh) | 固定双吊点悬臂轨道式桁吊安装方法 | |
CN202643086U (zh) | 一种羟化反应器的吊装工具 | |
CN209816682U (zh) | 桥梁钢箱梁高空作业操作平台 | |
CN210505201U (zh) | 一种钢筋批量吊装的设备 | |
CN212200101U (zh) | 一种空腹式刚构桥三角区上弦箱梁悬浇支撑立柱及结构 | |
CN213202069U (zh) | 一种桁式组合拱桥节段下弦边箱拆除吊运装置 | |
CN105887701A (zh) | 悬索桥上部结构拆除与更换安装方法 | |
CN212613671U (zh) | 一种悬支式钢桁架平台的施工装置 | |
CN105923534A (zh) | 一种用内钢管吊装和运输圆石柱的方法 | |
CN220450686U (zh) | 一种用于索塔上横梁支架牛腿拆除的刚性悬吊保险结构 | |
CN214570042U (zh) | 一种吊装工装 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200703 |