CN108343159A CN201710519952.8A CN201710519952A CN108343159A CN 108343159 A CN108343159 A CN 108343159A CN 201710519952 A CN201710519952 A CN 201710519952A CN 108343159 A CN108343159 A CN 108343159A
Authority
CN
China
Prior art keywords
building
wall
block
beam column
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710519952.8A
Other languages
Chinese (zh)
Inventor
李福安
高崎
黄靓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Jinke Resource Recycling Co Ltd
Original Assignee
Xuchang Jinke Resource Recycling Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang Jinke Resource Recycling Co Ltd filed Critical Xuchang Jinke Resource Recycling Co Ltd
Priority to CN201710519952.8A priority Critical patent/CN108343159A/en
Publication of CN108343159A publication Critical patent/CN108343159A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

A kind of complete green assembled architecture technique, utilize the building-block of autochthonal production more than building waste spoir, it is produced into the assembled building block wall of different sizes and shapes according to the requirement of building drawing in the workshop of batch production through artificial, wall-building machine or robot, then transports to building site and beam column component and is assembled into green assembled architecture.Wall used uses the building-block produced by building waste to build the assembled building block wall produced by laying bricks or stones through artificial, wall-building machine or robot.Beam column used using reinforced masonry structure placing concrete beam column either plant produced precast reinforced concrete beam column either beam column of steel structure or steel tube concrete beam and column.Floor used is using superimposed sheet or the prefabricated reinforced concrete floor of plant produced.The technology has many advantages such as energy-efficient, environmentally protective, at low cost, construction quality is good, development important in inhibiting of the present invention for building assembled technology and green building.

Description

A kind of complete green assembled architecture technique
Technical field:
The present invention relates to technical field of buildings, specially a kind of complete green assembled architecture technique belongs to building industrialization, dress With formula building and green building field.
Background technology:
With the development of the social economy, building construction technology constantly reforms breakthrough, but current construction is still using biography Based on the cast-in-place concrete of system and live masonry technology, although this traditional building construction technology is very ripe, and It still in continuous innovation and is promoted in cost, quality and efficiency etc., but is limited by its technology self character, there are many straight To the defect being still unavoidable from present:
(1)Labour demand is big.Traditional architecture construction technology is big to labour demand, but labour faces aging sum number at present The reduced situation of amount;
(2)Labor intensity is big.Requirement of the traditional architecture construction technology to labour is high, and labor intensity is big;
(3)Complicated construction technique.Traditional architecture construction technology has multiple working procedure, construction technology sufficiently complex;
(4)Affected by environment big, the construction time is long.Traditional architecture construction technology can not carry out under bad weather, environment, construction Time is long;
(5)Construction quality and construction cost are not easy to control.Because traditional architecture construction technology complex process and time are long, therefore existing Field construction quality and construction cost are not easy to control;
(6)Security risk is big.Traditional architecture construction technology is limited by complicated technique and technology, and live material and mechanical equipment are multiple It is miscellaneous, cause security risk big.
(7)Energy expenditure is seriously polluted greatly.Traditional architecture construction technology energy expenditure is big and pollution on the environment is tight Weight.
Assembled architecture is all kinds of building elements that have been prefabricated in the factory, then is transported to construction site, through assembling, connecting, is tied The building structure that conjunction part is cast-in-place and is formed.Assembled architecture has the advantage that:Component is prefabricated in the factory, and mechanical automation is set Standby application greatly reduces the demand to labour, and labor intensity also reduces;Shorten the construction time;It operates at the construction field (site) Time reduce, work progress is affected by environment small;Construction technology is simplified;Site safety hidden danger is reduced;Standardized work Prefabricated factory is that product and Construction Quality improve;Overall energy consumption is reduced, and is reduced to the pollution of environment.In general, it fills With formula building have it is energy-efficient, environmentally protective, reduce cost, improve many advantages such as construction quality.
Assembled architecture technology is still not mature enough at present, and existing assembled architecture technology is substantially mainly for building portion Divide the preparation of component or connection and installation only for component.Such as patent of invention:A kind of assembled architecture insulating light wall Plate and manufacture craft(Application number CN201610726186.8, publication number:CN106320597A), which disclose a kind of utilizations Chemical gypsum, it is excellent to prepare light, fire prevention, waterproof, heat preservation, sound insulation, resistance to compression, fracture resistance, prepares and dress easy for construction With formula building wall board;Patent of invention:A kind of installation method of assembled architecture(Application number CN201610312894.7, publication number: CN106013811A), which disclose a kind of installation method of assembled architecture, including the binding of base treatment, reinforcement foundation, Installation first layer vertical member pours base concrete, installation first layer top horizontal member, casting concrete, installation second Layer vertical member, casting concrete, installation second layer horizontal member, casting concrete and according to the above installation exercise flow according to Secondary cycle operation.Therefore develop a kind of set of assembled architecture technology, including component preparation connects with component, installs skill Art, it is very necessary.
What various assembled architectures in the prior art used is all the form for pouring into a mould precast wall body, due to construction wall Windowing, opening position, height are different, to cause each wall to be required for a dedicated prefab-form, cause artificial The expense for adjusting template is high, since template is all steel template, causes the expense of template also to remain high, it is difficult to promote Using.
On the other hand, with the continuous propulsion of Development of China's Urbanization, the building waste that China generates is increasing, it is estimated that I The annual city output rubbish of state is about 6,000,000,000 tons, and wherein building waste has accounted for the 40% of municipal refuse total amount.Building waste contains Multiple harmful substances, however, China is still taking accumulation and land-fill method to handle building waste at present, seriously polluted soil and Underground water directly contributes nearly 20,000,000,000 yuan of economic loss.While a large amount of building wastes bring this series of malpractice, it to be used for work The natural sand stone resource of Cheng Jianshe and clay, the limestone resource etc. needed for production cement are also faced with Tough questions, according to statistics, The 1 year natural sand stone consumed for engineering construction in China is just more than 7,000,000,000 tons.Therefore, reinforce the resource to building castoff Change and utilize, it appears is particularly important and urgent.
Invention content:
In order to overcome the problems, such as traditional architecture construction technology bring and building waste generate harm, built for existing assembled The deficiency for building technology, the present invention provides a kind of complete green assembled architecture techniques.The technical solution adopted in the present invention has Body is as follows:
A kind of complete green assembled architecture technique utilizes the powder of soil and brick and tile coagulation great soil group building waste more than building waste spoir The building-block for expecting production is produced into the workshop of batch production according to the requirement of building drawing through artificial, wall-building machine or robot The assembled building block wall of different sizes and shapes, then transport and be assembled into green assembled with beam column component to building site and build It builds.
The described complete green assembled architecture technique of one kind is built using soil more than building waste spoir and brick and tile coagulation great soil group The powder of building refuse produces building-block, including bearing building block and non-bearing building block.
The complete green assembled architecture technique of described one kind, wall used use the building-block produced by building waste Build the assembled building block wall produced by laying bricks or stones through artificial, wall-building machine or robot.
The complete green assembled architecture technique of described one kind, beam column used use reinforced masonry structure placing concrete beam Precast reinforced concrete beam column either beam column of steel structure or the steel tube concrete beam and column of column either plant produced.
The described complete green assembled architecture technique of one kind, floor used are pre- using superimposed sheet or plant produced Reinforced concrete floor processed.
The complete green assembled architecture technique of described one kind, precast wall body component and precast reinforced concrete beam column structure Either either steel tube concrete beam and column component or reinforced masonry casting concrete beam column carry out group to beam column of steel structure component to part Dress.
The complete green assembled architecture technique of described one kind, prefabricated assembled building block wall body construction and beam column component Connection using the hole of wall own reservation be inserted into reinforcing bar and penetration concrete complete between wall and wall, wall and beam column component Between connection.
It is described to produce building-block with the powder of soil and brick and tile coagulation great soil group building waste more than building waste spoir, with building The building-block of autochthonal production is divided into bearing building block and non-bearing building block more than building refuse spoir, and bearing building block includes but not limited to clear water Building block and decoration composite heat insulation block, non-bearing building block include but not limited to decorative heat preservation building block, decorate composite heat insulation block, is clear Water insulation blocks, clear water composite heat insulation block.
The assembled building block wall, assembled building block wall are divided into load bearing wall and filling wall, and load bearing wall is built by load-bearing Block is built by laying bricks or stones in factory and is produced through artificial, wall-building machine or robot, and filling wall is by non-bearing building block through artificial, wall-building machine or machine Device people builds by laying bricks or stones in factory to be produced.
The decoration composite heat insulation block, decorative heat preservation building block refer to soil and brick and tile concrete more than the building waste spoir One or more surfaces of the powder production building-block of class building waste applies the enamel of multiple color and flower pattern through being built made of sintering Block class product.
Compared with traditional architecture construction technology, the advantage of the invention is that:
(1)Construction speed is fast, and climate conditionality is small;
(2)Energy-saving and emission-reduction, construction cost is low, and residence comfort is greatly improved;
(3)Wall self-insulation and external decoration integration, thoroughly solve insulating layer and building different longevity and additional insulating layer are de- Simultaneously construction quality can be improved in the security hidden trouble that falls;
(4)Materials for wall using building waste spoir more than the production of the powder of soil and brick and tile coagulation great soil group building waste, it is not only sharp With building waste and the generation of building waste in process of construction is greatly reduced, realizes sustainable cycle development, green ring It protects;
(5)Wall production should not reinforcing bar and mold, saving steel and die cost, while reducing steel radiation and wireless signal quilt Shielding problem;
(6)The wall that any size can be built by laying bricks or stones according to design, does not need mold and steel;
(7)Whole construction cost is not only less than existing any assembled architecture and cuts knot less than existing conventional frame and frame Structure is built.
Self-insulating sintered block is produced using building waste, recycles artificial, wall-building machine or robot in the vehicle of batch production Between be produced into assembled building block wall, in conjunction with assembled architecture technology, can not only protect from building castoff is effectively treated Environment improves the industrial structure and product knot at the same time it can also push construction industry, building materials industry along circular economy Road Development The upgrading of structure forms a kind of green assembled architecture technology.
Description of the drawings:
Fig. 1 is a kind of complete green assembled architecture process flow chart
The reference numerals are as follows:
The construction refuse regenerated processing of 1- sinters various building blocks into;2- worker, wall-building machine, robot are built by laying bricks or stones in factory;3- utilizes wall Reinforcing bar is inserted into the hole of body own reservation and tank enters concrete and assembles.
Specific implementation mode:
It is real below in conjunction with implementing in order to which those skilled in the art can be better understood from technical solution provided by the present invention The present invention is described in detail for example.
A kind of complete green assembled architecture technique, using autochthonal production clear water building block more than building waste spoir as load-bearing block Then block, production decoration composite heat insulation block utilize automatic wall building machine, by clear water as non-bearing building block in the workshop of batch production Concrete block masonry builds into filling wall by laying bricks or stones at load bearing wall, by decoration composite heat insulation block, then transports to building site.
Beam column uses the reinforced concrete beam column of prefabrication.
Floor uses the prefabricated reinforced concrete floor of plant produced.
Reinforcing bar and tank are inserted into the hole using wall own reservation of prefabricated assembled blockwork component and beam column component Enter the connection between concrete completion wall and wall, between wall and beam column component, builds into green assembled architecture.
After the present invention is fabricated to brick or building block using building waste recovered material, according to the figure of various walls in factory Paper carries out prepackage and builds by laying bricks or stones, after building block specification carries out systematization standardized designs, building by laying bricks or stones for wall can be quickly realized, after building by laying bricks or stones Integral wall transport at the main body frame in house after be fixedly connected with the beam column on main body frame, due to wall It is not concrete prefabricated structure, weight reduces, reinforcing bar usage amount reduces, and the machine of automation may be implemented in building process People builds by laying bricks or stones, can also manually build by laying bricks or stones, the structure type of reinforced masonry can be added in wall body structure, or connect by tenon structure Building block and brick are connect, whole process is similar to children's puzzle process, original template has been abandoned, without design template special again , it is combined into monoblock wall by breaking the whole up into parts, then with zero, difficulty is reduced, reduces cost, achieve many things at one stroke.
Above-mentioned embodiment is merely to illustrate more preferably a kind of scheme of the application, is not constituted to the protection domain of the application Any restrictions, those skilled in the art carries out common variations and alternatives within the scope of the application should be included in the application's Within protection domain.

Claims (9)

1. a kind of complete green assembled architecture technique, it is characterized in that:With the building-block of autochthonal production more than building waste spoir, warp Manually, wall-building machine or robot are produced into the assembly of different sizes and shapes in the workshop of batch production according to the requirement of building drawing Formula blockwork, then transport to building site and beam column component and be assembled into green assembled architecture.
2. the complete green assembled architecture technique of one kind according to claim 1, it is characterized in that:More than building waste spoir Autochthonal production building-block, including bearing building block and non-bearing building block.
3. the complete green assembled architecture technique of one kind according to claim 1, it is characterized in that:Wall used is used by building The building-block of building refuse production builds the assembled building block wall produced by laying bricks or stones through artificial, wall-building machine or robot.
4. the complete green assembled architecture technique of one kind according to claim 1, it is characterized in that:Beam column used uses arrangement of reinforcement The precast reinforced concrete beam column or beam column of steel structure of masonry structure placing concrete beam column either plant produced, Huo Zhegang Pipe concrete beam column.
5. the complete green assembled architecture technique of one kind according to claim 1, it is characterized in that:Floor used is using overlapping The prefabricated reinforced concrete floor of plate or plant produced.
6. the complete green assembled architecture technique of one kind according to claim 1, it is characterized in that:Precast wall body component with it is pre- Either either steel tube concrete beam and column component or reinforced masonry pour beam column of steel structure component reinforced concrete beam column component processed Beam column built from concrete is built to be assembled.
7. the complete green assembled architecture technique of one kind according to claim 1, it is characterized in that:Prefabricated assembled building block The connection of wall body construction and beam column component is inserted into reinforcing bar using the hole of wall own reservation and penetration concrete completes wall and wall Connection between body, between wall and beam column component.
8. according to claim 2 use autochthonal production building-block more than building waste spoir, it is characterized in that:It is abandoned with building waste The building-block of autochthonal production is divided into bearing building block and non-bearing building block more than soil, and bearing building block includes but not limited to clear water building block and dress Decoration composite heat insulation building block, non-bearing building block include but not limited to decorative heat preservation building block, decoration composite heat insulation block, clear water heat preservation block Block, clear water composite heat insulation block.
9. assembled building block wall according to claim 3, it is characterized in that:Assembled building block wall is divided into load bearing wall and fills out Wall is filled, load bearing wall is built by laying bricks or stones in factory and produced through artificial, wall-building machine or robot by bearing building block, and filling wall is built by non-bearing Block is built by laying bricks or stones in factory and is produced through artificial, wall-building machine or robot.
CN201710519952.8A 2017-06-30 2017-06-30 A kind of complete green assembled architecture technique Pending CN108343159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710519952.8A CN108343159A (en) 2017-06-30 2017-06-30 A kind of complete green assembled architecture technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710519952.8A CN108343159A (en) 2017-06-30 2017-06-30 A kind of complete green assembled architecture technique

Publications (1)

Publication Number Publication Date
CN108343159A true CN108343159A (en) 2018-07-31

Family

ID=62963214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710519952.8A Pending CN108343159A (en) 2017-06-30 2017-06-30 A kind of complete green assembled architecture technique

Country Status (1)

Country Link
CN (1) CN108343159A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293856A (en) * 2021-06-07 2021-08-24 上海恪耐新材料科技有限公司 Construction method of fabricated building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572866A (en) * 2012-07-30 2014-02-12 吴淑环 Assembly type wall
CN103883023A (en) * 2014-04-16 2014-06-25 许昌金科建筑清运有限公司 Method for using building waste to manufacture building blocks and building reinforced masonry without adhesive mortar
CN103936354A (en) * 2014-04-16 2014-07-23 许昌金科建筑清运有限公司 Production process for external tiles with decorative surfaces during construction waste production
CN104790675A (en) * 2015-04-15 2015-07-22 哈尔滨达城绿色建筑技术开发股份有限公司 Reinforced concrete block masonry structure assemblage construction method
CN105908859A (en) * 2016-05-16 2016-08-31 苏州市世好建材新技术工程有限公司 Heat-preservation precast wall body and assembled house
CN106587928A (en) * 2016-12-28 2017-04-26 许昌金科资源再生股份有限公司 Production technology for producing sintered wall bricks or building blocks with glaze on surfaces from construction waste

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572866A (en) * 2012-07-30 2014-02-12 吴淑环 Assembly type wall
CN103883023A (en) * 2014-04-16 2014-06-25 许昌金科建筑清运有限公司 Method for using building waste to manufacture building blocks and building reinforced masonry without adhesive mortar
CN103936354A (en) * 2014-04-16 2014-07-23 许昌金科建筑清运有限公司 Production process for external tiles with decorative surfaces during construction waste production
CN104790675A (en) * 2015-04-15 2015-07-22 哈尔滨达城绿色建筑技术开发股份有限公司 Reinforced concrete block masonry structure assemblage construction method
CN105908859A (en) * 2016-05-16 2016-08-31 苏州市世好建材新技术工程有限公司 Heat-preservation precast wall body and assembled house
CN106587928A (en) * 2016-12-28 2017-04-26 许昌金科资源再生股份有限公司 Production technology for producing sintered wall bricks or building blocks with glaze on surfaces from construction waste

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293856A (en) * 2021-06-07 2021-08-24 上海恪耐新材料科技有限公司 Construction method of fabricated building

Similar Documents

Publication Publication Date Title
CN101285330A (en) Environment protection type structure thermal insulation concrete block, masonry and method for anti-knock domestic architecture
CN103306501B (en) Energy-saving domestic architecture with cast-in-place industrial gypsum bearing wall and manufacturing method thereof
CN105401654A (en) Environment-friendly assembled type ecological house and construction method thereof
CN103255856A (en) Building technology for prefabricating integral wall plate by aerated concrete
CN103286846B (en) Manufacturing process of concrete-composited self-heat-insulating blocks
CN105019593B (en) Building heat preservation prefabricated section and modular arrangement of reinforcement cast-in-place method construction method thereof
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN201713970U (en) Structural system with light multi-ribbed plates and light multi-ribbed floor systems
CN201224941Y (en) Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building
CN103590515B (en) A kind of self-balancing precast surface, cast-in-place core filler wall
CN108343159A (en) A kind of complete green assembled architecture technique
CN104612321A (en) Light high-strength inner partitioning wall plate and manufacturing method
CN108252449A (en) Precast foam concrete arrangement of reinforcement wallboard and its production method
CN104294962A (en) Method for manufacturing pre-placed recycled aggregate grouted concrete energy-saving and heat-preservation building block and wall system
CN204163266U (en) The large plate of hollow lath component building hollow wall
CN203867053U (en) Novel prefabricated composite wall plate with thermal insulating function
CN203296209U (en) Self-insulation mortarless block masonry shear wall system
CN206625450U (en) A kind of novel and multifunctional environmentally friendly combined wall board
CN204876276U (en) Building heat preservation prefabricated section
CN104790565A (en) Cast-in-site ardealite load bearing wall composite structure main building construction method
CN205444514U (en) Bearing light insulation intergral template
CN104847018A (en) Integral assembly method of precast concrete box structure building
CN105401681B (en) A kind of quick-assembling pitched roof and its method of construction based on assembled composite wall structure system
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house
CN2871691Y (en) L-shaped thermal-insulating building block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180731