CN108150197B - 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法 - Google Patents

弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法 Download PDF

Info

Publication number
CN108150197B
CN108150197B CN201810109790.5A CN201810109790A CN108150197B CN 108150197 B CN108150197 B CN 108150197B CN 201810109790 A CN201810109790 A CN 201810109790A CN 108150197 B CN108150197 B CN 108150197B
Authority
CN
China
Prior art keywords
arc
oil cylinder
shaped template
overturning
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810109790.5A
Other languages
English (en)
Other versions
CN108150197A (zh
Inventor
王占举
李兴瑷
刘龙卫
张瑞明
陈海锋
杨文军
刘大琳
杜乾
王玉玲
叶勇
唐标
石川
康政
张寒钰
李果
罗勇
陈晓成
杨怀强
袁有朝
李志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Yichu Co Ltd
Priority to CN201810109790.5A priority Critical patent/CN108150197B/zh
Publication of CN108150197A publication Critical patent/CN108150197A/zh
Application granted granted Critical
Publication of CN108150197B publication Critical patent/CN108150197B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/10Travelling bridges, i.e. roller bridges; Sliding bridges; Rotary cylinder bridges, i.e. rotating about longitudinal axis to invert and raise the road

Abstract

本发明公开了一种弧形模板径向翻转仰拱栈桥,包括主桥和固定安装架,弧形模板径向翻转机构用于对相应侧的两段铰接式弧形模板进行径向翻转,弧形模板径向翻转机构包括活动悬臂、第一提升油缸、第二提升油缸、摆动油缸、第一翻转油缸和第二翻转油缸;两段铰接式弧形模板由第一弧形模板的外侧端与第二弧形模板的内侧端铰接而成。采用两段铰接式弧形模板,并结合各自对应的由多个油缸和活动悬臂构成的弧形模板径向翻转机构进行径向翻转,最大限度地腾出仰拱弧形模板与钢筋安装、绑扎作业面的空间,使仰拱弧形模板安装定位及脱膜方便快捷、省时省力。同时,本发明还公开了使用上述仰拱栈桥进行弧形模板径向翻转从而完成安装定位及脱膜的方法。

Description

弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法
技术领域
本发明涉及隧道施工技术领域,具体涉及一种仰拱栈桥,以及使用该仰拱栈桥进行弧形模板径向翻转从而完成安装定位及脱膜的方法。
背景技术
隧道仰拱施工时,自行式液压栈桥采用常规配置的“手拉葫芦+双头丝杆”对仰拱弧形模板进行定位、脱模。在仰拱弧形模板脱模时,通过拧紧双头丝杆,使仰拱弧形模板脱离已浇筑完成的混凝土表面,然后拉动手拉葫芦,使仰拱弧形模板上升。但受液压栈桥结构的限制,仰拱弧形模板能提升的高度不足110cm。在液压栈桥移动至下一仰拱作业区时,需要在仰拱弧形模板与仰拱基岩之间运送、绑扎钢筋,由于仰拱为双层钢筋骨架设计,留给作业人员的作业空间不足70cm,作业人员在从事运送、绑扎钢筋等工作时处于“匍匐”工作状态,导致钢筋绑扎时间过长,作业劳动强度大,导致仰拱施工进度极为缓慢,与隧道开挖掘进进度不匹配,无法实现多工序平行施工,造成施工功效低,综合成本大;同时,常规方式定位、脱模工序繁琐、精度低,钢筋绑扎质量不易控制。
国家知识产权局于2017年8月22日公开了一种“隧道仰拱整体配套移动栈桥”,专利号为CN201720068811.4,在主桥100的底部设置由液压升降系统120,用于调整主桥100的高度;仰拱端头模板170,设置在两块仰拱弧形模板150之间,构成一个刚性整体。仰拱弧形模板150与护栏110通过多组连接组件160组成,多组连接组件160设置在主桥100的两侧,连接组件160包括支架161和多根连接杆165,多根连接杆165设置在支架161和仰拱弧形模板150之间。连接杆165的两端分别通过插销实现与支架161、仰拱弧形模板150的铰,连接杆165采用螺杆实现长度调节。连接组件160与护栏110固定连接,可以保证连接组件160的准确定位,二连接组件160与仰拱弧形模板150铰接,可以在栈桥发生晃动时,保证仰拱弧形模板150的稳定。但由于仰拱端头模板170与两块仰拱弧形模板150构成一个刚性架,仅能通过液压系统实现整体升降,仍存在仰拱施工空间不足,定位脱膜及钢筋绑扎耗时费力、功效低、精度差,工人劳动强度大等问题。
发明内容
针对上述技术问题,本发明旨在提供一种仰拱栈桥,使仰拱弧形模板安装定位及脱膜方便快捷、省时省力、增大仰拱施工的作业空间,从根本上改善传统仰拱施工空间不足,安装定位及脱模耗时费力,功效低的问题,间接降低了钢筋作业人员的劳动强度,保证了仰拱钢筋绑扎质量、仰拱弧形模板定位精度和作业人员安全。
为此,本发明所采用的技术方案为:一种弧形模板径向翻转仰拱栈桥,包括主桥,以及对称设置在主桥左右两侧的固定安装架;
每组固定安装架的外侧均设置有弧形模板径向翻转机构,用于对相应侧的两段铰接式弧形模板进行径向翻转;所述弧形模板径向翻转机构包括活动悬臂、第一提升油缸、第二提升油缸、摆动油缸、第一翻转油缸和第二翻转油缸;所述两段铰接式弧形模板由第一弧形模板的外侧端与第二弧形模板的内侧端铰接而成;
所述活动悬臂的内侧端与固定安装架的顶部外侧铰接,第一翻转油缸的一端铰接安装在固定安装架的顶上,另一端铰接安装在活动悬臂的顶上;所述摆动油缸位于第一翻转油缸的下方,摆动油缸的一端铰接在固定安装架的外侧,第一提升油缸的一端铰接在活动悬臂下方靠外侧位置处,摆动油缸的另一端、第一提升油缸的另一端通过第一共用铰接点铰接在第二弧形模板内壁靠外侧位置处;所述第二提升油缸的一端铰接在活动悬臂下方靠内侧位置处,第二翻转油缸的一端铰接在第一弧形模板内壁靠内侧位置处,第二提升油缸的另一端、第二翻转油缸的另一端通过第二共用铰接点铰接在第一弧形模板内壁靠外侧位置处。
作为上述方案的优选,所述固定安装架包括立柱、水平悬臂和斜撑粱,所述立柱与水平悬臂呈“7”字形布置,再与斜撑粱构成三角形固定框架。优化固定安装架的结构布置,提高强度,降低成本。
同时,本发明还提供了上述弧形模板径向翻转仰拱栈桥的安装定位脱膜方法,按以下步骤进行:
步骤一,两段铰接式弧形模板的安装定位,并按以下分步骤进行:
(1a)、将第二翻转油缸的活塞杆伸出,推动第一弧形模板向外翻转50±10°;
(1b)、将第一翻转油缸的活塞杆伸出,推动活动悬臂向下翻转50±10°;
(1c)、将第一提升油缸的活塞杆伸出,使两段铰接式弧形模板向隧道边墙方向旋转50±10°;
(1d)、将第一翻转油缸的活塞杆继续伸出,推动活动悬臂向下翻转直至处于水平状态;
(1e)、交替将第一提升油缸、第二提升油缸和摆动油缸的活塞杆伸出,使两段铰接式弧形模板逐渐移动至仰拱设定位置;
(1f)、进一步调整第一提升油缸、第二提升油缸和摆动油缸活塞杆的伸缩位置,实现第二弧形模板的精确定位;
(1g)、继续调整第二翻转油缸活塞杆伸缩的位置,实现第一弧形模板的精准定位;
步骤二,进行隧道仰拱的混凝土浇筑;
步骤三,两段铰接式弧形模板的脱膜,并按以下分步骤进行:
(3a)、收回第二翻转油缸的活塞杆,使第一弧形模板脱模,并向内旋转90°±5°;
(3b)、交替将摆动油缸、第一提升油缸和第二提升油缸的活塞杆收回,使第二弧形模板脱离仰拱混凝土表面,直至提升至离混凝土面的高度40cm以上;
(3c)、将第一翻转油缸的活塞杆收回,使活动悬臂向上翻转,两段铰接式弧形模板向上提升并内移;
(3d)、交替将摆动油缸、第一提升油缸和第二提升油缸的活塞杆收回,使活动悬臂向上翻转80±5°,第二弧形模板离隧道已浇注仰拱边基的宽度80cm以上,第一弧形模板离仰拱混凝土表面的高度130cm以上。
本发明的有益效果是:
1、采用两段铰接式弧形模板,并结合各自对应的由多个油缸和活动悬臂构成的弧形模板径向翻转机构进行径向翻转,最大限度地腾出仰拱弧形模板与钢筋安装、绑扎作业面的空间,便于作业人员施工,保证了仰拱钢筋绑扎质量、仰拱弧形模板定位精度和作业人员安全;
2、采用多个液压油缸驱动弧形模板定位、脱模,施工工艺简单,作业人员数量减少,劳动强度明显降低,显著节约了作业时间,施工效率与进度大幅提升,降低了施工成本。
3、采用多组液压油缸组件对弧形模板支撑固定,浇注后的混凝土线性顺畅,施工质量能得到有效控制,能够实现与拱墙衬砌的圆顺对接。
附图说明
图1是本发明的定位状态图。
图2是本发明的脱膜状态图。
具体实施方式
下面通过实施例并结合附图,对本发明作进一步说明:
结合图1—图2所示,一种弧形模板径向翻转仰拱栈桥,主要由主桥1、固定安装架A、弧形模板径向翻转机构B和两段铰接式弧形模板C组成,整体左右对称。
固定安装架A对称设置在主桥1的左右两侧,每组固定安装架A的外侧均设置有弧形模板径向翻转机构B,用于对相应侧的两段铰接式弧形模板C进行径向翻转。
最好是,固定安装架A由立柱10、水平悬臂11和斜撑粱12组成。立柱10与水平悬臂11呈“7”字形布置,再与斜撑粱12构成三角形固定框架。
弧形模板径向翻转机构B主要由活动悬臂2、第一提升油缸3、第二提升油缸4、摆动油缸5、第一翻转油缸6和第二翻转油缸7组成。两段铰接式弧形模板C由第一弧形模板8的外侧端与第二弧形模板9的内侧端铰接而成。
活动悬臂2的内侧端与固定安装架A的顶部外侧铰接,第一翻转油缸6的一端铰接安装在固定安装架A的顶上,另一端铰接安装在活动悬臂2的顶上。摆动油缸5位于第一翻转油缸6的下方,摆动油缸5的一端铰接在固定安装架A的外侧,第一提升油缸3的一端铰接在活动悬臂2下方靠外侧位置处,摆动油缸5的另一端、第一提升油缸3的另一端通过第一共用铰接点13铰接在第二弧形模板9内壁靠外侧位置处。第二提升油缸4的一端铰接在活动悬臂2下方靠内侧位置处,第二翻转油缸7的一端铰接在第一弧形模板8内壁靠内侧位置处,第二提升油缸4的另一端、第二翻转油缸7的另一端通过第二共用铰接点14铰接在第一弧形模板8内壁靠外侧位置处。
最好是,第一提升油缸3、第二提升油缸4、摆动油缸5、第一翻转油缸6和第二翻转油缸7均为普遍液压油缸,可直接在市场上购买。固定安装架A在施工现场采用普通工字钢加工焊接,现场取材,方便制作。
上述弧形模板径向翻转仰拱栈桥的安装定位脱膜方法,按以下步骤进行:
步骤一,两段铰接式弧形模板C的安装定位,并按以下分步骤进行:
(1a)、将第二翻转油缸7的活塞杆伸出,推动第一弧形模板8向外翻转50±10°,优选为50°;
(1b)、将第一翻转油缸6的活塞杆伸出,推动活动悬臂2向下翻转50±10°,优选为50°;
(1c)、将第一提升油缸3的活塞杆伸出,使两段铰接式弧形模板C向隧道边墙方向旋转50±10°,优选为50°;
(1d)、将第一翻转油缸6的活塞杆继续伸出,推动活动悬臂2向下翻转直至处于水平状态;
(1e)、交替将第一提升油缸3、第二提升油缸4和摆动油缸5的活塞杆伸出,使两段铰接式弧形模板C逐渐移动至仰拱设定位置;
(1f、)进一步调整第一提升油缸3、第二提升油缸4和摆动油缸5活塞杆的伸缩位置,实现第二弧形模板9的精确定位;
(1g)、继续调整第二翻转油缸7活塞杆伸缩的位置,实现第一弧形模板8的精准定位。
步骤二,进行隧道仰拱的混凝土浇筑。
步骤三,两段铰接式弧形模板C的脱膜,并按以下分步骤进行:
(3a)、收回第二翻转油缸7的活塞杆,使第一弧形模板8脱模,并向内旋转90°±5°,优选为90°;
(3b)、交替将摆动油缸5、第一提升油缸3和第二提升油缸4的活塞杆收回,使第二弧形模板9脱离仰拱混凝土表面,直至提升至离混凝土面的高度40cm以上;
(3c)、将第一翻转油缸6的活塞杆收回,使活动悬臂2向上翻转,两段铰接式弧形模板C向上提升并内移;
(3d)、交替将摆动油缸5、第一提升油缸3和第二提升油缸4的活塞杆收回,使活动悬臂2向上翻转80±5°(优选为80°),第二弧形模板9离隧道已浇注仰拱边基的宽度80cm以上(优选为90cm),第一弧形模板8离仰拱混凝土表面的高度130cm以上(优选为140cm)。

Claims (2)

1.一种弧形模板径向翻转仰拱栈桥的安装定位脱膜方法,其特征在于,包括弧形模板径向翻转仰拱栈桥,所述弧形模板径向翻转仰拱栈桥包括主桥(1),以及对称设置在主桥(1)左右两侧的固定安装架(A);
每组固定安装架(A)的外侧均设置有弧形模板径向翻转机构(B),用于对相应侧的两段铰接式弧形模板(C)进行径向翻转;所述弧形模板径向翻转机构(B)包括活动悬臂(2)、第一提升油缸(3)、第二提升油缸(4)、摆动油缸(5)、第一翻转油缸(6)和第二翻转油缸(7);所述两段铰接式弧形模板(C)由第一弧形模板(8)的外侧端与第二弧形模板(9)的内侧端铰接而成;
所述活动悬臂(2)的内侧端与固定安装架(A)的顶部外侧铰接,第一翻转油缸(6)的一端铰接安装在固定安装架(A)的顶上,另一端铰接安装在活动悬臂(2)的顶上;所述摆动油缸(5)位于第一翻转油缸(6)的下方,摆动油缸(5)的一端铰接在固定安装架(A)的外侧,第一提升油缸(3)的一端铰接在活动悬臂(2)下方靠外侧位置处,摆动油缸(5)的另一端、第一提升油缸(3)的另一端通过第一共用铰接点(13)铰接在第二弧形模板(9)内壁靠外侧位置处;所述第二提升油缸(4)的一端铰接在活动悬臂(2)下方靠内侧位置处,第二翻转油缸(7)的一端铰接在第一弧形模板(8)内壁靠内侧位置处,第二提升油缸(4)的另一端、第二翻转油缸(7)的另一端通过第二共用铰接点(14)铰接在第一弧形模板(8)内壁靠外侧位置处;
所述弧形模板径向翻转仰拱栈桥的安装定位脱膜方法,按以下步骤进行:
步骤一,两段铰接式弧形模板(C)的安装定位,并按以下分步骤进行:
(1a)、将第二翻转油缸(7)的活塞杆伸出,推动第一弧形模板(8)向外翻转50±10°;
(1b)、将第一翻转油缸(6)的活塞杆伸出,推动活动悬臂(2)向下翻转50±10°;
(1c)、将第一提升油缸(3)的活塞杆伸出,使两段铰接式弧形模板(C)向隧道边墙方向旋转50±10°;
(1d)、将第一翻转油缸(6)的活塞杆继续伸出,推动活动悬臂(2)向下翻转直至处于水平状态;
(1e)、交替将第一提升油缸(3)、第二提升油缸(4)和摆动油缸(5)的活塞杆伸出,使两段铰接式弧形模板(C)逐渐移动至仰拱设定位置;
(1f)、进一步调整第一提升油缸(3)、第二提升油缸(4)和摆动油缸(5)活塞杆的伸缩位置,实现第二弧形模板(9)的精确定位;
(1g)、继续调整第二翻转油缸(7)活塞杆伸缩的位置,实现第一弧形模板(8)的精准定位;
步骤二,进行隧道仰拱的混凝土浇筑;
步骤三,两段铰接式弧形模板(C)的脱膜,并按以下分步骤进行:
(3a)、收回第二翻转油缸(7)的活塞杆,使第一弧形模板(8)脱模,并向内旋转90°±5°;
(3b)、交替将摆动油缸(5)、第一提升油缸(3)和第二提升油缸(4)的活塞杆收回,使第二弧形模板(9)脱离仰拱混凝土表面,直至提升至离混凝土面的高度40cm以上;
(3c)、将第一翻转油缸(6)的活塞杆收回,使活动悬臂(2)向上翻转,两段铰接式弧形模板(C)向上提升并内移;
(3d)、交替将摆动油缸(5)、第一提升油缸(3)和第二提升油缸(4)的活塞杆收回,使活动悬臂(2)向上翻转80±5°,第二弧形模板(9)离隧道已浇注仰拱边基的宽度80cm以上, 第一弧形模板(8)离仰拱混凝土表面的高度130cm以上。
2.根据权利要求1所述的弧形模板径向翻转仰拱栈桥的安装定位脱膜方法,其特征在于:所述固定安装架(A)包括立柱(10)、水平悬臂(11)和斜撑粱(12),所述立柱(10)与水平悬臂(11)呈“7”字形布置,再与斜撑粱(12)构成三角形固定框架。
CN201810109790.5A 2018-02-05 2018-02-05 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法 Active CN108150197B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810109790.5A CN108150197B (zh) 2018-02-05 2018-02-05 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810109790.5A CN108150197B (zh) 2018-02-05 2018-02-05 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法

Publications (2)

Publication Number Publication Date
CN108150197A CN108150197A (zh) 2018-06-12
CN108150197B true CN108150197B (zh) 2024-04-05

Family

ID=62456875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810109790.5A Active CN108150197B (zh) 2018-02-05 2018-02-05 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法

Country Status (1)

Country Link
CN (1) CN108150197B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535148A (zh) * 2020-05-27 2020-08-14 李军 一种仰拱栈桥台车用自行式栈桥小车
CN112943303B (zh) * 2021-02-23 2022-11-01 中建桥梁有限公司 一种采用液压弧形模板的隧道仰拱施工方法

Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190714319A (en) * 1907-06-21 1908-03-26 John William Lodge Improvements in the Method of and Means for Making a Safe and Easily Defensible Working Connection between an Existing Railway on Land, and a Railway at a considerably Divergent Level in, or in Course of Construction in, a Subaqueous Mine, or Tunnel.
JPH1122390A (ja) * 1997-07-03 1999-01-26 Nishimatsu Constr Co Ltd トンネル覆工用型枠装置およびこれを用いた覆工方法
JP2001173386A (ja) * 1999-12-16 2001-06-26 Maeda Corp インバート型枠を用いたコンクリート打設装置およびその工法
GB8504146D0 (en) * 1985-02-18 2002-08-21 Secr Defence Support trestle for transportable bridge span
CN102230383A (zh) * 2011-06-14 2011-11-02 中交隧道工程局有限公司 全液压隧道仰拱栈桥式移动模架
CN103033174A (zh) * 2012-12-14 2013-04-10 中铁隧道集团一处有限公司 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法
CN103195450A (zh) * 2013-04-03 2013-07-10 湖南远东钢模电子科技有限责任公司 液压隧道仰拱作业台车及仰拱施工方法
CN203066990U (zh) * 2013-02-05 2013-07-17 重庆铁科轨道交通工程有限公司 一种全液压自行走隧道仰拱模筑台车
CN103352710A (zh) * 2013-07-25 2013-10-16 成都锐龙机械制造有限公司 一种悬挂翻转式隧道仰拱模板台车及其施工方法
CN103775105A (zh) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 双铰接可翻转式隧道衬砌台车钢端模
CN104005775A (zh) * 2014-06-18 2014-08-27 余波 隧道仰拱回填施工用一体化模板及其施工工艺
JP2014224351A (ja) * 2013-05-15 2014-12-04 株式会社大林組 シールドトンネルにおける坑内搬送システム
CN104314589A (zh) * 2014-08-25 2015-01-28 中铁隧道集团一处有限公司 隧道边墙基础的纵向止水带安装方法
CN105649654A (zh) * 2016-03-17 2016-06-08 湖南五新机械有限公司 自动液压仰拱栈桥台车及其施工方法
CN205874949U (zh) * 2016-07-04 2017-01-11 泰安东岳重工有限公司 基于自行走的栈桥装置
CN106499411A (zh) * 2016-11-29 2017-03-15 中铁隧道集团二处有限公司 一种单线隧道大区段仰拱自行式悬挂模板及施工方法
CN107060819A (zh) * 2017-01-23 2017-08-18 成都锐龙机械制造有限公司 一种隧道用油缸推行式仰拱栈桥及其使用方法
CN206429249U (zh) * 2017-01-20 2017-08-22 中铁隧道集团四处有限公司 隧道仰拱整体配套移动栈桥
CN206429248U (zh) * 2016-12-23 2017-08-22 泰安东岳重工有限公司 用于隧道的仰拱栈桥装置
CN107120128A (zh) * 2017-07-05 2017-09-01 中铁二十二局集团第五工程有限公司 一种新型隧道纵向止水带定位夹具的操作使用方法
CN107143355A (zh) * 2017-06-21 2017-09-08 中铁十局集团汉江重工有限公司 一种自行式仰拱弧模台车
CN107143351A (zh) * 2016-03-01 2017-09-08 中铁二局第四工程有限公司 一种自行式隧道超长仰拱移动模板钢箱梁栈桥
CN107191205A (zh) * 2017-06-20 2017-09-22 中铁二十局集团第三工程有限公司 隧道边墙仰拱混凝土成环浇注自行移动全弧模板
CN107269299A (zh) * 2017-07-26 2017-10-20 龚岗 隧道施工综合台车
CN206722852U (zh) * 2017-05-05 2017-12-08 中铁十二局集团有限公司 一种自带仰拱模板的长大移动仰拱栈桥
CN207944952U (zh) * 2018-02-05 2018-10-09 中铁隧道集团一处有限公司 弧形模板径向翻转仰拱栈桥

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967985B (zh) * 2010-09-08 2012-11-07 中铁隧道集团有限公司 自行式仰拱模板施工方法
CN102787850B (zh) * 2012-08-29 2014-12-24 中铁二十三局集团第一工程有限公司 用于隧道仰拱施工的仰拱模架

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190714319A (en) * 1907-06-21 1908-03-26 John William Lodge Improvements in the Method of and Means for Making a Safe and Easily Defensible Working Connection between an Existing Railway on Land, and a Railway at a considerably Divergent Level in, or in Course of Construction in, a Subaqueous Mine, or Tunnel.
GB8504146D0 (en) * 1985-02-18 2002-08-21 Secr Defence Support trestle for transportable bridge span
JPH1122390A (ja) * 1997-07-03 1999-01-26 Nishimatsu Constr Co Ltd トンネル覆工用型枠装置およびこれを用いた覆工方法
JP2001173386A (ja) * 1999-12-16 2001-06-26 Maeda Corp インバート型枠を用いたコンクリート打設装置およびその工法
CN102230383A (zh) * 2011-06-14 2011-11-02 中交隧道工程局有限公司 全液压隧道仰拱栈桥式移动模架
CN103033174A (zh) * 2012-12-14 2013-04-10 中铁隧道集团一处有限公司 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法
CN203066990U (zh) * 2013-02-05 2013-07-17 重庆铁科轨道交通工程有限公司 一种全液压自行走隧道仰拱模筑台车
CN103195450A (zh) * 2013-04-03 2013-07-10 湖南远东钢模电子科技有限责任公司 液压隧道仰拱作业台车及仰拱施工方法
JP2014224351A (ja) * 2013-05-15 2014-12-04 株式会社大林組 シールドトンネルにおける坑内搬送システム
CN103352710A (zh) * 2013-07-25 2013-10-16 成都锐龙机械制造有限公司 一种悬挂翻转式隧道仰拱模板台车及其施工方法
CN103775105A (zh) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 双铰接可翻转式隧道衬砌台车钢端模
CN104005775A (zh) * 2014-06-18 2014-08-27 余波 隧道仰拱回填施工用一体化模板及其施工工艺
CN104314589A (zh) * 2014-08-25 2015-01-28 中铁隧道集团一处有限公司 隧道边墙基础的纵向止水带安装方法
CN107143351A (zh) * 2016-03-01 2017-09-08 中铁二局第四工程有限公司 一种自行式隧道超长仰拱移动模板钢箱梁栈桥
CN105649654A (zh) * 2016-03-17 2016-06-08 湖南五新机械有限公司 自动液压仰拱栈桥台车及其施工方法
CN205874949U (zh) * 2016-07-04 2017-01-11 泰安东岳重工有限公司 基于自行走的栈桥装置
CN106499411A (zh) * 2016-11-29 2017-03-15 中铁隧道集团二处有限公司 一种单线隧道大区段仰拱自行式悬挂模板及施工方法
CN206429248U (zh) * 2016-12-23 2017-08-22 泰安东岳重工有限公司 用于隧道的仰拱栈桥装置
CN206429249U (zh) * 2017-01-20 2017-08-22 中铁隧道集团四处有限公司 隧道仰拱整体配套移动栈桥
CN107060819A (zh) * 2017-01-23 2017-08-18 成都锐龙机械制造有限公司 一种隧道用油缸推行式仰拱栈桥及其使用方法
CN206722852U (zh) * 2017-05-05 2017-12-08 中铁十二局集团有限公司 一种自带仰拱模板的长大移动仰拱栈桥
CN107191205A (zh) * 2017-06-20 2017-09-22 中铁二十局集团第三工程有限公司 隧道边墙仰拱混凝土成环浇注自行移动全弧模板
CN107143355A (zh) * 2017-06-21 2017-09-08 中铁十局集团汉江重工有限公司 一种自行式仰拱弧模台车
CN107120128A (zh) * 2017-07-05 2017-09-01 中铁二十二局集团第五工程有限公司 一种新型隧道纵向止水带定位夹具的操作使用方法
CN107269299A (zh) * 2017-07-26 2017-10-20 龚岗 隧道施工综合台车
CN207944952U (zh) * 2018-02-05 2018-10-09 中铁隧道集团一处有限公司 弧形模板径向翻转仰拱栈桥

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
液压移动式仰拱栈桥在隧道仰拱施工中的应用;马艳卫;;山西建筑;第37卷(第01期);第174-175页 *
溜槽技术在长距离有轨斜井施工中的应用;刘龙卫;秦亮;唐道国;黎中文;;隧道建设;第29卷(第03期);第352-355页 *
长大隧道自行式移动仰拱栈桥研制及施工技术;田晓峰;;施工技术;20170810;第46卷(第15期);第120-123页 *

Also Published As

Publication number Publication date
CN108150197A (zh) 2018-06-12

Similar Documents

Publication Publication Date Title
CN106593472B (zh) 一种适用于并列隧道中主洞和支洞施工的衬砌台车
CN105155423A (zh) 用于连续箱梁施工的上行式移动模架
JP5047680B2 (ja) 連続高架橋の施工方法
CN101408019B (zh) 一种低高度预制箱梁内模施工方法
CN108867647B (zh) 一种桩柱一体化施工用多功能钢管柱调垂机
CN108150197B (zh) 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法
CN202658533U (zh) 一种变幅宽曲线桥移动模架
CN206801592U (zh) 用于隧道明洞混凝土浇筑的液压衬砌台车
CN106050268B (zh) 圆角矩形截面隧洞混凝土衬砌用钢模台车
CN111749270B (zh) 一种混凝土管廊内模就位及脱模方法
CN207944952U (zh) 弧形模板径向翻转仰拱栈桥
CN112943303B (zh) 一种采用液压弧形模板的隧道仰拱施工方法
CN106593474B (zh) 一种用于地铁车站施工的衬砌台车及其施工方法
CN212335790U (zh) 一种大悬臂盖梁施工台车
CN211597706U (zh) 单侧墙模板装置
CN107939040A (zh) 一种车站雨棚施工移动模架以及车站雨棚施工方法
CN110952434B (zh) 栈桥用变跨距双支撑大位移前端支撑横移装置及横移方法
CN205955750U (zh) 圆角矩形截面隧洞混凝土衬砌用钢模台车
CN217813509U (zh) 一种无门架式台车
CN218540594U (zh) 一种自行式渡槽模板
CN215369871U (zh) 一种隧道仰拱液压弧形模板施工装置
CN218844315U (zh) 一种隧道衬砌伸缩变径式模板台车装置
CN108506025B (zh) 用于中顶板施工的模板台车
CN217053079U (zh) 一种可前后移动施工的移动模架系统
JPS6340609Y2 (zh)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Zhanju

Inventor after: Ye Yong

Inventor after: Tang Biao

Inventor after: Shi Chuan

Inventor after: Kang Zheng

Inventor after: Zhang Hanyu

Inventor after: Li Guo

Inventor after: Luo Yong

Inventor after: Chen Xiaocheng

Inventor after: Yang Huaiqiang

Inventor after: Yuan Youchao

Inventor after: Li Xingai

Inventor after: Li Zhijie

Inventor after: Liu Longwei

Inventor after: Zhang Ruiming

Inventor after: Chen Haifeng

Inventor after: Yang Wenjun

Inventor after: Liu Dalin

Inventor after: Du Qian

Inventor after: Wang Yuling

Inventor before: Wang Zhanju

Inventor before: Ye Yong

Inventor before: Tang Biao

Inventor before: Shi Chuan

Inventor before: Kang Zheng

Inventor before: Zhang Hanyu

Inventor before: Li Guo

Inventor before: Luo Yong

Inventor before: Chen Xiaocheng

Inventor before: Yang Huaiqiang

Inventor before: Yuan Youchao

Inventor before: Li Xingai

Inventor before: Liu Longwei

Inventor before: Zhang Ruiming

Inventor before: Chen Haifeng

Inventor before: Yang Wenjun

Inventor before: Liu Dalin

Inventor before: Du Qian

Inventor before: Wang Yuling

GR01 Patent grant
GR01 Patent grant