CN103033174A - 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法 - Google Patents

隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法 Download PDF

Info

Publication number
CN103033174A
CN103033174A CN2012105440333A CN201210544033A CN103033174A CN 103033174 A CN103033174 A CN 103033174A CN 2012105440333 A CN2012105440333 A CN 2012105440333A CN 201210544033 A CN201210544033 A CN 201210544033A CN 103033174 A CN103033174 A CN 103033174A
Authority
CN
China
Prior art keywords
gauge length
length instrument
tunnel
steel
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105440333A
Other languages
English (en)
Inventor
辛国平
陈海锋
陈建国
胡宝生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Yichu Co Ltd
Priority to CN2012105440333A priority Critical patent/CN103033174A/zh
Publication of CN103033174A publication Critical patent/CN103033174A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种隧道仰拱衬砌钢筋标距尺以及用标距尺进行的施工方法,其标距尺由两个相同的标距尺架组成,所述标距尺架的上方开有若干相互平行的凹槽,所述凹槽沿其宽度方向贯通,凹槽的间距等于环向主筋的间距,凹槽的宽度等于环向主筋的直径。本发明结构简单、操作简便,通过该标距尺进行仰拱钢筋的施工,实现了对环向主筋间距,以及钢筋高程的精确控制。

Description

隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法
技术领域
本发明涉及标距尺,特别是一种隧道仰拱衬砌钢筋标距尺。
背景技术
隧道仰拱衬砌钢筋一般在现场绑扎安装,其施工方法为:步骤一、由测量组根据设计图纸进行现场放样;步骤二、根据放样的结果安装定位骨架钢筋;步骤三、安装底层的环向钢筋;步骤四、安装底层的纵向钢筋;步骤五、待底层钢筋安装完成后,再根据两层钢筋的间距进行顶层纵、环向钢筋安装。在施工过程中,环向主筋的间距和标高精度不易控制。
发明内容
本发明的目的在于提供一种结构简单,使用方便的隧道仰拱衬砌钢筋标距尺,通过该标距尺进行仰拱钢筋的施工,能实现对环向主筋间距的精确控制,以及钢筋高程的精确控制。
本发明提供一种隧道仰拱衬砌钢筋标距尺,由两个相同的标距尺架组成,所述标距尺架的上方开有若干相互平行的凹槽,所述凹槽沿其宽度方向贯通,凹槽的间距等于环向主筋的间距,凹槽的宽度等于环向主筋的直径。
所述凹槽的横截面为矩形,且所述凹槽的深度大于或等于环向主筋的半径,确保环向主筋3不从凹槽2内滑出。
本发明还提供一种用隧道仰拱衬砌钢筋标距尺进行仰拱钢筋的施工方法,其步骤在于:
步骤一、搭设砂浆支墩/钢筋支架:在隧道的左右两侧分别搭设放置标距尺的砂浆支墩/钢筋支架;
步骤二、安装标距尺:标距尺由两个相同的标距尺架组成,将其中一个标距尺架放置在位于隧道左侧的砂浆支墩/钢筋支架上,将另一个标距尺架放置在位于隧道右侧的砂浆支墩/钢筋支架上;
步骤三、安装环向主筋:将加工好的环向主筋对应放置在两个标距尺架的凹槽上;
步骤四、安装纵向钢筋:待环向主筋安装完成后,从隧道中线位置向两侧安装纵向钢筋,并与环向主筋进行绑扎固定,即完成了底层钢筋的安装。
步骤五、安装顶层钢筋骨架:待底层钢筋安装完成后,根据两层钢筋的间距,安装顶层钢筋骨架,然后按照纵向、横向间距进行钢筋安装,并进行绑扎。
本发明的有益效果是:它结构简单,易加工,成本低,通过该标距尺对隧道仰拱衬砌的钢筋施工,能够达到对环形主筋间距的精确控制,通过精确设置标距尺标高,能够达到对钢筋高程的精度控制。
附图说明
图1是本发明的使用状态图;
图2是图1中沿A-A线的剖面图。
具体实施方式
下面结合附图和实施例对本发明作进一步说明:
如图1和图2所示的隧道仰拱衬砌钢筋标距尺,由两个相同的标距尺架1组成,标距尺架1通过矩形钢管加工而成,在标距尺架1的上方开有若干相互平行的凹槽2,凹槽2沿其宽度方向贯通,凹槽2的间距等于环向主筋3的间距,凹槽2横截面为矩形,且凹槽2的宽度等于环向主筋3的直径,凹槽2的深度大于(或等于)环向主筋3的半径,以确保环向主筋3不会从凹槽2内滑出。
一种用隧道仰拱衬砌钢筋标距尺进行仰拱钢筋的施工方法,包括以下步骤:
步骤一、搭设砂浆支墩/钢筋支架:首先计算隧道仰拱衬砌环向主筋3的标高,并推算出标距尺的安装标高,根据推算出的标距尺安装标高,在隧道仰拱开挖面测量放样,确定标距尺的安放位置,并根据仰拱开挖面与标距尺的高差情况,在隧道的左右两侧分别搭设放置标距尺的砂浆支墩/钢筋支架;
步骤二、安装标距尺:标距尺由两个相同的标距尺架1组成,将其中一个标距尺架1放置在位于隧道左侧的砂浆支墩/钢筋支架上,将另一个标距尺架1放置在位于隧道右侧的砂浆支墩/钢筋支架上;
步骤三、安装环向主筋:将加工好的环向主筋3对应放置在两个标距尺架1的凹槽2上;
步骤四、安装纵向钢筋:待环向主筋3安装完成后,从隧道中线位置向两侧安装纵向钢筋,并与环向主筋3进行绑扎固定,即完成了底层钢筋的安装。
步骤五、安装顶层钢筋骨架:待底层钢筋安装完成后,根据两层钢筋的间距,安装顶层钢筋骨架,然后按照纵向、横向间距进行钢筋安装,并进行绑扎。
上述凹槽2的横截面亦可为圆弧形或V形。

Claims (4)

1.一种隧道仰拱衬砌钢筋标距尺,其特征在于:由两个相同的标距尺架(1)组成,所述标距尺架(1)的上方开有若干相互平行的凹槽(2),所述凹槽(2)沿其宽度方向贯通,凹槽(2)的间距等于环向主筋(3)的间距,凹槽(2)的宽度等于环向主筋(3)的直径。
2.根据权利要求1所述的隧道仰拱衬砌钢筋标距尺,其特征在于:所述凹槽(2)的横截面为矩形,且所述凹槽(2)的深度大于或等于环向主筋(3)的半径。
3.根据权利要求1或2所述的隧道仰拱衬砌钢筋标距尺,其特征在于:所述标距尺架(1)由矩形钢管加工而成。
4.一种用权利要求1至3任一所述的隧道仰拱衬砌钢筋标距尺进行仰拱钢筋的施工方法,其步骤在于:
步骤一、搭设砂浆支墩/钢筋支架:在隧道的左右两侧分别搭设放置标距尺的砂浆支墩/钢筋支架;
步骤二、安装标距尺:标距尺由两个相同的标距尺架(1)组成,将其中一个标距尺架(1)放置在位于隧道左侧的砂浆支墩/钢筋支架上,将另一个标距尺架(1)放置在位于隧道右侧的砂浆支墩/钢筋支架上;
步骤三、安装环向主筋:将加工好的环向主筋(3)对应放置在两个标距尺架(1)的凹槽(2)上;
步骤四、安装纵向钢筋:待环向主筋(3)安装完成后,从隧道中线位置向两侧安装纵向钢筋,并与环向主筋(3)进行绑扎固定,即完成了底层钢筋的安装。
步骤五、安装顶层钢筋骨架:待底层钢筋安装完成后,根据两层钢筋的间距,安装顶层钢筋骨架,然后按照纵向、横向间距进行钢筋安装,并进行绑扎。
CN2012105440333A 2012-12-14 2012-12-14 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法 Pending CN103033174A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105440333A CN103033174A (zh) 2012-12-14 2012-12-14 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105440333A CN103033174A (zh) 2012-12-14 2012-12-14 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法

Publications (1)

Publication Number Publication Date
CN103033174A true CN103033174A (zh) 2013-04-10

Family

ID=48020316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105440333A Pending CN103033174A (zh) 2012-12-14 2012-12-14 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法

Country Status (1)

Country Link
CN (1) CN103033174A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105277095A (zh) * 2014-07-08 2016-01-27 兰州大学 一种隧道衬砌临空面喷层是否达到设计要求的检测装置
CN108150197A (zh) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法
CN108507435A (zh) * 2017-08-04 2018-09-07 五冶集团上海有限公司 一种钢柱柱头钻孔快速检查装置及其阵列孔检查方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2087648U (zh) * 1991-05-03 1991-10-30 胡晓 钢筋定位支架
CN2775116Y (zh) * 2005-03-23 2006-04-26 程士诚 混凝土桥梁钢筋骨架垫块
CN201087490Y (zh) * 2007-08-16 2008-07-16 同济大学 新型钢筋混凝土叠合板
CN201245799Y (zh) * 2008-03-27 2009-05-27 中铁大桥局股份有限公司 板式无碴轨道底座板钢筋骨架组装成型胎具
CN201660990U (zh) * 2010-03-12 2010-12-01 昆明理工大学 钢筋混凝土-木组合楼板
CN202031215U (zh) * 2010-05-06 2011-11-09 北京建筑工程学院 钢筋网片与压型钢板点焊组合楼板
CN202467176U (zh) * 2012-03-12 2012-10-03 中天建设集团有限公司 一种后浇带隔离模板
CN202938826U (zh) * 2012-12-14 2013-05-15 中铁隧道集团一处有限公司 隧道仰拱衬砌钢筋标距尺

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2087648U (zh) * 1991-05-03 1991-10-30 胡晓 钢筋定位支架
CN2775116Y (zh) * 2005-03-23 2006-04-26 程士诚 混凝土桥梁钢筋骨架垫块
CN201087490Y (zh) * 2007-08-16 2008-07-16 同济大学 新型钢筋混凝土叠合板
CN201245799Y (zh) * 2008-03-27 2009-05-27 中铁大桥局股份有限公司 板式无碴轨道底座板钢筋骨架组装成型胎具
CN201660990U (zh) * 2010-03-12 2010-12-01 昆明理工大学 钢筋混凝土-木组合楼板
CN202031215U (zh) * 2010-05-06 2011-11-09 北京建筑工程学院 钢筋网片与压型钢板点焊组合楼板
CN202467176U (zh) * 2012-03-12 2012-10-03 中天建设集团有限公司 一种后浇带隔离模板
CN202938826U (zh) * 2012-12-14 2013-05-15 中铁隧道集团一处有限公司 隧道仰拱衬砌钢筋标距尺

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105277095A (zh) * 2014-07-08 2016-01-27 兰州大学 一种隧道衬砌临空面喷层是否达到设计要求的检测装置
CN108507435A (zh) * 2017-08-04 2018-09-07 五冶集团上海有限公司 一种钢柱柱头钻孔快速检查装置及其阵列孔检查方法
CN108150197A (zh) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法
CN108150197B (zh) * 2018-02-05 2024-04-05 中铁隧道集团一处有限公司 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法

Similar Documents

Publication Publication Date Title
CN103882813B (zh) 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法
CN203229865U (zh) 卡槽式桥梁墩身钢筋定位装置
CN104895035A (zh) 垂直升船机大型承船厢高效安装方法及安装定位辅助工装装置
CN106245852B (zh) 异形混凝土拱柱钢筋定位方法
CN104562940A (zh) 一种钢箱梁顶推滑移施工方法及落梁辅助装置
CN103033174A (zh) 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法
CN204255243U (zh) 一种现浇楼板混凝土保护层厚度检测尺
CN205688332U (zh) 一种预制盖梁钢筋胎架
CN202938826U (zh) 隧道仰拱衬砌钢筋标距尺
CN204459477U (zh) 一种预埋管道固定支架
CN204001776U (zh) 现浇防撞护栏钢筋定位胎架
CN206002038U (zh) 一种墙柱模板垂直测量仪
CN104537566B (zh) 一种六边形煤巷表面位移量的预测方法
CN202450787U (zh) 一种快速确定柱位的工具
CN204370315U (zh) 一种钢箱梁顶推滑移落梁辅助装置
CN203755655U (zh) 一种剪力墙模板柱脚找平装置
CN102444275A (zh) 筒仓柔性滑模抗扭施工装置
CN204531443U (zh) 一种楼板钢筋排布间距控制工具
CN202519998U (zh) 一种直立墙面钢筋绑扎样架
CN203595478U (zh) 混凝土厚度检测尺
CN104028674B (zh) 一种大小可调的钢筋弯圆装置
CN103921347B (zh) 预制t梁肋板钢筋、预应力管道固定抽插式安装模架
CN203808550U (zh) 建筑物同步旋转平移轨道
CN105619595A (zh) 预制梁钢筋施工工艺
CN202745393U (zh) 一种控制箍筋间距的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130410