CN107950306A - The sculpture and construction method of the flexible ceramsite board of greening - Google Patents

The sculpture and construction method of the flexible ceramsite board of greening Download PDF

Info

Publication number
CN107950306A
CN107950306A CN201711152244.1A CN201711152244A CN107950306A CN 107950306 A CN107950306 A CN 107950306A CN 201711152244 A CN201711152244 A CN 201711152244A CN 107950306 A CN107950306 A CN 107950306A
Authority
CN
China
Prior art keywords
skeleton
flexible
ceramsite
ceramsite board
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711152244.1A
Other languages
Chinese (zh)
Inventor
刘杰
兰俊
燕波
高进
张罗送
李盟
高素芳
黎照
孙涛
阳菲
李杨
利文森
程振东
马涤尘
寇银盔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201711152244.1A priority Critical patent/CN107950306A/en
Publication of CN107950306A publication Critical patent/CN107950306A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C5/00Processes for producing special ornamental bodies
    • B44C5/06Natural ornaments; Imitations thereof

Landscapes

  • Cultivation Of Plants (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention discloses the sculpture and construction method of the flexible ceramsite board of greening, it includes Cement fibre net, high-strength ceramsite, plastic, rubber net, accumulator, skeleton, flexible ceramsite board and fixing anchor bar;The Cement fibre net is outer layer, and plastic, rubber net is internal layer, is filled with uniform and regularly arranged high-strength ceramsite between Cement fibre net and plastic, rubber net, and the gap filling between the high-strength ceramsite has humic Nutrition Soil;The accumulator is arranged on the inside of whole sculpture skeleton, and the flexibility ceramsite board is covered in the outside of skeleton, and wraps the soil of skeletal internal, and nutrition is provided for it.It can be beautified the environment using this greening technique, improve urban ecology, while air can be purified, reached the ecological effect of energy-saving and emission-reduction, have received significant effect.

Description

The sculpture and construction method of the flexible ceramsite board of greening
Technical field
The invention belongs to vertical planting field, is a kind of new, highly practical greening technique, and in particular to a kind of green Change the sculpture and construction method of flexible ceramsite board;Suitable for urban three-dimensional green landscape, afforestation, commercial advertising and green In many-sided field such as change.
Background technology
With the continuous progress of society, the quickening of urbanization process, urban population gradually increases, and urban architecture is progressively presented The synthesis of height and density, although alleviating the pressure of population to a certain extent, brings to construction of city afforestation Acid test.The development in city with land resource it is in short supply, environmental condition is increasingly severe the problems such as face bottleneck, city is built If the contradiction between land used and land use for greening grows in intensity, the serious hysteresis of urban afforestation, can all cause whole ecological environment Influence, seeking new urban afforestation approach becomes ever more important.In recent years, vertical planting is as a kind of new urban afforestation skill Art, becomes improvement urban ecological environment, enriches that urban afforestation landscape is important and effective manner.Develop vertical planting, can enrich The space structure levels and urban art of landscape effect of city afforestation, help further to increase the green amount in city, subtract Few tropical island effect, dust suction, reduce noise and pernicious gas, builds and improves city ecological environment, ensures the balance of urban ecology.
Vertical planting as it is a kind of it is energy saving save land, the Virescence form of beautiful environmental protection is gradually concerned by people, main bag Include the greening on roof, the greening of metope and greening of communal facility etc..Vertical planting, refers to as much as possible using various geographical positions Put, by creepers plant setting and seek connections with the greening means on various buildings, other space structures.Vertical planting is one General noun, its form can be presented by metope, balcony, flower stand, roof, frame, fence.The concept of vertical planting Vertical planting major embodiment be three-dimensional and spatiality, make full use of the advantage in space, no longer in a manner of plane greening, but Vertical planting, a kind of mode of beautification are carried out to city using plant.Realize that vertical planting will be by artificial creation, green Color ornamental plant is embodied in the surface of the building wall in city, indoor balcony, windowsill and roof and City Building, to increase Add the area of urban afforestation, it is overall to lift urban ecology level.Vertical planting is not only beautified the environment compared with plane greening, is improved Urban ecology, moreover it is possible to air is purified, so as to reach the ecological effect of energy-saving and emission-reduction.On the one hand, vertical planting can adjust city Micro climate, increase air humidity, self-restraint water and soil, reduction city noise, the vertical planting being planted on building or structures are planted Thing can allow Summer Indoor temperature to decline 3~5 DEG C, make building energy-saving;On the other hand, suitable plant variety is selected, its The fine hair on surface can play the particulate matter such as the effect for absorbing toxic and harmful gas, absorption PM 10, PM 2.5, lift air matter Amount.
At present, the development of China's vertical planting is still in primary period, and since domestic vertical planting is started late, there is grind Study carefully not system, economic benefit is few, form is more limited to, high cost problems.At present, vertical planting has been friends in the past city more at home Newly, New urban development, industrial conversion and " the old new clothing in room " four kinds of development modes.Existing stereo greening apparatus generally comprises one admittedly Planting bag is fixed at the frame structure on wall, the implantation hole in frame, green plants is planted in planting bag.It is this vertical Body greening mode, green plants are distributed in multiple planting bags, and globality is bad, and the plant planted all is that some are small Scale takes root shallow plant or rock-climbing plant, and floristics is single, and overall maintenance cost is high.One kind proposed by the invention The sculpture of the flexible ceramsite board of greening, overcome the deficiencies in the prior art, proposes a kind of simple structure, easy for construction, and cost is low, greening Effect is good, and the convenient novel stereo greening mode of later stage nourishment, market prospects and social benefit are very wide.
The content of the invention
It is an object of the invention to provide a kind of sculpture and construction method for afforesting flexible ceramsite board, stood for urban landscape Body is afforested.It can be beautified the environment using this greening technique, improve urban ecology, while air can be purified, reach energy-saving and emission-reduction Ecological effect, have received significant effect.
In order to realize above-mentioned technical characteristic, the object of the present invention is achieved like this:The sculpture of the flexible ceramsite board of greening, It includes Cement fibre net, high-strength ceramsite, plastic, rubber net, accumulator, skeleton, flexible ceramsite board and fixing anchor bar;It is described Cement fibre net is outer layer, and plastic, rubber net is internal layer, filled with uniform and rule between Cement fibre net and plastic, rubber net The high-strength ceramsite then arranged, the gap filling between the high-strength ceramsite have humic Nutrition Soil;The accumulator is arranged on The inside of whole sculpture skeleton, the flexibility ceramsite board is covered in the outside of skeleton, and wraps the soil of skeletal internal, is it Nutrition is provided.
The outer layer of the flexibility ceramsite board is made of Cement fibre net, its internal layer is made of plastic, rubber net.
The accumulator internal reservoir has moisture, and is connected using Wicking mode with its peripheral soil body, and is Its offer water;The accumulator is installed on the inside of skeleton by dismountable mode, and protective cover is provided with outside it.
External tapping is provided with the accumulator with nutrient solution supply arrangement to be connected, and provides nutrition to its inside soil Liquid.
The skeleton has a variety of different shapes, can use cylinder and multiedge cylinder structure.
Being added in the soil has adhesive and water-retaining agent, mixes the cement of a small amount of ratio in the soil.
Vermiculite is added in the soil, perlite, rice chaff shell, sawdust ease up formula haydite, and add oxygen slow release agent, peroxide Change calcium, urea and ferrous sulfate.
Fulvic acid, ardealite and sulfuric acid compound are added in the soil.
The construction method of the flexible ceramsite board sculpture of any one greening, comprises the following steps:
Step1:Make flexible ceramsite board;
Step2:The bedding flexibility ceramsite board on skeleton;
Step3:Flexible ceramsite board is laid with wall.
The detailed step of the Step1 is:First by plastic, rubber network planning site preparation paving in the horizontal plane, it is then rows of with stitch Galvanized wire layer crosses into rectangle grid one by one and is placed on that plastic, rubber is online, and the high-strength ceramsite chosen is sequentially placed into In grid, size, size, the density of high-strength ceramsite can be adjusted as needed;By galvanized wire layer or galvanized iron Silk screen tightening, reinforce plantation haydite, then the galvanized wire mesh that outer layer intersects is covered on plantation haydite, finally in each intersection Galvanized wire mesh and plastic, rubber net are tied together with galvanized wire at point, paving spills nutrition in ceramsite board hole Soil;
The detailed step of the Step2 is:It is firmly seated at the variously-shaped skeleton made is solid in the band of position, Then in the strapped galvanized wire mesh in intraskeletal middle part, it is online that accumulator is placed in galvanized wire, in each galvanized wire mesh It is tied together with the junction of skeleton with galvanized wire, galvanized wire mesh is used for the load of itself for sharing the soil body in skeleton, Accumulator can be also placed in outside by support accumulator, and whole haydite and skeleton are placed in the large volume catch basin of certain altitude In, add clear water at any time into accumulator, there is provided moisture facilitates inside soil body to conserve, later stage skeleton interplantation to the soil body in skeleton When later stage nourishment is no longer needed by growth and maturity, accumulator can be taken away;Then the soil body is put into skeleton, in skeleton It is upper to cover the flexible ceramsite board made, the part that flexible ceramsite board bottom surface is revealed all the details laminated plastics rubber or iron wire mesh Thicken, prevent intraskeletal soil because self gravitation breaks through ceramsite board;
The detailed step of the Step3 is:The constant spacing certain anchor pole and holdfast in wall, anchor is hung over by flexible ceramsite board On bar, certain hole is left in centre, is put into the soil body, installs accumulator successively on the anchor pole among wall, then uses galvanized iron The silk junction of ceramsite board and anchor pole is strapped, outer layer laminated plastics rubber or the iron wire mesh of bottom compliant ceramsite board Catch.
The method have the advantages that:
1st, flexible ceramsite board of the invention can be covered on the diversified skeleton of shape, not only beautiful and generous but also can reach any Afforest moulding effect.
2nd, flexible ceramsite board can fully wrap intraskeletal soil, its own can the circulation formed with self-regeneration function The ecosphere, one side porous are breathed freely, and beneficial to plant growth, soil stream on the other hand will not be caused because of rainwash Lose.
3rd, the high-strength ceramic granule in ceramsite board has the function that thermal insulation is heat-insulated, air-and water-permeable, utilizes itself hole feature to keep Constant temperature in soil, can inhale water storage point and fertilizer retain water and nutrients to a certain extent when skeletal internal soil volume is larger.
4th, the Cement fibre grid of flexible ceramsite board outer layer has certain suppleness and intensity, with the different shape of skeleton And change;Inner plastic rubber grid lattice have certain strength and stiffness, can prevent soil acidity from corroding ceramsite board.
5th, it is easy to operate beneficial to later stage nourishment easy to supplement nutrient and moisture due to the accumulator of setting, maintenance Cost is low.
6th, it is prefabricated can first to consider to do inclined plane front to downward inclined plane kind vegetation, treats that vegetation germinating growth is good, Reversed position normally conserves again, ensures the vegetation of all directions in skeleton and can obtain the protection and maintenance of ceramsite board.
7th, grass seeds species can change as requested, can in different zones needed for different grass seeds structures pattern, The grass seeds subregion plantation of different colours can be selected, form different color blocks, increase ornamental value.
8th, accumulator can be placed in skeletal internal with separation, add clear water in accumulator at any time, there is provided moisture is given The soil body in skeleton, facilitates inside soil body to conserve, can be with when vegetation growth and maturity no longer need later stage nourishment in later stage skeleton Optionally choose whether to take away.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the ceramsite board schematic diagram reinforced after high-strength ceramic granule.
Fig. 2 is the ceramsite board schematic diagram after periphery paving plus galvanized wire mesh.
Fig. 3 is the side schematic view of flexible ceramsite board.
Fig. 4 is pyramid skeleton bedding flexibility ceramsite board perspective view schematic diagram.
Fig. 5 is pyramid skeleton bedding flexibility ceramsite board overall structure diagram.
Fig. 6 is cylinder skeleton bedding flexibility ceramsite board perspective view schematic diagram.
Fig. 7 is cylinder skeleton bedding flexibility ceramsite board overall structure diagram.
Fig. 8 is five-pointed star skeleton bedding flexibility ceramsite board perspective view schematic diagram.
Fig. 9 is five-pointed star skeleton bedding flexibility ceramsite board overall structure diagram.
Figure 10 is the spherical skeleton bedding flexibility ceramsite board perspective view schematic diagram of two halves.
Figure 11 is retaining wall metope bedding flexibility ceramsite board schematic diagram.
In figure:It is Cement fibre net 1, high-strength ceramsite 2, plastic, rubber net 3, accumulator 4, skeleton 5, flexible ceramsite board 6, solid Determine anchor pole 7.
Embodiment
Embodiments of the present invention are described further below in conjunction with the accompanying drawings.
Embodiment 1:
Such as Fig. 1-11, afforest the sculpture of flexible ceramsite board, it include Cement fibre net 1, high-strength ceramsite 2, plastic, rubber net 3, Accumulator 4, skeleton 5, flexible ceramsite board 6 and fixing anchor bar 7;The Cement fibre net 1 is outer layer, and plastic, rubber net 3 is internal layer, Uniform and regularly arranged high-strength ceramsite 2, the high intensity pottery are filled between Cement fibre net 1 and plastic, rubber net 3 Gap filling between grain 2 has humic Nutrition Soil;The accumulator 4 is arranged on the inside of whole sculpture skeleton 5, the flexible pottery Grain plate 6 is covered in the outside of skeleton 5, and wraps the soil inside skeleton 5, and nutrition is provided for it.By using above-mentioned green Change the sculpture of flexible ceramsite board, it is high using stereochemical structure sculpture, space availability ratio;Material is easy to get, used Cement fibre net Outer layer is done, makes it not perishable, it is anti-aging, increase service life;Using the sculpture of the flexible ceramsite board of greening of the present invention, Simple structure, be easy to construction, greening environment, can be limited from regional condition, flexibly be placed in city required greening place everywhere, Beautifying city landscape, brings good visual effect.
Further, the outer layer of the flexible ceramsite board 6 is made of Cement fibre net 1, its internal layer uses plastic, rubber Net 3 is made.Wherein Cement fibre net 1 is using siliceous, calcareous material as primary raw material, adds plant fiber, by slurrying, copies Take, pressurize, conserving a kind of new material formed;Make full use of its waterproof and dampproof, fire-proof insulation, heat-insulating sound-insulating, high-strength light, The characteristics of safe and harmless, overlong service life, corrosion resistance are strong etc..Wherein plastic, rubber net 3 requires certain strength and stiffness, And be made of cheap material, construction cost is low, its object is to:Prevent soil acidity from corroding ceramsite board, produce destruction, influence Afforestation effect.
Further, 4 internal reservoir of accumulator has moisture, and using the Wicking mode soil body phase peripheral with its Connection, and provided for it and use water;The accumulator 4 is installed on the inside of skeleton 5 by dismountable mode, and is set outside it It is equipped with protective cover.Meanwhile accumulator 4 can have certain construction to be connected with periphery grid, soil pressure is not all concentrated To bottom;Install accumulator 4 its object is to:Moisture is provided to the soil body, facilitates inside soil body to conserve, vegetation in later stage skeleton 5 When growth and maturity no longer need later stage nourishment, accumulator 4 can be taken away.
Further, the high-strength ceramsite 2 filled has the function that thermal insulation is heat-insulated, air-and water-permeable, utilizes itself hole Feature keeps constant temperature in soil, while can bear washing away for rainwater, protects ceramsite board inner material.
Further, external tapping is provided with the accumulator 4 with nutrient solution supply arrangement to be connected, and to its inside soil Nutrient solution is provided.Easy to use easy to later stage nourishment, maintenance cost is low.
Further, flexible ceramsite board 6 is close to grid compacting soil by the present invention, since haydite is formed after oversintering High intensity structure light aggregate, there is abrasion resistance, its object is to can be greatly lowered soil because of weight stress and Later stage downward draw, reduces the loss of soil and nutrient, the adhesive force of enhancing root system of plant in the soil, improves plant Survival rate, can accomplish zero loss of soil after plant growth.
Further, when flexible ceramsite board 6 wraps up the soil of large volume, there is provided nutriment and water needed for plant growth Point, effective self-repairing capability itself can be formed, and flexible ceramsite board 6 can be covered on the diversified skeleton 5 of shape, It is easy to operate, beautiful and generous, reach afforest moulding effect, construction cost is low, later stage nourishment's cost is low.
Further, the flexible 6 medium-height grass kind species of ceramsite board can change according to the actual requirements, can be in different zones Using the pattern of different grass seeds structure various patterns, the grass seeds subregion plantation of different colours also can be selected, form different color blocks, Increase ornamental value.
Further, will not be dead in flexible 6 middle or short term of ceramsite board using plant the characteristics of, can be made into by two hemisphere groups Into spheroid form, by regular spinning ball, the uniform pickup for reaching nutrient utilizes, and increases multi-form, greening, beautification effect Fruit gets both.
Further, the skeleton 5 has a variety of different shapes, can use cylinder and multiedge cylinder structure.Bone 5 inside soil volume of frame can inhale water storage point and fertilizer retain water and nutrients to a certain extent when larger.
Further, being added in the soil has adhesive and water-retaining agent, mixes the cement of a small amount of ratio in the soil.Increase Add soil strength, prevent from, since soil strength is low, porousness is big, making soil be deposited in skeleton bottom, to skeleton and ceramsite board Bring hidden danger and can be deformed, unsightly.The materials such as adhesive epoxy resin, polyvinyl alcohol, carboxymethyl cellulose;Water conservation The materials such as agent hydroscopic high-molecular resin.
Further, vermiculite is added in the soil, perlite, rice chaff shell, sawdust ease up formula haydite, mix and subtract with soil Light weight, prevents that soil body weight crosses conference be collapsed skeleton in skeleton.And add oxygen slow release agent, calper calcium peroxide, urea and sulfuric acid The soil conditioner of the components such as ferrous iron adjusts soil physical chemistry state, and chesson, increases gas permeability, prevent because of soil long-time plate Knot, permeable breathable decline.
Further, fulvic acid, ardealite and sulfuric acid compound are added in the soil.Cement in the soil body is neutralized to bring Alkalescence and can quick fertilizer to the soil body, long-term fertilizer can be provided to soil by adding the haydite of slow formula fertilizer.
Further, the size of the flexible ceramsite board and intraskeletal haydite, size, density can as needed into Row adjustment.
Further, the skeleton will select intensity, rigidity high, corrosion-resistant material, such as reinforcing bar, shaped steel, aluminium alloy Deng.In work progress, solid modeling processing can be carried out to the metallic framework material to get rusty that is easily corroded.
Embodiment 2:
The construction method of the flexible ceramsite board sculpture of any one greening, comprises the following steps:
Step1:Make flexible ceramsite board 6;
Step2:The bedding flexibility ceramsite board 6 on skeleton 5;
Step3:Flexible ceramsite board 6 is laid with wall.
The detailed step of the Step1 is:First plastic, rubber net 3 is regularly spread in the horizontal plane, then it is in a row with stitch Galvanized wire layer cross into rectangle grid one by one and be placed on plastic, rubber net 3, by the high-strength ceramsite 2 chosen successively It is put into grid, size, size, the density of high-strength ceramsite can be adjusted as needed;By galvanized wire layer or plating The tightening of zinc-iron silk screen, reinforce plantation haydite, then the galvanized wire mesh that outer layer intersects is covered on plantation haydite, finally each Galvanized wire mesh and plastic, rubber net 3 are tied together by intersection galvanized wire, are spread and are spilt in ceramsite board hole Nutrition Soil;
The detailed step of the Step2 is:The band of position is firmly seated at by the variously-shaped skeleton 5 made is solid Interior, the strapped galvanized wire mesh in middle part then in skeleton 5, it is online to be placed in galvanized wire, in each galvanized iron by accumulator 4 The junction of silk screen and skeleton is tied together with galvanized wire, and galvanized wire mesh is used for the lotus of itself for sharing the soil body in skeleton Carry, support accumulator 4, accumulator 4 can be also placed in outside, whole haydite and skeleton 5 are placed in the large volume of certain altitude In catch basin, clear water is added at any time into accumulator, there is provided moisture facilitates inside soil body to conserve, later stage bone to the soil body in skeleton When vegetation growth and maturity no longer need later stage nourishment in frame, accumulator can be taken away;Then the soil body is put into skeleton, The flexible ceramsite board 6 made, part laminated plastics rubber or the iron that flexible 6 bottom surface of ceramsite board is revealed all the details are covered on skeleton Silk screen grid thickeies, and prevents intraskeletal soil because self gravitation breaks through ceramsite board;
The detailed step of the Step3 is:The constant spacing certain anchor pole and holdfast in wall, flexible ceramsite board 6 is hung over On anchor pole, certain hole is left in centre, is put into the soil body, installs accumulator successively on the anchor pole among wall, then with zinc-plated Iron wire is strapped by the junction of ceramsite board and anchor pole, outer layer laminated plastics rubber or the wire netting of bottom compliant ceramsite board 6 Grid is caught.
Above-described embodiment is used for illustrating the present invention, rather than limits the invention, the present invention spirit and In scope of the claims, to any modifications and changes of the invention made, protection scope of the present invention is both fallen within.

Claims (10)

1. the sculpture of the flexible ceramsite board of greening, it is characterised in that:It includes Cement fibre net(1), high-strength ceramsite(2), plastics Rubber net(3), accumulator(4), skeleton(5), flexible ceramsite board(6)And fixing anchor bar(7);The Cement fibre net(1)To be outer Layer, plastic, rubber net(3)For internal layer, in Cement fibre net(1)With plastic, rubber net(3)Between filled with uniform and regularly arranged High-strength ceramsite(2), the high-strength ceramsite(2)Between gap filling have humic Nutrition Soil;The accumulator(4)Set In whole sculpture skeleton(5)Inside, it is described flexibility ceramsite board(6)It is covered in skeleton(5)Outside, and wrap skeleton(5) Internal soil, nutrition is provided for it.
2. the sculpture of the flexible ceramsite board of greening according to claim 1, it is characterised in that:The flexibility ceramsite board(6)'s Outer layer uses Cement fibre net(1)It is made, its internal layer uses plastic, rubber net(3)It is made.
3. the sculpture of the flexible ceramsite board of greening according to claim 1, it is characterised in that:The accumulator(4)Inside storage There is moisture, and is connected using Wicking mode with its peripheral soil body, and provided for it and use water;The accumulator(4) Skeleton is installed on by dismountable mode(5)Inside, and protective cover is provided with outside it.
4. the sculpture of the flexible ceramsite board of greening according to claim 1 or 3, it is characterised in that:The accumulator(4)On set It is equipped with external tapping with nutrient solution supply arrangement to be connected, and nutrient solution is provided to its inside soil.
5. the sculpture of the flexible ceramsite board of greening according to claim 1, it is characterised in that:The skeleton(5)With a variety of Different shapes, can use cylinder and multiedge cylinder structure.
6. the sculpture of the flexible ceramsite board of greening according to claim 1, it is characterised in that:Being added in the soil has bonding Agent and water-retaining agent, mix the cement of a small amount of ratio in the soil.
7. the sculpture of the flexible ceramsite board of greening according to claim 1, it is characterised in that:In the soil add vermiculite, Perlite, rice chaff shell, sawdust ease up formula haydite, and add oxygen slow release agent, calper calcium peroxide, urea and ferrous sulfate.
8. the sculpture of the flexible ceramsite board of greening according to claim 1, it is characterised in that:Added in the soil yellow rotten Acid, ardealite and sulfuric acid compound.
9. using the construction method of the flexible ceramsite board sculpture of claim 1-8 any one greening, it is characterised in that including following Step:
Step1:Make flexible ceramsite board(6);
Step2:In skeleton(5)Upper bedding flexibility ceramsite board(6);
Step3:Flexible ceramsite board is laid with wall(6).
10. the construction method of flexible ceramsite board sculpture is afforested according to claim 9, it is characterised in that:The Step1's is detailed Carefully step is:First by plastic, rubber net(3)Regularly spread in the horizontal plane, then with the rows of galvanized wire layer right-angled intersection of stitch Plastic, rubber net is placed on into rectangle grid one by one(3)On, the high-strength ceramsite that will choose(2)It is sequentially placed into grid, it is high-strength Size, size, the density of degree haydite can be adjusted as needed;By galvanized wire layer or galvanized wire mesh tightening, add Admittedly planting haydite, then the galvanized wire mesh that outer layer intersects is covered on plantation haydite, finally in each intersection with zinc-plated Iron wire is by galvanized wire mesh and plastic, rubber net(3)It is tied together, paving spills Nutrition Soil in ceramsite board hole;
The detailed step of the Step2 is:The variously-shaped skeleton that will be made(5)It is solid to be firmly seated at the band of position It is interior, then in skeleton(5)The strapped galvanized wire mesh in interior middle part, by accumulator(4)It is online to be placed in galvanized wire, in each plating The junction of zinc-iron silk screen and skeleton is tied together with galvanized wire, and galvanized wire mesh is used to sharing itself of the soil body in skeleton Load, support accumulator(4,)Also can be by accumulator(4)Outside is placed in, by whole haydite and skeleton(5)It has been placed in certain height In the large volume catch basin of degree, clear water is added at any time into accumulator, there is provided moisture facilitates inside soil body to support to the soil body in skeleton Protect, when vegetation growth and maturity no longer need later stage nourishment in later stage skeleton, accumulator can be taken away;Then in skeleton The soil body is put into, the flexible ceramsite board made is covered on skeleton(6), flexible ceramsite board(6)The part multilayer that bottom surface is revealed all the details Plastic, rubber or iron wire mesh thicken, and prevent intraskeletal soil because self gravitation breaks through ceramsite board;
The detailed step of the Step3 is:The constant spacing certain anchor pole and holdfast in wall, by flexible ceramsite board(6)Hang On anchor pole, certain hole is left in centre, is put into the soil body, installs accumulator successively on the anchor pole among wall, then with plating Zinc-iron silk is strapped by the junction of ceramsite board and anchor pole, bottom compliant ceramsite board(6)Outer layer laminated plastics rubber or iron The screen grid string bag is lived.
CN201711152244.1A 2017-11-19 2017-11-19 The sculpture and construction method of the flexible ceramsite board of greening Pending CN107950306A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711152244.1A CN107950306A (en) 2017-11-19 2017-11-19 The sculpture and construction method of the flexible ceramsite board of greening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711152244.1A CN107950306A (en) 2017-11-19 2017-11-19 The sculpture and construction method of the flexible ceramsite board of greening

Publications (1)

Publication Number Publication Date
CN107950306A true CN107950306A (en) 2018-04-24

Family

ID=61964830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711152244.1A Pending CN107950306A (en) 2017-11-19 2017-11-19 The sculpture and construction method of the flexible ceramsite board of greening

Country Status (1)

Country Link
CN (1) CN107950306A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113141929A (en) * 2021-04-14 2021-07-23 陶娟 Forest breeder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201393429Y (en) * 2009-03-02 2010-02-03 乌鲁木齐市燕儿窝风景区管理站 Frame using garden plants to rapidly manufacture three-dimensional contouring
CN103039345A (en) * 2013-01-19 2013-04-17 东南大学 Combined mobile type wall space greening module
CN205276591U (en) * 2015-12-17 2016-06-01 三亚新大兴园林生态有限公司 Box with a net formula plant curtain
CN106638630A (en) * 2016-12-14 2017-05-10 三峡大学 Ecological greening device for side slope with flexible ceramsite plates, and greening method thereof
CN107094521A (en) * 2017-05-02 2017-08-29 三峡大学 A kind of method and device afforested using gabion

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201393429Y (en) * 2009-03-02 2010-02-03 乌鲁木齐市燕儿窝风景区管理站 Frame using garden plants to rapidly manufacture three-dimensional contouring
CN103039345A (en) * 2013-01-19 2013-04-17 东南大学 Combined mobile type wall space greening module
CN205276591U (en) * 2015-12-17 2016-06-01 三亚新大兴园林生态有限公司 Box with a net formula plant curtain
CN106638630A (en) * 2016-12-14 2017-05-10 三峡大学 Ecological greening device for side slope with flexible ceramsite plates, and greening method thereof
CN107094521A (en) * 2017-05-02 2017-08-29 三峡大学 A kind of method and device afforested using gabion

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113141929A (en) * 2021-04-14 2021-07-23 陶娟 Forest breeder

Similar Documents

Publication Publication Date Title
CN106284863B (en) A kind of construction method of skyscraper Green Roof
CN201131194Y (en) Vertical greening plant wall
CN101507391B (en) Rock slope-surface ecology treatment method
CN104221704B (en) A kind of method of Auricularia hanging bag cultivation
CN1844611A (en) Pot type ecological yard and construction method thereof
CN109220327A (en) A kind of roof greening module
CN106278345A (en) A kind of celluar concrete vegetation brick, its preparation method and application
CN108401729A (en) The water-saving mosquito proof plant walls of assembled antivibration
CN100559928C (en) The preparation method of bagged edible fungus suspension cultivation batch production workshop
CN104620963A (en) Three-dimensional greening heat-preserving module
CN106718223A (en) A kind of high-efficiency water-saving cultivating container and its application process for urban three-dimensional green
CN107950306A (en) The sculpture and construction method of the flexible ceramsite board of greening
CN207099813U (en) A kind of vertical greening device
CN202890063U (en) Three-dimensional breeding greenhouse
CN103250598B (en) Solar heat storage greenhouse and building method thereof
CN203951915U (en) Stereo greening apparatus
CN203424097U (en) Three-dimensional greening module
CN206923393U (en) The woody fixed support of one kind greening transplanting
CN202014493U (en) Movable ecological container
CN206402751U (en) A kind of ecological planting system for roof
CN110761302A (en) Nutrient medium for rock slope greening and construction process thereof
CN209234375U (en) A kind of roof greening module
CN203313773U (en) Solar energy heat storage greenhouse
CN207927322U (en) A kind of wall-mounted infiltrating irrigation growing device
CN209151876U (en) Assembled vertical greening wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424

RJ01 Rejection of invention patent application after publication