CN107905522A - 一种外墙拼装木模板整体施工方法 - Google Patents
一种外墙拼装木模板整体施工方法 Download PDFInfo
- Publication number
- CN107905522A CN107905522A CN201711347839.2A CN201711347839A CN107905522A CN 107905522 A CN107905522 A CN 107905522A CN 201711347839 A CN201711347839 A CN 201711347839A CN 107905522 A CN107905522 A CN 107905522A
- Authority
- CN
- China
- Prior art keywords
- template
- wall
- construction method
- exterior wall
- plank sheathing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明的一种外墙拼装木模板整体施工方法,具体涉及建筑领域的外墙支模施工方法。该方法包括绘制全套模板设计图、组装模板、安装主龙骨和次龙骨、整体吊装、调整模板、固定安装、墙体模板拆除等步骤。本发明的优点是:促进建筑施工技术现代化,提高效率,缩短工期,保护环境,节能减排,并确保建筑物的质量和性能,建筑工程新技术以及高效率。
Description
技术领域
本发明涉及建筑领域的外墙支模施工方法,具体涉及一种外墙拼装木模板整体施工方法。
背景技术
对于一栋高层房屋建筑,外墙的工程量占据较大比重,施工现场若按以往的常规方法进行模板施工:模板设计→配(拼)模→模板加固→模板设计→配(拼)模→······,每层施工周而复始,施工方法繁琐,重复作业之处较多,施工效率低;同时模板的每次拆装,降低了模板拼缝严密的效果,造成混凝土漏浆、混凝土相邻表面高低不平等现象的频发,对混凝土施工质量影响极大。
众所周知,一个工程项目经济效益的好坏,很大程度上取决于项目成本的控制,而工期的缩短无疑是成本控制中不可或缺的一部分。
为了促进建筑施工技术现代化,提高效率,缩短工期,保护环境,节能减排,并确保建筑物的质量和性能,建筑工程新技术以及高效率的应用已经是行业发展的趋势。
发明内容
本发明的目的是为了解决了以上现有技术出现的问题,加快了施工进度,简便了模板的拆装过程,保证了施工质量,降低了施工成本。
本发明的技术方案如下:
一种外墙拼装木模板整体施工方法,该方法按照以下步骤进行:
步骤一:根据工程结构形式和特点及现场施工条件设计模板,确定模板平面布置,绘制全套模板设计图。
步骤二:组装模板,按照步骤一中所述设计图拼装模板,将完成拼装的模板上预留对拉螺栓孔,所述模板的外侧以纵向拼装的方木做为次龙骨,所述木方的外侧以横向拼装且两根为一组的钢管作为主龙骨,各组钢管的中心线与所述对拉螺栓孔的中心相对应,所述各组钢管的外侧以C形托板进行加固,所述C形托板固定到所述方木上。利用木方将其整体钉牢,使主次龙骨及面板连接成整体,利用C形托板的作用,下一层外墙模板拆除时,拆掉对拉螺杆也不会造成主次龙骨及面板的散落,确保上一层周转时整体吊装。
步骤三:在所述对拉螺栓孔周边设置墙体的定位钢筋。防止模板位移。
步骤四:将步骤二完成加固的所述模板吊装在墙体一侧,所述模板就位后,以模板位置线调整模板,在所述模板与阴角模下部用水泥砂浆封堵。在所述模板与阴角模下部用水泥砂浆封堵,避免墙体出现烂根现象。
步骤五:吊装墙体另一侧的模板,调整两块模板的位置和垂直度,同时调整斜撑角度,固定斜撑,贯穿所述混凝土外墙内外侧的模板、木方以及钢管安装对拉螺栓并在两端戴上扣件及螺母,对拉紧固后,拧紧螺母。
步骤六:墙体模板与楼板拼缝采用硬拼缝,在所述墙模板下口加贴海绵条。防止少量渗浆以及在安装模板压缩变形伸入墙内。
步骤七:墙体模板拆除,先拆除所述穿墙螺栓,再拆除所述斜撑,用撬棍轻轻撬动模板,使模板整体离开墙体。拆卸方便,模板可以重复使用并且加快了施工进度。
本发明的一种外墙拼装木模板整体施工方法,所述模板优先选用通用、大块模板。使其种类和块数最小,木模镶拼量最少。模板长向拼接宜采用错开布置。以增加模板的整体刚度。
本发明的一种外墙拼装木模板整体施工方法,所述C形托板竖向间距与所述钢管一致,横向间距为1.0-1.5m。托板按此要求的间距,起到撑托作用。模板设计并经组装完成后,利用C形托板的作用,下一层外墙模板拆除时,拆掉对拉螺杆也不会造成主次龙骨及面板的散落,确保上一层周转时整体吊装。
本发明的一种外墙拼装木模板整体施工方法,所述海绵条宽度为30mm,厚度为10mm,海绵条距模板线5mm。防止安装模板压缩变形伸入墙内。依据放线位置进行模板的安装就位贴海绵条,校正模板并用斜撑固定。
本发明的一种外墙拼装木模板整体施工方法,所述模板位置线包括均与墙体平行的内线和外线,所述内线到墙体的距离与模板整体厚度相同,所述外线到墙体的距离为200㎜。这样的目的是使外模板安装误差在线区内,减小误差。
与现有技术相比,本发明的有益效果为:由于外墙采用了整体提升式模板,在每一施工层模板支设时,省去了木工配置木模的施工的时间,同时缩短了施工员、质量员及监理检查验收时间,6~10层施工完毕共缩短工期2天,6~25层共节约工期8天,工期提前8天节约三钢租赁费、塔吊租赁费: 8天×(0.2136万元+0.06万元)=2.1888万元。采用外墙拼装木模板整体施工方法,不仅保证了工程质量,而且加快了施工进度,降低了施工成本费用,取得了一定的经济效益,简便了模板的拆装过程,提高效率,模板整体的拆装可以重复利用,并确保建筑物的质量和性能。
附图说明
图1本发明的主视结构示意图;
图2本发明的侧视结构示意图。
具体实施方式
为了使本发明的技术方案更容易被清楚理解,下面结合附图对实施例作以详细的说明。
由图1和图2可见,一种外墙拼装木模板整体施工方法,该方法按照以下步骤进行:
步骤一:根据工程结构形式和特点及现场施工条件设计模板,确定模板平面布置,绘制全套模板设计图。
步骤二:组装模板,按照步骤一中所述设计图拼装模板1,将完成拼装的模板1上预留对拉螺栓孔,模板1的外侧以纵向拼装的方木3做为次龙骨,方木3的外侧以横向拼装且两根为一组的钢管4作为主龙骨,各组钢管4的中心线与对拉螺栓孔的中心相对应,各组钢管4的外侧以C形托板5进行加固,C形托板5通过长钉固定到方木3上。
步骤三:在对拉螺栓孔周边设置墙体的定位钢筋7。
步骤四:将步骤二完成加固的模板1吊装在墙体一侧,模板1就位后,以模板位置线调整模板1,在模板1与阴角模下部用水泥砂浆封堵。
步骤五:吊装墙体另一侧的模板1,调整两块模板的位置和垂直度,同时调整斜撑10角度,固定斜撑10,贯穿混凝土外墙内外侧的模板1、木方3以及钢管4安装对拉螺栓6并在两端戴上扣件2及螺母8,对拉紧固后,拧紧螺母8。
步骤六:墙体模板1与楼板拼缝采用硬拼缝,在模板下口加贴海绵条9。
步骤七:墙体模板拆除,先拆除穿墙螺栓8,再拆除斜撑10,用撬棍轻轻撬动模板1,使模板1整体离开墙体13。
模板1优先选用通用、大块模板,使其种类和块数最小,木模镶拼量最少,模板长向拼接宜采用错开布置。以增加模板的整体刚度。
C形托板5竖向间距与钢管4一致,横向间距为1.0m。C形托板5按此要求的间距,起到撑托作用。利用C形托板5的作用,下一层外墙模板拆除时,拆掉对拉螺杆6也不会造成主次龙骨及面板的散落,确保上一层周转时整体吊装。
海绵条9宽度为30mm,厚度为10mm,海绵条距模板线5mm。防止安装模板压缩变形伸入墙内。依据放线位置进行模板的安装就位贴海绵条,校正模板并用斜撑10固定。
模板位置线包括均与墙体平行的内线11和外线12,内线11到墙体13的距离与模板外侧厚度相同,外线12到墙体13的距离为200㎜。这样的目的是使外模板安装误差在线区内,减小误差。
参照附体和实施例,对本发明的技术方案进行了适宜性描述,改描述没有限制性。本领域的技术人员应能理解,在实际应用中,本发明中各个步骤的实施细节均有可能发生某些变化,而其他人员在其启示下也可能做出相似设计。特别需要指出的是:只要不脱离本发明的涉及宗旨,所有显而易见的细节变化或相似设计,均包含在本发明的保护范围之内。
Claims (5)
1.一种外墙拼装木模板整体施工方法,其特征在于:该方法按照以下步骤进行:
步骤一:根据工程结构形式和特点及现场施工条件设计模板,确定模板平面布置,绘制全套模板设计图;
步骤二:组装模板,按照步骤一中所述设计图拼装模板,将完成拼装的模板上预留对拉螺栓孔,所述模板的外侧以纵向拼装的方木做为次龙骨,所述方木的外侧以横向拼装且两根为一组的钢管作为主龙骨,各组钢管的中心线与所述对拉螺栓孔的中心相对应,所述各组钢管的外侧以C形托板进行加固,所述C形托板固定到所述方木上;
步骤三:在所述对拉螺栓孔周边设置墙体的定位钢筋;
步骤四:将步骤二完成加固的所述模板吊装在墙体一侧,所述模板就位后,以模板位置线调整模板,在所述模板与阴角模下部用水泥砂浆封堵;
步骤五:吊装墙体另一侧的模板,调整两块模板的位置和垂直度,同时调整斜撑角度,固定斜撑,贯穿所述混凝土外墙内外侧的模板、木方以及钢管安装对拉螺栓并在两端戴上扣件及螺母,对拉紧固后,拧紧螺母;
步骤六:墙体模板与楼板拼缝采用硬拼缝,在所述墙模板下口加贴海绵条。
2.步骤七:墙体模板拆除,先拆除所述穿墙螺栓,再拆除所述斜撑,用撬棍轻轻撬动模板,使模板整体离开墙体;
如权利要求书1所述的一种外墙拼装木模板整体施工方法,其特征在于:所述模板优先选用通用、大块模板,模板长向拼接宜采用错开布置。
3.如权利要求书1所述的一种外墙拼装木模板整体施工方法,其特征在于:所述C形托板竖向间距与所述钢管一致,横向间距为1.0-1.5m。
4.如权利要求书1所述的一种外墙拼装木模板整体施工方法,其特征在于:所述海绵条宽度为30mm,厚度为10mm,海绵条距模板线5mm。
5.如权利要求书1所述的一种外墙拼装木模板整体施工方法,其特征在于:所述模板位置线包括均与墙体平行的内线和外线,所述内线到墙体的距离与模板整体厚度相同,所述外线到墙体的距离为200㎜。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711347839.2A CN107905522A (zh) | 2017-12-15 | 2017-12-15 | 一种外墙拼装木模板整体施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711347839.2A CN107905522A (zh) | 2017-12-15 | 2017-12-15 | 一种外墙拼装木模板整体施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107905522A true CN107905522A (zh) | 2018-04-13 |
Family
ID=61869900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711347839.2A Pending CN107905522A (zh) | 2017-12-15 | 2017-12-15 | 一种外墙拼装木模板整体施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107905522A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930406A (zh) * | 2018-08-07 | 2018-12-04 | 杭州江润科技有限公司 | 基于整体拼装大模板狭窄空间墙体施工方法 |
CN109594765A (zh) * | 2018-11-12 | 2019-04-09 | 中国华冶科工集团有限公司 | 剪力墙模板系统支模方法 |
CN109707158A (zh) * | 2018-11-06 | 2019-05-03 | 中机国能电力工程有限公司 | 一种圆形筒仓腔体异形模板及其施工工法 |
CN110258864A (zh) * | 2019-06-24 | 2019-09-20 | 南通大学 | 一种地下室剪力墙的免打孔模板施工方法 |
CN110424721A (zh) * | 2019-07-24 | 2019-11-08 | 中国十七冶集团有限公司 | 一种模板支撑体系及施工方法 |
CN110905202A (zh) * | 2019-12-12 | 2020-03-24 | 中天建设集团有限公司 | 一种墙模板垂直度调节组件及其施工方法 |
CN113216707A (zh) * | 2021-04-28 | 2021-08-06 | 烟建集团有限公司 | 一种拖曳水池池壁的施工方法 |
CN113482328A (zh) * | 2021-07-01 | 2021-10-08 | 广西建工集团控股有限公司 | 一种外剪力墙钢管模板整体吊装安装施工方法 |
CN114892851A (zh) * | 2022-05-12 | 2022-08-12 | 中国二十二冶集团有限公司 | Cl剪力墙模板整片施工组装方法 |
CN115506581A (zh) * | 2022-11-01 | 2022-12-23 | 民航机场建设工程有限公司 | 一种绳拉式建筑变形缝现浇墙模板紧固系统施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100918970B1 (ko) * | 2009-05-21 | 2009-09-29 | 주식회사 삼인공영 | 앙카조립체 및 그것을 구비한 추락방지용 갱폼 |
CN102953546A (zh) * | 2012-08-28 | 2013-03-06 | 中联世纪建设集团有限公司 | 双墙处变形缝模板安装施工方法 |
CN103306474A (zh) * | 2013-06-19 | 2013-09-18 | 泰兴市第一建筑安装工程有限公司 | 组合整体木模板 |
CN104074352A (zh) * | 2014-06-29 | 2014-10-01 | 北京首钢建设集团有限公司 | 一种空间狭窄部位墙体模板支设方法 |
CN204492162U (zh) * | 2015-01-22 | 2015-07-22 | 江苏万象建工集团有限公司 | 双重剪力墙变形缝模板施工结构 |
CN205617784U (zh) * | 2016-04-14 | 2016-10-05 | 江苏万象建工集团有限公司 | 防错台剪力墙模板支护结构 |
CN206581591U (zh) * | 2017-03-10 | 2017-10-24 | 青岛建设集团有限公司 | 一种内墙模板与顶板模板体系 |
-
2017
- 2017-12-15 CN CN201711347839.2A patent/CN107905522A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100918970B1 (ko) * | 2009-05-21 | 2009-09-29 | 주식회사 삼인공영 | 앙카조립체 및 그것을 구비한 추락방지용 갱폼 |
CN102953546A (zh) * | 2012-08-28 | 2013-03-06 | 中联世纪建设集团有限公司 | 双墙处变形缝模板安装施工方法 |
CN103306474A (zh) * | 2013-06-19 | 2013-09-18 | 泰兴市第一建筑安装工程有限公司 | 组合整体木模板 |
CN104074352A (zh) * | 2014-06-29 | 2014-10-01 | 北京首钢建设集团有限公司 | 一种空间狭窄部位墙体模板支设方法 |
CN204492162U (zh) * | 2015-01-22 | 2015-07-22 | 江苏万象建工集团有限公司 | 双重剪力墙变形缝模板施工结构 |
CN205617784U (zh) * | 2016-04-14 | 2016-10-05 | 江苏万象建工集团有限公司 | 防错台剪力墙模板支护结构 |
CN206581591U (zh) * | 2017-03-10 | 2017-10-24 | 青岛建设集团有限公司 | 一种内墙模板与顶板模板体系 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930406A (zh) * | 2018-08-07 | 2018-12-04 | 杭州江润科技有限公司 | 基于整体拼装大模板狭窄空间墙体施工方法 |
CN108930406B (zh) * | 2018-08-07 | 2020-08-04 | 杭州江润科技有限公司 | 基于整体拼装大模板狭窄空间墙体施工方法 |
CN109707158A (zh) * | 2018-11-06 | 2019-05-03 | 中机国能电力工程有限公司 | 一种圆形筒仓腔体异形模板及其施工工法 |
CN109594765A (zh) * | 2018-11-12 | 2019-04-09 | 中国华冶科工集团有限公司 | 剪力墙模板系统支模方法 |
CN110258864A (zh) * | 2019-06-24 | 2019-09-20 | 南通大学 | 一种地下室剪力墙的免打孔模板施工方法 |
CN110424721A (zh) * | 2019-07-24 | 2019-11-08 | 中国十七冶集团有限公司 | 一种模板支撑体系及施工方法 |
CN110905202A (zh) * | 2019-12-12 | 2020-03-24 | 中天建设集团有限公司 | 一种墙模板垂直度调节组件及其施工方法 |
CN113216707A (zh) * | 2021-04-28 | 2021-08-06 | 烟建集团有限公司 | 一种拖曳水池池壁的施工方法 |
CN113482328A (zh) * | 2021-07-01 | 2021-10-08 | 广西建工集团控股有限公司 | 一种外剪力墙钢管模板整体吊装安装施工方法 |
CN114892851A (zh) * | 2022-05-12 | 2022-08-12 | 中国二十二冶集团有限公司 | Cl剪力墙模板整片施工组装方法 |
CN115506581A (zh) * | 2022-11-01 | 2022-12-23 | 民航机场建设工程有限公司 | 一种绳拉式建筑变形缝现浇墙模板紧固系统施工方法 |
CN115506581B (zh) * | 2022-11-01 | 2024-01-09 | 民航机场建设工程有限公司 | 一种绳拉式建筑变形缝现浇墙模板紧固系统施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107905522A (zh) | 一种外墙拼装木模板整体施工方法 | |
CN101886466B (zh) | 捣固式焦炉煤塔模板支撑结构的施工方法 | |
CN106320691B (zh) | 铝木模板施工方法 | |
CN100469995C (zh) | 后浇带梁板模板的施工方法 | |
CN103352564B (zh) | 水平结构模板体系及施工方法 | |
CN111236604A (zh) | 圆筒主体结构上悬挑平台的安全施工方法 | |
CN102505708B (zh) | 轨道交通超大断面明挖区间隧道施工方法 | |
CN112854745A (zh) | 一种装配式建筑铝合金模板施工工艺 | |
CN105926942A (zh) | 组合铝/钢框木塑模板体系的施工方法 | |
CN103206089A (zh) | 装配式铝合金模板体系施工方法 | |
CN206616862U (zh) | 模板根部加固装置 | |
CN108894488A (zh) | 一种新型型钢龙骨钢木组合模板的施工方法 | |
CN103806647A (zh) | 大跨度混凝土双向密肋梁模壳的安装和拆除工艺 | |
CN204001652U (zh) | 装配式剪力墙结构便携式外墙操作平台 | |
CN105839784B (zh) | 拼装顶升式建筑施工方法 | |
CN113482312A (zh) | 导向式双层结构电梯井操作平台及基于该平台的施工方法 | |
CN206289945U (zh) | 一种装配式便捷安全操作架 | |
CN107401279A (zh) | 一次性整体浇筑楼梯间墙梯组合钢模板安装施工方法 | |
CN109252879B (zh) | 一种公路隧道排水沟内衬工具式模板及施工方法 | |
CN202831624U (zh) | 剪力墙变形缝模板 | |
CN107060338A (zh) | 一种支模二次浇筑楼梯间柱的方法 | |
CN111576878A (zh) | 铝合金模板快拆体系施工工艺 | |
CN102777028B (zh) | 仿古建筑飞檐椽子聚苯模板体系的施工方法 | |
CN105275198B (zh) | 一种剪力墙加固模板结构及其施工方法 | |
CN106193578B (zh) | 一种基于凹槽式矩管的配模系统及施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180413 |