CN107893422A - A kind of reinforcement type ecological slope protection structure and its construction method - Google Patents

A kind of reinforcement type ecological slope protection structure and its construction method Download PDF

Info

Publication number
CN107893422A
CN107893422A CN201711000025.1A CN201711000025A CN107893422A CN 107893422 A CN107893422 A CN 107893422A CN 201711000025 A CN201711000025 A CN 201711000025A CN 107893422 A CN107893422 A CN 107893422A
Authority
CN
China
Prior art keywords
fix bar
geotechnical grid
protection structure
fixed
slope protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711000025.1A
Other languages
Chinese (zh)
Other versions
CN107893422B (en
Inventor
代光明
梁超群
林福加
王淑珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen shenfuhua Ecological Environment Construction Co., Ltd
Original Assignee
Xiamen Deep Fuhua Gardening Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Deep Fuhua Gardening Co Ltd filed Critical Xiamen Deep Fuhua Gardening Co Ltd
Priority to CN201711000025.1A priority Critical patent/CN107893422B/en
Publication of CN107893422A publication Critical patent/CN107893422A/en
Application granted granted Critical
Publication of CN107893422B publication Critical patent/CN107893422B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0021Mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of reinforcement type ecological slope protection structure and its construction method, including base soil layer, geotechnical grid, three-dimension vegetative net, vegetable layer, on the base soil layer distribution be fixed with fix bar, the fix bar upper end is worn be positioned at the rotation of the geotechnical grid in;The three-dimension vegetative net is positioned at the fix bar upper end by one end grafting of U-shaped holdfast and is fixed.The present invention has advantages below and effect:By the fixation of fix bar itself, the positioning of geotechnical grid and three-dimension vegetative net can be fixed simultaneously, not need extra keeper that geotechnical grid and three-dimension vegetative net are fixed, reduce laying difficulty, improve the stability of the structure of whole bank protection.

Description

A kind of reinforcement type ecological slope protection structure and its construction method
Technical field
The present invention relates to ecological vestige, more particularly to a kind of reinforcement type ecological slope protection structure and its construction method.
Background technology
Ecological revetment, it is that supporting is carried out to slope or side slope, forms the synthesis bank protection being made up of plant or engineering and plant The bulkhead tech of system.After excavation slope is formed, by planting plants, plant and rock, the interaction (root system of the soil body are utilized Anchorage effect) side slope top layer protected, reinforced, it is allowed to that the requirement that side slope top layer is stable can be met, and can recovers quilt The bank protection mode of the natural ecological environment of destruction.
Notification number is CN206267161U Chinese patent《A kind of three-dimension vegetative net slope protection construction suitable for soil-slope Structure》, disclose and three-dimension vegetative net be fixed with by U-shaped steel nail and lumps of wood stake on soil-slope is domatic, then in vegetation net On sow grass seeds by duster straight trough, by the netted guard system in the root system of vegetation net, the plant scene of be combineding with each other, and then ensure domatic stabilization, And reduce directly washing away for rainwater side slope.
Publication No. is CN105926647A Chinese patent《A kind of greening side slope geotechnical grid and its application method》, it is open By setting up geotechnical grid on bank protection, realizing effective collection of rainwater and permeate, for for plant growth, while plant Root system play a part of soil and slope protection.
It is fixed although above-mentioned vegetation net can be followed closely by U-shaped steel into lumps of wood stake, in vegetation without completely raw Before length, there is when run into rainwater it is more abundant when and after soil erosion of the rainwater to bank protection upper surface layer is complete, rainwater energy Enough the problem of directly breaking up U-shaped steel nail, thus the installation that still can influence vegetation net is fixed, and then cause the online plant of vegetation Thing is destroyed;Geotechnical grid equally exists above mentioned problem.
The content of the invention
It is an object of the invention to provide a kind of reinforcement type ecological slope protection structure, has geotechnical grid and vegetation net can be complete The full effect being fixed on bank protection.
The present invention above-mentioned technical purpose technical scheme is that:A kind of reinforcement type ecological revetment knot Structure, including base soil layer, geotechnical grid, three-dimension vegetative net, vegetable layer, on the base soil layer distribution be fixed with fix bar, it is described solid Fixed pole upper end is worn be positioned at the rotation of the geotechnical grid in;One end grafting that the three-dimension vegetative net passes through U-shaped holdfast The fix bar upper end is positioned to be fixed.
By using above-mentioned technical proposal, the fix bar protruded by fixing upper end on base soil layer, the fix bar one side Geotechnical grid directly can be fixed for face, is fixed without extra fixture;On the other hand also can be simultaneously U-shaped holdfast on three-dimensional vegetation is fixed, avoid U-shaped holdfast grafting with it is domatic when, because vegetation rareness early stage causes After soil passage, generation the problem of loosely is fixed to the U-shaped holdfast., can by fix bar early stage in the positioning of base soil layer Make geotechnical grid when mounted, installation site can be fully deployed fixed, without also needing extra essence in laying Power positions to geotechnical grid, reduces laying difficulty,
The further setting of the present invention is:The spliced eye for the fix bar grafting, the grafting are offered on the base soil layer The cement mortar for fixing the fix bar is poured into hole;Cement and sand ratio in cement mortar are 1:3.
By using above-mentioned technical proposal, fix bar is carried out after the spliced eye being plugged on base soil layer with cement mortar It is fixed, realize that fix bar can be completely fixed on base soil layer, on the other hand can also strengthen stability domatic at this, and then The overall structural strength for improving base soil layer upper strata.
The further setting of the present invention is:Spacing hole is offered at the rotation of the geotechnical grid, is set in the spacing hole Anti-corrosion pipe is equipped with, grease is filled between the anti-corrosion pipe and the fix bar.
By using above-mentioned technical proposal, in each spacing hole of geotechnical grid fixation can have anti-corrosion pipe, in anti-corrosion After pipe is installed in fix bar, the grease of filling can protrude to the fix bar plays antisepsis with a part for base soil layer, The generation for the problem of avoiding fix bar deuterogenesis corrosion and causing fix bar to be damaged.
The further setting of the present invention is:Positioning hole is offered in the fix bar, one end of the U-shaped holdfast is provided with Can interference be plugged in locating dowel in the positioning hole, and described U-shaped holdfast one end is plugged in the anti-corrosion pipe upper end.
By using above-mentioned technical proposal, positioning hole is offered in fix bar upper end, when needing to lay three-dimension vegetative net, Only need U-shaped holdfast being inverted, then the one end for being provided with locating dowel is plugged into the positioning hole, U-shaped holdfast is relative to solid Fixed pole, which is realized, fixes, i.e., three-dimension vegetative net is positioned at into geotechnical grid upper end by U holdfasts, difficult for drop-off.
The further setting of the present invention is:The soil for three-dimension vegetative net described in colligation is additionally provided with the geotechnical grid Work rope.
By using above-mentioned technical proposal, the geotechnique's rope set on geotechnical grid can expand geotechnical grid and three-dimensional vegetation Tie point between net, the stability of both two-stages of enhancing.
The further setting of the present invention is:Also it is distributed with using nonwoven between the geotechnical grid and the three-dimension vegetative net The carded sliver is planted made of cloth, the plant carded sliver is built with conditioned soil, organic fertilizer and vegetation seed;The plant carded sliver is restricted by geotechnique It is fixed.
By using above-mentioned technical proposal, for some high gradient slopes because the gradient is larger so that when spraying vegetation, plant Be easy to slide by matrix, thus by plant the carded sliver on the one hand play the vegetation substrate for planting carded sliver upper end is carried out it is spacing, Prevent its landing and lower floor;On the other hand itself can play a part of vegetation substrate.The carded sliver is planted to be made up of non-woven fabrics so that The growth water and soil of vegetation is washed away after a period of time, and the non-woven fabrics is differentiated, final still to turn into vegetable layer.The carded sliver is planted to exist Directly it can be fixed when fixed by geotechnique's rope, without being fixed using other additional ways.
It is an object of the invention to provide a kind of construction method, has the stable effect of bank protection previous structure distribution.
The present invention above-mentioned technical purpose technical scheme is that:A kind of construction method, its feature It is:Including step:
It is 1. smooth domatic:Artificial leveling, eliminate all rocks, broken clod, plant, rubbish, 90 ~ 100mm of backfill improvement soil thickness;
2. pumping equipment is constructed:Wide 300mm is excavated, depth is not less than 200mm rectangle grooves;
3. geotechnical grid is constructed:Use to be drilled with screw-thread steel on domatic and generate spliced eye, described in the interior insertion of the spliced eye Fix bar, then toward pouring into cement mortar in the spliced eye, to fixed fix bar,
When laying geotechnical grid, the anti-corrosion pipe distribution in the spacing hole of geotechnical grid is plugged into each fix bar, finally Conditioned soil is filled up in the cell compartment of each geotechnical grid and is compacted, and is higher by 10 ~ 20mm of geotechnical grid;
4. planting carded sliver construction, the carded sliver will be planted and be laid on above geotechnical grid, bound by geotechnique's rope;
5. three-dimension vegetative net is constructed:Laid along slope, then by the locating dowel plugged and fixed of one end of U-shaped holdfast to fix bar It is in the positioning hole at end that the tie point progress of three-dimension vegetative net is spacing, then bound with geotechnique's rope;
6. construction of sowing grass seeds by duster:Vegetation substrate is sowed grass seeds by duster on domatic, finally covering non-woven fabrics maintenance.
The further setting of the present invention is:Step 3. in, it is described anti-after the anti-corrosion pipe is plugged into the fix bar Corruption pipe is sealed with filling grease in the gap of the fix bar, and grease is equally filled in anti-corrosion pipe upper end, is available for U-shaped holdfast One end carries out grafting sealing.
In summary, the invention has the advantages that:
1st, fix bar by cement mortar be fixed to base soil layer on, can more preferably side slope play firm effect;
2nd, by the fixation of fix bar itself, the positioning of geotechnical grid and three-dimension vegetative net can be fixed simultaneously, not need volume Geotechnical grid and three-dimension vegetative net are fixed outer keeper, reduce laying difficulty, improve the knot of whole bank protection The stability of structure;
3rd, the carded sliver is planted by fixed domatic, can be applied to carry out the kind of sowing grass seeds by duster of vegetation on the larger high gradient slope of the gradient Plant.
Brief description of the drawings
Fig. 1 is the distribution schematic diagram of embodiment one;
Fig. 2 is the structural representation that embodiment one is provided with geotechnical grid;
Fig. 3 is the structural relation figure of geotechnical grid and three-dimension vegetative net in embodiment one;
Fig. 4 is the annexation figure of U-shaped holdfast and fix bar in embodiment one.
In figure:1st, base soil layer;2nd, geotechnical grid;3rd, three-dimension vegetative net;4th, vegetable layer;5th, spliced eye;6th, fix bar;7th, limit Position hole;8th, anti-corrosion pipe;9th, the carded sliver is planted;10th, U-shaped holdfast;11st, positioning hole;12nd, locating dowel.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment one, a kind of reinforcement type ecological slope protection structure, reference picture 1, including be cleaned it is smooth after base soil layer 1, paving Geotechnical grid 2 and three-dimension vegetative net 3 on base soil layer 1, and the last vegetable layer 4 for growing into afforestation vegetation.
There is spliced eye 5 in the upper end rectangular array of base soil layer 1, one is provided with each spliced eye 5 as fix bar 6 Drill rod, while be fixed between fix bar 6 and spliced eye 5 by cement mortar, fix bar 6 passes through the cement mortar after solidification The overall stability in the upper end of base soil layer 1 can be enhanced.
Reference picture 2, geotechnical grid 2 offer spacing hole 7 at rotation, at the same fix in the spacing hole 7 one by Anti-corrosion pipe 8 made of polyethylene or polypropylene;When geotechnical grid 2 lay install when, it is native only 8 sets of anti-corrosion pipe need to be set to base In the fix bar 6 set on layer 1, while grease is filled between anti-corrosion pipe 8 and fix bar 6, it is ensured that fix bar 6 is not easy rotten Erosion.Geotechnical grid 2 need to only be installed to the installation site of fix bar 6 in laying, without extra energy to geotechnical grid 2 Carry out expansion positioning.Lay toward after geotechnical grid 2, toward backfilling conditioned soil on geotechnical grid 2, and conditioned soil is compacted in cell compartment Inside, the upper end of geotechnical grid 2 is covered using moist conditioned soil, and is higher by 210 ~ 20mm of geotechnical grid.
Multirow is distributed with the upper end of geotechnical grid 2 by more hedge planting carded slivers 9(Reference picture 1)The limiting section of composition, for the gradient Larger is domatic, for being carried out spacing to vegetation substrate, even conditioned soil.The carded sliver 9 is planted to be formed by non-woven fabrics sewing, while Plant the inside of the carded sliver 9 and be filled with conditioned soil, organic fertilizer and vegetation seed.The both ends for planting the carded sliver 9 can be by being arranged on geotechnological lattice On room 2 geotechnique rope is fixed, after bank protection is building one of time, non-woven fabrics can automatic weathering, internal improvement Soil is directly becoming a part for bank protection.
After the complete plant carded sliver 9 of fixation, then toward geotechnical grid 2 and plant one layer of three-dimension vegetative net 3 of the top of the carded sliver 9 laying, three-dimensional The one side of vegetation net 3 can be bound by the geotechnique's rope being connected on geotechnical grid 2, on the other hand can pass through U-shaped anchor Nail 10 is fixed.Reference picture 3 and Fig. 4, U-shaped holdfast 10 can be set U-shaped holdfast 10 in fixed three-dimension vegetative net 3 One end of locating dowel 12 is inserted into the anti-corrosion pipe 8 on geotechnical grid 2(Reference picture 2)Interior, now locating dowel 12 being capable of interference grafting Realize and fix in the positioning hole 11 that the upper end of fix bar 6 is set, now the bending place of the U-shaped upper end of holdfast 10 can be by three-dimensional vegetation The upper end of geotechnical grid 2 is pressed on, realizes positioning.
Embodiment two, a kind of construction method of above-described embodiment one of constructing, including step:
It is 1. smooth domatic:Artificial leveling, eliminate all rocks, broken clod, plant, rubbish, 90 ~ 100mm of backfill improvement soil thickness;
2. pumping equipment is constructed:Wide 300mm is excavated, depth is not less than 200mm rectangle grooves, on the other hand can be according to domatic Uninterrupted considers whether to set domatic transverse drain ditch;
3. geotechnical grid 2 is constructed:Use to be drilled with screw-thread steel on domatic and generate spliced eye 5, toward the interior insertion fix bar of spliced eye 5 6, then toward pouring into ratio in spliced eye 5 as 1:3 cement mortar, fix bar 6 is fixed,
Then when laying geotechnical grid 2, the distribution of anti-corrosion pipe 8 in the spacing hole 7 of geotechnical grid 2 is plugged into each fixation On bar 6, finally fill up conditioned soil in the cell compartment of each geotechnical grid 2 and be compacted, and be higher by 210 ~ 20mm of geotechnical grid, eminence The conditioned soil of geotechnical grid 2 can be gently compacted using wetland.
After anti-corrosion pipe 8 is plugged into fix bar 6, anti-corrosion pipe 8 is sealed with filling grease in the gap of fix bar 6, Grease is equally filled in the upper end of anti-corrosion pipe 8, is available for one end of U-shaped holdfast 10 to carry out grafting sealing;
4. planting the carded sliver 9 to construct, direction is extended downwardly along the gradient, lays multirow, each carded sliver 9 of planting is laid on the top of geotechnical grid 2, Bound by geotechnique's rope;
5. three-dimension vegetative net 3 is constructed:Laid along slope, then the plugged and fixed of locating dowel 12 by one end of U-shaped holdfast 10 is to consolidating In the positioning hole 11 of the upper end of fixed pole 6 that the tie point progress of three-dimension vegetative net 3 is spacing, remaining position can be directly using geotechnique's rope Bound;
6. construction of sowing grass seeds by duster:Vegetation substrate is sowed grass seeds by duster on domatic, finally covering non-woven fabrics maintenance.
Wherein vegetation substrate can be the mixed material of grass seeds, wood-fibred, water-loss reducer, bonding agent, coloring agent and water, lead to Spray seeder is crossed uniformly to sow on three-dimension vegetative net 3.When conserving early stage, 45D is no less than between watering maintenance, periodically carries out disease Even if the after-culture after pest control, top dressing and grass seeds germination.
Specific embodiment is only explanation of the invention, and it is not limitation of the present invention, those skilled in the art The modification of no creative contribution can be made to the present embodiment as needed after this specification is read, but as long as in this hair All protected in bright right by Patent Law.

Claims (8)

1. a kind of reinforcement type ecological slope protection structure, including base soil layer (1), geotechnical grid (2), three-dimension vegetative net (3), vegetable layer (4), it is characterised in that:Distribution is fixed with fix bar (6) on the base soil layer (1), and fix bar (6) upper end, which is worn, to be positioned at In at the rotation of the geotechnical grid (2);The three-dimension vegetative net (3) is positioned at institute by one end grafting of U-shaped holdfast (10) Fix bar (6) upper end is stated to be fixed.
A kind of 2. reinforcement type ecological slope protection structure according to claim 1, it is characterised in that:Opened on the base soil layer (1) Provided with the spliced eye (5) for the fix bar (6) grafting, poured into the spliced eye (5) for fixing the fix bar (6) Cement mortar;Cement and sand ratio in cement mortar are 1:3.
A kind of 3. reinforcement type ecological slope protection structure according to claim 2, it is characterised in that:The geotechnical grid (2) Spacing hole (7) is offered at rotation, anti-corrosion pipe (8), the anti-corrosion pipe (8) and the fixation are provided with the spacing hole (7) Grease is filled between bar (6).
A kind of 4. reinforcement type ecological slope protection structure according to claim 3, it is characterised in that:Opened on the fix bar (6) Provided with positioning hole (11), one end of the U-shaped holdfast (10) be provided with can interference be plugged in the positioning hole (11) and determine Position post (12), and the U-shaped holdfast (10) one end is plugged in the anti-corrosion pipe (8) upper end.
A kind of 5. reinforcement type ecological slope protection structure according to claim 4, it is characterised in that:On the geotechnical grid (2) It is additionally provided with geotechnique's rope for three-dimension vegetative net (3) described in colligation.
6. a kind of reinforcement type ecological slope protection structure according to claim 5 and its construction method, it is characterised in that:The soil Also it is distributed between work cell compartment (2) and the three-dimension vegetative net (3) using the plant carded sliver (9), the plant carded sliver made of non-woven fabrics (9) built with conditioned soil, organic fertilizer and vegetation seed;The plant carded sliver (9) is fixed by geotechnique's rope.
It is 7. a kind of for the construction method for the reinforcement type ecological slope protection structure constructed described in the claims 6, it is characterised in that: Including step:
It is 1. smooth domatic:Artificial leveling, eliminate all rocks, broken clod, plant, rubbish, 90 ~ 100mm of backfill improvement soil thickness;
2. pumping equipment is constructed:Wide 300mm is excavated, depth is not less than 200mm rectangle grooves;
3. geotechnical grid (2) is constructed:Use to be drilled with screw-thread steel on domatic and generate spliced eye (5), it is interior toward the spliced eye (5) The fix bar (6) is inserted, then cement mortar is poured into toward the spliced eye (5) is interior, to fixed fix bar (6)
When laying geotechnical grid (2), anti-corrosion pipe (8) distribution in the spacing hole (7) of geotechnical grid (2) is plugged into each admittedly In fixed pole (6), conditioned soil is finally filled up in the cell compartment of each geotechnical grid (2) and is compacted, and be higher by geotechnical grid (2) 10 ~ 20mm;
4. planting the carded sliver (9) construction, the carded sliver (9) will be planted and be laid on above geotechnical grid (2), bound by geotechnique's rope;
5. three-dimension vegetative net (3) is constructed:Laid along slope, then locating dowel (12) grafting by one end of U-shaped holdfast (10) is solid Surely it is spacing to arrive the interior tie point progress by three-dimension vegetative net (3) of positioning hole (11) of fix bar (6) upper end, then is carried out with geotechnique's rope Binding;
6. construction of sowing grass seeds by duster:Vegetation substrate is sowed grass seeds by duster on domatic, finally covering non-woven fabrics maintenance.
8. a kind of reinforcement type ecological slope protection structure according to claim 7 and its construction method, it is characterised in that:Step is 3. In, after the anti-corrosion pipe (8) is plugged into the fix bar (6), the anti-corrosion pipe (8) and the gap of the fix bar (6) Interior filling grease is sealed, and grease is equally filled in anti-corrosion pipe (8) upper end, is available for one end progress grafting of U-shaped holdfast (10) close Envelope.
CN201711000025.1A 2017-10-24 2017-10-24 A kind of reinforcement type ecological slope protection structure and its construction method Active CN107893422B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711000025.1A CN107893422B (en) 2017-10-24 2017-10-24 A kind of reinforcement type ecological slope protection structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711000025.1A CN107893422B (en) 2017-10-24 2017-10-24 A kind of reinforcement type ecological slope protection structure and its construction method

Publications (2)

Publication Number Publication Date
CN107893422A true CN107893422A (en) 2018-04-10
CN107893422B CN107893422B (en) 2019-11-01

Family

ID=61803722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711000025.1A Active CN107893422B (en) 2017-10-24 2017-10-24 A kind of reinforcement type ecological slope protection structure and its construction method

Country Status (1)

Country Link
CN (1) CN107893422B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555082A (en) * 2018-10-09 2019-04-02 荟岩环境建设(无锡)有限公司 A kind of construction method of river high gradient slope zoology green-recovery
CN110036811A (en) * 2019-04-04 2019-07-23 三峡大学 Slope vegetation protection structure and its construction method
CN111456082A (en) * 2020-04-01 2020-07-28 安徽金联地矿科技有限公司 Re-greening method for mine slope surface
CN111636444A (en) * 2020-05-22 2020-09-08 中电建十一局工程有限公司 Water and soil conservation method for side slope in high-altitude area
CN113170674A (en) * 2021-04-23 2021-07-27 云南大学 Rock mass afforestation equipment desertifies
CN113235620A (en) * 2021-04-26 2021-08-10 湖南省绿林建设集团有限公司 Slope ecological restoration structure of damaged mountain and restoration method thereof
CN113463668A (en) * 2021-07-21 2021-10-01 中信国安建工集团有限公司 Highway slope stability protection structure and construction operation method
CN115997579A (en) * 2022-12-30 2023-04-25 景古环境建设股份有限公司 Three-dimensional plant net planting structure
CN117306553A (en) * 2023-09-28 2023-12-29 重庆地质矿产研究院 Slope environment-friendly ecological protection method
CN118029413A (en) * 2024-04-15 2024-05-14 华北建工工程集团有限公司 Soil and water conservation stabilizes bank protection device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603316A (en) * 2013-11-04 2014-02-26 河海大学 Ecological cement and geocell combination slope protection technology

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603316A (en) * 2013-11-04 2014-02-26 河海大学 Ecological cement and geocell combination slope protection technology

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555082A (en) * 2018-10-09 2019-04-02 荟岩环境建设(无锡)有限公司 A kind of construction method of river high gradient slope zoology green-recovery
CN110036811A (en) * 2019-04-04 2019-07-23 三峡大学 Slope vegetation protection structure and its construction method
CN111456082A (en) * 2020-04-01 2020-07-28 安徽金联地矿科技有限公司 Re-greening method for mine slope surface
CN111636444A (en) * 2020-05-22 2020-09-08 中电建十一局工程有限公司 Water and soil conservation method for side slope in high-altitude area
CN113170674A (en) * 2021-04-23 2021-07-27 云南大学 Rock mass afforestation equipment desertifies
CN113235620A (en) * 2021-04-26 2021-08-10 湖南省绿林建设集团有限公司 Slope ecological restoration structure of damaged mountain and restoration method thereof
CN113235620B (en) * 2021-04-26 2022-06-17 湖南省绿林建设集团有限公司 Slope ecological restoration structure of damaged mountain and restoration method thereof
CN113463668A (en) * 2021-07-21 2021-10-01 中信国安建工集团有限公司 Highway slope stability protection structure and construction operation method
CN115997579A (en) * 2022-12-30 2023-04-25 景古环境建设股份有限公司 Three-dimensional plant net planting structure
CN117306553A (en) * 2023-09-28 2023-12-29 重庆地质矿产研究院 Slope environment-friendly ecological protection method
CN118029413A (en) * 2024-04-15 2024-05-14 华北建工工程集团有限公司 Soil and water conservation stabilizes bank protection device

Also Published As

Publication number Publication date
CN107893422B (en) 2019-11-01

Similar Documents

Publication Publication Date Title
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN105484275B (en) Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area
CN104314087B (en) A kind of side-slope greening and protection structure and construction method thereof
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN108589743B (en) Ecological geogrid for slope protection
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN109723068B (en) Steep concrete sash Liang Hupo system beneficial to slope vegetation growth and construction method
CN104264692A (en) Ecological restoration method of slope
CN106638630B (en) Flexible ceramsite board slope ecological afforestation equipment and its greening method
CN107100176B (en) A kind of expressway slope greening system
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN112064655A (en) Rapid restoration and greening method for limestone bare high and steep slope
KR20090014058A (en) Vegetation method reinforced soil slopes with geotextile curtain wall combined with steel buckel and anchor nails
CN110106894B (en) Slope protection device
CN101622931B (en) Greening sloping surface for rock side slope facing wall and construction method thereof
CN108049423A (en) Ecological landscape retaining wall
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN110219310A (en) Drainage pipe combines the frame grid type vegetation soil cement bank protecting method and facility of the multi-functional reinforced bands that draw water
CN203530993U (en) Steel-bar mesh planting hole
CN206681026U (en) Side slope
CN211621621U (en) Plant biological bag protection device for high and steep rocky slope
CN109452064B (en) Vertical greening construction method for lattice beam of mountain rock slope
CN209816870U (en) Steep concrete frame beam slope protection system beneficial to growth of slope vegetation
CN206289637U (en) Flexible ceramsite board slope ecological afforestation equipment
CN212896409U (en) Three-dimensional geotechnique's net pad grass planting slope protection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Unit 167 1604, Tapu East Road, Siming District, Xiamen City, Fujian Province

Patentee after: Xiamen shenfuhua Ecological Environment Construction Co., Ltd

Address before: Unit 167 1604, Tapu East Road, Siming District, Xiamen City, Fujian Province

Patentee before: XIAMEN SHENFUHUA GARDENING Co.,Ltd.

CP01 Change in the name or title of a patent holder