CN206289637U - Flexible ceramsite board slope ecological afforestation equipment - Google Patents
Flexible ceramsite board slope ecological afforestation equipment Download PDFInfo
- Publication number
- CN206289637U CN206289637U CN201621371742.6U CN201621371742U CN206289637U CN 206289637 U CN206289637 U CN 206289637U CN 201621371742 U CN201621371742 U CN 201621371742U CN 206289637 U CN206289637 U CN 206289637U
- Authority
- CN
- China
- Prior art keywords
- flexible
- layer
- square body
- vegetation soil
- ceramsite board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of flexible ceramsite board slope ecological afforestation equipment, including many anchor poles being embedded on side slope surface, every four anchor poles constitute a square body, connected by many steel wires between the anchor pole of lower end two of square body, wire netting block is equipped with many steel wires, on side slope surface between many anchor poles of square body geotextiles layer is equipped with the wire netting block of the lower end of square body, nutritious vegetation soil layer is laid on geotechnological layer of cloth in square body, flexible ceramsite board is embedded in nutrition vegetation soil layer, and Turf Culture is also equipped with nutrition vegetation soil layer.The flexible ceramsite board slope ecological afforestation equipment that the utility model is provided, can solve the problems, such as that existing method can not realize that greening side slope or soil easily wash away, rainwater directly washing away and stability of the pressure dressing power to have additional nutrients between vegetation soil and palisades is provided to nutrition vegetation soil can be reduced, the survival rate of plant is improve, the greening protective action of large area is served.
Description
Technical field
The utility model is related to greening side slope field, especially a kind of flexible ceramsite board slope ecological afforestation equipment.
Background technology
At present, with the fast development of China's economy, infrastructure is advanced by leaps and bounds, and occurs in that various types of diggings, embankment
Side slope, in order to ensure side slope safety stabilization, prevents erosion and ecological protection greening is protected into current slope retaining
Major issue.As traditional means of defence has concrete shotcrete to protect, the method can be effective as a kind of physical protection method
Prevent slope instability from caving in, the geological disaster such as rock is tumbled, soil erosion, but this kind of method uses concrete support side
Method, the method loses the natural conditions of plant growth, is discord with city or road landscape pole, and it is dirty to bring vision
Dye, while being unfavorable for ecological construction.Greening to massif and the hillside fields for building surrounding, particularly precipitous domatic greening does not have
There is fixed soil to support and be easy to be formed the structure of vegetation, all simply there is soil to support again in the domatic of the earth, then the planting plants in soil is supported,
Form greening.Due to it is precipitous it is domatic be readily formed landslide, the soil of formation is also easy to slide or fallen by rain drop erosion, together
When in some arid area side slopes, be even more survival rate for slope greening plant extremely low, and the greening cycle is long.Therefore, pin
How the problem of Slope Stability protection supporting greening, particularly accomplishing that side slope prevents from washing away, plant growth water nutrition is
On the problems such as no abundance, survival rate, growth cycle, but solved without corresponding method.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of flexible ceramsite board slope ecological afforestation equipment, can be with
Solve the problems, such as that existing method can not realize that greening side slope or soil easily wash away, rainwater can be reduced to the straight of nutrition vegetation soil
The stability for washing away and providing pressure dressing power to have additional nutrients between vegetation soil and palisades is connect, the survival rate of plant is improve, played
The greening protective action of large area.
In order to solve the above technical problems, the technical scheme that the utility model is used is:A kind of flexible ceramsite board side slope life
State afforestation equipment, including many anchor poles on side slope surface are embedded in, every four anchor poles constitute a square body, under square body
Connected by many steel wires between two anchor poles in end, wire netting block is equipped with many steel wires, between many anchor poles of square body
Side slope surface on the wire netting block of the lower end of square body on be equipped with geotextiles layer, laid on the geotechnological layer of cloth in square body
Nutritious vegetation soil layer, flexible ceramsite board is embedded in nutrition vegetation soil layer, and kind is also equipped with nutrition vegetation soil layer
Grass planting skin.
It is uniform in the middle of two sheets of flexible net to be equipped with least one of which haydite layer in flexible ceramsite board, lay the two of haydite layer
Connect to form entirety by band between layer flexible net.
In flexible ceramsite board, embedded at least one of which haydite layer, has buried the nutrition after haydite layer in nutrition vegetation soil layer
Individual layer wire netting is also equipped with vegetation soil layer.
The flexible ceramsite board slope ecological afforestation equipment that the utility model is provided, has the beneficial effect that:
1st, on rock side slope, it is possible to resolve the plant raw-soil long-term cohesive force on palisades is spread on during general tradition greening not enough and
Root system of plant is insecure to cause the problem of slump, and flexible ceramsite board is close to the domatic domatic thin solum of compacting by the utility model,
Because haydite is the light coarse aggregate of structure of the high intensity formed after oversintering, with abrasion resistance, rainwater pair can be reduced
The direct of nutrition vegetation soil is washed away and provides stability of the pressure dressing power to have additional nutrients between vegetation soil and palisades, while multiple
The superposition of haydite and outside bends play buffering and eliminate rain drop erosion power, also protect the stabilization of nutrition vegetation soil
Property;After plant growth is vigorous, after root system of plant penetrates flexible ceramsite board, applying between root system of plant and side slope can be greatly increased
Put forth effort, so as to improve the survival rate of plant, serve the greening protective action of large area.
2nd, on soil level sideslope, flexible ceramsite board is close to the domatic domatic thin solum of compacting, except to nutrition vegetation soil
Playing a part of to increase apposition power, preventing washing away and to increased apposition power between plant and side slope so as to improve outside plant survival rate,
Even more soil level sideslope is played rainwater directly wash away and under ooze the protective effect for causing side slope unstable.
3rd, flexible ceramsite board can be provided for a long term the effect of thermal insulation retain water and nutrients for vegetation during greening side slope, solve general side slope
Vegetation causes that plant is withered, growth cycle slow, root system is difficult set and survival rate is low because of high temperature water shortage fertilizer deficiency during greening
Problem.
4th, it is computed, is fabricated to 1 square metre of flexible ceramsite board cost for nearly 5 yuan, it is with low cost.
5th, the making of flexible ceramsite board is simple, can be prefabricated, and materials are extensive, can make arbitrary shape, and can roll over can fold and can roll up
It is bent into cylinder, it is easy to construction transport.
6th, domatic suitable for various rock ground, especially high steep, domatic uneven, rock crevice is small and many, weather
The rock geotechnical slope slope support of inclement condition.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the structural representation of the utility model embodiment three;
Fig. 3 is the structural representation of the utility model example IV;
Fig. 4 is the schematic diagram of the flexible ceramsite board that the utility model is made using two sheets of flexible net;
Fig. 5 is the A-A of the utility model Fig. 4 to sectional view;
Fig. 6 be every four anchor poles of the utility model constitute anchor pole connection of square body lower end two many steel wires and
The schematic diagram of the wire netting of laying.
Specific embodiment
Embodiment one
As shown in figure 1, a kind of flexible ceramsite board slope ecological afforestation equipment, including it is embedded in many on side slope surface 1
Anchor pole 2, every four anchor poles 2 constitute a square body, are connected by many steel wires 6 between the anchor pole 2 of lower end two of square body, many
Wire netting block 5, the iron on the side slope surface 1 between many anchor poles 2 of square body with the lower end of square body are equipped with root steel wire 6
Geotextiles layer 9 is equipped with silk screen block 5, nutritious vegetation soil layer 4, flexible haydite are laid on the geotechnological layer of cloth 9 in square body
Plate 3 is embedded in nutrition vegetation soil layer 4, and Turf Culture 8 is also equipped with nutrition vegetation soil layer 4.
A kind of method for carrying out greening side slope using above-mentioned slope ecological afforestation equipment, the method is comprised the following steps:
Step 1:One piece of battered slope domatic 1 is arbitrarily chosen in slope excavating supporting afforestation project, side slope domatic 1 is entered
Row areal extent is measured, and makes the flexible ceramsite board 3 for being adapted size;
Step 2:Make nutrition vegetation soil;
Step 3:Dilution Nutrition Soil makes nutrition soil paste uniform fold exist into slurries, flexible ceramsite board 3 obtained in soaking step 1
On flexible ceramsite board 3 so that the haydite particles in plate fully adsorb soil paste nutrient solution;
Step 4:Drilled on side slope surface 1 and complete the supporting of anchor pole 2, every four anchor poles 2 constitute a square body, square
Many iron wires 6 are connected between the anchor pole 2 of body bottom two and set up wire netting block 5, the side slope surface between many anchor poles 2 of square body
On 1 geotechnological layer of cloth 9 is formed with one layer of geotextiles of laying on the wire netting block 5 of the lower end of square body;
Step 5:The thick nutrition vegetation soil layers 4 of one layer of 5cm are laid on geotechnological layer of cloth 9 in square body, then in nutrition
Laying and the soaked flexible ceramsite board 3 of fixing step 3 on vegetation soil layer 4, then one layer 2 lis are laid on flexible ceramsite board 3
The thick nutrition vegetation soil layer 4 of rice, Turf Culture 8 is layed on nutrition vegetation soil layer 4, that is, complete greening side slope, is planted
Sod thickness is 2cm to 5cm.
Embodiment two
A kind of flexible ceramsite board slope ecological afforestation equipment, including be embedded on side slope surface 1 composition square body it is many
Root anchor pole 2, is connected between many of the lower end anchor pole 2 of square body by many steel wires 6, and wire netting block is equipped with many steel wires 6
5, it is equipped with geotextiles layer with the wire netting block 5 of the lower end of square body on the side slope surface 1 between many anchor poles 2 of square body
9, nutritious vegetation soil layer 4 is laid on the geotechnological layer of cloth 9 in square body, flexible ceramsite board 3 is embedded in nutrition vegetation soil layer 4
It is interior, it is embedded with multiple grass-seeds in nutrition vegetation soil layer 4.
A kind of method for carrying out greening side slope using above-mentioned slope ecological afforestation equipment, the method is comprised the following steps:
Step 1:One piece of battered slope domatic 1 is arbitrarily chosen in slope excavating supporting afforestation project, side slope domatic 1 is entered
Row areal extent is measured, and makes the flexible ceramsite board 3 for being adapted size;
Step 2:Make nutrition vegetation soil;
Step 3:Dilution Nutrition Soil makes nutrition soil paste uniform fold exist into slurries, flexible ceramsite board 3 obtained in soaking step 1
On flexible ceramsite board 3 so that the haydite particles in plate fully adsorb soil paste nutrient solution;
Step 4:Drilled on side slope surface 1 and complete the supporting of anchor pole 2, every four anchor poles 2 constitute a square body, square
Many iron wires 6 are connected between the anchor pole 2 of body bottom two and set up wire netting block 5, the side slope surface between many anchor poles 2 of square body
On 1 geotechnological layer of cloth 9 is formed with one layer of geotextiles of laying on the wire netting block 5 of the lower end of square body;
Step 5:The thick nutrition vegetation soil layers 4 of one layer of 3cm to 10cm are laid on geotechnological layer of cloth 9 in square body, then
Laying and the soaked flexible ceramsite board 3 of fixing step 3 on nutrition vegetation soil layer 4, then lay one on flexible ceramsite board 3
Layer nutrition vegetation soil layer 4, grass-seed is spread in nutrition vegetation soil layer 4, that is, complete greening side slope.
Before sowing grass-seed, grass-seed need to be shifted to an earlier date and be soaked 5 to 12 hours in water.Managed after sowing or plantation, according to soil
Crop producing power, humidity, weather condition, maintenance of periodically applying fertilizer and sprinkle water;The previous moon after sowing or plantation, water daily 1 to 2 times,
Fertilising by each Monday time, until grass growth it is healthy and strong it is vigorous after, depending on watering, fertilizing can be according to situations such as weather soil;Grass
Seed addition is 150g/ square metres.
Embodiment three
As shown in Fig. 2 a kind of flexible ceramsite board slope ecological afforestation equipment, including it is embedded in the composition on side slope surface 1
Many anchor poles 2 of square body, are connected between many of the lower end anchor pole 2 of square body by many steel wires 6, are laid on many steel wires 6
There is wire netting block 5, laid with the wire netting block 5 of the lower end of square body on the side slope surface 1 between many anchor poles 2 of square body
There is geotechnological layer of cloth 9, nutritious vegetation soil layer 4 is laid on the geotechnological layer of cloth 9 in square body, flexible ceramsite board 3 is layed in nutrition
On vegetation soil layer 4, multiple grass-seeds are embedded with nutrition vegetation soil layer 4.
A kind of method for carrying out greening side slope using above-mentioned slope ecological afforestation equipment, the method is comprised the following steps:
Step 1:One piece of battered slope domatic 1 is arbitrarily chosen in slope excavating supporting afforestation project, side slope domatic 1 is entered
Row areal extent is measured, and makes the flexible ceramsite board 3 for being adapted size;
Step 2:Make nutrition vegetation soil;
Step 3:Dilution Nutrition Soil makes nutrition soil paste uniform fold exist into slurries, flexible ceramsite board 3 obtained in soaking step 1
On flexible ceramsite board 3 so that the haydite particles in plate fully adsorb soil paste nutrient solution;
Step 4:Drilled on side slope surface 1 and complete the supporting of anchor pole 2, every four anchor poles 2 constitute a square body, square
Many iron wires 6 are connected between the anchor pole 2 of body bottom two and set up wire netting block 5, the side slope surface between many anchor poles 2 of square body
On 1 geotechnological layer of cloth 9 is formed with one layer of geotextiles of laying on the wire netting block 5 of the lower end of square body;
Step 5:The thick nutrition vegetation soil layers 4 of one layer of 3cm to 10cm are laid on geotechnological layer of cloth 9 in square body, will
Grass-seed is spread in nutrition vegetation soil layer 4, then laying and the soaked flexible pottery of fixing step 3 on nutrition vegetation soil layer 4
Grain plate 3, that is, complete greening side slope.
In one-embodiment of above-described embodiment three,
As shown in fig. 4-5, it is uniform in the middle of two sheets of flexible net 7 to be equipped with least one of which haydite layer in flexible ceramsite board 3
11, connect to form entirety by band between the two sheets of flexible net 7 for having laid haydite layer 11, material wherein used by two sheets of flexible net 7
Expect to cross modeling galvanized wire mesh, can anti-corrosion, increase service life.
The preparation method of flexible ceramsite board 3 is:Flexible net is cut into arbitrary shape, is uniformly spread in the middle of Double-layer flexible net
If single or multiple lift haydite, wherein haydite arrangement density can be adjusted according to distance is tied up, in being penetrated with tied silk or Plastic Bandage
Between the haydite laid Double-layer flexible net is tied up again to Double-layer flexible network edge and middle part with every 2 points at a distance of 5 centimetres to 20
The mode of centimetre one-step bundling is tied up, that is, complete the making of flexible ceramsite board.
The big I in space 12 between haydite passes through tied silk or Plastic Bandage or other things with the spacing between stranded Double-level Reticulated
Controlled less than the mode of haydite height;Flexible ceramsite board be made it is rear it is rollable into cylinder or fold place
In one-embodiment of above-described embodiment three, the preparation method of nutrition vegetation soil is:Soil is collected, is added in soil
Enter cement, zymophyte, Nutrition Soil and soil binding agent;Mass ratio is 1:0.05: 0.03: 0.03 :0.015, add suitable
Amount water stirs into thick, is fabricated to nutrition vegetation soil.
Example IV
As shown in figure 3, a kind of flexible ceramsite board slope ecological afforestation equipment, including it is embedded in the composition on side slope surface 1
Many anchor poles 2 of square body, are connected between many of the lower end anchor pole 2 of square body by many steel wires 6, are laid on many steel wires 6
There is wire netting block 5, laid with the wire netting block 5 of the lower end of square body on the side slope surface 1 between many anchor poles 2 of square body
There is geotechnological layer of cloth 9, nutritious vegetation soil layer 4 is laid on the geotechnological layer of cloth 9 in square body, flexible ceramsite board 3 is embedded in nutrition
The interior or flexible ceramsite board 3 of vegetation soil layer 4 is layed on nutrition vegetation soil layer 4, and multiple is embedded with nutrition vegetation soil layer 4
Grass-seed.
In flexible ceramsite board 3, at least one of which haydite layer 11 is buried in nutrition vegetation soil layer 4, after having buried haydite layer 11
Nutrition vegetation soil layer 4 on be also equipped with individual layer wire netting 10.
A kind of method for carrying out greening side slope using above-mentioned slope ecological afforestation equipment, the method is comprised the following steps:
Step 1:One piece of battered slope domatic 1 is arbitrarily chosen in slope excavating supporting afforestation project, side slope domatic 1 is entered
Row areal extent is measured, and makes the flexible ceramsite board 3 for being adapted size;
Step 2:Make nutrition vegetation soil;
Step 3:Dilution Nutrition Soil makes nutrition soil paste uniform fold exist into slurries, flexible ceramsite board 3 obtained in soaking step 1
On flexible ceramsite board 3 so that the haydite particles in plate fully adsorb soil paste nutrient solution;
Step 4:Drilled on side slope surface 1 and complete the supporting of anchor pole 2, every four anchor poles 2 constitute a square body, square
Many iron wires 6 are connected between the anchor pole 2 of body bottom two and set up wire netting block 5, the side slope surface between many anchor poles 2 of square body
On 1 geotechnological layer of cloth 9 is formed with one layer of geotextiles of laying on the wire netting block 5 of the lower end of square body;
Step 5:The thick nutrition vegetation soil layers 4 of one layer of 3cm to 10cm are laid on geotechnological layer of cloth 9 in square body, then
Haydite is equably sprayed formation haydite layer in press-in nutrition vegetation soil layer 4, grass-seed is then spread on nutrition vegetation soil layer 4
Surface, then individual layer wire netting 10 is laid suppress and be fixed on nutrition vegetation soil layer 4 on, that is, complete greening side slope.
The preparation method of nutrition vegetation soil is:Soil is collected, to addition cement, zymophyte, Nutrition Soil and soil in soil
Earth binding agent;Mass ratio is 1:0.05: 0.03: 0.03 :0.03, add suitable quantity of water to stir into thick, it is fabricated to battalion
Support vegetation soil.
Before sowing grass-seed, grass-seed need to be shifted to an earlier date and be soaked 5 to 12 hours in water.Managed after sowing or plantation, according to soil
Crop producing power, humidity, weather condition, maintenance of periodically applying fertilizer and sprinkle water;The previous moon after sowing or plantation, water daily 1 to 2 times,
Fertilising by each Monday time, until grass growth it is healthy and strong it is vigorous after, depending on watering, fertilizing can be according to situations such as weather soil;Grass
Seed addition is 150g/ square metres.
In one-example IV of above-described embodiment, haydite using haydites of book structure or lytag haydite diameter 10 millimeters-
20 millimeters, every four anchor poles constitute showing for many steel wires of anchor pole connection of square body lower end two and the wire netting of laying
It is intended to as shown in Figure 6.
Claims (3)
1. a kind of flexible ceramsite board slope ecological afforestation equipment, including it is embedded in side slope surface(1)On many anchor poles(2), often
Four anchor poles(2)One square body of composition, it is characterised in that:The anchor pole of lower end two of square body(2)Between pass through many steel wires
(6)Connection, many steel wires(6)On be equipped with wire netting block(5), many anchor poles of square body(2)Between side slope surface(1)On
With the wire netting block of the lower end of square body(5)On be equipped with geotextiles layer(9), the geotechnological layer of cloth in square body(9)On be laid with
Nutrition vegetation soil layer(4), flexible ceramsite board(3)It is embedded in nutrition vegetation soil layer(4)It is interior, nutrition vegetation soil layer(4)On
Also it is equipped with Turf Culture(8).
2. flexible ceramsite board slope ecological afforestation equipment according to claim 1, it is characterised in that:Flexible ceramsite board(3)
In, two sheets of flexible net(7)It is middle to be uniformly equipped with least one of which haydite layer(11), laid haydite layer(11)Two sheets of flexible net
(7)Between connect to form entirety by band.
3. flexible ceramsite board slope ecological afforestation equipment according to claim 1, it is characterised in that:Flexible ceramsite board(3)
In, nutrition vegetation soil layer(4)Interior embedded at least one of which haydite layer(11), buried haydite layer(11)Nutrition vegetation soil afterwards
Layer(4)On be also equipped with individual layer wire netting(10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621371742.6U CN206289637U (en) | 2016-12-14 | 2016-12-14 | Flexible ceramsite board slope ecological afforestation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621371742.6U CN206289637U (en) | 2016-12-14 | 2016-12-14 | Flexible ceramsite board slope ecological afforestation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206289637U true CN206289637U (en) | 2017-06-30 |
Family
ID=59103973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621371742.6U Active CN206289637U (en) | 2016-12-14 | 2016-12-14 | Flexible ceramsite board slope ecological afforestation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206289637U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638630A (en) * | 2016-12-14 | 2017-05-10 | 三峡大学 | Ecological greening device for side slope with flexible ceramsite plates, and greening method thereof |
CN109258184A (en) * | 2018-08-31 | 2019-01-25 | 三峡大学 | A kind of high steep rock afforestation equipment and method |
-
2016
- 2016-12-14 CN CN201621371742.6U patent/CN206289637U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638630A (en) * | 2016-12-14 | 2017-05-10 | 三峡大学 | Ecological greening device for side slope with flexible ceramsite plates, and greening method thereof |
CN106638630B (en) * | 2016-12-14 | 2019-07-05 | 三峡大学 | Flexible ceramsite board slope ecological afforestation equipment and its greening method |
CN109258184A (en) * | 2018-08-31 | 2019-01-25 | 三峡大学 | A kind of high steep rock afforestation equipment and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638630B (en) | Flexible ceramsite board slope ecological afforestation equipment and its greening method | |
CN106900342B (en) | Integrated semi-lithologic high slope vegetation reconstruction protection method | |
CN101818499B (en) | Revegetation system on steep rocky slopes and implementing method thereof | |
CN102498875B (en) | Method for constructing shrub and grass plant communities on rocky slope and application thereof | |
CN203755318U (en) | Ecological protective side slope | |
CN103290854B (en) | Fast construction method of rock slope protection | |
CN103340114B (en) | The multilayer vegetation bag that a kind of burlap is made | |
CN107893422B (en) | A kind of reinforcement type ecological slope protection structure and its construction method | |
CN107100176B (en) | A kind of expressway slope greening system | |
CN105178339A (en) | Spray-sowing slope protection structure for steep rock side slope | |
CN112064655A (en) | Rapid restoration and greening method for limestone bare high and steep slope | |
CN106688357A (en) | Iron mine waste land vegetation recovery method | |
CN112211203A (en) | High-strength structure organic fiber composite repair method for high and steep slope | |
Broda et al. | Reclamation of abandoned open mines with innovative meandrically arranged geotextiles | |
CN110565586A (en) | Construction process for protecting slope water and soil of silty sandy soil saline-alkali soil | |
CN107604930B (en) | A method of slope retaining and greening are carried out using hole kind shrub | |
CN112075249A (en) | Slope greening planting V-shaped groove and construction method thereof | |
CN206289637U (en) | Flexible ceramsite board slope ecological afforestation equipment | |
CN207331716U (en) | A kind of double nets plant raw rod ecological slope protection structure | |
CN112042307A (en) | Ecological isolation ridge and construction method thereof | |
CN210031859U (en) | Greening system for reinforcing side slope | |
CN103988627A (en) | Vegetative component with slow release fertilizer efficiency and water retention function and preparation method of vegetative component | |
CN111636444A (en) | Water and soil conservation method for side slope in high-altitude area | |
CN103828633B (en) | The multiple method for green of vegetation bag bank protection and multiple green structure | |
CN110144849A (en) | A kind of hung type greening plate and rock side slope ecological slope protection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |