CN106437756A - 一种防止盾构空推管片位移的限位方法 - Google Patents

一种防止盾构空推管片位移的限位方法 Download PDF

Info

Publication number
CN106437756A
CN106437756A CN201610816479.5A CN201610816479A CN106437756A CN 106437756 A CN106437756 A CN 106437756A CN 201610816479 A CN201610816479 A CN 201610816479A CN 106437756 A CN106437756 A CN 106437756A
Authority
CN
China
Prior art keywords
jurisdiction
hole
pushing away
cystidium
method preventing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610816479.5A
Other languages
English (en)
Other versions
CN106437756B (zh
Inventor
严石友
陈强
陈卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Second Bureau Construction Co.,Ltd.
China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201610816479.5A priority Critical patent/CN106437756B/zh
Publication of CN106437756A publication Critical patent/CN106437756A/zh
Application granted granted Critical
Publication of CN106437756B publication Critical patent/CN106437756B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种防止盾构空推管片位移的限位方法,包括以下步骤:a、在管片上开通孔;b、从通孔塞入单一入口通道囊状体至缝隙;c、注浆机对囊状体灌注水泥浆,囊状体膨胀并接触管片与初期支护体系;d、注浆完成后,分离入口通道和注浆机;e、待水泥浆凝固成型。运用该方法,在管片与初期支护体系间的缝隙中塞入囊状体,并对囊状体灌注水泥浆来支撑于管片与初期支护体系间,起到对管片的限位支撑作用;该方法工艺简单,可操作性强,耗费工时少,成本低,实施效果较好,实施完毕即可封闭吊装孔或者注浆孔,省去后续工作,便于推广。

Description

一种防止盾构空推管片位移的限位方法
技术领域
本发明涉及一种隧道施工方法,特别涉及一种防止盾构空推管片位移的限位方法。
背景技术
采用盾构法挖隧道时,一般采用矿山法先开挖成型隧道段,盾构机需沿该暗挖隧道段空载推进,并在推进过程中架设构成隧道环的管片(现有常用管片壁厚为300mm-500mm),该管片与该隧道段中的初期支护体系存在缝隙(根据隧道设计进行控制,如在构造初期支护体系时填堵较大坑包,控制该缝隙最大间距一般为150mm-350mm),需要注浆填充,而在注浆前,拼装成型的管片环不可避免地会出现上浮等位移现象,需要防止管片的位移,以达到隧道设计要求。
现有防止管片相对初期支护体系位移的固定施工方法,大多采用顶杆支撑管片或者在缝隙中向后方吹填豆粒石两种方法;采用顶杆支撑管片法时,顶杆在安装时较方便,但后续拆除麻烦,并且被其支撑的管片局部受力,防止管片位移效果差,顶杆成本高;采用在缝隙中向后方吹填豆粒石的方法时,操作复杂,填充量大,影响整体施工进度。
发明内容
本发明的目的在于克服现有技术中所存在的现有采用顶杆支撑管片法时,顶杆在安装时较方便,但后续拆除麻烦,并且被其支撑的管片局部受力,防止管片位移效果差,顶杆成本高;采用在缝隙中向后方吹填豆粒石的方法时,操作复杂,填充量大,影响整体施工进度的上述不足,提供一种采用囊状体注浆限位支撑管片的防止盾构空推管片位移的限位方法。
为了实现上述发明目的,本发明提供了以下技术方案:
一种防止盾构空推管片位移的限位方法,包括以下步骤:
a、盾构机每环管片脱出盾尾后,在所述管片上开若干个通孔;
b、在所述管片和初期支护体系间的缝隙腔体内设置若干个囊状体,每个所述通孔对应至少一个囊状体,每个所述囊状体设有连通其内腔的入口通道,所述入口通道与对应所述通孔配合;
c、将每个所述入口通道与注浆机连通,所述注浆机对每个所述囊状体灌注水泥浆,每个所述囊状体膨胀,直至每个所述囊状体接触所述管片与初期支护体系,实现对所述管片与初期支护体系分别施加压力;
d、注浆完成后,分离所述入口通道和注浆机,并将每个所述通孔封闭;
e、待所述水泥浆凝固成型,即完成所述管片相对所述初期支护体系之间的固定。
采用本发明所述的一种防止盾构空推管片位移的限位方法,在管片与初期支护体系间的缝隙中塞入囊状体,并对囊状体灌注水泥浆来支撑于管片与初期支护体系间,起到对管片的限位支撑作用;相对现有采用顶杆支撑管片法时,顶杆在安装时较方便,但后续拆除麻烦,并且被其支撑的管片局部受力,防止管片位移效果差,顶杆成本高,采用在缝隙中向后方吹填豆粒石的方法时,操作复杂,填充量大,影响整体施工进度的问题,该方法工艺简单,可操作性强,耗费工时少,成本低,实施效果较好,实施完毕即可封闭吊装孔或者注浆孔,省去后续工作,便于推广。
优选地,所述通孔为所述管片上的吊装孔或者注浆孔。
优选地,所述囊状体的材质采用防水面料。
优选地,所述囊状体为布袋,所述布袋自由膨胀后的直径大于或者等于350mm。
优选地,所述布袋的容积为24L-27L。
优选地,所述水泥浆中水泥与水的质量比为1:1.25至1:1。
优选地,所述水泥浆中可配入水玻璃形成水泥-水玻璃双液浆。
采用水泥浆和水玻璃同时注入形成双液浆,克服单液水泥浆凝固时间长且难以控制、动水条件下结石率低等缺点,提高了水泥注浆的效果。
优选地,所述双液浆中可加入速凝剂,使所述双液浆迅速凝固,提高所述囊状体的限位支撑效果。
优选地,所述双液浆中水泥浆与水玻璃的体积比为9:1至17:1。
优选地,所述双液浆中水泥浆与水玻璃分别通过两个独立注浆通道同时与所述入口通道连通,并向所述囊状体腔体内注浆,所述水泥浆的注浆通道和水玻璃的注浆通道压力值相同。
优选地,所述通孔的开孔位置位于所述管片环的上半环。
综上所述,由于采用了上述技术方案,本发明的有益效果是:
1、运用本发明所述的一种防止盾构空推管片位移的限位方法,在管片与初期支护体系间的缝隙中塞入囊状体,并对囊状体灌注水泥浆来支撑于管片与初期支护体系间,起到对管片的限位支撑作用;相对现有采用顶杆支撑管片法时,顶杆在安装时较方便,但后续拆除麻烦,并且被其支撑的管片局部受力,防止管片位移效果差,顶杆成本高,采用在缝隙中向后方吹填豆粒石的方法时,操作复杂,填充量大,影响整体施工进度的问题,该方法工艺简单,可操作性强,耗费工时少,成本低,实施效果较好,实施完毕即可封闭吊装孔或者注浆孔,省去后续工作,便于推广;
2、运用本发明所述的一种防止盾构空推管片位移的限位方法,水泥浆中可配入水玻璃形成水泥-水玻璃双液浆,可有效克服单液水泥浆凝固时间长且难以控制、动水条件下结石率低等缺点,提高了水泥注浆的效果;
3、运用本发明所述的一种防止盾构空推管片位移的限位方法,双液浆中可加入速凝剂,使双液浆迅速凝固,提高囊状体的限位支撑效果。
附图说明
图1为本发明所述的方法限位支撑管片的局部剖视图;
图2为本发明所述的方法限位支撑管片的整体剖视图。
图中标记:1-管片,11-通孔,2-初期支护体系,3-囊状体,31-入口通道,4-缝隙。
具体实施方式
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。
实施例
如图1-2所示,运用本发明所述的一种防止盾构空推管片位移的限位方法限位支撑管片的剖视图,包括管片1、通孔11、初期支护体系2、囊状体3、入口通道31和缝隙4。
该方法包括一下步骤:
a、盾构机每环管片1脱出盾尾后,在所述管片1上开若干个通孔11;
b、在所述管片1和初期支护体系2间的缝隙4腔体内设置若干个囊状体3,每个所述通孔11对应至少一个囊状体3,每个所述囊状体3设有连通其内腔的入口通道31,所述入口通道31与对应所述通孔11配合;
c、将每个所述入口通道31与注浆机连通,所述注浆机对每个所述囊状体3灌注水泥浆,每个所述囊状体3膨胀,直至每个所述囊状体3接触所述管片1与初期支护体系2,实现对所述管片1与初期支护体系2分别施加压力;
d、注浆完成后,分离所述入口通道31和注浆机,并将每个所述通孔11封闭;
e、待所述水泥浆凝固成型,即完成所述管片1相对所述初期支护体系2之间的固定。
所述管片1壁厚为300mm,所述通孔11为所述管片1上的吊装孔,所述通孔11的开孔位置位于所述管片1环的上半环。
所述囊状体3为材质采用防水面料的布袋,所述布袋袋身尺寸长×宽为500mm×500mm,布袋的入口通道31长×宽×高尺寸为50mm×50mm×350mm,所述布袋自由膨胀后的直径等于350mm,所述布袋的容积为26L。
所述水泥浆中可配入水玻璃形成水泥-水玻璃双液浆,可有效克服单液水泥浆凝固时间长且难以控制、动水条件下结石率低等缺点,提高了水泥注浆的效果,所述水泥浆中水泥与水的质量比为1:1,所述双液浆中水泥浆与水玻璃的体积比为16:1,所述双液浆中水泥浆与水玻璃分别通过两个独立注浆通道同时与所述入口通道31连通,并向所述囊状体3腔体内注浆,所述水泥浆的注浆通道和水玻璃的注浆通道压力值相同。
所述双液浆中可加入速凝剂,使所述双液浆迅速凝固,提高所述囊状体3的限位支撑效果。
运用本发明所述的一种防止盾构空推管片位移的限位方法,在管片1与初期支护体系2间的缝隙4中塞入囊状体3,并对囊状体3灌注水泥浆来支撑于管片1与初期支护体系2间,起到对管片1的限位支撑作用;相对现有采用顶杆支撑管片1法时,顶杆在安装时较方便,但后续拆除麻烦,并且被其支撑的管片1局部受力,防止管片1位移效果差,顶杆成本高,采用在缝隙4中向后方吹填豆粒石的方法时,操作复杂,填充量大,影响整体施工进度的问题,该方法工艺简单,可操作性强,耗费工时少,成本低,实施效果较好,实施完毕即可封闭吊装孔或者注浆孔,省去后续工作,便于推广。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (10)

1.一种防止盾构空推管片位移的限位方法,其特征在于,包括以下步骤:
a、盾构机每环管片(1)脱出盾尾后,在所述管片(1)上开若干个通孔(11);
b、在所述管片(1)和初期支护体系(2)间的缝隙(4)腔体内设置若干个囊状体(3),每个所述通孔(11)对应至少一个囊状体(3),每个所述囊状体(3)设有连通其内腔的入口通道(31),所述入口通道(31)与对应所述通孔(11)配合;
c、将每个所述入口通道(31)与注浆机连通,所述注浆机对每个所述囊状体(3)灌注水泥浆,每个所述囊状体(3)膨胀,直至每个所述囊状体(3)接触所述管片(1)与初期支护体系(2),实现对所述管片(1)与初期支护体系(2)分别施加压力;
d、注浆完成后,分离所述入口通道(31)和注浆机,并将每个所述通孔(11)封闭;
e、待所述水泥浆凝固成型,即完成所述管片(1)相对所述初期支护体系(2)之间的固定。
2.根据权利要求1所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述通孔(11)为所述管片(1)上的吊装孔或者注浆孔。
3.根据权利要求1所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述囊状体(3)的材质采用防水面料。
4.根据权利要求3所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述囊状体(3)为布袋,所述布袋自由膨胀后的直径大于或者等于350mm。
5.根据权利要求4所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述布袋的容积为24L-27L。
6.根据权利要求1所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述水泥浆中水泥与水的质量比为1:1.25至1:1。
7.根据权利要求1所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述水泥浆中可配入水玻璃形成水泥-水玻璃双液浆。
8.根据权利要求7所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述双液浆中水泥浆与水玻璃的体积比为9:1至17:1。
9.根据权利要求7所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述双液浆中水泥浆与水玻璃分别通过两个独立注浆通道同时与所述入口通道(31)连通,并向所述囊状体(3)腔体内注浆,所述水泥浆的注浆通道和水玻璃的注浆通道压力值相同。
10.根据权利要求1-9任一所述的一种防止盾构空推管片位移的限位方法,其特征在于,所述通孔(11)的开孔位置位于所述管片(1)环的上半环。
CN201610816479.5A 2016-09-12 2016-09-12 一种防止盾构空推管片位移的限位方法 Active CN106437756B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610816479.5A CN106437756B (zh) 2016-09-12 2016-09-12 一种防止盾构空推管片位移的限位方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610816479.5A CN106437756B (zh) 2016-09-12 2016-09-12 一种防止盾构空推管片位移的限位方法

Publications (2)

Publication Number Publication Date
CN106437756A true CN106437756A (zh) 2017-02-22
CN106437756B CN106437756B (zh) 2018-12-11

Family

ID=58167537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610816479.5A Active CN106437756B (zh) 2016-09-12 2016-09-12 一种防止盾构空推管片位移的限位方法

Country Status (1)

Country Link
CN (1) CN106437756B (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130979A (zh) * 2017-05-31 2017-09-05 广州市市政工程设计研究总院 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法
CN107503770A (zh) * 2017-10-13 2017-12-22 中铁三局集团有限公司 一种盾构隧道管片二次注浆方法
CN107587882A (zh) * 2017-08-25 2018-01-16 中国水利水电科学研究院 一种双护盾tbm管片模袋灌浆快速支护结构及施工方法
CN109763837A (zh) * 2019-02-28 2019-05-17 中国水利水电第四工程局有限公司 一种tbm隧洞膜袋水泥止浆体结构及施工方法
CN110242331A (zh) * 2019-07-29 2019-09-17 西南交通大学 一种用于盾构隧道中的抗浮装置及采用其辅助管片衬砌环抗浮的方法
CN110593896A (zh) * 2019-09-24 2019-12-20 西南交通大学 一种防止盾构隧道不均匀沉降的结构与实施方法
CN111305872A (zh) * 2020-03-10 2020-06-19 天津大学 Tbm盾构隧道管片及其作业方法
CN111577324A (zh) * 2020-06-11 2020-08-25 长沙中天交通凿岩技术服务有限公司 一种固定盾构隧道管片的管片固定桩装置及使用方法
CN112647972A (zh) * 2021-03-15 2021-04-13 中铁九局集团第四工程有限公司 一种盾构隧道管片定向方法
CN112855231A (zh) * 2021-02-23 2021-05-28 陇东学院 一种煤矿井下巷道支护装置
CN113187492A (zh) * 2021-05-18 2021-07-30 中交二航局成都城市建设工程有限公司 钢套筒内防止负环管片上浮装置
CN113958343A (zh) * 2021-05-10 2022-01-21 南昌轨道交通集团有限公司 一种用于全断面岩层盾构隧道抑制管片上浮的结构及方法
CN115030230A (zh) * 2022-08-10 2022-09-09 衡橡科技股份有限公司 一种先桩式充浆封闭封隔器及封闭方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1603817A (en) * 1978-05-15 1981-12-02 Tunnel Research & Dev Ltd Lining of tunnels and excavations and constructing walls
JPH09328997A (ja) * 1996-06-11 1997-12-22 Fujita Corp トンネル掘削壁面の覆工方法
JP2001065296A (ja) * 1999-08-31 2001-03-13 Tac:Kk 二次覆工中詰め充填材の仕切り構築方法および堰き止め機構
JP2002070499A (ja) * 2000-09-01 2002-03-08 Maeda Kosen Co Ltd トンネルの構造及びトンネル構築方法
JP2011074652A (ja) * 2009-09-30 2011-04-14 Hazama Corp コンクリートの養生方法と養生装置
RU2417321C1 (ru) * 2009-08-24 2011-04-27 Общество с ограниченной ответственностью "ЭКОС-С" Способ закладки пустот в шахтных выработках
CN205297600U (zh) * 2015-12-18 2016-06-08 中国建筑土木建设有限公司 盾构空推管片支顶注浆两用管及其管片支顶、注浆结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1603817A (en) * 1978-05-15 1981-12-02 Tunnel Research & Dev Ltd Lining of tunnels and excavations and constructing walls
JPH09328997A (ja) * 1996-06-11 1997-12-22 Fujita Corp トンネル掘削壁面の覆工方法
JP2001065296A (ja) * 1999-08-31 2001-03-13 Tac:Kk 二次覆工中詰め充填材の仕切り構築方法および堰き止め機構
JP2002070499A (ja) * 2000-09-01 2002-03-08 Maeda Kosen Co Ltd トンネルの構造及びトンネル構築方法
RU2417321C1 (ru) * 2009-08-24 2011-04-27 Общество с ограниченной ответственностью "ЭКОС-С" Способ закладки пустот в шахтных выработках
JP2011074652A (ja) * 2009-09-30 2011-04-14 Hazama Corp コンクリートの養生方法と養生装置
CN205297600U (zh) * 2015-12-18 2016-06-08 中国建筑土木建设有限公司 盾构空推管片支顶注浆两用管及其管片支顶、注浆结构

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130979A (zh) * 2017-05-31 2017-09-05 广州市市政工程设计研究总院 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法
CN107587882A (zh) * 2017-08-25 2018-01-16 中国水利水电科学研究院 一种双护盾tbm管片模袋灌浆快速支护结构及施工方法
CN107587882B (zh) * 2017-08-25 2018-10-30 中国水利水电科学研究院 一种双护盾tbm管片模袋灌浆快速支护结构及施工方法
CN107503770A (zh) * 2017-10-13 2017-12-22 中铁三局集团有限公司 一种盾构隧道管片二次注浆方法
CN109763837A (zh) * 2019-02-28 2019-05-17 中国水利水电第四工程局有限公司 一种tbm隧洞膜袋水泥止浆体结构及施工方法
CN110242331A (zh) * 2019-07-29 2019-09-17 西南交通大学 一种用于盾构隧道中的抗浮装置及采用其辅助管片衬砌环抗浮的方法
CN110242331B (zh) * 2019-07-29 2024-03-26 西南交通大学 一种用于盾构隧道中的抗浮装置及采用其辅助管片衬砌环抗浮的方法
CN110593896A (zh) * 2019-09-24 2019-12-20 西南交通大学 一种防止盾构隧道不均匀沉降的结构与实施方法
CN111305872A (zh) * 2020-03-10 2020-06-19 天津大学 Tbm盾构隧道管片及其作业方法
CN111305872B (zh) * 2020-03-10 2020-12-01 天津大学 Tbm盾构隧道管片及其作业方法
CN111577324A (zh) * 2020-06-11 2020-08-25 长沙中天交通凿岩技术服务有限公司 一种固定盾构隧道管片的管片固定桩装置及使用方法
CN111577324B (zh) * 2020-06-11 2022-03-22 湖南中天凿岩科技有限公司 一种固定盾构隧道管片的管片固定桩装置及使用方法
CN112855231B (zh) * 2021-02-23 2022-03-18 陇东学院 一种煤矿井下巷道支护装置
CN112855231A (zh) * 2021-02-23 2021-05-28 陇东学院 一种煤矿井下巷道支护装置
CN112647972B (zh) * 2021-03-15 2021-12-10 中铁九局集团第四工程有限公司 一种盾构隧道管片定向方法
CN112647972A (zh) * 2021-03-15 2021-04-13 中铁九局集团第四工程有限公司 一种盾构隧道管片定向方法
CN113958343A (zh) * 2021-05-10 2022-01-21 南昌轨道交通集团有限公司 一种用于全断面岩层盾构隧道抑制管片上浮的结构及方法
CN113958343B (zh) * 2021-05-10 2024-04-02 南昌轨道交通集团有限公司 一种用于全断面岩层盾构隧道抑制管片上浮的结构及方法
CN113187492A (zh) * 2021-05-18 2021-07-30 中交二航局成都城市建设工程有限公司 钢套筒内防止负环管片上浮装置
CN115030230A (zh) * 2022-08-10 2022-09-09 衡橡科技股份有限公司 一种先桩式充浆封闭封隔器及封闭方法

Also Published As

Publication number Publication date
CN106437756B (zh) 2018-12-11

Similar Documents

Publication Publication Date Title
CN106437756A (zh) 一种防止盾构空推管片位移的限位方法
CN206016824U (zh) 一种防止盾构空推管片位移的限位装置
CN103924987B (zh) 一种smw工法桩盾构洞门防渗水结构及其施工方法
CN104131556B (zh) 一种软硬夹层交互地基排水预应力管桩的施工方法
CN101230573B (zh) 四重管地层减压式双液水平旋喷的施工设备
CN105386435B (zh) 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺
CN105927231A (zh) 斜井穿越富水致密流砂层循环诱导帷幕注浆方法
CN107747312B (zh) 一种砂砾石地层钻孔灌浆施工的方法
CN111101964B (zh) 盾构法隧道封堵接收洞门的施工方法
CN107939420A (zh) 暗挖隧道装配式二衬背后填充的施工方法
CN108951648A (zh) 明挖隧道砂层涌水涌砂基坑加固方法
CN106703010A (zh) 一种无套壳料层袖阀管注浆快速施工方法
CN207212360U (zh) 一种盾构机盾尾外接式双液同步注浆管路系统
CN104790982A (zh) 一种暗挖隧道超深孔注浆用套壳料
CN101864968A (zh) 一种用于隧道底地层加固的防喷涌装置及其施工方法
CN205895264U (zh) 一种盾构机注浆防堵构件
CN105220700A (zh) 基坑止水帷幕补强方法
CN202247897U (zh) 一种管桩基础的后注浆装置
CN204982923U (zh) 基坑止水帷幕补强结构
CN108978694B (zh) 一种用于隧道内建造止水帷幕的精确制导注浆方法
CN103898913B (zh) 一种内布袋袖阀管注浆施工方法
CN207498973U (zh) 一种水电站帷幕灌浆截污引流管
CN206554078U (zh) 一种注浆和成孔的护筒装置
CN113174927B (zh) 一种用于软土基的微型桩的加固施工方法
CN105221150B (zh) 一种水平旋喷桩加固式石门揭煤的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: China Railway Second Bureau Construction Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190801

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee before: China Railway Second Bureau Construction Co.,Ltd.