CN101864968A - 一种用于隧道底地层加固的防喷涌装置及其施工方法 - Google Patents

一种用于隧道底地层加固的防喷涌装置及其施工方法 Download PDF

Info

Publication number
CN101864968A
CN101864968A CN 201010208940 CN201010208940A CN101864968A CN 101864968 A CN101864968 A CN 101864968A CN 201010208940 CN201010208940 CN 201010208940 CN 201010208940 A CN201010208940 A CN 201010208940A CN 101864968 A CN101864968 A CN 101864968A
Authority
CN
China
Prior art keywords
steel pipe
pipe
stratum
ball valve
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010208940
Other languages
English (en)
Other versions
CN101864968B (zh
Inventor
王小军
赵晖
易觉
赖伟文
李江
董维奇
杜运洪
李波
杨锦钊
陈俊山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hua Qiao construction group Limited by Share Ltd
Original Assignee
CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG filed Critical CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority to CN 201010208940 priority Critical patent/CN101864968B/zh
Publication of CN101864968A publication Critical patent/CN101864968A/zh
Application granted granted Critical
Publication of CN101864968B publication Critical patent/CN101864968B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种用于隧道底地层加固的防喷涌装置及其施工方法,其包括设置在地层管片内壁上的下钢管,下钢管通过球阀与上钢管连接,所述上钢管通过异型接头与小钢管连接固定,所述小钢管内壁设置有若干个密封胶圈,所述密封胶圈内径与钻头上的钻杆外径相同;本产品有效保证了在钻孔过程和下注浆管过程时均是处于密封状态下,防止了地层出现喷涌现象的发生,本产品由于结构简单、操作方便,从而可以广泛应用于隧道底地层的加固上;本发明有效保证了在钻孔过程和下注浆管过程时均是处于密封状态下,防止了地层出现喷涌现象的发生,本产品由于结构简单、操作方便,从而可以广泛应用于隧道底地层的加固上。

Description

一种用于隧道底地层加固的防喷涌装置及其施工方法
技术领域
本发明涉及一种用于隧道成形后对隧道底部地层进行加固处理的防喷涌装置,以及该防喷涌装置的施工方法。
背景技术
在城市轨道交通的盾构工程中,经常会遇到软弱地层或是液化砂层,此类地层会对地铁的运营造成影响,因此隧道底部以下的此类必须进行加固处理,而盾构工程都是位于城市繁华区域,通常都不具备地面加固的条件,因此只能等盾构隧道成形后,再从隧道内进行注浆加固,但若是直接利用管片吊装孔进行压力注浆加固,仅能对管片周边很小范围注浆,其注浆范围不受控制,并容易导致管片过大上浮,影响成型隧道的质量,并且不能真正取到地层加固的效果。若是采用从管片上钻孔埋管进行注浆加固,由于隧道埋深较深,隧道底部水头承力较大,在钻穿管片、下注浆管过程均容易出现喷水、喷砂的情况,从而有可能导致隧道的变形,其后果非常严重。
发明内容
为了克服现有技术的不足,本发明提供一种结构简单、操作方便的用于隧道底地层加固的防喷涌装置及其施工方法。
本发明解决其技术问题所采用的技术方案是:
一种用于隧道底地层加固的防喷涌装置,其包括设置在地层管片内壁上的下钢管,下钢管通过球阀与上钢管连接,所述上钢管通过异型接头与小钢管连接固定,所述小钢管内壁设置有若干个密封胶圈,所述密封胶圈内径与钻头上的钻杆外径相同,所述下钢管侧壁预留有套壳料注入管。
一种应用上述防喷涌装置的施工方法,其施工步骤如下:
1):首先在地层管片内壁上连接下钢管,接着在下钢管上依此连接球阀和上钢管;
2):把钻头上的钻杆套装在小钢管内,并将异型接头连接在上钢管上;
3):打开球阀,钻头通过球阀进行钻孔;
4):当钻头钻至设计底标高后提起钻头,待钻头过球阀后关闭球阀;
5):松开异形接头,提出钻头并从钻杆上取出小钢管;
6):将异型接头连接在上钢管上,插入注浆管,待注浆管通过小钢管内壁的密封胶圈后再打开球阀让注浆管下到设计底标高;
7):在注浆管内插入注浆芯管至设计底标高;
8):通过下钢管侧壁的注入管注入套壳料;
9):通过注浆芯管进行注浆,同时缓慢提升注浆芯管,从而实现分层注浆。
本发明的有益效果是:本产品有效保证了在钻孔过程和下注浆管过程时均是处于密封状态下,防止了地层出现喷涌现象的发生,本产品由于结构简单、操作方便,从而可以广泛应用于隧道底地层的加固上。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的结构示意图;
图2是本发明的使用状态结构示意图。
具体实施方式
参照图1、图2,一种用于隧道底地层加固的防喷涌装置,其包括设置在地层管片7内壁上的下钢管1,所述下钢管1侧壁预留有套壳料注入管12,所述下钢管1与地层管片7之间采用紧固膨胀螺栓9进行固定连接,为了保证连接的密封性,其之间还设置有密封橡胶片11。下钢管1通过球阀2与上钢管3连接,所述上钢管3通过异型接头4与小钢管5连接固定,本产品将异型接头4与小钢管5为一体焊接成型,当然也可以采用分体密封固定连接的方式进行制作;所述小钢管5内壁设置有若干个密封胶圈6,所述密封胶圈6内径与钻头82上的钻杆81外径相同,为了保证密封效果,密封胶圈6为3个或以上,其安装方式是首先在小钢管5内壁设置有凹槽,再将密封胶圈6固定在凹槽内即可。
一种应用上述防喷涌装置的施工方法,其施工步骤如下:
1):首先在地层管片7内壁上连接下钢管1,接着在下钢管1上依此连接球阀2和上钢管3;
2):把钻头82上的钻杆81套装在小钢管5内,并将异型接头4连接在上钢管3上;
3):打开球阀2,钻头82通过球阀2进行钻孔;
4):当钻头82钻至设计底标高后提起钻头82,待钻头82过球阀2后关闭球阀2;
5):松开异形接头4,提出钻头82并从钻杆81上取出小钢管5;
6):将异型接头4连接在上钢管3上,插入注浆管,待注浆管通过小钢管5内壁的密封胶圈6后再打开球阀4让注浆管下到设计底标高;所述注浆管外径为52mm的钢管,钢管末端为锥形,钢管上每隔100mm车一道50mm长、厚2mm的内槽,内槽部位梅花型开直径2mm~4mm的小孔,然后在内槽位置套上一个橡胶套。由于注浆管与钻杆81外径相同,从而有效保证了密封效果。
7):在注浆管内插入注浆芯管至设计底标高;所述注浆芯管由开孔钢花管和两个橡胶套栓塞组成,注浆芯管末端用闷盖封堵。
8):通过下钢管1侧壁的注入管12注入套壳料。所述套壳料由膨润土和水泥现场搅拌而成。
9):通过注浆芯管进行注浆,同时缓慢提升注浆芯管,通过压力击穿注浆管上的橡胶套,从而实现分层注浆。
本产品有效保证了在钻孔过程和下注浆管过程时均是处于密封状态下,防止了地层出现喷涌现象的发生,本产品由于结构简单、操作方便,从而可以广泛应用于隧道底地层的加固上。

Claims (7)

1.一种用于隧道底地层加固的防喷涌装置,其特征在于:包括设置在地层管片(7)内壁上的下钢管(1),下钢管(1)通过球阀(2)与上钢管(3)连接,所述上钢管(3)通过异型接头(4)与小钢管(5)连接固定,所述小钢管(5)内壁设置有若干个密封胶圈(6),所述密封胶圈(6)内径与钻头(82)上的钻杆(81)注浆管外径相同,所述下钢管(1)侧壁预留有套壳料注入管(12)。
2.根据权利要求1所述的一种用于隧道底地层加固的防喷涌装置,其特征在于:所述下钢管(1)与地层管片(7)内壁之间设置有密封橡胶片(11)。
3.根据权利要求1所述的一种用于隧道底地层加固的防喷涌装置,其特征在于:所述异型接头(4)与小钢管(5)为一体焊接成型。
4.根据权利要求1所述的一种用于隧道底地层加固的防喷涌装置,其特征在于:所述下钢管(1)通过紧固膨胀螺栓(9)固定安装在地层管片(7)上。
5.根据权利要求1所述的一种用于隧道底地层加固的防喷涌装置,其特征在于:所述小钢管(5)内壁设置安装密封胶圈(6)的凹槽。
6.一种应用上述防喷涌装置的施工方法,其特征在于:施工步骤如下:
1):首先在地层管片(7)内壁上连接下钢管(1),接着在下钢管(1)上依此连接球阀(2)和上钢管(3);
2):把钻头(82)上的钻杆(81)套装在小钢管(5)内,并将异型接头(4)连接在上钢管(3)上;
3):打开球阀(2),钻头(82)通过球阀(2)进行钻孔;
4):当钻头(82)钻至设计底标高后提起钻头(82),待钻头(82)过球阀(2)后关闭球阀(2);
5):松开异形接头(4),提出钻头(82)并从钻杆(81)上取出小钢管(5);
6):将异型接头(4)连接在上钢管(3)上,插入注浆管,待注浆管通过小钢管(5)内壁的密封胶圈(6)后再打开球阀(4)让注浆管下到设计底标高;
7):在注浆管内插入注浆芯管至设计底标高;
8):通过下钢管(1)侧壁的注入管(12)注入套壳料;
9):通过注浆芯管进行注浆,同时缓慢提升注浆芯管,从而实现分层注浆。
7.根据权利要求6所述的一种防喷涌装置的施工方法,其特征在于:步骤8)所述的套壳料由膨润土和水泥搅拌而成。
CN 201010208940 2010-06-23 2010-06-23 一种用于隧道底地层加固的防喷涌装置及其施工方法 Active CN101864968B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010208940 CN101864968B (zh) 2010-06-23 2010-06-23 一种用于隧道底地层加固的防喷涌装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010208940 CN101864968B (zh) 2010-06-23 2010-06-23 一种用于隧道底地层加固的防喷涌装置及其施工方法

Publications (2)

Publication Number Publication Date
CN101864968A true CN101864968A (zh) 2010-10-20
CN101864968B CN101864968B (zh) 2013-04-17

Family

ID=42956874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010208940 Active CN101864968B (zh) 2010-06-23 2010-06-23 一种用于隧道底地层加固的防喷涌装置及其施工方法

Country Status (1)

Country Link
CN (1) CN101864968B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500784A (zh) * 2011-09-28 2012-06-20 广东省基础工程公司 一种泥水平衡式顶管机分隔板上钻设注浆孔的方法
CN104533468A (zh) * 2014-12-19 2015-04-22 上海地铁维护保障有限公司工务分公司 一种地铁隧道钻孔壁后注浆方法
CN104929686A (zh) * 2015-07-01 2015-09-23 中南大学 一种控制盾构隧道上浮的排水减压方法及其管片
CN111396082A (zh) * 2020-03-06 2020-07-10 中国一冶集团有限公司 一种建设期地铁管片临时加固装置及加固方法
CN113547647A (zh) * 2021-07-06 2021-10-26 上海市基础工程集团有限公司 高水压大厚度钢筋混凝土快速开孔装置及方法
CN113756840A (zh) * 2021-09-13 2021-12-07 中国建设基础设施有限公司 一种在富水砂层中施打袖阀钢管的防喷涌装置及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1485505A (zh) * 2003-08-29 2004-03-31 北京市城市建设工程研究院 双栓塞注浆花管及施工工艺
CN101255799A (zh) * 2008-04-18 2008-09-03 上海市第二市政工程有限公司 隧道内微扰动注浆工艺
JP2009138489A (ja) * 2007-12-10 2009-06-25 Kajima Corp トンネル外周地山の調査方法、調査装置および調査用棒材
CN201310362Y (zh) * 2008-11-28 2009-09-16 中铁隧道集团有限公司 高压涌水钻孔内孔口管的安装装置
CN201401178Y (zh) * 2009-03-31 2010-02-10 中煤第七十一工程处 矿山及地下堵水注浆装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1485505A (zh) * 2003-08-29 2004-03-31 北京市城市建设工程研究院 双栓塞注浆花管及施工工艺
JP2009138489A (ja) * 2007-12-10 2009-06-25 Kajima Corp トンネル外周地山の調査方法、調査装置および調査用棒材
CN101255799A (zh) * 2008-04-18 2008-09-03 上海市第二市政工程有限公司 隧道内微扰动注浆工艺
CN201310362Y (zh) * 2008-11-28 2009-09-16 中铁隧道集团有限公司 高压涌水钻孔内孔口管的安装装置
CN201401178Y (zh) * 2009-03-31 2010-02-10 中煤第七十一工程处 矿山及地下堵水注浆装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500784A (zh) * 2011-09-28 2012-06-20 广东省基础工程公司 一种泥水平衡式顶管机分隔板上钻设注浆孔的方法
CN104533468A (zh) * 2014-12-19 2015-04-22 上海地铁维护保障有限公司工务分公司 一种地铁隧道钻孔壁后注浆方法
CN104929686A (zh) * 2015-07-01 2015-09-23 中南大学 一种控制盾构隧道上浮的排水减压方法及其管片
CN111396082A (zh) * 2020-03-06 2020-07-10 中国一冶集团有限公司 一种建设期地铁管片临时加固装置及加固方法
CN113547647A (zh) * 2021-07-06 2021-10-26 上海市基础工程集团有限公司 高水压大厚度钢筋混凝土快速开孔装置及方法
CN113756840A (zh) * 2021-09-13 2021-12-07 中国建设基础设施有限公司 一种在富水砂层中施打袖阀钢管的防喷涌装置及施工方法
CN113756840B (zh) * 2021-09-13 2024-04-02 中国建设基础设施有限公司 一种在富水砂层中施打袖阀钢管的防喷涌装置及施工方法

Also Published As

Publication number Publication date
CN101864968B (zh) 2013-04-17

Similar Documents

Publication Publication Date Title
CN101864968B (zh) 一种用于隧道底地层加固的防喷涌装置及其施工方法
CN100494581C (zh) 混凝土封底和带桩翼的筒桩成孔器及施工工艺
CN105569560B (zh) 全套管式长螺旋钻孔桩机及利用该桩机施工的方法
CN101251018B (zh) 孔口止浆管外混合双管分段后退式注浆方法
CN201334669Y (zh) 一种尾矿库初期坝顶防渗土工膜的锚固结构
CN102268973B (zh) 封孔装置
CN201129183Y (zh) 小导管分段反复注浆装置
CN109881692B (zh) 预先装配式降水井
CN105604593A (zh) 一种三阶段锚固组合式中空注浆锚杆
CN101251019A (zh) 孔口止浆管内混合双管分段后退式注浆方法
CN107165661A (zh) 一种高地应力软弱围岩大变形隧道超长扩大头锚索施工方法
CN105240024A (zh) 一种平行盾构法扩建施工地铁车站的方法
CN103089276A (zh) 深浅孔与高低压耦合注浆工艺
CN105649655B (zh) 一种用于从盾构机内往周边地层注浆加固装置
CN103031847B (zh) 变径搭接组合式孔口管灌浆法
CN109488370A (zh) 一种井下灰岩探放水钻孔施工方法
CN201753606U (zh) 深浅孔两用注浆管
CN205918368U (zh) 钻注一体后退式注浆钻杆
CN201448488U (zh) 止回阀及设置有止回阀的钢管
CN205445634U (zh) 一种用于从盾构机内往周边地层注浆加固装置
CN208763204U (zh) 一种低层装配式建筑预制墙板竖向连接构造
CN101545259A (zh) 钻孔桩非水下灌注混凝土的装置和方法
CN104564105B (zh) 一种煤层底板注浆加固二级套管的装置和方法
CN203782681U (zh) 冻结管注浆止回装置
CN101644150B (zh) 后装式孔口管及其安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510220 Guangdong city of Guangzhou province Haizhuqu District Yue Xuan Street No. 81 (G-3) 1501-1512, 1604-1607 room

Patentee after: Guangdong Hua Qiao construction group Limited by Share Ltd

Address before: 510635 No. 559 Tianhe North Road, Guangdong, Guangzhou 1802-1805

Patentee before: China Tunnel Construction Co., Ltd. Guangdong