一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 Download PDFInfo
- Publication number
- CN107130979A CN107130979A CN201710405134.5A CN201710405134A CN107130979A CN 107130979 A CN107130979 A CN 107130979A CN 201710405134 A CN201710405134 A CN 201710405134A CN 107130979 A CN107130979 A CN 107130979A
- Authority
- CN
- China
- Prior art keywords
- duct piece
- tunneling
- jurisdiction
- shield
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 46
- 238000005065 mining Methods 0.000 title claims abstract description 44
- 230000005641 tunneling Effects 0.000 title claims abstract description 41
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 238000007569 slipcasting Methods 0.000 claims abstract description 44
- 239000012530 fluid Substances 0.000 claims abstract description 26
- 239000004744 fabric Substances 0.000 claims abstract description 18
- 239000011083 cement mortar Substances 0.000 claims abstract description 16
- 235000019353 potassium silicate Nutrition 0.000 claims abstract description 14
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims abstract description 14
- 239000002002 slurry Substances 0.000 claims description 24
- 229920002472 Starch Polymers 0.000 claims 1
- 239000011440 grout Substances 0.000 claims 1
- 239000007788 liquid Substances 0.000 claims 1
- 235000019698 starch Nutrition 0.000 claims 1
- 239000008107 starch Substances 0.000 claims 1
- 238000005336 cracking Methods 0.000 abstract description 5
- 238000006073 displacement reaction Methods 0.000 abstract description 5
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000007667 floating Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000007712 rapid solidification Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
一种盾构空推过矿山法隧道的管片抗浮结构及施工方法,此管片抗浮结构包括设置在矿山法隧道初衬与盾构管片之间的注浆袋体,注浆袋体的敞口端从盾构管片的注浆孔伸出,盾构管片的注浆孔处可拧入带螺纹的双液注浆管构件,通过双液注浆管构件向注浆袋体同时注入水泥浆和水玻璃,布袋可约束抗浮结构体形成的范围,可有效的形成块状的具有一定强度的填充处于矿山法隧道初衬与盾构管片之间空隙的抗浮结构体,其以块状面接触方式填充处于矿山法隧道初衬与盾构管片之间的空隙,能有效地防止局部应力集中引起管片的开裂和变形;而且,盾构管片上部的三个间隔布置的抗浮结构体范围较大,对隧道具有较好的包裹和紧箍,完全限制了盾构管片的位移和变形。
Description
技术领域
本发明涉及盾构隧道施工技术领域,特别涉及一种盾构空推过矿山法隧道的管片抗浮结构及施工方法。
背景技术
为确保盾构顺利推进,对隧道洞身需穿越极硬岩且长度较长时一般采用矿山法先行开挖,施做好矿山法隧道初衬结构后,盾构空推拼装管片通过,俗称盾构空推。盾构空推过矿山法隧道施工完成后,通常盾构管片与矿山法隧道初衬之间存在200mm左右的空隙,当这个空隙逐渐充水或管片后进行注浆时,管片上部没有约束,因此管片会上浮,由于拼装的盾构管片是通过不同的衬砌块采用螺栓连接构成,当浮力较大,管片上浮时,管片与管片之间的接头及螺栓孔处应力较大,往往导致管片破损、崩裂、错台等,使得管片结构损坏,同时过大的变形将导致隧道设计中线发生偏差,给后续的轨道铺设及运营等造成不小的困难,甚至导致隧道部分区段结构超限,造成较大损失。
现有技术为解决管片上浮而常利用盾构管片的注浆孔设计一种防管片上浮螺栓,如附图1和2所示,该螺栓1前端具有一个钢柱2,长度约为200mm,当空推管片成型后,将螺栓1拧入管片3的注浆孔4,直到螺栓1的钢柱2前端顶到矿山法隧道初衬5,从而达到防止管片上浮及限制管片位移的作用。
然而,通过该螺栓来防止管片上浮存在以下缺陷:
1、由于钢柱是以点接触方式抵紧矿山法隧道初衬面,随着围岩应力的逐步释放,在管片的浮力及围岩应力的双重叠加之下,注浆孔处的集中力往往较大,常常使得盾构管片螺栓孔周围混凝土出现环形裂缝;同时初衬喷混的强度相对较低,初衬厚度较薄且脆,在过大的钢柱集中力下容易对初衬结构造成破坏,使得以钢柱点支撑的管片结构容易失稳,管片上浮位移加大,管片结构损坏;
2、通过在钟表方位上10点钟方向、12点钟方向、2点钟方向布置该螺栓来达到约束管片位置的作用有限,约束点较少,由于钢柱与矿山法隧道初衬面之间是点接触,各接触点的变形不同步、不协调,并不能较好的固定管片的位置,管片与管片之间的错台及螺栓孔处的混凝土崩裂现象依然存在;
3、由于矿山法隧道初衬施工时的误差,管片与矿山法隧道初衬之间的距离不可能是刚好200mm,因此,存在钢柱前端与矿山法隧道初衬面之间没有抵紧接触的可能,实际施工时常常需要通过测量管片与矿山法隧道初衬面的实际距离来调整钢柱的长度,给施工造成较大不便,因此螺栓不能批量生产,影响施工进度。
发明内容
本发明所要解决的技术问题是提供一种安全可靠、施工方便的盾构空推过矿山法隧道的管片抗浮结构及施工方法。
为解决上述技术问题所采用的技术方案:一种盾构空推过矿山法隧道的管片抗浮结构施工方法,包括以下步骤:
S1:拧出盾构管片上注浆孔处的管片螺旋盖,经盾构管片的注浆孔向盾构管片与矿山法隧道初衬之间的空隙塞入注浆袋体,注浆袋体的敞口端伸出盾构管片上的注浆孔;
S2:在注浆孔处拧入外壁具有螺纹的双液注浆管构件;
S3;经过双液注浆管构件向注浆袋体内同时注入水泥浆和水玻璃浆;
S4:待注浆袋体内的浆液充满后,逐步减少注浆压力,直至注浆袋体内的浆液快速初凝形成抗浮结构体;
S5:拧出注浆孔处的双液注浆管构件并冲洗干净备用,盾构管片上注浆孔处盖上止回阀。
进一步地,步骤S3中,水泥浆的水灰比为0.6~1.0,水泥浆与水玻璃浆的体积比为1:0.6~1:1,注浆压力采用0.3~1.0Bar,也可根据现场实际进行实验确定。
为解决上述技术问题所采用的技术方案:一种盾构空推过矿山法隧道的管片抗浮结构,所述管片抗浮结构处于盾构管片的上半圈部分,包括设置在矿山法隧道初衬与盾构管片之间的注浆袋体,所述注浆袋体的敞口端伸出盾构管片上的注浆孔,所述盾构管片的注浆孔处可拧入带螺纹的双液注浆管构件,通过所述双液注浆管构件向注浆袋体同时注入水泥浆和水玻璃浆,直至注浆袋体内的浆液快速初凝形成抗浮结构体,所述抗浮结构体以块状面接触方式填充处于矿山法隧道初衬与盾构管片之间的空隙。
进一步地,所述双液注浆管构件外壁具有一段外螺纹,所述注浆孔内壁具有内螺纹,通过螺纹配合连接实现双液注浆管构件拧入注浆孔内。
进一步地,所述双液注浆管构件具有伸入注浆袋体内并列的第一注浆管和第二注浆管。
进一步地,所述盾构管片与矿山法隧道初衬之间位于钟表方位上的10点钟方向、12点钟方向、2点钟方向分别形成三个抗浮结构体。当然,根据实际施工情况抗浮结构体的方位和数量会进行相应调整。
进一步地,所述注浆袋体为布袋,所述布袋的面料支数为40-80支,布袋可约束抗浮结构体形成的范围,且布袋具有一定的透气性和致密性,可使得注浆时浆液能饱满填充袋体又不会造成大的浆液流失,可有效的形成块状的具有一定强度的填充处于隧道初衬与盾构管片之间空隙的注浆加固体,布袋的半径可为0.2~0.5m,深度可为1.0~1.5m,也可根据实际工程需要确定布袋尺寸,必要的时候可采用两个或多个袋子叠加使用。
有益效果:此管片抗浮结构及施工方法中,通过注浆袋体和双液注浆管构件在矿山法隧道初衬与盾构管片之间快速形成块状的抗浮结构体,其以块状面接触方式填充处于矿山法隧道初衬与盾构管片之间的空隙,能有效地防止局部应力集中引起管片的开裂和变形;而且,盾构管片上部的三个间隔布置的抗浮结构体形成了较大范围的块状填充,具有较好的包裹和紧箍,完全限制了盾构管片的位移和变形。本发明盾构空推过矿山法隧道的管片抗浮结构及施工方法可有效地解决盾构空推过矿山法隧道的管片上浮造成管片开裂、破损、错台及隧道中心线偏移过大等问题,同时解决了采用设置钢柱抗浮带来的管片应力集中引起的相关问题,保证隧道的施工品质,减少管片的开裂渗漏和破损变形,减少了后期运营维护的费用。
附图说明
下面结合附图和实施例对本发明做进一步的说明;
图1为现有技术防止管片上浮结构示意图;
图2为现有技术中防止管片上浮螺栓的结构示意图;
图3为本发明实施例管片抗浮结构示意图;
图4为本发明实施例中双液注浆管的结构示意图。
具体实施方式
参照图3和图4,本发明一种盾构空推过矿山法隧道的管片抗浮结构施工方法,包括以下步骤:
S1:拧出盾构管片10上注浆孔11处的管片螺旋盖,经盾构管片10的注浆孔11向盾构管片10与矿山法隧道初衬20之间的空隙40塞入注浆袋体42,注浆袋体42的敞口端伸出盾构管片10上的注浆孔11;
S2:在注浆孔11处拧入外壁具有螺纹的双液注浆管构件30,其中,双液注浆管构件30具有伸入注浆袋体内并列的第一注浆管31和第二注浆管32;
S3:经过双液注浆管构件30向注浆袋体42内同时注入水泥浆和水玻璃浆,水泥浆的水灰比通常采用0.6~1.0,水泥浆与水玻璃的体积比可采用1:0.6~1:1,注浆压力采用0.3~1.0Bar,也可根据现场实际进行实验确定;
S4:注浆之前,需先估算单个注浆袋体42的注浆体积,实际注浆体积可稍大于理论计算体积,待注浆袋体42中的浆液充满后,逐步减少注浆压力,直至浆液快速初凝形成抗浮结构体41,通常是3~6分钟;
S5:拧出双液注浆管构件30,冲洗干净可继续使用,注浆孔11处盖上止回阀。
其中,由于注浆袋体42内同时注入水泥浆和水玻璃浆,并且水玻璃浆具有速凝固作用,注浆袋体42内的浆液能快速凝固定型,并达到一定强度,注浆袋体42为浆液提供了一个快速凝固区域,防止浆液流窜。注浆袋体42采用一种轻薄布袋,布袋可约束抗浮结构体形成的范围,且布袋具有一定的透气性和致密性,可使得注浆时浆液能饱满填充袋体又不会造成大的浆液流失,可有效的形成块状的具有一定强度的填充处于矿山法隧道初衬20与盾构管片10之间空隙40的注浆加固体,布袋的面料支数可为40~80支,布袋半径可为0.2~0.5m,深度可为1.0~1.5m,也可根据实际工程需要确定布袋尺寸,必要的时候可采用两个或多个袋子叠加使用。
本发明一种盾构空推过矿山法隧道的管片抗浮结构,包括设置在矿山法隧道初衬20与盾构管片10之间的抗浮结构体41,其数量为三个,分别处于钟表方位上的10点钟方向、12点钟方向、2点钟方向,当然,根据实际施工情况抗浮结构体的方位和数量会进行相应调整。注浆袋体42的敞口端从盾构管片10的注浆孔11伸出,盾构管片10的注浆孔11处可拧入带螺纹的双液注浆管构件30,具体地,双液注浆管构件30外壁具有一段外螺纹,盾构管片10上的注浆孔11内壁具有内螺纹,通过螺纹配合连接可实现带螺纹的双液注浆管构件30拧入注浆孔11内。其中,带螺纹的双液注浆管构件30具有伸入注浆袋体内并列的第一注浆管31和第二注浆管32,分别与水泥浆软管和水玻璃浆软管相连接,通过第一注浆管31和第二注浆管32分别将水泥浆和水玻璃浆注入注浆袋体,水泥浆和水玻璃在注浆袋体内快速凝固定型,形成块状的抗浮结构体41,其以块状面接触方式填充矿山法隧道初衬与盾构管片之间的空隙,能有效地防止局部应力集中引起管片的开裂和变形;而且,盾构管片上部的三个间隔布置的抗浮结构体41范围较大,对隧道具有较好的包裹和紧箍,完全限制了盾构管片的位移和变形。
上面结合附图对本发明的实施方式作了详细说明,但是本发明不限于上述实施方式,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。
Claims (7)
1.一种盾构空推过矿山法隧道的管片抗浮结构施工方法,其特征在于,包括以下步骤:
S1:拧出盾构管片上注浆孔处的管片螺旋盖,经盾构管片的注浆孔向盾构管片与矿山法隧道初衬之间的空隙塞入注浆袋体,注浆袋体的敞口端伸出盾构管片上的注浆孔;
S2:在注浆孔处拧入外壁具有螺纹的双液注浆管构件;
S3;经过双液注浆管构件向注浆袋体内同时注入水泥浆和水玻璃浆;
S4:待注浆袋体内的浆液充满后,逐步减少注浆压力,直至注浆袋体内的浆液快速初凝形成抗浮结构体;
S5:拧出注浆孔处的双液注浆管构件并冲洗干净备用,盾构管片上注浆孔处盖上止回阀。
2.根据权利要求1所述的盾构空推过矿山法隧道的管片抗浮结构施工方法,其特征在于:步骤S3中,水泥浆的水灰比为0.6~1.0,水泥浆与水玻璃浆的体积比为1:0.6~1:1,注浆压力采用0.3~1.0Bar。
3.一种盾构空推过矿山法隧道的管片抗浮结构,所述管片抗浮结构处于盾构管片的上半圈部分,其特征在于:包括设置在矿山法隧道初衬与盾构管片之间的注浆袋体,所述注浆袋体的敞口端伸出盾构管片上的注浆孔,所述盾构管片的注浆孔处可拧入带螺纹的双液注浆管构件,通过所述双液注浆管构件向注浆袋体同时注入水泥浆和水玻璃浆,直至注浆袋体内的浆液快速初凝形成抗浮结构体,所述抗浮结构体以块状面接触方式填充处于矿山法隧道初衬与盾构管片之间的空隙。
4.根据权利要求3所述的盾构空推过矿山法隧道的管片抗浮结构,其特征在于:所述双液注浆管构件外壁具有一段外螺纹,所述注浆孔内壁具有内螺纹,通过螺纹配合连接实现双液注浆管构件拧入注浆孔内。
5.根据权利要求3或4所述的盾构空推过矿山法隧道的管片抗浮结构,其特征在于:所述双液注浆管构件具有伸入注浆袋体内并列的第一注浆管和第二注浆管。
6.根据权利要求3或4所述的盾构空推过矿山法隧道的管片抗浮结构,其特征在于:所述盾构管片与矿山法隧道初衬之间位于钟表方位上的10点钟方向、12点钟方向、2点钟方向分别形成三个抗浮结构体。
7.根据权利要求3或4所述的盾构空推过矿山法隧道的管片抗浮结构,其特征在于:所述注浆袋体为布袋,所述布袋的面料支数为40-80支。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710405134.5A CN107130979A (zh) | 2017-05-31 | 2017-05-31 | 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710405134.5A CN107130979A (zh) | 2017-05-31 | 2017-05-31 | 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107130979A true CN107130979A (zh) | 2017-09-05 |
Family
ID=59734358
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710405134.5A Pending CN107130979A (zh) | 2017-05-31 | 2017-05-31 | 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107130979A (zh) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107587882A (zh) * | 2017-08-25 | 2018-01-16 | 中国水利水电科学研究院 | 一种双护盾tbm管片模袋灌浆快速支护结构及施工方法 |
CN108590702A (zh) * | 2018-04-19 | 2018-09-28 | 陈胜玉 | 具有背贴式散体填充袋的隧道拱架及其安装方法 |
CN109653767A (zh) * | 2018-11-12 | 2019-04-19 | 西南交通大学 | 用于盾构隧道的抗浮型管片及其加工方法和使用方法 |
CN109723465A (zh) * | 2019-03-19 | 2019-05-07 | 成都理工大学 | Tbm隧道掘进机管片扶正方法 |
CN109763837A (zh) * | 2019-02-28 | 2019-05-17 | 中国水利水电第四工程局有限公司 | 一种tbm隧洞膜袋水泥止浆体结构及施工方法 |
CN109973116A (zh) * | 2019-03-11 | 2019-07-05 | 中铁十二局集团第二工程有限公司 | 一种盾构隧道防上浮的管片结构及其施工方法 |
CN110005441A (zh) * | 2019-04-19 | 2019-07-12 | 中铁第一勘察设计院集团有限公司 | 基于外嵌式通道与伸张性囊袋的管片衬砌注浆系统及方法 |
CN110242331A (zh) * | 2019-07-29 | 2019-09-17 | 西南交通大学 | 一种用于盾构隧道中的抗浮装置及采用其辅助管片衬砌环抗浮的方法 |
CN110593896A (zh) * | 2019-09-24 | 2019-12-20 | 西南交通大学 | 一种防止盾构隧道不均匀沉降的结构与实施方法 |
CN110645016A (zh) * | 2019-06-27 | 2020-01-03 | 国网浙江省电力有限公司经济技术研究院 | 基于可调节注浆容器的顶管隧道位置精确调整装置和方法 |
CN110761797A (zh) * | 2018-07-26 | 2020-02-07 | 中交第三航务工程局有限公司 | 一种盾构空推过矿山法隧道的施工方法 |
CN111255479A (zh) * | 2020-03-21 | 2020-06-09 | 中建铁路投资建设集团有限公司 | 一种用于岩层防盾构管片上浮的方法 |
CN111425208A (zh) * | 2020-03-30 | 2020-07-17 | 济南市市政工程设计研究院(集团)有限责任公司 | 一种基于盾构管片的抗悬浮装置、系统及方法 |
CN111577324A (zh) * | 2020-06-11 | 2020-08-25 | 长沙中天交通凿岩技术服务有限公司 | 一种固定盾构隧道管片的管片固定桩装置及使用方法 |
CN111963201A (zh) * | 2020-08-27 | 2020-11-20 | 中铁二十局集团有限公司 | 隧道管片结构及施工方法 |
CN112145182A (zh) * | 2020-08-25 | 2020-12-29 | 广州市市政工程设计研究总院有限公司 | 一种超小净距盾构隧道并下穿既有线的方法 |
CN112647972A (zh) * | 2021-03-15 | 2021-04-13 | 中铁九局集团第四工程有限公司 | 一种盾构隧道管片定向方法 |
CN112943272A (zh) * | 2021-03-24 | 2021-06-11 | 上海市基础工程集团有限公司 | 小直径盾构隧道f块限位器 |
CN113153326A (zh) * | 2021-04-21 | 2021-07-23 | 广州市力劲机电有限公司 | 一种盾构同步注浆速凝装置及使用方法 |
CN113187493A (zh) * | 2021-05-18 | 2021-07-30 | 中交二航局成都城市建设工程有限公司 | 盾构机钢套筒内防止负环管片上浮的控制方法 |
CN113565526A (zh) * | 2021-07-26 | 2021-10-29 | 深圳市全域英赛工程顾问有限公司 | 一种地下结构保护的排桩框架皮囊加压装置 |
CN114382492A (zh) * | 2021-12-27 | 2022-04-22 | 河海大学 | 一种脱出盾尾的管片位置纠正装置及其纠正方法 |
CN114776323A (zh) * | 2022-04-01 | 2022-07-22 | 成都未来智隧科技有限公司 | 一种控制盾构隧道地层和应力损失双补偿的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010065499A (ja) * | 2008-09-12 | 2010-03-25 | Jfe Metal Products & Engineering Inc | シールドトンネル用袋体付きセグメント |
CN102352757A (zh) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN106437756A (zh) * | 2016-09-12 | 2017-02-22 | 中铁二局集团有限公司 | 一种防止盾构空推管片位移的限位方法 |
CN206016824U (zh) * | 2016-09-12 | 2017-03-15 | 中铁二局集团有限公司 | 一种防止盾构空推管片位移的限位装置 |
CN206888996U (zh) * | 2017-05-31 | 2018-01-16 | 广州市市政工程设计研究总院 | 一种盾构空推过矿山法隧道的管片抗浮结构 |
-
2017
- 2017-05-31 CN CN201710405134.5A patent/CN107130979A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010065499A (ja) * | 2008-09-12 | 2010-03-25 | Jfe Metal Products & Engineering Inc | シールドトンネル用袋体付きセグメント |
CN102352757A (zh) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN106437756A (zh) * | 2016-09-12 | 2017-02-22 | 中铁二局集团有限公司 | 一种防止盾构空推管片位移的限位方法 |
CN206016824U (zh) * | 2016-09-12 | 2017-03-15 | 中铁二局集团有限公司 | 一种防止盾构空推管片位移的限位装置 |
CN206888996U (zh) * | 2017-05-31 | 2018-01-16 | 广州市市政工程设计研究总院 | 一种盾构空推过矿山法隧道的管片抗浮结构 |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107587882A (zh) * | 2017-08-25 | 2018-01-16 | 中国水利水电科学研究院 | 一种双护盾tbm管片模袋灌浆快速支护结构及施工方法 |
CN108590702A (zh) * | 2018-04-19 | 2018-09-28 | 陈胜玉 | 具有背贴式散体填充袋的隧道拱架及其安装方法 |
CN110761797A (zh) * | 2018-07-26 | 2020-02-07 | 中交第三航务工程局有限公司 | 一种盾构空推过矿山法隧道的施工方法 |
CN109653767A (zh) * | 2018-11-12 | 2019-04-19 | 西南交通大学 | 用于盾构隧道的抗浮型管片及其加工方法和使用方法 |
CN109653767B (zh) * | 2018-11-12 | 2023-09-15 | 西南交通大学 | 用于盾构隧道的抗浮型管片及其加工方法和使用方法 |
CN109763837A (zh) * | 2019-02-28 | 2019-05-17 | 中国水利水电第四工程局有限公司 | 一种tbm隧洞膜袋水泥止浆体结构及施工方法 |
CN109973116A (zh) * | 2019-03-11 | 2019-07-05 | 中铁十二局集团第二工程有限公司 | 一种盾构隧道防上浮的管片结构及其施工方法 |
CN109973116B (zh) * | 2019-03-11 | 2020-09-22 | 中铁十二局集团第二工程有限公司 | 一种盾构隧道防上浮的管片结构及其施工方法 |
CN109723465A (zh) * | 2019-03-19 | 2019-05-07 | 成都理工大学 | Tbm隧道掘进机管片扶正方法 |
CN110005441A (zh) * | 2019-04-19 | 2019-07-12 | 中铁第一勘察设计院集团有限公司 | 基于外嵌式通道与伸张性囊袋的管片衬砌注浆系统及方法 |
CN110005441B (zh) * | 2019-04-19 | 2024-05-03 | 中铁第一勘察设计院集团有限公司 | 基于外嵌式通道与伸张性囊袋的管片衬砌注浆系统及方法 |
CN110645016A (zh) * | 2019-06-27 | 2020-01-03 | 国网浙江省电力有限公司经济技术研究院 | 基于可调节注浆容器的顶管隧道位置精确调整装置和方法 |
CN110645016B (zh) * | 2019-06-27 | 2021-06-29 | 国网浙江省电力有限公司经济技术研究院 | 基于可调节注浆容器的顶管隧道位置精确调整装置和方法 |
CN110242331A (zh) * | 2019-07-29 | 2019-09-17 | 西南交通大学 | 一种用于盾构隧道中的抗浮装置及采用其辅助管片衬砌环抗浮的方法 |
CN110242331B (zh) * | 2019-07-29 | 2024-03-26 | 西南交通大学 | 一种用于盾构隧道中的抗浮装置及采用其辅助管片衬砌环抗浮的方法 |
CN110593896A (zh) * | 2019-09-24 | 2019-12-20 | 西南交通大学 | 一种防止盾构隧道不均匀沉降的结构与实施方法 |
CN111255479A (zh) * | 2020-03-21 | 2020-06-09 | 中建铁路投资建设集团有限公司 | 一种用于岩层防盾构管片上浮的方法 |
CN111425208A (zh) * | 2020-03-30 | 2020-07-17 | 济南市市政工程设计研究院(集团)有限责任公司 | 一种基于盾构管片的抗悬浮装置、系统及方法 |
CN111577324A (zh) * | 2020-06-11 | 2020-08-25 | 长沙中天交通凿岩技术服务有限公司 | 一种固定盾构隧道管片的管片固定桩装置及使用方法 |
CN111577324B (zh) * | 2020-06-11 | 2022-03-22 | 湖南中天凿岩科技有限公司 | 一种固定盾构隧道管片的管片固定桩装置及使用方法 |
CN112145182A (zh) * | 2020-08-25 | 2020-12-29 | 广州市市政工程设计研究总院有限公司 | 一种超小净距盾构隧道并下穿既有线的方法 |
CN111963201A (zh) * | 2020-08-27 | 2020-11-20 | 中铁二十局集团有限公司 | 隧道管片结构及施工方法 |
CN112647972B (zh) * | 2021-03-15 | 2021-12-10 | 中铁九局集团第四工程有限公司 | 一种盾构隧道管片定向方法 |
CN112647972A (zh) * | 2021-03-15 | 2021-04-13 | 中铁九局集团第四工程有限公司 | 一种盾构隧道管片定向方法 |
CN112943272A (zh) * | 2021-03-24 | 2021-06-11 | 上海市基础工程集团有限公司 | 小直径盾构隧道f块限位器 |
CN112943272B (zh) * | 2021-03-24 | 2023-01-24 | 上海市基础工程集团有限公司 | 小直径盾构隧道f块限位器 |
CN113153326A (zh) * | 2021-04-21 | 2021-07-23 | 广州市力劲机电有限公司 | 一种盾构同步注浆速凝装置及使用方法 |
CN113187493A (zh) * | 2021-05-18 | 2021-07-30 | 中交二航局成都城市建设工程有限公司 | 盾构机钢套筒内防止负环管片上浮的控制方法 |
CN113565526A (zh) * | 2021-07-26 | 2021-10-29 | 深圳市全域英赛工程顾问有限公司 | 一种地下结构保护的排桩框架皮囊加压装置 |
CN114382492A (zh) * | 2021-12-27 | 2022-04-22 | 河海大学 | 一种脱出盾尾的管片位置纠正装置及其纠正方法 |
CN114776323A (zh) * | 2022-04-01 | 2022-07-22 | 成都未来智隧科技有限公司 | 一种控制盾构隧道地层和应力损失双补偿的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107130979A (zh) | 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 | |
CN206888996U (zh) | 一种盾构空推过矿山法隧道的管片抗浮结构 | |
CN104453913B (zh) | 一种竖井工作面超前预注浆方法 | |
CN106761835B (zh) | 一种岩溶隧道漏水分段注浆施工方法 | |
WO2015176614A1 (zh) | 压力分散型扩大头锚杆的施工方法及结构 | |
CN102561992B (zh) | 一种采用变形止水器的注浆封堵工艺 | |
CN104453946B (zh) | 一种软弱围岩隧道修建的超前加固施工方法 | |
CN103334770A (zh) | 一种长大反坡隧道超高水压富水破碎带施工方法 | |
CN111119935A (zh) | 一种巷道松软破碎构造围岩多层次注浆加固方法 | |
CN206554832U (zh) | 一种孔内止浆组件及采用该组件的注浆锚索和锚杆 | |
CN105201514B (zh) | 一种含水岩层井壁结构及施工方法 | |
CN103306687A (zh) | 软岩隧道长悬臂水平旋喷变形控制施工方法 | |
CN103133026A (zh) | 一种新型胀壳倒楔式可注浆锚杆 | |
CN107605498A (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法 | |
CN110043295A (zh) | 一种先拱后填的隧道塌方处理方法 | |
CN108119143A (zh) | 一种立井工作面水泥-水玻璃双液与化学浆液双圈帷幕联合注浆方法 | |
CN108868827A (zh) | 千米深井高地应力组合锚索注浆封孔装置及封孔方法 | |
CN105064280A (zh) | 一种隧洞暗河涌水封堵施工方法 | |
CN109139018A (zh) | 深孔袖阀管注浆与水平旋喷相结合的隧道施工方法及系统 | |
CN114109442B (zh) | 隧道岩溶破碎带溜塌半断面帷幕前进式注浆加固处理方法 | |
CN206784327U (zh) | 一种浆砌石坝劣质坝体灌浆补强加固结构 | |
CN201033872Y (zh) | 一种注浆式锚杆 | |
CN207406345U (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构 | |
CN105274994B (zh) | 在深厚饱水砂层中防倒吸防沉淀的注浆工艺及注浆装置 | |
CN103775102B (zh) | 潜孔钻跟管成孔回填砼稳定临空面处理塌方施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District Applicant after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd. Address before: 510060, No. 95, Guangzhou Avenue, Tianhe District, Guangdong, Guangzhou Applicant before: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170905 |
|
RJ01 | Rejection of invention patent application after publication |