CN112943272B - 小直径盾构隧道f块限位器 - Google Patents
小直径盾构隧道f块限位器 Download PDFInfo
- Publication number
- CN112943272B CN112943272B CN202110313799.XA CN202110313799A CN112943272B CN 112943272 B CN112943272 B CN 112943272B CN 202110313799 A CN202110313799 A CN 202110313799A CN 112943272 B CN112943272 B CN 112943272B
- Authority
- CN
- China
- Prior art keywords
- shaped buckle
- shaped
- buckle
- upper side
- small
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
本发明涉及一种小直径盾构隧道F块限位器,包括螺栓、L型卡扣及U型卡扣,所述L型卡扣上侧面上设有螺孔,下侧设有连接通孔;所述L型卡扣下侧通过连接通孔连接管片纵向螺栓,上侧通过螺栓拧紧固定形成向管片外侧的顶推力。所述U型卡扣固定L型卡扣及管片预埋铸铁件,避免管片因受到外部土体压力引起内弧面张开,增加管片间的摩阻力。本发明的特点是通过螺栓与L型卡扣连接形成向隧道外侧的顶推力以平衡盾构掘进期间周边土体对F块的作用力,U型卡扣连接L型卡扣及管片预埋铸铁件,避免管片因受到周边土压力引起管片内弧面张开,从而增加管片间的摩阻力。有效得解决了成型隧道封顶块两侧错台过大,确保盾构隧道成型质量符合标准要求。
Description
技术领域
本发明涉及一种盾构法施工中采用的限位器,特别涉及一种小直径盾构隧道限位器。
背景技术
随着城市不断发展,人口数量急剧增加,过去采用的明挖敷设的给排水、燃气等管道的施工方法已无法满足需求,人们逐渐将目光转向暗挖施工技术。盾构法施工技术因机械化程度高、对地面影响小、质量高等诸多优点进入了人们的视野中。盾构法隧道常采用预制块状管片,在盾构拼装区域组装成环形成隧道。在施工期间,管片错台时常困扰着施工技术人员,它不仅影响隧道的外观质量,而且还会引起隧道漏水、管片破裂和盾尾刷损坏等问题,甚至会对成型隧道造成严重的影响。因此,需要设计一种专用的小直径盾构隧道F块限位器来解决上述技术问题。
发明内容
本发明的目的是根据上述现有的建设困境,提出了一种小直径盾构隧道F块限位器。
为实现上述目的,本发明采用的技术方案是:一种小直径盾构隧道F块限位器,包括螺栓、L型卡扣及U型卡扣,所述L型卡扣上侧面上设有螺孔,下侧设有连接通孔;所述L型卡扣下侧通过连接通孔连接管片纵向螺栓,上侧通过螺栓拧紧固定形成向管片外侧的顶推力。
进一步,所述U型卡扣固定L型卡扣及管片预埋铸铁件,避免管片因受到外部土体压力引起内弧面张开,增加管片间的摩阻力。
进一步,所述U型卡扣固定L型卡扣及管片预埋铸铁件时,所述L型卡扣上侧面至所述U型卡扣的距离为50mm,并与水平线呈向下30度角布置。
进一步,所述L型卡扣上侧宽度120mm,长度100mm。
进一步,所述L型卡扣上侧面与下侧面的连接通孔之间的距离为166mm。
进一步,所述L型卡扣上侧面上的螺孔为M30。
进一步,所述L型卡扣下侧上的连接通孔的直径为55mm。
本发明的有益效果为:
1.解决了隧道掘进过程中已成型隧道封顶块两侧错台过大的问题。
2.采用的F块限位器非常小巧、安拆方便,可结合现场实际情况灵活设置。
附图说明
图1是本发明的F块限位器结构主视图;
图2是本发明的F块限位器结构侧视图;
图3是L型卡扣结构主视图;
图4是L型卡扣结构侧视图;
图5是U型卡扣结构主视图;
图6是图5的俯视图;
具体实施方式
以下结合附图通过实施例对本发明的特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1至图6所示,本发明的小直径盾构隧道F块限位器,包括螺栓1、L型卡扣2及U型卡扣3。L型卡扣2上侧面上设有螺孔,下侧设有连接通孔。
L型卡扣2下侧通过连接通孔连接管片纵向螺栓,上侧通过螺栓1拧紧固定形成向管片外侧的顶推力。
U型卡扣3连接固定L型卡扣2及管片预埋铸铁件,避免管片因受到外部土体压力引起内弧面张开,增加管片间的摩阻力。
U型卡扣3固定L型卡扣2及管片预埋铸铁件时,L型卡扣2上侧面至所述U型卡扣3的距离为50mm,并与水平线呈向下30度角布置。
在管片拼装完成后,在封顶块与邻接块连接螺栓处安装L型卡扣2,一侧连接管片纵向螺栓,另一侧通过螺栓1拧紧固定,再用U型卡扣3连接固定L型卡扣2及管片预埋铸铁件。
如图3,4所示,L型卡扣2上侧宽度120mm,长度100mm。L型卡扣2上侧面与下侧面的连接通孔之间的距离为166mm。L型卡扣2上侧面上的螺孔为M30,螺孔中心到L型卡扣2上侧面的前端面距离为40mm。L型卡扣2下侧上的连接通孔的直径为55mm。L型卡扣2壁厚为20mm。
如图5,6所示,U型卡扣3长度为110mm,宽度为155mm,厚度为12mm,中间槽的宽度为75mm,两侧厚各为40mm,槽底至U型卡扣底边的厚度为40mm。
本发明的特点是通过螺栓与L型卡扣连接形成向隧道外侧的顶推力以平衡盾构掘进期间周边土体对F块的作用力,U型卡扣连接L型卡扣及管片预埋铸铁件,避免管片因受到周边土压力引起管片内弧面张开,从而增加管片间的摩阻力。有效得解决了成型隧道封顶块两侧错台过大,确保盾构隧道成型质量符合标准要求。
Claims (6)
1.一种小直径盾构隧道F块限位器,包括螺栓(1)、L型卡扣(2)及U型卡扣(3),其特征在于:所述L型卡扣(2)上侧面上设有螺孔,下侧设有连接通孔;所述L型卡扣(2)下侧通过连接通孔连接管片纵向螺栓,上侧通过螺栓(1)拧紧固定形成向管片外侧的顶推力;所述U型卡扣(3)固定L型卡扣(2)及管片预埋铸铁件,避免管片因受到外部土体压力引起内弧面张开,增加管片间的摩阻力。
2.根据权利要求1所述的小直径盾构隧道F块限位器,其特征在于:所述U型卡扣(3)固定L型卡扣(2)及管片预埋铸铁件时,所述L型卡扣(2)上侧面至所述U型卡扣(3)的距离为50mm;并与水平线呈向下30度角布置。
3.根据权利要求1所述的小直径盾构隧道F块限位器,其特征在于:所述L型卡扣(2)上侧宽度120mm,长度100mm。
4.根据权利要求1所述的小直径盾构隧道F块限位器,其特征在于:所述L型卡扣(2)上侧面与下侧面的连接通孔之间的距离为166mm。
5.根据权利要求1所述的小直径盾构隧道F块限位器,其特征在于:所述L型卡扣(2)上侧面上的螺孔为M30。
6.根据权利要求1所述的小直径盾构隧道F块限位器,其特征在于:所述L型卡扣(2)下侧上的连接通孔的直径为55mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110313799.XA CN112943272B (zh) | 2021-03-24 | 2021-03-24 | 小直径盾构隧道f块限位器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110313799.XA CN112943272B (zh) | 2021-03-24 | 2021-03-24 | 小直径盾构隧道f块限位器 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112943272A CN112943272A (zh) | 2021-06-11 |
CN112943272B true CN112943272B (zh) | 2023-01-24 |
Family
ID=76228042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110313799.XA Active CN112943272B (zh) | 2021-03-24 | 2021-03-24 | 小直径盾构隧道f块限位器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112943272B (zh) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002147182A (ja) * | 2000-11-14 | 2002-05-22 | Penta Ocean Constr Co Ltd | ほぞ付セグメントの組立ボルト脱落防止構造 |
CN101435334A (zh) * | 2008-12-16 | 2009-05-20 | 上海隧道工程股份有限公司 | 盾构法隧道进出洞段管片连接结构及其施工方法 |
CN104790974A (zh) * | 2015-04-29 | 2015-07-22 | 浙江省交通规划设计研究院 | 一种采用特殊纵向连接件的城市地铁重叠盾构隧道管片结构 |
CN105178984A (zh) * | 2015-09-29 | 2015-12-23 | 中国石油天然气集团公司 | 一种应用于隧道管片的锁紧装置 |
CN106437788A (zh) * | 2016-11-16 | 2017-02-22 | 中铁二院工程集团有限责任公司 | 一种盾构隧道管片弹性密封垫主动压密装置 |
CN107013230A (zh) * | 2017-03-21 | 2017-08-04 | 中铁二院工程集团有限责任公司 | 大直径盾构隧道混凝土管片连接构造 |
CN107130979A (zh) * | 2017-05-31 | 2017-09-05 | 广州市市政工程设计研究总院 | 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 |
CN207920610U (zh) * | 2018-01-22 | 2018-09-28 | 中交第二航务工程局有限公司 | 超小始发井盾构分体始发负环管片支撑结构 |
CN109026063A (zh) * | 2018-09-27 | 2018-12-18 | 中铁隧道局集团有限公司 | 一种管片接头式盾构隧道结构 |
CN208518676U (zh) * | 2018-07-26 | 2019-02-19 | 中交第三航务工程局有限公司 | 一种盾构空推拼管片段的管片支撑系统 |
CN208996738U (zh) * | 2018-09-12 | 2019-06-18 | 中天建设集团有限公司 | 盾构管片防错台安装结构 |
CN210530882U (zh) * | 2019-08-23 | 2020-05-15 | 中铁十二局集团第二工程有限公司 | 一种大直径纵向管片防错台临时固定夹具 |
CN210829290U (zh) * | 2019-09-20 | 2020-06-23 | 天津滨海新区轨道交通投资发展有限公司 | 一种控制盾构隧道封顶块错台量的装置 |
CN211777462U (zh) * | 2019-12-24 | 2020-10-27 | 中交隧道工程局有限公司 | 一种管片拼装用轻便型定位模具 |
CN111894636A (zh) * | 2020-08-11 | 2020-11-06 | 中铁电气化局集团有限公司 | 盾构区间隧道联络通道管片支撑结构 |
CN212027802U (zh) * | 2020-01-22 | 2020-11-27 | 华东交通大学 | 一种盾构隧道纵向管片预紧力施加装置 |
CN112081595A (zh) * | 2019-06-14 | 2020-12-15 | 宏润建设集团股份有限公司 | 盾构施工的方法、用于盾构施工的防水和监测方法 |
CN212927859U (zh) * | 2020-08-03 | 2021-04-09 | 中交隧道工程局有限公司 | 一种用于降低管片错台的装置 |
-
2021
- 2021-03-24 CN CN202110313799.XA patent/CN112943272B/zh active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002147182A (ja) * | 2000-11-14 | 2002-05-22 | Penta Ocean Constr Co Ltd | ほぞ付セグメントの組立ボルト脱落防止構造 |
CN101435334A (zh) * | 2008-12-16 | 2009-05-20 | 上海隧道工程股份有限公司 | 盾构法隧道进出洞段管片连接结构及其施工方法 |
CN104790974A (zh) * | 2015-04-29 | 2015-07-22 | 浙江省交通规划设计研究院 | 一种采用特殊纵向连接件的城市地铁重叠盾构隧道管片结构 |
CN105178984A (zh) * | 2015-09-29 | 2015-12-23 | 中国石油天然气集团公司 | 一种应用于隧道管片的锁紧装置 |
CN106437788A (zh) * | 2016-11-16 | 2017-02-22 | 中铁二院工程集团有限责任公司 | 一种盾构隧道管片弹性密封垫主动压密装置 |
CN107013230A (zh) * | 2017-03-21 | 2017-08-04 | 中铁二院工程集团有限责任公司 | 大直径盾构隧道混凝土管片连接构造 |
CN107130979A (zh) * | 2017-05-31 | 2017-09-05 | 广州市市政工程设计研究总院 | 一种盾构空推过矿山法隧道的管片抗浮结构及施工方法 |
CN207920610U (zh) * | 2018-01-22 | 2018-09-28 | 中交第二航务工程局有限公司 | 超小始发井盾构分体始发负环管片支撑结构 |
CN208518676U (zh) * | 2018-07-26 | 2019-02-19 | 中交第三航务工程局有限公司 | 一种盾构空推拼管片段的管片支撑系统 |
CN208996738U (zh) * | 2018-09-12 | 2019-06-18 | 中天建设集团有限公司 | 盾构管片防错台安装结构 |
CN109026063A (zh) * | 2018-09-27 | 2018-12-18 | 中铁隧道局集团有限公司 | 一种管片接头式盾构隧道结构 |
CN112081595A (zh) * | 2019-06-14 | 2020-12-15 | 宏润建设集团股份有限公司 | 盾构施工的方法、用于盾构施工的防水和监测方法 |
CN210530882U (zh) * | 2019-08-23 | 2020-05-15 | 中铁十二局集团第二工程有限公司 | 一种大直径纵向管片防错台临时固定夹具 |
CN210829290U (zh) * | 2019-09-20 | 2020-06-23 | 天津滨海新区轨道交通投资发展有限公司 | 一种控制盾构隧道封顶块错台量的装置 |
CN211777462U (zh) * | 2019-12-24 | 2020-10-27 | 中交隧道工程局有限公司 | 一种管片拼装用轻便型定位模具 |
CN212027802U (zh) * | 2020-01-22 | 2020-11-27 | 华东交通大学 | 一种盾构隧道纵向管片预紧力施加装置 |
CN212927859U (zh) * | 2020-08-03 | 2021-04-09 | 中交隧道工程局有限公司 | 一种用于降低管片错台的装置 |
CN111894636A (zh) * | 2020-08-11 | 2020-11-06 | 中铁电气化局集团有限公司 | 盾构区间隧道联络通道管片支撑结构 |
Also Published As
Publication number | Publication date |
---|---|
CN112943272A (zh) | 2021-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109209293B (zh) | 一种石门揭突出煤层的综合防突施工方法 | |
CN102808422B (zh) | 灌注钢筋混凝土结构有粘结后张预应力工法 | |
CN107780437A (zh) | 综合管廊预制装配式管节 | |
CN109881705A (zh) | 一种预制装配式混凝土综合管廊稳固防水装置及方法 | |
CN112943272B (zh) | 小直径盾构隧道f块限位器 | |
CN107313785B (zh) | 高坝生态供水洞封堵段衬砌结构 | |
CN208934007U (zh) | 一种综合管廊的连接结构 | |
CN110374680B (zh) | 围岩破碎涌水巷道挡水墙的构筑工艺 | |
CN115341916B (zh) | 一种双线隧道拱圆盾构衬砌结构 | |
CN111706352A (zh) | 一种偏压隧道拱套拱进洞方法 | |
CN210483748U (zh) | 一种环向施工缝错缝的山岭隧道结构 | |
CN102518129A (zh) | 后压浆预应力空心方桩及制作方法 | |
CN105240023A (zh) | 一种曲线顶管支护结构扩建盾构施工地铁车站的方法 | |
CN206233262U (zh) | 综合管廊预制装配式管节 | |
CN110685256B (zh) | 水电站压力管道施工支洞用作检修通道的结构及施工方法 | |
CN109578017A (zh) | 一种特长小断面水工隧洞快速衬砌结构及其施工方法 | |
CN214005669U (zh) | 墙体锚杆支护结构 | |
CN209398430U (zh) | 一种特长小断面水工隧洞快速衬砌结构 | |
CN210599101U (zh) | 一种盾构隧道的防排水结构 | |
CN210013303U (zh) | 新旧污水管道连接结构 | |
CN214062998U (zh) | 一种联络通道处隧道内预应力钢支撑结构 | |
CN101725763A (zh) | 薄壁压力输水管道 | |
CN215669375U (zh) | 施工支洞与压力管道排水廊道及检修洞结合布置结构 | |
CN108999194A (zh) | 一种地铁车站深基坑部分逆作的施工结构及施工方法 | |
CN219953443U (zh) | 一种富水砂层联络通道冻结开挖防护门 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |