CN210483748U - 一种环向施工缝错缝的山岭隧道结构 - Google Patents
一种环向施工缝错缝的山岭隧道结构 Download PDFInfo
- Publication number
- CN210483748U CN210483748U CN201921237447.5U CN201921237447U CN210483748U CN 210483748 U CN210483748 U CN 210483748U CN 201921237447 U CN201921237447 U CN 201921237447U CN 210483748 U CN210483748 U CN 210483748U
- Authority
- CN
- China
- Prior art keywords
- secondary lining
- joint
- arch
- construction joint
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
一种环向施工缝错缝的山岭隧道结构,以有效提高隧道结构的整体性,大幅度减小隧道差异沉降,加强山岭隧道对差异沉降的适应性。由初次衬砌和二次衬砌构成,二次衬砌结构由环向两端面对接且形成纵向施工缝的仰拱段二次衬砌、拱墙段二次衬砌构成,其特征是:仰拱段二次衬砌拱墙段二次衬砌,各相邻仰拱段二次衬砌之间的仰拱环向施工缝与各相邻拱墙段二次衬砌之间的拱墙环向施工缝所在位置相错,位于不同横断面上。
Description
技术领域
本实用新型涉及隧道工程,特别涉及一种环向施工缝错缝的山岭隧道结构。
背景技术
随着国家交通事业的快速发展,矿山法施工的山岭隧道在我国中西部山区应用广泛。
通常,山岭隧道断面为马蹄形,隧道衬砌结构由初次衬砌结构和二次衬砌结构组成。初次衬砌结构一般采用喷射混凝土,起到封闭毛洞、稳定围岩的作用。二次衬砌结构采用现浇混凝土或钢筋混凝土,主要起到隧道二次加固作用,提高衬砌结构的安全系数。
由于山岭隧道断面为马蹄形,按隧道施工要求,仰拱开挖后要提前浇筑仰拱段二次衬砌混凝土进行封闭,导致筑拱墙段二次衬砌滞后于仰拱段二次衬砌。
目前,山岭隧道中的仰拱段二次衬砌、拱墙段二次衬砌按等长进行浇筑混凝土施工,导致相邻仰拱段二次衬砌之间的仰拱环向施工缝、相邻拱墙段二次衬砌之间的拱墙环向施工缝位于同一横断面上,人为地将隧道二次衬砌结构划分为若干独立单元。其不足之处是,削弱了隧道结构的整体性,在沿线地质差异大、地基承载力分布不均情况下,会造成隧道差异沉降明显,严重影响隧道正常使用。
实用新型内容
本实用新型所要解决的技术问题是提供一种环向施工缝错缝的山岭隧道结构,以有效提高隧道结构的整体性,大幅度减小隧道差异沉降,加强山岭隧道对差异沉降的适应性。
本实用新型解决其技术问题所采用的技术方案如下:
本实用新型的一种环向施工缝错缝的山岭隧道结构,由初次衬砌和二次衬砌构成,二次衬砌结构由环向两端面对接且形成纵向施工缝的仰拱段二次衬砌、拱墙段二次衬砌构成,其特征是:仰拱段二次衬砌拱墙段二次衬砌,各相邻仰拱段二次衬砌之间的仰拱环向施工缝与各相邻拱墙段二次衬砌之间的拱墙环向施工缝所在位置相错,位于不同横断面上。
本实用新型的有益效果是,各仰拱环向施工缝与各拱墙环向施工缝所在位置相错,位于不同横断面上,可有效加强隧道的整体性和均一性,提高纵向刚度,大幅度减小隧道差异沉降,加强山岭隧道对差异沉降的适应性。
附图说明
本说明书包括如下两幅附图:
图1是本实用新型一种环向施工缝错缝的山岭隧道结构的横断面图;
图2是沿图1中A-A线的剖面图。
图中示出构件和对应的标记:纵向施工缝1、拱墙环向施工缝2、仰拱环向施工缝3、初次衬砌结构10、拱墙段二次衬砌21、仰拱段二次衬砌22。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
参照图1和图2,本实用新型的一种环向施工缝错缝的山岭隧道结构,由初次衬砌结构和二次衬砌结构构成,二次衬砌结构,二次衬砌结构由环向两端面对接且形成纵向施工缝1的仰拱段二次衬砌22、拱墙段二次衬砌21构成。各相邻仰拱段二次衬砌22之间的仰拱环向施工缝3与各相邻拱墙段二次衬砌21之间的拱墙环向施工缝2所在位置相错,位于不同横断面上。可有效加强隧道的整体性和均一性,提高纵向刚度,大幅度减小隧道差异沉降,加强山岭隧道对差异沉降的适应性。
以上所述只是用图解说明本实用新型一种环向施工缝错缝的山岭隧道结构的一些原理,并非是要将本实用新型局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本实用新型所申请的专利范围。
Claims (1)
1.一种环向施工缝错缝的山岭隧道结构,由初次衬砌结构和二次衬砌结构构成,二次衬砌结构由环向两端面对接且形成纵向施工缝(1)的仰拱段二次衬砌(22)、拱墙段二次衬砌(21)构成,其特征是:所述相邻的仰拱段二次衬砌(22)之间的仰拱环向施工缝(3)与相邻的拱墙段二次衬砌(21)之间的拱墙环向施工缝(2)所在位置相错,位于不同横断面上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921237447.5U CN210483748U (zh) | 2019-08-01 | 2019-08-01 | 一种环向施工缝错缝的山岭隧道结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921237447.5U CN210483748U (zh) | 2019-08-01 | 2019-08-01 | 一种环向施工缝错缝的山岭隧道结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210483748U true CN210483748U (zh) | 2020-05-08 |
Family
ID=70533957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921237447.5U Active CN210483748U (zh) | 2019-08-01 | 2019-08-01 | 一种环向施工缝错缝的山岭隧道结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210483748U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111550262A (zh) * | 2020-05-22 | 2020-08-18 | 西华大学 | 一种隧道装配式预应力衬砌设计方法 |
-
2019
- 2019-08-01 CN CN201921237447.5U patent/CN210483748U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111550262A (zh) * | 2020-05-22 | 2020-08-18 | 西华大学 | 一种隧道装配式预应力衬砌设计方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102996133B (zh) | 适用于软弱围岩隧道斜井与正洞交汇处的施工方法 | |
CN103643966B (zh) | 一种装配式隧道衬砌管片 | |
CN204984441U (zh) | 改变单护盾tbm管片背后回填质量的新型管片 | |
CN112780304B (zh) | 强刚度低配筋预应力盾构隧道结构及其施工方法 | |
CN107130968A (zh) | 一种隧道建设用中隔墙 | |
CN103821523A (zh) | 一种既有单洞两车道隧道扩建为四车道隧道的开挖方法 | |
CN210483748U (zh) | 一种环向施工缝错缝的山岭隧道结构 | |
CN207420587U (zh) | 一种适用于tbm隧道衬砌环 | |
CN205532623U (zh) | 一种适用于特殊岩土盾构隧道管片环 | |
CN108374674B (zh) | 六导洞十二步地下空间开挖支护方法 | |
CN110055952A (zh) | 一种地下连续墙接头结构及其施工方法 | |
CN207567738U (zh) | 导流隧洞封堵结构 | |
CN103195449B (zh) | 大跨度重荷载明洞预应力钢筋混凝土衬砌结构 | |
CN206801584U (zh) | 一种盾构管片 | |
CN115341916B (zh) | 一种双线隧道拱圆盾构衬砌结构 | |
CN108868789A (zh) | 一种适用于盾构法施工隧道的地层主动托换方法 | |
CN211370397U (zh) | 能减小盾构始发或接收风险的围护结构 | |
CN218467617U (zh) | 一种盾构法联络通道管片结构 | |
CN204627621U (zh) | 一种小导管注浆支护体系 | |
CN110700848A (zh) | 小曲率半径盾构施工分段纠偏方法 | |
CN216008513U (zh) | 一种铁路盾构隧道管片环分块结构 | |
CN108716409A (zh) | 一种跨座式单轨隧道全预制轨道墙结构及其施工方法 | |
CN110500116B (zh) | 一种主动泄水抗浮管片及衬砌结构 | |
CN212454439U (zh) | 一种拱墙预制衬砌结构 | |
CN209398430U (zh) | 一种特长小断面水工隧洞快速衬砌结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |