CN106284082B - 悬索桥主缆索股预成型及架设施工方法 - Google Patents
悬索桥主缆索股预成型及架设施工方法 Download PDFInfo
- Publication number
- CN106284082B CN106284082B CN201610667476.XA CN201610667476A CN106284082B CN 106284082 B CN106284082 B CN 106284082B CN 201610667476 A CN201610667476 A CN 201610667476A CN 106284082 B CN106284082 B CN 106284082B
- Authority
- CN
- China
- Prior art keywords
- strand
- rectangular
- section
- preforming
- saddle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/16—Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610667476.XA CN106284082B (zh) | 2016-08-15 | 2016-08-15 | 悬索桥主缆索股预成型及架设施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610667476.XA CN106284082B (zh) | 2016-08-15 | 2016-08-15 | 悬索桥主缆索股预成型及架设施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284082A CN106284082A (zh) | 2017-01-04 |
CN106284082B true CN106284082B (zh) | 2019-03-08 |
Family
ID=57672087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610667476.XA Active CN106284082B (zh) | 2016-08-15 | 2016-08-15 | 悬索桥主缆索股预成型及架设施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284082B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385519B (zh) * | 2018-01-18 | 2023-09-19 | 西南交通大学 | 多塔悬索桥主缆索股布置结构 |
CN108360378B (zh) * | 2018-02-08 | 2024-03-19 | 江苏法尔胜缆索有限公司 | 一种悬索桥索股深隔板入鞍装置及入鞍方法 |
CN108442256A (zh) * | 2018-05-25 | 2018-08-24 | 中交四公局第五工程有限公司 | 一种悬索桥散索套安装的双约束架和施工方法 |
CN110468724B (zh) * | 2019-08-30 | 2020-12-01 | 西安市政设计研究院有限公司 | 一种空间缆索悬索桥主缆施工辅助装置及主缆施工方法 |
CN110565523A (zh) * | 2019-09-17 | 2019-12-13 | 广东迈诺工业技术有限公司 | 一种悬索桥主缆预成型索股制造及入鞍系统 |
CN110878523B (zh) * | 2019-09-19 | 2020-12-29 | 西南交通大学 | 一种基于多标准丝的悬索桥主缆索股标记对位架设方法 |
CN112160242A (zh) * | 2020-09-23 | 2021-01-01 | 中国铁建投资集团有限公司 | 一种索股加工工艺 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2415005B (en) * | 2004-06-08 | 2006-05-03 | Thomas John Upstone | Suspension bridge cables |
CN101608426B (zh) * | 2008-06-20 | 2012-04-04 | 上海浦江缆索股份有限公司 | 仿悬索桥主缆线性单元束股的预成型牵引机构 |
CN201221052Y (zh) * | 2008-06-20 | 2009-04-15 | 上海浦江缆索股份有限公司 | 仿悬索桥主缆线性单元束股的预成型机构 |
CN205188822U (zh) * | 2015-11-20 | 2016-04-27 | 江苏法尔胜缆索有限公司 | 一种悬索桥主缆预成型索股用制作装置 |
CN105442449B (zh) * | 2015-11-21 | 2017-09-22 | 江苏法尔胜缆索有限公司 | 一种悬索桥主缆预成型索股制造及入鞍系统 |
CN105421244B (zh) * | 2015-12-10 | 2017-07-28 | 江苏法尔胜缆索有限公司 | 一种悬索桥主缆用预制平行钢丝预成型索股的制作方法 |
-
2016
- 2016-08-15 CN CN201610667476.XA patent/CN106284082B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106284082A (zh) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284082B (zh) | 悬索桥主缆索股预成型及架设施工方法 | |
CN102444086B (zh) | 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法 | |
EP2653613B1 (en) | Method for horizontal winding and horizontal unwinding parallel stell stranded wire | |
US20160130108A1 (en) | Device and method for winding and unwinding a parallel wire strand horizontally | |
CN102290742B (zh) | 张力架线施工工艺 | |
CN204279135U (zh) | 一种电气化铁路接触网动滑轮式张力调节机构 | |
CN104631329A (zh) | 一种悬索桥连续式猫道整体线形调整方法 | |
CN212025936U (zh) | 用于斜拉桥塔端连续型钢绞线斜拉索安装的设备 | |
CN111431092B (zh) | 间隙性导线平衡挂线安装优化方法 | |
CN111236072A (zh) | 一种连续梁超长束钢绞线穿束施工方法 | |
CN102593759B (zh) | 大截面导线一牵二展放施工工艺 | |
CN1332870C (zh) | 防止电磁挂梁起重机起动和制动时挂梁及钢板摆动的方法 | |
CN102810346A (zh) | 一种碳纤维复合材料电缆及其电缆芯的制备方法 | |
CN103708371A (zh) | 索驱动的换绳机构 | |
CN201942371U (zh) | 卧式砼管缠丝装置 | |
CN201367332Y (zh) | 可变起重滑轮组 | |
CN203612868U (zh) | 索驱动的换绳机构 | |
CN202197048U (zh) | 一种塔用双角钢挂点起重连接工具 | |
CN203946831U (zh) | 门式起重机开式齿轮单倍率荷载试验装置 | |
CN201171147Y (zh) | 超高层电缆垂直吊装夹具 | |
CN107522121A (zh) | 一种钢绞线绕绳导向装置及钢绞线并排绕绳方法 | |
CN204203526U (zh) | 双边式adss光缆耐张线夹 | |
CN210828529U (zh) | 一种钢丝绳复绕提升曳引系统 | |
CN207175306U (zh) | 一种钢绞线绕绳导向装置 | |
CN110318331A (zh) | 悬索桥主缆索股预成型及架设施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 650217 Room 301, 3rd Floor, Comprehensive Office Building, East Kunming Administration Office, Xiaoxi Village Toll Station, Kunming Economic and Technological Development Zone, Yunnan Province Applicant after: Yunnan Yunling Bridge Technology Co., Ltd. Applicant after: The Yunnan investment group Yunling Construction Co. Ltd. Applicant after: Longjiang Yunnan bridge construction headquarters Applicant after: Pujiang Cable Rope Co., Ltd., Shanghai Address before: 650217 Room 301, 3rd Floor, Comprehensive Office Building, East Kunming Administration Office, Xiaoxi Village Toll Station, Kunming Economic and Technological Development Zone, Yunnan Province Applicant before: Yunnan Yunling Bridge Technology Co., Ltd. Applicant before: Yunling, Yunnan expressway construction Group Co., Ltd Applicant before: Longjiang Yunnan bridge construction headquarters Applicant before: Pujiang Cable Rope Co., Ltd., Shanghai |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |