CN101608426B - 仿悬索桥主缆线性单元束股的预成型牵引机构 - Google Patents

仿悬索桥主缆线性单元束股的预成型牵引机构 Download PDF

Info

Publication number
CN101608426B
CN101608426B CN200810039340XA CN200810039340A CN101608426B CN 101608426 B CN101608426 B CN 101608426B CN 200810039340X A CN200810039340X A CN 200810039340XA CN 200810039340 A CN200810039340 A CN 200810039340A CN 101608426 B CN101608426 B CN 101608426B
Authority
CN
China
Prior art keywords
track
preforming
suspension bridge
main cable
traction mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810039340XA
Other languages
English (en)
Other versions
CN101608426A (zh
Inventor
顾庆华
张海良
朱金林
罗国强
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pujiang Cable Co Ltd
Zhejiang Pujiang Cable Co Ltd
Original Assignee
Shanghai Pujiang Cable Co Ltd
Zhejiang Pujiang Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pujiang Cable Co Ltd, Zhejiang Pujiang Cable Co Ltd filed Critical Shanghai Pujiang Cable Co Ltd
Priority to CN200810039340XA priority Critical patent/CN101608426B/zh
Publication of CN101608426A publication Critical patent/CN101608426A/zh
Application granted granted Critical
Publication of CN101608426B publication Critical patent/CN101608426B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种桥梁制造技术领域的仿悬索桥主缆线性单元束股的预成型牵引机构,其中边轨道座、中间轨道座及套筒与底座固定连接,升降螺杆一端与套筒连接,另一端与轨道托板连接,轨道托板设置在轨道的底部,轨道由若干段组成,组成段之间铰接,铰接处与中间轨道座连接,轨道的两侧分别与边轨道座连接,夹具有若干个,均匀分布于链条上,夹具用于夹紧待制作的钢丝束股,链条绕过两端的链轮,链轮设置于底座上。本发明实现了仿悬索桥主缆线性单元束股在制作过程中的牵引束股,并且牵引过程中,能够使钢丝束股弯曲,同时钢丝束股的弯曲程度可以调整。

Description

仿悬索桥主缆线性单元束股的预成型牵引机构
技术领域
本发明涉及一种桥梁制造技术领域的装置,具体是一种仿悬索桥主缆线性单元束股的预成型牵引机构。
背景技术
单元束股是悬索桥、自锚式悬索桥等桥梁和建筑结构中主缆的组成,是悬索桥、自锚式悬索桥等桥梁和建筑结构中主缆的承载载荷的受力件。目前的单元束股组成一根束股的钢丝长度均相同,在一段距离的束股上每隔一定距离在钢丝束股外包裹增强聚酯带或细钢丝。随着桥梁技术的发展,在一些悬索桥、自锚式悬索桥等桥梁和建筑结构中要求主缆可以进行弯曲。然而,传统的单元束股在施加载荷后由于主缆线性的复杂性,使得每根钢丝受力并不均衡,从而使个别钢丝受力大于其它钢丝,有的可能超过钢丝的抗拉强度,导致安全隐患的存在。这就要求组成主缆的钢丝束股内每根钢丝的相对长度不同,以保证单元束股(或称索股)在施加载荷后每根钢丝受力均衡。
发明内容
本发明针对上述现有技术的不足,提供了一种仿悬索桥主缆线性单元束股的预成型牵引机构,使其在仿悬索桥主缆线性单元束股制作时的牵引,并使束股弯曲,适应新型仿悬索桥主缆线性单元束股的要求。
本发明是通过如下技术方案实现的,本发明包括:底座、轨道、边轨道座、中间轨道座、轨道托板、升降螺杆、套筒、链条、链轮、轴承座、夹具,其中:边轨道座、中间轨道座及套筒与底座固定连接,升降螺杆一端与套筒连接,另一端与轨道托板连接,轨道托板设置在轨道的底部,轨道由若干段组成,组成段之间铰接,铰接处与中间轨道座连接,轨道的两侧分别与边轨道座连接,夹具有若干个,均匀分布于链条上,夹具用于夹紧待制作的钢丝束股,链条绕过两端的链轮,链轮设置于底座上。
所述轨道托板有若干个,均匀设置于轨道的底部。
所述轨道,其组成段之间的铰接处与中间轨道座铰接。
所述中间轨道座,其设有竖直方向长孔槽,轨道可沿长孔槽方向移动。
所述边轨道座,其设有水平方向的长孔槽,轨道可沿长孔槽方向移动。
所述夹具,包括夹紧体、夹具体、滚轮,夹紧体和夹具体之间夹持待制作的钢丝束股,滚轮与夹具体连接,滚轮卡于轨道的凹槽中,并能在轨道中自由滚动。
与现有技术相比,本发明实现了仿悬索桥主缆线性单元束股在制作过程中的牵引束股,并且牵引过程中,能够使钢丝束股弯曲,同时钢丝束股的弯曲程度可以调整。
附图说明
图1为本发明的结构示意图;
图2为本发明的轨道的分段连接示意图;
图3为本发明的实施例中所要求加工成的缆索钢丝束股弯曲的形状图;
图4为为本发明加工成弯曲缆索钢丝束股后包裹增强聚酯带或细钢丝的结构示意图;
图5为本实施例中夹具在轨道内的位置示意图。
具体实施方式
下面结合附图对本发明的实施例作详细说明:本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1所示,本实施例包括:底座1、轨道2、边轨道座3、中间轨道座4、轨道托板5、升降螺杆6、套筒7、链条8、链轮9、轴承座10、夹具11,其中:
边轨道座3、中间轨道座4及套筒7与底座1固定连接,升降螺杆6一端与套筒7连接,另一端与轨道托板5连接,轨道托板5设置在轨道2的底部,轨道2由若干段组成,组成段之间铰接,每个铰接处均与中间轨道座4连接,轨道2的两侧均与边轨道座3连接,夹具11有若干个,均匀分布于链条8上,夹具11用于夹紧待制作的钢丝束股,链条8绕过底座两端的两个链轮9,链轮9设置于底座1上。
如图2所示,所述轨道2由三段组成,每段之间铰接连接。
所述轨道托板5有两个,均匀设置于轨道2的底部,相应的升降螺杆6、套筒7也均为两个,用于提升或降低轨道2的高度。
所述轨道2,其组成段之间的铰接处与中间轨道座4铰接。
所述中间轨道座4,其设有竖直方向长孔槽,轨道2可沿长孔槽方向移动。
所述边轨道座3,其设有水平方向的长孔槽,轨道2可沿长孔槽方向移动。
如图5所示,所述夹具11,包括夹紧体17、夹具体16、滚轮15,夹紧体17和夹具体16之间夹持待制作的钢丝束股14,滚轮15与夹具体连接,滚轮15卡于轨道2的凹槽中,并能在轨道中自由滚动。
本实施例在牵引时,通过套筒7内的螺纹,使升降螺杆6上下移动,带动轨道托板5及与之焊接的轨道的中间部分上下移动,从而调整中间部分轨道与两边部分轨道之间角度,使之形成圆弧形状。然后轨道槽内的夹具11之间会产生高度差,带动其所夹紧的钢丝束股14产生弯曲,可以弯曲成如3所示的形状。此时钢丝束股14内处于外层的钢丝长度要长于内层的钢丝,然后包裹增强聚酯带12或细钢丝13使其弯曲度固定(如图4所示)。而通过控制升降螺杆6上下移动的距离的大小,可控制轨道2之间的角度变化,从而可在一定范围内随意控制钢丝束股14弯曲程度的大小。
本发明能够在仿悬索桥主缆线性单元束股制作的过程中,把钢丝束夹紧牵引并使钢丝束弯曲,使钢丝束在绕包成股后束股可以进行不同角度的弯曲,可以调整钢丝束股的弯曲程度。

Claims (6)

1.一种仿悬索桥主缆线性单元束股的预成型牵引机构,其特征在于,包括:底座、轨道、边轨道座、中间轨道座、轨道托板、升降螺杆、套筒、链条、链轮、轴承座、夹具,其中:边轨道座、中间轨道座及套筒与底座固定连接,升降螺杆一端与套筒连接,另一端与轨道托板连接,轨道托板设置在轨道的底部,轨道由若干段组成,组成段之间铰接,铰接处与中间轨道座连接,轨道的两侧分别与边轨道座连接,夹具有若干个,均匀分布于链条上,夹具用于夹紧待制作的钢丝束股,链条绕过两端的链轮,链轮设置于底座上。
2.根据权利要求1所述的仿悬索桥主缆线性单元束股的预成型牵引机构,其特征是,所述轨道托板有若干个,均匀设置于轨道的底部。
3.根据权利要求1所述的仿悬索桥主缆线性单元束股的预成型牵引机构,其特征是,所述轨道,其组成段之间的铰接处与中间轨道座铰接。
4.根据权利要求1所述的仿悬索桥主缆线性单元束股的预成型牵引机构,其特征是,所述中间轨道座,其设有竖直方向长孔槽,轨道可沿长孔槽方向移动。
5.根据权利要求1所述的仿悬索桥主缆线性单元束股的预成型牵引机构,其特征是,所述边轨道座,其设有水平方向的长孔槽,轨道可沿长孔槽方向移动。
6.根据权利要求1所述的仿悬索桥主缆线性单元束股的预成型牵引机构,其特征是,所述夹具,包括夹紧体、夹具体、滚轮,夹紧体和夹具体之间夹持待制作的钢丝束股,滚轮与夹具体连接,滚轮卡于轨道的凹槽中,并能在轨道中自由滚动。
CN200810039340XA 2008-06-20 2008-06-20 仿悬索桥主缆线性单元束股的预成型牵引机构 Active CN101608426B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810039340XA CN101608426B (zh) 2008-06-20 2008-06-20 仿悬索桥主缆线性单元束股的预成型牵引机构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810039340XA CN101608426B (zh) 2008-06-20 2008-06-20 仿悬索桥主缆线性单元束股的预成型牵引机构

Publications (2)

Publication Number Publication Date
CN101608426A CN101608426A (zh) 2009-12-23
CN101608426B true CN101608426B (zh) 2012-04-04

Family

ID=41482324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810039340XA Active CN101608426B (zh) 2008-06-20 2008-06-20 仿悬索桥主缆线性单元束股的预成型牵引机构

Country Status (1)

Country Link
CN (1) CN101608426B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949130B (zh) * 2010-04-27 2011-12-07 江苏法尔胜新日制铁缆索有限公司 用基准丝控制标准丝制作的方法
CN103738109A (zh) * 2013-12-10 2014-04-23 刘良汉 中国书画牵纸机
CN104746431B (zh) * 2013-12-31 2017-11-28 上海浦江缆索股份有限公司 悬索桥主缆直接编索架设的进度调整机构及其使用方法
CN106284082B (zh) * 2016-08-15 2019-03-08 云南云岭桥隧科技有限公司 悬索桥主缆索股预成型及架设施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3810323C1 (en) * 1988-03-26 1989-04-20 Dyckerhoff & Widmann Ag, 8000 Muenchen, De Process for mounting a tension member which runs in a freely stressed manner between its anchorage points, in particular a stay cable for a cable-stayed bridge
WO2000056994A1 (fr) * 1999-03-23 2000-09-28 Freyssinet International (Stup) Dispositif pour fixer un cable de structure a un element de construction
CN2635725Y (zh) * 2003-09-10 2004-08-25 袁国东 一种安全缆索
DE202004008620U1 (de) * 2004-06-01 2005-10-13 Dywidag-Systems International Gmbh Ausbildung eines korrisionsgeschützten Zugglieds im Bereich einer an einer Abstützung angeordneten Umlenkstelle, insbesondere eines Schrägseils am Pylon einer Schrägseilbrücke
CN101177931A (zh) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 大跨度悬索桥主缆架设门架式小循环牵引系统
CN101200875A (zh) * 2007-11-26 2008-06-18 中铁大桥局集团第七工程有限公司 主缆缠丝机及其缠丝方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3810323C1 (en) * 1988-03-26 1989-04-20 Dyckerhoff & Widmann Ag, 8000 Muenchen, De Process for mounting a tension member which runs in a freely stressed manner between its anchorage points, in particular a stay cable for a cable-stayed bridge
WO2000056994A1 (fr) * 1999-03-23 2000-09-28 Freyssinet International (Stup) Dispositif pour fixer un cable de structure a un element de construction
CN2635725Y (zh) * 2003-09-10 2004-08-25 袁国东 一种安全缆索
DE202004008620U1 (de) * 2004-06-01 2005-10-13 Dywidag-Systems International Gmbh Ausbildung eines korrisionsgeschützten Zugglieds im Bereich einer an einer Abstützung angeordneten Umlenkstelle, insbesondere eines Schrägseils am Pylon einer Schrägseilbrücke
CN101200875A (zh) * 2007-11-26 2008-06-18 中铁大桥局集团第七工程有限公司 主缆缠丝机及其缠丝方法
CN101177931A (zh) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 大跨度悬索桥主缆架设门架式小循环牵引系统

Also Published As

Publication number Publication date
CN101608426A (zh) 2009-12-23

Similar Documents

Publication Publication Date Title
CN101608426B (zh) 仿悬索桥主缆线性单元束股的预成型牵引机构
CN100535367C (zh) 夹具、自移式爬升装置和联接夹具与管形件的方法
KR101171039B1 (ko) 주경간 긴장수단을 이용한 일부 및 전부 타정식 사장교와 그 시공 방법
CN101891121B (zh) 起重机的后拉索展开器
CN104278637B (zh) 一种悬索桥主缆索股无猫道的索道架设方法
US3526570A (en) Parallel wire strand
JP5812325B2 (ja) 電線張力低減装置及び電線張力低減工法
CN101614083A (zh) 夹具、自移式爬升装置和联接夹具与管形件的方法
CA2563166A1 (en) Transportable bridge system
CN106882083A (zh) 现代有轨电车接触网小张力放线施工工法
WO2013075454A1 (zh) 一种起重机及其超起装置
CN102747839A (zh) 用于网架结构的柔性提升方法
CA2323931A1 (en) Rope deflection and suitable synthetic fiber rope and their use
CN208206698U (zh) 一种适用于多分裂导线扭转刚度测试的试验装置
CN101613992B (zh) 仿悬索桥主缆束股的预成型方法
JP3140674B2 (ja) 大張間架構の構築工法
US20150048218A1 (en) Supporting device for cables and method for using the same
CN206143609U (zh) 一种小半径曲线箱梁体外预应力钢束减摩阻装置
CN107302195A (zh) 一种电缆敷设方法
CN209619862U (zh) 一种适用于环境限制大的吊索拱桥拱肋安装支撑架
US6785925B1 (en) Bridge system
CN2499853Y (zh) 光缆耐张线夹
JPH08289425A (ja) 延線金車
CN115791372A (zh) 一种钢绞线生产用预应力强度检测装置
CN110593138A (zh) 悬索桥主缆索更换方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Preformed traction mechanism for linear unit strands of simulated suspension bridge main cable

Granted publication date: 20120404

Pledgee: China Everbright Bank Co.,Ltd. Shanghai Branch

Pledgor: SHANGHAI PUJIANG CABLE Co.,Ltd.

Registration number: Y2024310000284

PE01 Entry into force of the registration of the contract for pledge of patent right