CN101613992B - 仿悬索桥主缆束股的预成型方法 - Google Patents
仿悬索桥主缆束股的预成型方法 Download PDFInfo
- Publication number
- CN101613992B CN101613992B CN2008100397805A CN200810039780A CN101613992B CN 101613992 B CN101613992 B CN 101613992B CN 2008100397805 A CN2008100397805 A CN 2008100397805A CN 200810039780 A CN200810039780 A CN 200810039780A CN 101613992 B CN101613992 B CN 101613992B
- Authority
- CN
- China
- Prior art keywords
- strand
- thigh
- steel wire
- section
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 239000000725 suspension Substances 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 36
- 239000010959 steel Substances 0.000 claims abstract description 36
- 229920000728 polyester Polymers 0.000 claims abstract description 5
- 238000007493 shaping process Methods 0.000 claims abstract description 4
- 210000000689 upper leg Anatomy 0.000 claims description 27
- 210000002435 tendon Anatomy 0.000 claims description 8
- 238000000465 moulding Methods 0.000 claims description 3
- 238000004064 recycling Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 3
- 238000005452 bending Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及桥梁制造技术领域的仿悬索桥主缆束股的预成型方法。包括步骤:(1)钢丝束股制作时使钢丝经过收口模和整形轮,使达到设计所需的束股截面形状;(2)经过压轮、圆弧轨道、压轮装置使束股中的一段与圆弧轨道贴合,呈圆弧形状;(3)在此段圆弧形束股上每隔一定距离用夹具加紧,使其保持长度差不变;(4)此段圆弧形束股牵引出圆弧轨道装置,以进行下一段束股的成型并夹紧过程;(5)与此同时在牵引出的已成型的束股上每隔一定距离用细钢丝或增强聚酯带绕包;(6)绕包后可将加紧夹具卸掉,用于下一段束股的预成型加紧,循环利用。本发明使组成主缆的钢丝束股内每根钢丝的相对长度不同,以保证单元束股在施加载荷后每根钢丝受力均衡。
Description
技术领域
本发明涉及一种桥梁制造技术领域的方法,具体是一种仿悬索桥主缆束股的预成型方法。
背景技术
单元束股(或称索股)是悬索桥、自锚式悬索桥等桥梁和建筑结构中主缆的组成,是悬索桥、自锚式悬索桥等桥梁和建筑结构中主缆的承载载荷的受力件。目前的单元束股组成一根束股的钢丝长度均相同,在一段距离的束股上每隔一定距离在钢丝束股外包裹增强聚酯带或细钢丝。然而,传统的单元束股在施加载荷后由于主缆线性的复杂性,使得每根钢丝受力并不均衡,从而使个别钢丝受力大于其它钢丝,有的可能超过钢丝的抗拉强度,导致安全隐患的存在。随着桥梁技术的发展,在一些悬索桥、自锚式悬索桥等桥梁和建筑结构中要求主缆可以进行弯曲。这就要求组成主缆的钢丝束股内每根钢丝的相对长度不同,以保证单元束股在施加载荷后每根钢丝受力均衡。
发明内容
本发明的目的在于克服现有技术的不足,提供一种仿悬索桥主缆束股的预成型方法。本发明使组成主缆的钢丝束股内每根钢丝的相对长度不同,以保证单元束股在施加载荷后每根钢丝受力均衡。
本发明是通过如下技术方案实现的,本发明包括步骤:
(1)钢丝束股制作时使钢丝经过收口模和整形轮,使达到设计所需的束股截面形状;
(2)然后经过压轮、圆弧轨道、压轮等装置使束股中的一段与圆弧轨道贴合,呈圆弧形状,此时处于圆弧外层的钢丝与内层钢丝之间由于圆半径的不同而出现长度差;
(3)在此段圆弧形束股上每隔一定距离用夹具加紧,使其保持长度差不变;
(4)此段圆弧形束股牵引出圆弧轨道装置,以进行下一段束股的成型并夹紧过程;
(5)与此同时在牵引出的已成型的束股上每隔一定距离用细钢丝或增强聚酯带绕包;
(6)绕包后可将加紧夹具卸掉,用于下一段束股的预成型加紧,循环利用。
步骤(5)中,所述每隔一定距离,为紧贴加紧夹具位置间距离。
本发明方法使组成主缆的钢丝束股内每根钢丝的相对长度不同,以保证单元束股在各种复杂建筑或桥梁形状中施加载荷后每根钢丝受力均衡,从而排除了安全隐患。
具体实施方式
以下对本发明的实施例作详细说明:本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式,但本发明的保护范围不限于下述的实施例。
本实施例包括:步骤:(1)钢丝束股制作时使钢丝经过收口模和整形轮,使达到设计所需的束股截面形状;(2)然后经过压轮、圆弧轨道、压轮等装置使束股中的一段与圆弧轨道贴合,呈圆弧形状,此时处于圆弧外层的钢丝与内层钢丝之间由于圆半径的不同而出现长度差;(3)在此段圆弧形束股上每隔一定距离用夹具加紧,使其保持长度差不变;(4)此段圆弧形束股牵引出圆弧轨道装置,以进行下一段束股的成型并夹紧过程;(5)与此同时在牵引出的已成型的束股上每隔一定距离(为紧贴加紧夹具位置间距离)用细钢丝或增强聚酯带绕包;(6)绕包后可将加紧夹具卸掉,用于下一段束股的预成型加紧,循环利用。
本实施例预成型方法,使组成主缆的钢丝束股内每根钢丝的相对长度不同,以保证单元束股在施加载荷后每根钢丝受力均衡,从而排除了安全隐患。
Claims (2)
1.一种仿悬索桥主缆束股的预成型方法,其特征在于,包括步骤:
(1)钢丝束股制作时使钢丝经过收口模和整形轮,使达到设计所需的束股截面形状;
(2)然后经过压轮、圆弧轨道、压轮装置使束股中的一段与圆弧轨道贴合,呈圆弧形状,此时处于圆弧外层的钢丝与内层钢丝之间由于圆半径的不同而出现长度差;
(3)在此段圆弧形束股上每隔一定距离用夹具加紧,使其保持长度差不变;
(4)此段圆弧形束股牵引出圆弧轨道装置,以进行下一段束股的成型并夹紧过程;
(5)与此同时在牵引出的已成型的束股上每隔一定距离用细钢丝或增强聚酯带绕包;
(6)绕包后将加紧夹具卸掉,用于下一段束股的预成型加紧,循环利用。
2.如权利要求1所述的仿悬索桥主缆束股的预成型方法,其特征在于,步骤(5)中,所述每隔一定距离,为紧贴加紧夹具位置间距离。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100397805A CN101613992B (zh) | 2008-06-27 | 2008-06-27 | 仿悬索桥主缆束股的预成型方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100397805A CN101613992B (zh) | 2008-06-27 | 2008-06-27 | 仿悬索桥主缆束股的预成型方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101613992A CN101613992A (zh) | 2009-12-30 |
CN101613992B true CN101613992B (zh) | 2011-12-28 |
Family
ID=41493864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100397805A Active CN101613992B (zh) | 2008-06-27 | 2008-06-27 | 仿悬索桥主缆束股的预成型方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101613992B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101949130B (zh) * | 2010-04-27 | 2011-12-07 | 江苏法尔胜新日制铁缆索有限公司 | 用基准丝控制标准丝制作的方法 |
CN104746431B (zh) * | 2013-12-31 | 2017-11-28 | 上海浦江缆索股份有限公司 | 悬索桥主缆直接编索架设的进度调整机构及其使用方法 |
CN105442450B (zh) * | 2015-11-21 | 2017-11-03 | 江苏法尔胜缆索有限公司 | 一种悬索桥主缆预成型索股制造方法及入鞍方法 |
CN105401521B (zh) * | 2015-12-15 | 2016-12-28 | 中交一公局第三工程有限公司 | 悬索桥主缆索股整形方法以及索股整形夹具 |
-
2008
- 2008-06-27 CN CN2008100397805A patent/CN101613992B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101613992A (zh) | 2009-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101613992B (zh) | 仿悬索桥主缆束股的预成型方法 | |
WO2009011397A1 (ja) | コードおよびその製造方法並びに、コードおよびゴムの複合体 | |
ATE533889T1 (de) | Kunstfaserseil, aufzugsanlage mit einem solchen kunstfaserseil und verfahren zur herstellung eines kunstfaserseiles | |
TW200500151A (en) | Method of forming double-bonded corrosion protection coatings on prestressing strand and prestressing strand | |
MY154445A (en) | Method for making a flexible tubular pipe having a long length | |
CN110445061B (zh) | 一种19根绞钢芯铝绞线嵌铝耐张线夹压接方法 | |
CN105442449A (zh) | 一种悬索桥主缆预成型索股制造及入鞍系统 | |
CN201221051Y (zh) | 仿悬索桥主缆线性单元束股的整形夹具 | |
CN216551323U (zh) | 高粘合力微细钢丝绳生产用预变形装置 | |
CN202649569U (zh) | 光缆生产中用于铝带纵包的模具 | |
CN109797588B (zh) | 用于橡胶强化的钢帘线 | |
CN107956174B (zh) | 直径φ264mm大型海洋工程用钢丝绳制造方法 | |
CN101608426A (zh) | 仿悬索桥主缆线性单元束股的预成型牵引机构 | |
JP2005194768A (ja) | コンクリート柱補修および/又は補強工法及び補修および/又は補強部材 | |
JP2015225835A (ja) | 架空送電線、及び、架空送電線の製造方法 | |
CN203966621U (zh) | 自承式数据线缆 | |
CN110416951B (zh) | 一种钢芯铝绞线嵌铝耐张线夹结构 | |
JP4037041B2 (ja) | 繊維複合材の端末加工法及び端末定着方法 | |
CN110444983B (zh) | 一种圆线同心绞架空导线19根绞钢芯铝绞线压接方法 | |
CN103513353A (zh) | 光缆生产中用于铝带纵包的模具 | |
CN105484080B (zh) | 一种复合型带有胶层加强型绳缆 | |
CN106436399A (zh) | 填充型环氧树脂涂层预应力钢绞线生产线 | |
KR20040076027A (ko) | 플렉시블전선 및 그 제조방법 | |
CN204903283U (zh) | 一种用于卧式拉力试验机的圆线同心绞架空导线用夹具 | |
CN101613993A (zh) | 单元束股标准长度钢丝的制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Prefabrication method for simulating the main cable strands of suspension bridges Granted publication date: 20111228 Pledgee: China Construction Bank Corporation Shanghai Zhangjiang Branch Pledgor: SHANGHAI PUJIANG CABLE Co.,Ltd.|ZHEJIANG PUJIANG CABLE Co.,Ltd. Registration number: Y2024310000126 |