CN102593759B - 大截面导线一牵二展放施工工艺 - Google Patents
大截面导线一牵二展放施工工艺 Download PDFInfo
- Publication number
- CN102593759B CN102593759B CN201210035146.0A CN201210035146A CN102593759B CN 102593759 B CN102593759 B CN 102593759B CN 201210035146 A CN201210035146 A CN 201210035146A CN 102593759 B CN102593759 B CN 102593759B
- Authority
- CN
- China
- Prior art keywords
- wire
- construction
- unfolding
- lead
- leads
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210035146.0A CN102593759B (zh) | 2012-02-16 | 2012-02-16 | 大截面导线一牵二展放施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210035146.0A CN102593759B (zh) | 2012-02-16 | 2012-02-16 | 大截面导线一牵二展放施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102593759A CN102593759A (zh) | 2012-07-18 |
CN102593759B true CN102593759B (zh) | 2015-07-01 |
Family
ID=46482091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210035146.0A Active CN102593759B (zh) | 2012-02-16 | 2012-02-16 | 大截面导线一牵二展放施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102593759B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104993419B (zh) * | 2015-06-05 | 2018-04-03 | 天津送变电工程公司 | 输电线路放线施工导引绳分绳工艺 |
CN106207868A (zh) * | 2016-06-28 | 2016-12-07 | 江苏永太新能源科技有限公司 | 一种走二走三拖线法施工工艺 |
CN112563972A (zh) * | 2020-12-08 | 2021-03-26 | 中国电建集团山东电力建设第一工程有限公司 | 一种追踪炮索道跨越施工方法及系统 |
CN113800326B (zh) * | 2021-09-22 | 2022-10-25 | 宁夏智安电力工程有限公司 | 架空输电线路施工方法 |
CN114221289B (zh) * | 2021-12-01 | 2024-03-19 | 浙江省送变电工程有限公司 | 一种间隙型自阻尼导线大跨越架线施工方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102208777A (zh) * | 2011-03-24 | 2011-10-05 | 青海送变电工程公司 | V形串导线滑车并列悬挂施工方法 |
-
2012
- 2012-02-16 CN CN201210035146.0A patent/CN102593759B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102208777A (zh) * | 2011-03-24 | 2011-10-05 | 青海送变电工程公司 | V形串导线滑车并列悬挂施工方法 |
Non-Patent Citations (3)
Title |
---|
±600kV直流输电示范工程1000mm2大截面导线张力放线技术;吕兆福等;《黑龙江电力》;20111231;第33卷(第6期);第455-457页 * |
500kV四分裂大截面导线张力架线施工;陈方东;《电力建设》;20030531;第24卷(第5期);第24-26页和第29页 * |
超高压输电线路张力放线施工;季鑫;《机械管理开发》;20081031;第23卷(第5期);第59-61页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102593759A (zh) | 2012-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102290742B (zh) | 张力架线施工工艺 | |
CN102354926A (zh) | 大截面导线张力架线施工方法 | |
CN100440660C (zh) | 超长大截面电缆的机械敷设方法 | |
CN102593759B (zh) | 大截面导线一牵二展放施工工艺 | |
CN203377546U (zh) | 跨越高速铁路施工装置 | |
CN204316006U (zh) | 一种输电线路带电跨越封网装置 | |
CN109687349B (zh) | 一种旁路电缆架线方法及其专用设备 | |
CN212210305U (zh) | 一种输电线路跨越封网结构 | |
CN204068054U (zh) | 一种多分裂大截面导线牵张共场张力架线施工系统 | |
JP5812325B2 (ja) | 電線張力低減装置及び電線張力低減工法 | |
CN102324712A (zh) | 一种高压输变电线路带电跨越施工方法 | |
CN101442194A (zh) | 超、特高压线路施工无跨越架跨越方法 | |
CN101582572A (zh) | 一种特高压张力架线的方法 | |
CN102347596A (zh) | 一种8分裂导线紧挂线及附件安装方法 | |
CN105780658A (zh) | 一种空间索面结构缆索系统横向对拉方法 | |
CN212025936U (zh) | 用于斜拉桥塔端连续型钢绞线斜拉索安装的设备 | |
CN111355187B (zh) | 一种利用旧导线封网跨越高铁更换导地线的方法 | |
CN102403673A (zh) | 新型2×一牵三张力架线施工工艺 | |
CN105113414A (zh) | 一种悬索桥主索快速架设方法 | |
CN101335435B (zh) | 塔上液压紧线方法及其系统 | |
CN103311844A (zh) | 山区地形跨越带电高压线路的架线方法 | |
CN203129020U (zh) | 一种现浇箱梁超长张拉穿束装置 | |
CN203722136U (zh) | 用于跨越铁路张力架线施工的绝缘绳网装置 | |
CN203445520U (zh) | 带电跨越装置 | |
CN208508389U (zh) | 一种三相四线制线缆紧线器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121221 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Applicant after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Applicant before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd. |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20121221 Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Applicant after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. Applicant after: State Grid Corporation of China Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Applicant before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |