CN102324712A - 一种高压输变电线路带电跨越施工方法 - Google Patents

一种高压输变电线路带电跨越施工方法 Download PDF

Info

Publication number
CN102324712A
CN102324712A CN201110277417A CN201110277417A CN102324712A CN 102324712 A CN102324712 A CN 102324712A CN 201110277417 A CN201110277417 A CN 201110277417A CN 201110277417 A CN201110277417 A CN 201110277417A CN 102324712 A CN102324712 A CN 102324712A
Authority
CN
China
Prior art keywords
rope
safety net
power transmission
construction
voltage power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110277417A
Other languages
English (en)
Inventor
彭世建
吕明
张松华
余秋安
高文林
汤祖澎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
Hubei Electric Transmission & Transformation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Electric Transmission & Transformation Engineering Co filed Critical Hubei Electric Transmission & Transformation Engineering Co
Priority to CN201110277417A priority Critical patent/CN102324712A/zh
Publication of CN102324712A publication Critical patent/CN102324712A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明公开了一种高压输变电线路带电跨越施工方法,包含以下步骤:①施工准备:计算跨越架位置、高度和宽度;②搭设跨越架:按照所设计的跨越架型式,在新建线路跨越档两侧铁塔上安装悬吊滑车的辅助抱杆,在抱杆上悬吊双层滑车,将迪尼玛绳穿过双层滑车,形成索道,作为安全网的承载绳,安全网通过吊带及小滑轮悬挂在承载绳下方;③展放绝缘引绳;④展放导线、地线:在安全网上方利用绝缘引绳展放导线、地线及安装附件;⑤带电跨越施工完毕后拆除所搭设的跨越架。应用本发明方法节约跨越架租用资金,施工速度快、绝缘强度好,具有很高的可靠性、实用性、优越性,具有较高的社会经济效益。

Description

一种高压输变电线路带电跨越施工方法
技术领域
本发明涉及输变电电力线路施工工艺,具体地说涉及一种高压输变电线路带电跨越施工方法,特别适用于220kV~1000kV高压输变电线路施工中跨越公路、铁路、江河、高压电力线、被跨电力线电压等级可达500kV的输变电电力线路带电跨越施工方法。
背景技术
随着电网建设的发展,输变电工程中,带电跨越施工量越来越多,跨越难度也是越来越大,同时国家标准规范中对带电跨越的要求也越来越高。高压输变电线路施工中会跨越常见的公路、铁路、江河、高压电力线。为了保证输变电电力线路施工安全,带电跨越架的研发工作显得非常迫切。现有的跨越施工中搭设的跨越架有毛竹跨越架、柱式跨越架(四柱、每相四柱或每相双柱)等多种形式,高压输变电线路施工对搭设跨越架提出新的安全性等要求,不仅要考虑带电跨越施工的绝缘性能,而且还要考虑到运输及安装便利性和劳动强度、对被跨越场地的适应性、搭设和拆除跨越架工作的劳动强度、跨越架能适应的档距范围、使用方式、操作便利性等等因素,目前国内外并没有现成的带电跨越施工经验可借鉴。
发明内容
本发明的目的在于解决上述背景技术中存在的问题,提供一种适应档距范围广、跨越架轻便、场地适应性好、使用方式灵活多变、操作简单、绝缘强度高的高压输变电线路带电跨越施工方法。
为实现上述目的,本发明提供的一种高压输变电线路带电跨越施工方法,其技术方案包含以下步骤:
①、施工准备:根据输变电线路被跨越对象的参数设计跨越架型式,计算跨越架位置、高度和宽度;
②、搭设跨越架:按照所设计的跨越架型式,在新建线路跨越档两侧铁塔上安装悬吊滑车的辅助抱杆,在抱杆上悬吊双层滑车,将迪尼玛绳穿过双层滑车,形成索道,迪尼玛绳形成的索道作为安全网的承载绳,安全网通过吊带及小滑轮悬挂在承载绳下方,采用绝缘循环绳拖着安全网在承载绳上滑动并定位;
③、展放绝缘引绳:根据跨越架线施工中的跨距参数,选择展放绝缘引绳的方法:所需跨距大的施工条件下,采用遥控飞机或飞艇、动力伞,在安全网上方高空展放绝缘引绳;所需跨距小的施工条件下,采用带电作业人员登上被跨越杆塔及导线,人工在安全网上方高空展放绝缘引绳;
④、展放导线、地线:在安全网上方利用绝缘引绳展放钢丝绳引绳,再由钢丝绳引绳展放导线、地线,并在安全网上方进行紧线、挂线操作,最后附件安装;
⑤、带电跨越施工完毕后拆除所搭设的跨越架。
本发明在施工前的准备工作中,综合考虑多方面因素,合理考虑输变电线路被跨越对象的参数设计跨越架的型式,本发明提供的跨越架具有如下优点:1、最大跨越档距可以达到500米以上,最小跨距不受限制,具有适应档距范围广的优点;2、整个跨越架的网架主要为绳网设备,采用迪尼玛绳、安全网、杜邦绳、玻璃钢杆、双层滑车等自重都非常轻的设备,给运输及安装等带来了非常大的便利;3、整个跨越架搭设过程中,索道直接支撑在跨越塔上,索道以下地形对跨越架的搭设和拆除毫无影响,场地适应性好;4、跨越架可以很好的满足公路、铁路、水库湖泊、电力线等所有跨越对象的要求,跨越对象范围广;5、可以和立柱式跨越架配合使用,以提高局部的绳网驰度;也可以用于一个跨越档内同时跨越多个跨越物;也可以用于连续档多处跨越;也可以用于任意直线塔和耐张塔;甚至可以不需要在铁塔上横绑抱杆,将双层滑车直接悬挂在铁塔塔身上,或将迪尼玛索道直接锚固在山体上使用,使用方式灵活多变,适应于各种地形的被跨越物;6、跨越架的搭设及展放等操作与张力放线类似,辅助设备完全和放线设备相同,无须额外配置。工人搭设跨越架非常熟练,功效高,对于一般的跨越,搭设和拆除跨越架只要一个工作日,操作简单,大大降低了劳动强度;7、跨越设备都具有很高的绝缘性能,可以满足跨越500kV及以上电力线的要求。
本发明具有较高的社会经济性效益,为特高压试验示范工程安全施工、提高工效、实现环保目标提供了技术支持,也为今后国内其它特高压项目中带电跨越施工具有重大的参考价值和指导意义。
附图说明
图1为本发明总体施工工艺流程图;
图2为本发明跨越架结构示意图;图中,1、抱杆;2、双层滑车;3、迪尼玛绳;4、安全网;5、滑轮;6、循环绳;7、玻璃钢杆;8、绳盘。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
如图1所示,高压输变电线路带电跨越施工方法,包含以下步骤:
①、施工准备:根据输变电线路被跨越对象的参数设计跨越架型式,计算跨越架位置、高度和宽度;
②、搭设跨越架:按照所设计的跨越架型式,在新建线路跨越档两侧铁塔上安装悬吊滑车的辅助抱杆,在该抱杆上悬吊双层滑车,将迪尼玛绳穿过该滑车,形成索道,作为安全网的承载绳,安全网通过吊带及小滑轮悬挂在承载绳下方,采用绝缘循环绳拖着安全网在承载绳上滑动并定位;
③、展放绝缘引绳:根据跨越架线施工中的跨距参数,选择展放绝缘引绳的方法:所需跨距大的施工条件下,采用遥控飞机或飞艇、动力伞,在安全网上方高空展放绝缘引绳;所需跨距小的施工条件下,采用带电作业人员登上被跨越杆塔及导线,人工在安全网上方高空展放绝缘引绳;
④、展放导线、地线:在安全网上方利用绝缘引绳展放钢丝绳引绳,再由钢丝绳引绳展放导线、地线,并在安全网上方进行紧线、挂线操作,最后附件安装;
⑤、带电跨越施工完毕后拆除所搭设的跨越架。
具体实施例
以1000kV特高压试验基地输变电线路施工中电力线路架线施工带电跨越施工为例详细说明本发明方法。
1、施工之前:
根据输变电线路被跨越对象的参数设计跨越架型式,计算跨越架位置、高度和宽度,整体设计跨越架,计算出跨越架施工所需的绝缘材料、各种工器具,做好运输材料和安装、搭设跨越架的准备工作。
2、搭设跨越架:
参阅图2所示,在新建线路跨越档两侧铁塔上安装辅助抱杆1,在抱杆1上悬吊特制的双层滑车2。将直径φ为16mm的迪尼玛绳3穿过该双层滑车2,形成索道,作为安全网的承载绳。安全网4通过吊带及小滑轮5悬挂在承载绳下,通过直径φ为10mm循环绳6拖着安全网4在承载绳上滑动及定位。
采用尼龙绳编织安全网4,安全网4由多个单网连接而成,单网长度为10米,相邻的单网连接以延长单网的长度,安全网的四周有绳鼻,用于与其他绳或钩对接。
安全网附件包括玻璃钢支撑杆7,在安全网4上设置一些玻璃钢支撑杆,防止安全网横向收缩。玻璃钢支撑杆采用玻璃钢材质,自重轻,强度较高,具有一定的耐磨性,除了可以承受导线重力的载荷外,还可以撑开安全网防止其枕行收缩变形,玻璃钢支撑杆的杆长6.2米,双环间距6米,与安全网同宽,玻璃钢支撑杆的两端有铁环方便与其他绳或钩对接。
小滑轮和挂钩通过尼龙吊带连接起来,小滑轮的侧板打开,将小滑轮挂到迪尼玛绳上,轮体材料为尼龙,侧板材料为玻璃钢,既保证了迪尼玛绳不被磨损,也保证了小滑轮的绝缘性能。挂钩采用安全腰带常用的挂钩,开合操作简单方便。
双层滑车包括依次固定于两个侧板之间的挂钩、上轮和下轮,挂钩载荷大于或等于5吨,上轮供直径φ为16mm的迪尼玛绳穿行,且载荷大于或等于3吨;下轮供直径φ为10mm的循环绳穿行,且载荷大于或等于2吨,上下轮的侧板都能打开,方便上绳和下绳进出。轮体材料为尼龙,侧板材料为玻璃钢,既保证了不磨损迪尼玛绳,也保证了双层滑车的绝缘性能。
迪尼玛承载绳,采用直径φ为16mm的迪尼玛承载绳,是荷兰进口的高强度纤维编织的编织物,外面浸有防腐油剂,以防水和腐蚀物,作为承载绳索外面还包裹丙轮编织物以防磨损。它的比重比水小,比同等直径钢丝绳轻87.5%左右,保证其绝缘性能好,伸缩率小,能防紫外线,强度高,比同等直径钢丝绳强度高1.5倍左右。直径φ为16mm迪尼玛高强度承载绳,拉断力为210kN,拉断伸缩率为3.8%,线密度0.132kg/m,包护套后单重0.177kg/m。循环绳的直径φ为10mm,采用进口杜邦丝编织而成,绝缘性能好,自重小,拉断力可达20kN。
辅助设备主要指:组塔抱杆1、绳盘8、放线架、绞磨、磨绳、钢丝绳套、卸扣、旋转连接器、转向滑车、绳夹、接地线等。这些设备完全直接采用张力放线设备施工,无须额外配置。
3、展放绝缘引绳:
根据跨越架线施工中的跨距参数,选择展放绝缘引绳的方法,所需跨距大的施工条件下,采用遥控飞机或飞艇、动力伞,在安全网上方高空展放绝缘引绳;所需跨距小的施工条件下,采用带电作业人员登上被跨越杆塔及导线,人工在安全网上方高空展放绝缘引绳。
4、展放导线、地线:
在安全网上方利用绝缘引绳展放导线、地线,并在安全网上方进行紧线、挂线操作,最后安装附件;具体的展放导线、地线施工方法同其它的特高压展放线施工工艺。
带电跨越施工完毕后拆除所搭设的跨越架。
应用本发明方法在特高压输电线架线试验基地验证了搭设跨越架及拆除跨越架都只需一个工作日即可完成,节约跨越架租用资金,可防止被跨线路迎峰度夏拉闸停电,又实现了跨越架高效搭设,大量节省了工程费用。
这些试验验证了本发明方法具有很强的可靠性、实用性、优越性。
本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (9)

1.一种高压输变电线路带电跨越施工方法,其特征在于包含以下步骤:
①、施工准备:根据输变电线路被跨越对象的参数设计跨越架型式,计算跨越架位置、高度和宽度;
②、搭设跨越架:按照所设计的跨越架型式,在新建线路跨越档两侧铁塔上安装悬吊滑车的辅助抱杆,在抱杆上悬吊双层滑车,将迪尼玛绳穿过双层滑车,形成索道作为安全网的承载绳,安全网通过吊带及小滑轮悬挂在承载绳下方,采用绝缘循环绳拖着安全网在承载绳上滑动并定位;
③、展放绝缘引绳:根据跨越架线施工中的跨距参数,选择展放绝缘引绳的方法:所需跨距大的施工条件下,采用遥控飞机或飞艇、动力伞,在安全网上方高空展放绝缘引绳;所需跨距小的施工条件下,采用带电作业人员登上被跨越杆塔及导线,人工在安全网上方高空展放绝缘引绳;
④、展放导线、地线:在安全网上方利用绝缘引绳展放钢丝绳引绳,再由钢丝绳引绳展放导线、地线,并在安全网上方进行紧线、挂线操作,最后附件安装;
⑤、带电跨越施工完毕后拆除所搭设的跨越架。
2.根据权利要求1所述的高压输变电线路带电跨越施工方法,其特征在于:步骤①中被跨越对象的参数包括被跨越物公路、铁路或江河的地形、高压电力线高度、宽度、被跨越电力线电压等级。
3.根据权利要求1所述的高压输变电线路带电跨越施工方法,其特征在于:在步骤②中,所述迪尼玛绳直径φ为16~18mm,所述循环绳的直径φ为10~12mm。
4.根据权利要求1所述的高压输变电线路带电跨越施工方法,其特征在于:在步骤②中,安全网上设置多根玻璃钢支撑杆。
5.根据权利要求1-4任一所述的高压输变电线路带电跨越施工方法,其特征在于:在步骤②中,所述安全网为多张单安全网连接而成,所述每张单安全网采用尼龙绳编织而成,每张单安全网的长度为10米。
6.根据权利要求5所述的高压输变电线路带电跨越施工方法,其特征在于:在步骤②中,所述双层滑车包括依次固定于两个侧板之间的挂钩、上轮和下轮,所述挂钩载荷大于或等于5吨,所述上轮供迪尼玛绳穿行,且载荷大于或等于3吨,所述下轮供绝缘循环绳穿行,且载荷大于或等于2吨。
7.根据权利要求6所述的高压输变电线路带电跨越施工方法,其特征在于:所采用的迪尼玛绳拉断力大于或等于210kN。
8.根据权利要求6所述的高压输变电线路带电跨越施工方法,其特征在于:所采用的绝缘循环绳拉断力大于或等于20kN。
9.根据权利要求8所述的高压输变电线路带电跨越施工方法,其特征在于:在步骤④中,所安装的附件包括组塔抱杆、绳盘、放线架、绞磨、磨绳、钢丝绳套、卸扣、旋转连接器、转向滑车、绳夹、接地线。
CN201110277417A 2011-09-19 2011-09-19 一种高压输变电线路带电跨越施工方法 Pending CN102324712A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110277417A CN102324712A (zh) 2011-09-19 2011-09-19 一种高压输变电线路带电跨越施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110277417A CN102324712A (zh) 2011-09-19 2011-09-19 一种高压输变电线路带电跨越施工方法

Publications (1)

Publication Number Publication Date
CN102324712A true CN102324712A (zh) 2012-01-18

Family

ID=45452399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110277417A Pending CN102324712A (zh) 2011-09-19 2011-09-19 一种高压输变电线路带电跨越施工方法

Country Status (1)

Country Link
CN (1) CN102324712A (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103236656A (zh) * 2013-04-08 2013-08-07 国家电网公司 一种立柱悬索式跨越架及其作业方法
CN103311844A (zh) * 2013-05-31 2013-09-18 山西太行建设开发有限公司 山区地形跨越带电高压线路的架线方法
CN103427369A (zh) * 2013-08-29 2013-12-04 国家电网公司 展放跨越架绳索用双层滑车及其使用方法
CN103840396A (zh) * 2014-02-24 2014-06-04 国网重庆云阳县供电有限责任公司 一种高压铁塔更换避雷线的方法
CN104133976A (zh) * 2014-08-25 2014-11-05 国家电网公司 一种索道式跨越架承载绳受力计算方法
CN106786157A (zh) * 2016-12-31 2017-05-31 浙江省送变电工程公司 通航水面上方的输电线路大跨越拆旧方法
CN107834434A (zh) * 2017-09-27 2018-03-23 安徽送变电工程公司 用于输电线路张力放线施工的跨越方法
CN108512123A (zh) * 2018-06-13 2018-09-07 贵州电网有限责任公司 一种用于高压输电线路的快速封网器
CN108736377A (zh) * 2018-08-16 2018-11-02 国网湖南省电力有限公司 一种放线施工跨越电力线路的带电跨越系统及其应用方法
CN109167302A (zh) * 2018-08-17 2019-01-08 安徽送变电工程有限公司 一种用于输电线路紧挂线施工的导线端部牵拉方法
CN109861138A (zh) * 2019-03-22 2019-06-07 内蒙古送变电有限责任公司 一种使用无人机高空架线跨越原始森林施工方法
CN111884124A (zh) * 2020-07-15 2020-11-03 宁夏荣光电力工程有限公司 一种带电跨越的封网装置及其使用方法
CN112152152A (zh) * 2020-10-10 2020-12-29 国网新疆电力有限公司昌吉供电公司 输电线路跨越装置及其使用方法
CN113690794A (zh) * 2021-08-27 2021-11-23 中国电建集团重庆工程有限公司 基于山体的超长档距封网方法
CN114221251A (zh) * 2021-10-29 2022-03-22 中国电建集团贵州电力设计研究院有限公司 一种在带电连接导线上方进行铁塔接线的搭接方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1288276A (zh) * 2000-08-02 2001-03-21 国家电力公司电力建设研究所 利用架空索道进行跨越施工的方法及其装置
CN201355751Y (zh) * 2009-01-23 2009-12-02 湖北省输变电工程公司 一种绝缘索网带电跨越架

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1288276A (zh) * 2000-08-02 2001-03-21 国家电力公司电力建设研究所 利用架空索道进行跨越施工的方法及其装置
CN201355751Y (zh) * 2009-01-23 2009-12-02 湖北省输变电工程公司 一种绝缘索网带电跨越架

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
凌一朋等: "对不停电跨越施工安全的探讨与建议", 《电力建设》 *
檀英: "浅析输电线路跨越铁路的施工技术", 《山西建筑》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103236656A (zh) * 2013-04-08 2013-08-07 国家电网公司 一种立柱悬索式跨越架及其作业方法
CN103236656B (zh) * 2013-04-08 2017-02-08 国家电网公司 一种立柱悬索式跨越架及其作业方法
CN103311844A (zh) * 2013-05-31 2013-09-18 山西太行建设开发有限公司 山区地形跨越带电高压线路的架线方法
CN103311844B (zh) * 2013-05-31 2016-02-10 山西太行建设开发有限公司 山区地形跨越带电高压线路的架线方法
CN103427369A (zh) * 2013-08-29 2013-12-04 国家电网公司 展放跨越架绳索用双层滑车及其使用方法
CN103427369B (zh) * 2013-08-29 2016-12-28 国家电网公司 展放跨越架绳索用双层滑车及其使用方法
CN103840396A (zh) * 2014-02-24 2014-06-04 国网重庆云阳县供电有限责任公司 一种高压铁塔更换避雷线的方法
CN104133976A (zh) * 2014-08-25 2014-11-05 国家电网公司 一种索道式跨越架承载绳受力计算方法
CN104133976B (zh) * 2014-08-25 2017-04-12 国家电网公司 一种索道式跨越架承载绳受力计算方法
CN106786157A (zh) * 2016-12-31 2017-05-31 浙江省送变电工程公司 通航水面上方的输电线路大跨越拆旧方法
CN107834434A (zh) * 2017-09-27 2018-03-23 安徽送变电工程公司 用于输电线路张力放线施工的跨越方法
CN108512123A (zh) * 2018-06-13 2018-09-07 贵州电网有限责任公司 一种用于高压输电线路的快速封网器
CN108512123B (zh) * 2018-06-13 2024-02-02 贵州电网有限责任公司 一种用于高压输电线路的快速封网器
CN108736377A (zh) * 2018-08-16 2018-11-02 国网湖南省电力有限公司 一种放线施工跨越电力线路的带电跨越系统及其应用方法
CN109167302A (zh) * 2018-08-17 2019-01-08 安徽送变电工程有限公司 一种用于输电线路紧挂线施工的导线端部牵拉方法
CN109861138A (zh) * 2019-03-22 2019-06-07 内蒙古送变电有限责任公司 一种使用无人机高空架线跨越原始森林施工方法
CN111884124A (zh) * 2020-07-15 2020-11-03 宁夏荣光电力工程有限公司 一种带电跨越的封网装置及其使用方法
CN111884124B (zh) * 2020-07-15 2021-05-28 宁夏荣光电力工程有限公司 一种带电跨越的封网装置及其使用方法
CN112152152A (zh) * 2020-10-10 2020-12-29 国网新疆电力有限公司昌吉供电公司 输电线路跨越装置及其使用方法
CN113690794A (zh) * 2021-08-27 2021-11-23 中国电建集团重庆工程有限公司 基于山体的超长档距封网方法
CN113690794B (zh) * 2021-08-27 2022-08-26 中国电建集团重庆工程有限公司 基于山体的超长档距封网方法
CN114221251A (zh) * 2021-10-29 2022-03-22 中国电建集团贵州电力设计研究院有限公司 一种在带电连接导线上方进行铁塔接线的搭接方法
CN114221251B (zh) * 2021-10-29 2024-01-23 中国电建集团贵州电力设计研究院有限公司 一种在带电连接导线上方进行铁塔接线的搭接方法

Similar Documents

Publication Publication Date Title
CN102324712A (zh) 一种高压输变电线路带电跨越施工方法
CN201355751Y (zh) 一种绝缘索网带电跨越架
CN202881852U (zh) 悬索桥缆索安装系统
CN204316006U (zh) 一种输电线路带电跨越封网装置
CN202090286U (zh) 一种适用于自锚式双索面悬索桥的牵引系统
CN203645249U (zh) 一种钩网平面式带电跨越装置
CN102354926A (zh) 大截面导线张力架线施工方法
CN101442194A (zh) 超、特高压线路施工无跨越架跨越方法
CN102290742B (zh) 张力架线施工工艺
CN204068054U (zh) 一种多分裂大截面导线牵张共场张力架线施工系统
CN203080400U (zh) 一种单叶双曲面空间索网主缆的特大跨径悬索桥
CN205489264U (zh) 液压装配式跨越架
CN204316007U (zh) 一种输电线路跨越施工装置
CN101958519B (zh) 一种双回路双分裂输电线路直线塔带电异地升高改造方法
CN103311844B (zh) 山区地形跨越带电高压线路的架线方法
CN102593759B (zh) 大截面导线一牵二展放施工工艺
CN105586832A (zh) 悬挂式猫道面网安装系统
CN201325826Y (zh) 地下厂房天锚梁吊装装置
CN201252365Y (zh) 超、特高压输电线路施工带电跨越装置
CN203722136U (zh) 用于跨越铁路张力架线施工的绝缘绳网装置
CN203445520U (zh) 带电跨越装置
CN205025154U (zh) 一种330kV GIS配电装置场地刚接风帆式构架
CN101966823A (zh) 一种承力索跨越架及其架设方法
CN207677356U (zh) 加强型钢管悬索跨越架
CN102611057A (zh) 跨越网

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd.

TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Applicant after: State Grid Corporation of China

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120118