CN106276294B - A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems - Google Patents
A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems Download PDFInfo
- Publication number
- CN106276294B CN106276294B CN201610731523.2A CN201610731523A CN106276294B CN 106276294 B CN106276294 B CN 106276294B CN 201610731523 A CN201610731523 A CN 201610731523A CN 106276294 B CN106276294 B CN 106276294B
- Authority
- CN
- China
- Prior art keywords
- shipping
- vehicle
- trench
- car
- overhead traveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B1/00—General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
- B61B1/005—Rail vehicle marshalling systems; Rail freight terminals
Abstract
The invention discloses a kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, and there is traverse table, transfer lines, track switch, parking line, shipping trench, mobile overhead crane, solution to compile trench, fixed overhead traveling crane, tramcar, shipping lorry, shipping trench planar section, shipping trench bevel phase and car lifting J-Horner lifting platform.Present invention accomplishes conversion of each vehicle when subsequent handling and bicycle parking ship;Solve the technical barrier of a variety of models mixing shipping and saved a large amount of vehicle production time costs;Solves the technical barrier that the shipping of volume state is conciliate in a variety of models reorganization;While reducing floor space a large amount of financial cost have been saved for company again;Meet that owner validates the car, hands over the needs of car at any time, improve company's integrated production capacity.
Description
Technical field
The present invention relates to a kind of system of urban track traffic bicycle parking shipping, more particularly to a kind of more cars of urban track traffic
The system of type bicycle parking shipping.
Background technology
In rail traffic vehicles manufacturing process, the storage and lifting shipping of vehicle are one and its important step.Car
Storage be mainly vehicle manufacture after owner do not have also temporarily during demand need continue stored temporarily in plant area, due to vehicle
Volume itself it is larger thus floor space very greatly and back and forth between move backward it is also relatively difficult.So how to utilize limited field
Ground, rational to put a variety of models be an important process layout.
In addition, to owner hand over car when need by the vehicle of storage go to shipping line by lifting or vehicle ship method into
Row shipping.Must take into consideration in hoisting process the shipping form of a variety of models, vehicle hoisting point position, vehicle overall size etc. because
Element, to ensure to meet a variety of models, the requirement of dispatching a car in the form of various shippings.
So car stowage is one and its important step with shipping.The process layout of rationalization, just right set
Standby and correct apparatus and method could meet the various technological requirements of vehicle manufacture, and can be that company saves substantial amounts of people
Power and material resources, and a kind of apparatus and method of multi-vehicle-type bicycle parking shipping can fully meet the bicycle parking shipping of existing a variety of models
Substantial amounts of financial cost can be saved for company.
The content of the invention
The present invention proposes a kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, solves bicycle parking in the prior art
The problem of system of shipping can only ship single vehicle, makes the system that bicycle parking ships use enhanced convenience fast
It is prompt.
In order to solve the above technical problem, the present invention provides following technical solution:
A kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, wherein, including traverse table, transfer lines, track switch, bicycle parking
Line, ships trench, mobile overhead crane, and solution compiles trench, fixed overhead traveling crane;
The parking line is provided with 7 tracks, and the track is arranged in parallel successively from top to bottom, the center line of the track
Distance is 4m, and the track is pressed is named as 1-7 tracks successively from top to bottom;
The transfer lines is arranged on the right side of parking line, and passes through traverse table and No. 1 orbital docking of parking line;
The track switch uses No. 7 track switches of standard, is separately positioned on No. 1 track and No. 2 tracks, No. 1 track and No. 3 tracks
Between;
The shipping trench is set on the left of parking line, and is connected with No. 1 orbital docking position;
The fixed overhead traveling crane is set on the left of parking line, and is set up along the longitudinal direction across parking line;
The mobile overhead crane is arranged on the right side of the fixed overhead traveling crane, and is set up along the longitudinal direction across parking line, the shifting
Dynamic overhead traveling crane can be vertically moved along long rails;
The solution is compiled trench and is arranged on the left of parking line, is attached with No. 2 tracks and No. 3 tracks.
Further, the shipping trench is made of shipping trench planar section and shipping trench bevel phase, ships trench
Width is not less than 4.8m, and the shipping trench planar section depth is not less than 1.3 meters of trench, and length is not less than 40m;The shipping
Trench inclined-plane segment length is 20m, and does slope processing.
Structure of the subway is typically all four marshallings or six marshalling modules, and the appearance and size of each module is essentially the same, its suspension centre
Position is basically identical, and need not solve volume trench during solution volume.Therefore the shipping of railcar is relatively easy;Parking line will be stored in
On railcar solution editorial afterword be directly pushed into vehicle hoisting area below two overhead traveling cranes, ensure two by adjusting portable overhead traveling crane
Its following distance is exactly that the lifting point position of railcar ships so as to complete lifting;A kind of railcar lifts shipping method,
Comprise the following steps:The first step, when owner wants car preparation shipping, vehicle is directly compiled trench solution in solution and compiled by technologist, solves and compiles
Can individually it walk per train afterwards;Second step, is pushed into suitable position below fixed overhead traveling crane and mobile overhead crane by head car first, adjusts
Whole mobile overhead crane, makes fixed overhead traveling crane and mobile overhead crane act directly on vehicle hoisting point position by suspender;3rd step, head car handling
Afterwards, promote successively and all vehicles behind handling, completion lifting shipping.
The shipping method of three module tramcars:Three module tramcars include 1 number car, middle car and 2 number cars;Including
Following steps:
The first step:Three module tramcars are moved to suitable position below overhead traveling crane, fixed overhead traveling crane and portable overhead traveling crane
1 number car vehicle hoisting point position is acted directly on by suspender;Technologist compiles trench completion solution using solution and compiles, by 1 number car
It is completely isolated out with middle car below and 2 number cars;The automobile-used fixed overhead traveling crane of 1 number and portable overhead traveling crane for solving editorial afterword are adjusted to
Ship lorry;
Second step:After 1 number car is by overhead traveling crane handling, remaining middle car and 2 number car, two module can be directly pushed into two days
Suitable position below car;Fixed overhead traveling crane and portable overhead traveling crane are acted on into 2 number car hoisting point positions at the same time, then utilize solution
Compile trench and carry out solution volume separation;2 number cars are directly hung on shipping lorry by fixed overhead traveling crane and portable overhead traveling crane;
3rd step:After all handlings of two head cars, remaining middle vehicle commander's degree is shorter and has a bogie can be with independent stations
Vertical and walking;Middle car is moved into the suitable position below fixed overhead traveling crane or portable overhead traveling crane;Four legs are added to hang using an overhead traveling crane
Car in band handling, completes lifting shipping.
A kind of method that tramcar integrally ships, comprises the following steps:
The first step:Track of the installation with bicycle parking railway line to rail on shipping lorry;
Second step:Lorry will be shipped to pour into shipping trench and complete with bicycle parking railway line to rail;
3rd step:Tramcar vehicle is pushed on shipping lorry, and with being shipped after shipping fixture fixed vehicle.
A kind of urban track traffic multi-vehicle-type parking method, comprises the following steps:
The first step:Traverse table is moved to and is docked with No. 1 track and transfer lines;
Second step:Reorganization vehicle passes sequentially through transfer lines and traverse table enters No. 1 track;
3rd step:As needed, reorganization vehicle can be respectively enterd into No. 2 tracks and No. 3 tracks by track switch, completes vehicle
It is temporary.
The beneficial effect that is reached of the present invention is:
1st, conversion of each vehicle when subsequent handling and bicycle parking ship is met.2nd, solves a variety of models mixing shipping
Technical barrier and a large amount of vehicle production time costs are saved.3rd, solves the technology that the shipping of volume state is conciliate in a variety of models reorganization
Problem.4th, a large amount of financial cost have been saved for company again while reducing floor space.5th, meet that owner validates the car, hands over car at any time
Demand, improves company's integrated production capacity.
Brief description of the drawings
Attached drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention
Apply example to be used to explain the present invention together, be not construed as limiting the invention.In the accompanying drawings:
Fig. 1 be the present invention turn sequence plane arrangement structure schematic diagram;
Fig. 2 is the tramcar shipping step schematic diagram of the present invention;
Fig. 3 is the railcar shipping step schematic diagram of the present invention;
The utilization that Fig. 4 is the present invention ships trench shipping vehicle shipping schematic diagram;
Fig. 5 is the utilization car lifting J-Horner lifting platform shipping vehicle shipping schematic diagram of the present invention;
Fig. 6 is the utilization car lifting J-Horner lifting platform shipping vehicle shipping top view of the present invention
In figure:1st, traverse table;2nd, transfer lines;3rd, track switch;4th, parking line;5th, trench is shipped;6th, mobile overhead crane;7th, solution compiles ground
Ditch;8th, fixed overhead traveling crane;9th, tramcar;10th, lorry is shipped;11st, trench planar section is shipped;12nd, trench bevel phase is shipped;13、
Car lifting J-Horner lifting platform.
Embodiment
The preferred embodiment of the present invention is illustrated below in conjunction with attached drawing, it will be appreciated that described herein preferred real
Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1
As shown in Figure 1, the present invention provides a kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, including traverse table 1,
Transfer lines 2, track switch 3, parking line 4 ship trench 5, mobile overhead crane 6, and solution compiles trench 7, fixed overhead traveling crane 8;
Traverse table 1:A kind of equipment similar to transfer bridge, its main function are to complete car body welding, application, assembling in vehicle
And the connection after quiet tune with dynamic line transfer outside workshop, secondly vehicle can be by moving car after the dynamic debugging of dynamic line transfer completion is tested
Platform goes to bicycle parking shipping line;
Transfer lines 2:The railway line arranged according to company's overall planning and process layout, is mainly used for vehicle and turns sequence;
Track switch 3:Using No. 7 track switches of standard, its main function is the reversing between satisfaction 1,2, No. 3 parking lines, because
2nd, No. 3 line arrangements, which understand, compiles trench, and vehicle must solve volume when dispatching a car for some special vehicles, and need solution during solution volume and compile ground
Ditch could be completed;
Parking line 4:4 main function of parking line is the interim storage for vehicle, and the spacing of every track centerline is
4m, what safety factor when this is mainly according to vehicle appearance and size itself and consideration vehicle lifting determined.And gauge uses
Standard gauge 1435mm meets the storage of a variety of models;
Ship trench 5:There is the situation of particular/special requirement to vehicle shipping form primarily directed to some special vehicles and owner,
Shipping trench 5 can meet that vehicle directly shipping need not be lifted using overhead traveling crane, in a kind of optional embodiment, ship trench 5
Width 4.8m meets that lorry normally enters, its structural dimensions is above to do slope processing for 20 meters, behind 40 meters be a depth
The trench of 1.3 meters of degree, ensures lorry by making it with depositing into the smooth trench of 40 meters of length, 1.3 meters of depth behind slope position
Fare orbital docking ships so as to complete the vehicle of vehicle;
Mobile overhead crane 6:Bearing capacity 32t, main function is that the vehicle for solving editorial afterword is hung on lorry to ship, due to different
Vehicle has different lifting points, so this overhead traveling crane is portable, has 18 meters of long displacement distances so as to meet different automobile types
The vehicle lifting operation of different suspension centres;
Solution compiles trench 7:Main function is the solution volume process for vehicle, for most of vehicle, the shipping of vehicle
Need to arrange trench ability when all needing to solve the single-row shipping of editorial afterword, but compiling the technological requirement vehicle solution volume of process according to solution
Complete solution to compile, and solve 1.3 meters of depth for compiling trench, 1.2 meters of width, 20 meters of length is determined by related process requirement;
Fixed overhead traveling crane 8:Fixed overhead traveling crane 8 acts on substantially consistent with portable overhead traveling crane 6, and unique difference is exactly basis fixation
It cannot vertically move, bearing capacity 32t.Since each module of every kind of vehicle and a kind of vehicle is all different, some modules are only
An overhead traveling crane is needed to complete lifting, and most of vehicle modules are required for the operation at the same time of two overhead traveling cranes to complete vehicle
Lifting shipping.
Parking line 4 is provided with 7 tracks, and track is arranged in parallel successively from top to bottom, and the center line distance of track is 4mm,
Track is pressed is named as 1-7 tracks successively from top to bottom;
Transfer lines 2 is arranged on the right side of parking line 4, and passes through traverse table 1 and No. 1 orbital docking of parking line 4;So can be with
Realize No. 1 track of the reorganization vehicle directly by transfer lines 2 by traverse table 1 to parking line 4, realize the bicycle parking of reorganization vehicle.
Track switch 3 using standard No. 7 track switches, be separately positioned on No. 1 track and No. 2 tracks, No. 1 track and No. 3 tracks it
Between;If reorganizing vehicle needs to solve volume, No. 2 tracks or No. 3 tracks can be transported to vehicle will be reorganized by setting track switch 3,
Reorganization vehicle is subjected to solution volume in solution compiles trench 7 again.
Ship trench 5 and the left side of parking line 4 is set, and be connected with No. 1 orbital docking position;Suitable for reorganization shipping when
Wait, a reorganization vehicle can be carried out and directly carry out reorganization shipping by shipping trench 5.
Fixed overhead traveling crane 8 sets the left side of parking line 4, and is set up along the longitudinal direction across parking line 4;
Mobile overhead crane 6 is arranged on the fixed left side of overhead traveling crane 8, and is set up along the longitudinal direction across parking line 4, and mobile overhead crane 6 can
Vertically moved along long rails;
Solution compiles trench 7 and is arranged on the left side of parking line 4, is attached with No. 2 tracks and No. 3 tracks;
Shipping trench 5 is made of shipping trench planar section 11 and shipping trench bevel phase 12;It is not small to ship 5 width of trench
In 4.8m, 11 depth of shipping trench planar section is not less than 1.3 meters of trench, and length is not less than 40m;The shipping trench is oblique
Face 12 length of section are 20m, and do slope processing, and shipping trench is mainly that the vehicle of convenient reorganization is shipped.
A kind of urban track traffic multi-vehicle-type parking method:Comprise the following steps:The first step:Traverse table 1 is moved to and 1
Number track and transfer lines 2 dock;Second step:Reorganization vehicle passes sequentially through transfer lines 2 and traverse table 1 enters No. 1 track;3rd
Step:As needed, reorganization vehicle can be respectively enterd into No. 2 tracks and No. 3 tracks by track switch 3, completes the temporary of vehicle.
Embodiment 2
As shown in Fig. 2, a kind of three modules, five module tramcars shipping method:This tramcar 9 and subway are most bright
The characteristics of aobvious, exactly three module tramcars 9 shared 2 bogies, and five module tramcars 9 only have 3 bogies altogether, and
Subway has 2 bogies per train.According to 9 technological requirement of tramcar, tramcar 9 is unable to vehicle handling, can only solve volume
Single-row lifting afterwards, and subway solution can be solved after compiling per train with independent ambulation but tramcar 9 editorial afterword part of module be cannot be only
Vertical support and walking, vehicle shipping step is described in detail with the tramcar 9 of 3 modules below.
The shipping method of three module tramcars 9, comprises the following steps:
Such as Fig. 2(A)It is shown, the first step:1. tramcar 9 is moved to below overhead traveling crane, fixed overhead traveling crane 8 and portable day
Car 6 acts directly on vehicle hoisting point position by suspender;2. after overhead traveling crane effect, technologist compiles the completion solution of trench 7 using solution and compiles,
Head car is completely isolated out with two trains below;3. solve the head car of editorial afterword directly can be adjusted to shipping lorry 10 with overhead traveling crane, and
Remaining two modules, which share two bogies, to stand and walk alone.
Such as Fig. 2(B)It is shown, second step:1. after a car is by overhead traveling crane handling, remaining two modules can directly be pushed into two overhead traveling cranes
The suitable position of lower section;2. two overhead traveling cranes are acted on a car hoisting point position at the same time, then compiling trench 7 using solution carries out solution volume point
From;3. overhead traveling crane acts on, after the completion of solution is compiled, head car can be directly hung on shipping lorry 10 by overhead traveling crane.
Such as Fig. 2(C)It is shown, the 3rd step:1. after all handlings of two head cars, remaining middle vehicle commander's degree is shorter and has one to turn
Independently it can stand and walk to frame;2. middle car is moved into fixed overhead traveling crane 8 or the suitable position of the portable lower section of overhead traveling crane 6;3.
Add four leg suspender belts can car directly in handling using an overhead traveling crane.
Embodiment 3
A kind of as shown in figure 3, railcar shipping method:Structure of the subway is typically all that four marshallings or six organize into groups modules, often
The appearance and size of a module is essentially the same, its hoisting point position is basically identical, and need not solve volume trench during solution volume.Therefore subway
Shipping it is relatively easy;The vehicle railcar solution editorial afterword being stored on parking line 4 being directly pushed into below two overhead traveling cranes
Hoisting area, ensures that two days following distances are exactly the lifting point position of railcar so as to completing by adjusting portable overhead traveling crane 6
Lifting shipping;Railcar handling method, comprises the following steps:
Such as Fig. 3(A)Shown, the first step, when owner wants car preparation shipping, technologist directly can compile vehicle solution, and solution is compiled
Can individually it walk per train afterwards;
Such as Fig. 3(B)Shown, second step, is pushed into suitable position below two overhead traveling cranes by head car first, adjusts mobile overhead crane 6,
Two crown block hooks are in vehicle hoisting point position;
Such as Fig. 3(C)Shown, the 3rd step, after head car handling, promotes and all vehicles behind handling, completion lifting successively
Shipping.
Embodiment 4
As shown in figure 4, in vehicle shipping process, owner considers that the various factors such as itself storage space, handling appliance can
It can may require that the form for taking vehicle to ship when vehicle supplying unit vehicle hands over car, and be directed to 9 technological requirement of tramcar not
Energy vehicle lifting, so using a kind of installation shipping fixture on shipping lorry 10 and the side for shipping trench 5 to ship can be combined
Method.
Vehicle shipping method is shipped using trench 5 is shipped, is comprised the following steps:1. 5 depth of trench is shipped by shipping lorry
10 height and shipping fixture determine that width need to meet lorry in planar section normally to rail;2. lorry 10 is shipped by shipping trench
Slope section 12 pours into shipping trench planar section 11 and completes with parking line 4 to rail;After 3. lorry completion and parking line 4 are to rail,
The shipping lorry 10 on tramcar 9 is pushed directly on, recycles the shipping fixture of lorry to dispatch a car after vehicle is fixed.
Embodiment 5
As seen in figs. 5-6, vehicle shipping method is shipped using car lifting J-Horner lifting platform 13, comprised the following steps:1. it will need
The tramcar 9 of shipping is pushed into the supporting point position of car lifting J-Horner lifting platform 13;2. starting car lifting J-Horner lifting platform 13, and car will be shipped
Rise to certain altitude;3. shipping lorry 10 enters 13 lower section suitable position of car lifting J-Horner lifting platform, car lifting J-Horner lifting platform 13 is utilized
Fall car to fix and then ship.
Present invention accomplishes conversion of each vehicle when subsequent handling and bicycle parking ship;Solves a variety of models mixing shipping
Technical barrier and saved a large amount of vehicle production time costs;Solves the technology that the shipping of volume state is conciliate in a variety of models reorganization
Problem;While reducing floor space a large amount of financial cost have been saved for company again;Meet that owner validates the car, hands over the need of car at any time
Ask, improve company's integrated production capacity.
Finally it should be noted that:It these are only the preferred embodiment of the present invention, be not intended to limit the invention, although
The present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can be right
Technical solution described in foregoing embodiments is modified, or carries out equivalent substitution to which part technical characteristic.It is all
Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on, should be included in the protection of the present invention
Within the scope of.
Claims (6)
1. a kind of urban track traffic multi-vehicle-type bicycle parking shipping systems, it is characterised in that including traverse table(1), transfer lines(2),
Track switch(3), parking line(4), ship trench(5), mobile overhead crane(6), solution volume trench(7), fixed overhead traveling crane(8);
The parking line(4)7 tracks are provided with, the track is arranged in parallel successively from top to bottom, the center line of the track
Distance is 4m, and the track is pressed is named as 1-7 tracks successively from top to bottom;
The transfer lines(2)It is arranged on parking line parking line(4)Right side, and pass through traverse table(1)With parking line(4)No. 1 rail
Dock in road;
The track switch(3)Using No. 7 track switches of standard, parking line is separately positioned on(4)No. 1 track and No. 2 tracks, No. 1 rail
Between road and No. 3 tracks;
The shipping trench(5)Parking line is set(4)Left side, and be connected with No. 1 orbital docking position;
The fixed overhead traveling crane(8)Parking line is set(4)Left side, and along the longitudinal direction across parking line(4)Set up;
The mobile overhead crane(6)It is arranged on the fixed overhead traveling crane(8)Right side, and along the longitudinal direction across parking line(4)Set up, institute
State mobile overhead crane(6)It can be vertically moved along long rails;
The solution compiles trench(7)It is arranged on parking line parking line(4)Left side, is attached with No. 2 tracks and No. 3 tracks.
2. urban track traffic multi-vehicle-type bicycle parking shipping systems according to claim 1, it is characterised in that:The shipping ground
Ditch(5)It is by shipping trench planar section(11)With shipping trench bevel phase(12)Composition, ships trench(5)Width is not less than
4.8m, the shipping trench planar section(11)Depth is not less than 1.3 meters of trench, and length is not less than 40m;The shipping trench is oblique
Face section(12)Length is 20m, and does slope processing.
3. the railcar lifting shipping method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1,
It is characterised in that it includes following steps:
S1:When owner wants car preparation shipping, vehicle is directly compiled trench by technologist in solution(7)Solution is compiled, and solution editorial afterword can per train
Individually to walk;
S2:Head car is pushed into fixed overhead traveling crane first(8)And mobile overhead crane(6)The suitable position in lower section, adjusts mobile overhead crane(6),
Make fixed overhead traveling crane(8)And mobile overhead crane(6)Vehicle hoisting point position is acted directly on by suspender;
S3:After head car handling, promote successively and all vehicles behind handling, completion lifting shipping.
4. three module tramcar shipping sides of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1
Method, the three modules tramcar(9)Including 1 number car, middle car and 2 number cars, it is characterised in that comprise the following steps:
S1:By three module tramcars(9)It is moved to suitable position below overhead traveling crane, fixed overhead traveling crane(8)With portable overhead traveling crane
(6)1 number car vehicle hoisting point position is acted directly on by suspender;Technologist compiles trench completion solution using solution and compiles, by 1 number
Car is completely isolated out with middle car below and 2 number cars;Solve the automobile-used fixed overhead traveling crane of 1 number of editorial afterword(8)With portable day
Car(6)It is adjusted to shipping lorry(10);
S2:After 1 number car is by overhead traveling crane handling, remaining middle car and 2 number car, two module can be directly pushed into below two overhead traveling cranes
Suitable position;By fixed overhead traveling crane(8)With portable overhead traveling crane(6)2 number car hoisting point positions are acted at the same time, are then compiled using solution
Trench(7)Carry out solution and compile separation;Pass through fixed overhead traveling crane(8)With portable overhead traveling crane(6)2 number cars are directly hung to shipping lorry
(10)On;
S3:After all handlings of two head cars, remaining middle vehicle commander's degree is shorter and has a bogie independently can stand and walk;
Middle car is moved into fixed overhead traveling crane(8)Or portable overhead traveling crane(6)The suitable position of lower section;Four leg suspender belts are added to hang using an overhead traveling crane
Car in fortune, completes lifting shipping.
5. the tramcar of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 2 integrally ships method,
It is characterised in that it includes following steps:
S1:In shipping lorry(10)Track of the upper installation with bicycle parking railway line to rail;
S2:Lorry will be shipped(10)Pour into shipping trench(5)And complete with bicycle parking railway line to rail;
S3:By tramcar(9)Vehicle is pushed into shipping lorry(10)On, and with being shipped after shipping fixture fixed vehicle.
6. the multi-vehicle-type parking method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1, its feature
It is, comprises the following steps:
S1:By traverse table(1)It is moved to and No. 1 track and transfer lines(2)Docking;
S2:Reorganization vehicle passes sequentially through transfer lines(2)And traverse table(1)Into No. 1 track;
S3:As needed, reorganization vehicle is passed through into track switch(3)No. 2 tracks and No. 3 tracks can be respectively enterd, complete the temporary of vehicle
Deposit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610731523.2A CN106276294B (en) | 2016-08-26 | 2016-08-26 | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610731523.2A CN106276294B (en) | 2016-08-26 | 2016-08-26 | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106276294A CN106276294A (en) | 2017-01-04 |
CN106276294B true CN106276294B (en) | 2018-05-11 |
Family
ID=57676727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610731523.2A Active CN106276294B (en) | 2016-08-26 | 2016-08-26 | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106276294B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112441089B (en) * | 2019-08-30 | 2022-03-18 | 比亚迪股份有限公司 | Train dispatching control method, platform and system, intelligent carriage and medium |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1378802A (en) * | 1971-11-18 | 1974-12-27 | Mini Verkehrswesen | Railway marshalling yard system |
CN2038076U (en) * | 1988-07-06 | 1989-05-24 | 李宗录 | Formation-disassembly of car group for freight train |
CN2412801Y (en) * | 1999-12-17 | 2001-01-03 | 王家庠 | Rail train marshalling station railway carriage transversing transponting equipment |
EP1129922A2 (en) * | 2000-03-03 | 2001-09-05 | Tiefenbach GmbH | Method for controlling the gravity shunting from a slope of a marshalling yard of the wagons of a railway train to be segregated. |
CN1743214A (en) * | 2005-06-20 | 2006-03-08 | 向川北 | Motor vehicle railway conveying system |
CN101070122A (en) * | 2006-05-12 | 2007-11-14 | 上海明路绳网索具有限公司 | Container loading-unloading automatic flow-line |
CN201659985U (en) * | 2010-01-22 | 2010-12-01 | 北京铁道工程机电技术研究所 | Comprehensive underfloor lifting system for high-speed electricity multiple units |
CN102501852A (en) * | 2011-11-21 | 2012-06-20 | 铁道第三勘察设计院集团有限公司 | Layout structure for integration of train depot and junction station of urban rail |
CN102529980A (en) * | 2012-02-24 | 2012-07-04 | 铁道第三勘察设计院集团有限公司 | Intensive structure for railcar-train parks |
CN103770790A (en) * | 2014-02-20 | 2014-05-07 | 四川大学 | Overhead rail transport platform system |
CN104742913A (en) * | 2013-12-27 | 2015-07-01 | 王冠军 | System and method for realizing station-front turning-back of urban rail transit |
-
2016
- 2016-08-26 CN CN201610731523.2A patent/CN106276294B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1378802A (en) * | 1971-11-18 | 1974-12-27 | Mini Verkehrswesen | Railway marshalling yard system |
CN2038076U (en) * | 1988-07-06 | 1989-05-24 | 李宗录 | Formation-disassembly of car group for freight train |
CN2412801Y (en) * | 1999-12-17 | 2001-01-03 | 王家庠 | Rail train marshalling station railway carriage transversing transponting equipment |
EP1129922A2 (en) * | 2000-03-03 | 2001-09-05 | Tiefenbach GmbH | Method for controlling the gravity shunting from a slope of a marshalling yard of the wagons of a railway train to be segregated. |
CN1743214A (en) * | 2005-06-20 | 2006-03-08 | 向川北 | Motor vehicle railway conveying system |
CN101070122A (en) * | 2006-05-12 | 2007-11-14 | 上海明路绳网索具有限公司 | Container loading-unloading automatic flow-line |
CN201659985U (en) * | 2010-01-22 | 2010-12-01 | 北京铁道工程机电技术研究所 | Comprehensive underfloor lifting system for high-speed electricity multiple units |
CN102501852A (en) * | 2011-11-21 | 2012-06-20 | 铁道第三勘察设计院集团有限公司 | Layout structure for integration of train depot and junction station of urban rail |
CN102529980A (en) * | 2012-02-24 | 2012-07-04 | 铁道第三勘察设计院集团有限公司 | Intensive structure for railcar-train parks |
CN104742913A (en) * | 2013-12-27 | 2015-07-01 | 王冠军 | System and method for realizing station-front turning-back of urban rail transit |
CN103770790A (en) * | 2014-02-20 | 2014-05-07 | 四川大学 | Overhead rail transport platform system |
Also Published As
Publication number | Publication date |
---|---|
CN106276294A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2014044006A1 (en) | Layout structure and assembly method for bogie flexible production line | |
CN102817329B (en) | Process for erecting construction auxiliary girder on existing railway | |
CN110055902A (en) | Bridge construction method and its erection method on a kind of large-tonnage box beam normotopia bale handle | |
CN107933578A (en) | A kind of transportation resources and pipeline | |
CN203866654U (en) | Mobile assembly platform used for ballastless track laying construction | |
CN106276294B (en) | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems | |
CN201659985U (en) | Comprehensive underfloor lifting system for high-speed electricity multiple units | |
CN102826094B (en) | Rail transit train system | |
CN114542094A (en) | Arrangement mode for battery car group rail transfer in miniature shield tunnel | |
CN203922540U (en) | Hydraulic pressure change the outfit frame and complete equipment thereof | |
CN202743237U (en) | Rail transit train system | |
CN208037564U (en) | A kind of container rail-road movement system | |
CN207903820U (en) | A kind of two-way side draw device | |
CN203769791U (en) | Small curvature radius steering sliding device for shield train equipment | |
US10946876B2 (en) | Connected transportation network system | |
CN211733747U (en) | Compatible fixed frame vehicle system of float tram | |
CN202574213U (en) | Intensive structure for railroad train park lot | |
CN202861765U (en) | Bogie flexible assembly line layout structure | |
CN106218645B (en) | A kind of rail traffic reorganization vehicle is dispatched a car system | |
CN112031490A (en) | Vehicle base structure of moving platform of suspended monorail train and process flow | |
CN207293955U (en) | The railway track construction for possessing new derricking gear is hung with just beam is traversing | |
CN213948443U (en) | Power-concentrated motor train unit integrated sand feeding system | |
CN212507607U (en) | Vehicle base structure of moving platform of suspension type monorail train | |
CN215710230U (en) | Side loading and unloading system for road-rail combined transportation of containers | |
CN204738237U (en) | 660t low clearance rail line fortune roof beam car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |