CN106276294B CN201610731523.2A CN201610731523A CN106276294B CN 106276294 B CN106276294 B CN 106276294B CN 201610731523 A CN201610731523 A CN 201610731523A CN 106276294 B CN106276294 B CN 106276294B
Authority
CN
China
Prior art keywords
shipping
vehicle
trench
car
overhead traveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610731523.2A
Other languages
Chinese (zh)
Other versions
CN106276294A (en
Inventor
姜中辉
李向宝
胡玖林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Changke Xinzhu Track Traffic Equipment Co Ltd
Original Assignee
Chengdu Changke Xinzhu Track Traffic Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Changke Xinzhu Track Traffic Equipment Co Ltd filed Critical Chengdu Changke Xinzhu Track Traffic Equipment Co Ltd
Priority to CN201610731523.2A priority Critical patent/CN106276294B/en
Publication of CN106276294A publication Critical patent/CN106276294A/en
Application granted granted Critical
Publication of CN106276294B publication Critical patent/CN106276294B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G63/00Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • B61B1/005Rail vehicle marshalling systems; Rail freight terminals

Abstract

The invention discloses a kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, and there is traverse table, transfer lines, track switch, parking line, shipping trench, mobile overhead crane, solution to compile trench, fixed overhead traveling crane, tramcar, shipping lorry, shipping trench planar section, shipping trench bevel phase and car lifting J-Horner lifting platform.Present invention accomplishes conversion of each vehicle when subsequent handling and bicycle parking ship;Solve the technical barrier of a variety of models mixing shipping and saved a large amount of vehicle production time costs;Solves the technical barrier that the shipping of volume state is conciliate in a variety of models reorganization;While reducing floor space a large amount of financial cost have been saved for company again;Meet that owner validates the car, hands over the needs of car at any time, improve company's integrated production capacity.

Description

A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems
Technical field
The present invention relates to a kind of system of urban track traffic bicycle parking shipping, more particularly to a kind of more cars of urban track traffic The system of type bicycle parking shipping.
Background technology
In rail traffic vehicles manufacturing process, the storage and lifting shipping of vehicle are one and its important step.Car Storage be mainly vehicle manufacture after owner do not have also temporarily during demand need continue stored temporarily in plant area, due to vehicle Volume itself it is larger thus floor space very greatly and back and forth between move backward it is also relatively difficult.So how to utilize limited field Ground, rational to put a variety of models be an important process layout.
In addition, to owner hand over car when need by the vehicle of storage go to shipping line by lifting or vehicle ship method into Row shipping.Must take into consideration in hoisting process the shipping form of a variety of models, vehicle hoisting point position, vehicle overall size etc. because Element, to ensure to meet a variety of models, the requirement of dispatching a car in the form of various shippings.
So car stowage is one and its important step with shipping.The process layout of rationalization, just right set Standby and correct apparatus and method could meet the various technological requirements of vehicle manufacture, and can be that company saves substantial amounts of people Power and material resources, and a kind of apparatus and method of multi-vehicle-type bicycle parking shipping can fully meet the bicycle parking shipping of existing a variety of models Substantial amounts of financial cost can be saved for company.
The content of the invention
The present invention proposes a kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, solves bicycle parking in the prior art The problem of system of shipping can only ship single vehicle, makes the system that bicycle parking ships use enhanced convenience fast It is prompt.
In order to solve the above technical problem, the present invention provides following technical solution:
A kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, wherein, including traverse table, transfer lines, track switch, bicycle parking Line, ships trench, mobile overhead crane, and solution compiles trench, fixed overhead traveling crane;
The parking line is provided with 7 tracks, and the track is arranged in parallel successively from top to bottom, the center line of the track Distance is 4m, and the track is pressed is named as 1-7 tracks successively from top to bottom;
The transfer lines is arranged on the right side of parking line, and passes through traverse table and No. 1 orbital docking of parking line;
The track switch uses No. 7 track switches of standard, is separately positioned on No. 1 track and No. 2 tracks, No. 1 track and No. 3 tracks Between;
The shipping trench is set on the left of parking line, and is connected with No. 1 orbital docking position;
The fixed overhead traveling crane is set on the left of parking line, and is set up along the longitudinal direction across parking line;
The mobile overhead crane is arranged on the right side of the fixed overhead traveling crane, and is set up along the longitudinal direction across parking line, the shifting Dynamic overhead traveling crane can be vertically moved along long rails;
The solution is compiled trench and is arranged on the left of parking line, is attached with No. 2 tracks and No. 3 tracks.
Further, the shipping trench is made of shipping trench planar section and shipping trench bevel phase, ships trench Width is not less than 4.8m, and the shipping trench planar section depth is not less than 1.3 meters of trench, and length is not less than 40m;The shipping Trench inclined-plane segment length is 20m, and does slope processing.
Structure of the subway is typically all four marshallings or six marshalling modules, and the appearance and size of each module is essentially the same, its suspension centre Position is basically identical, and need not solve volume trench during solution volume.Therefore the shipping of railcar is relatively easy;Parking line will be stored in On railcar solution editorial afterword be directly pushed into vehicle hoisting area below two overhead traveling cranes, ensure two by adjusting portable overhead traveling crane Its following distance is exactly that the lifting point position of railcar ships so as to complete lifting;A kind of railcar lifts shipping method, Comprise the following steps:The first step, when owner wants car preparation shipping, vehicle is directly compiled trench solution in solution and compiled by technologist, solves and compiles Can individually it walk per train afterwards;Second step, is pushed into suitable position below fixed overhead traveling crane and mobile overhead crane by head car first, adjusts Whole mobile overhead crane, makes fixed overhead traveling crane and mobile overhead crane act directly on vehicle hoisting point position by suspender;3rd step, head car handling Afterwards, promote successively and all vehicles behind handling, completion lifting shipping.
The shipping method of three module tramcars:Three module tramcars include 1 number car, middle car and 2 number cars;Including Following steps:
The first step:Three module tramcars are moved to suitable position below overhead traveling crane, fixed overhead traveling crane and portable overhead traveling crane 1 number car vehicle hoisting point position is acted directly on by suspender;Technologist compiles trench completion solution using solution and compiles, by 1 number car It is completely isolated out with middle car below and 2 number cars;The automobile-used fixed overhead traveling crane of 1 number and portable overhead traveling crane for solving editorial afterword are adjusted to Ship lorry;
Second step:After 1 number car is by overhead traveling crane handling, remaining middle car and 2 number car, two module can be directly pushed into two days Suitable position below car;Fixed overhead traveling crane and portable overhead traveling crane are acted on into 2 number car hoisting point positions at the same time, then utilize solution Compile trench and carry out solution volume separation;2 number cars are directly hung on shipping lorry by fixed overhead traveling crane and portable overhead traveling crane;
3rd step:After all handlings of two head cars, remaining middle vehicle commander's degree is shorter and has a bogie can be with independent stations Vertical and walking;Middle car is moved into the suitable position below fixed overhead traveling crane or portable overhead traveling crane;Four legs are added to hang using an overhead traveling crane Car in band handling, completes lifting shipping.
A kind of method that tramcar integrally ships, comprises the following steps:
The first step:Track of the installation with bicycle parking railway line to rail on shipping lorry;
Second step:Lorry will be shipped to pour into shipping trench and complete with bicycle parking railway line to rail;
3rd step:Tramcar vehicle is pushed on shipping lorry, and with being shipped after shipping fixture fixed vehicle.
A kind of urban track traffic multi-vehicle-type parking method, comprises the following steps:
The first step:Traverse table is moved to and is docked with No. 1 track and transfer lines;
Second step:Reorganization vehicle passes sequentially through transfer lines and traverse table enters No. 1 track;
3rd step:As needed, reorganization vehicle can be respectively enterd into No. 2 tracks and No. 3 tracks by track switch, completes vehicle It is temporary.
The beneficial effect that is reached of the present invention is:
1st, conversion of each vehicle when subsequent handling and bicycle parking ship is met.2nd, solves a variety of models mixing shipping Technical barrier and a large amount of vehicle production time costs are saved.3rd, solves the technology that the shipping of volume state is conciliate in a variety of models reorganization Problem.4th, a large amount of financial cost have been saved for company again while reducing floor space.5th, meet that owner validates the car, hands over car at any time Demand, improves company's integrated production capacity.
Brief description of the drawings
Attached drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Apply example to be used to explain the present invention together, be not construed as limiting the invention.In the accompanying drawings:
Fig. 1 be the present invention turn sequence plane arrangement structure schematic diagram;
Fig. 2 is the tramcar shipping step schematic diagram of the present invention;
Fig. 3 is the railcar shipping step schematic diagram of the present invention;
The utilization that Fig. 4 is the present invention ships trench shipping vehicle shipping schematic diagram;
Fig. 5 is the utilization car lifting J-Horner lifting platform shipping vehicle shipping schematic diagram of the present invention;
Fig. 6 is the utilization car lifting J-Horner lifting platform shipping vehicle shipping top view of the present invention
In figure:1st, traverse table;2nd, transfer lines;3rd, track switch;4th, parking line;5th, trench is shipped;6th, mobile overhead crane;7th, solution compiles ground Ditch;8th, fixed overhead traveling crane;9th, tramcar;10th, lorry is shipped;11st, trench planar section is shipped;12nd, trench bevel phase is shipped;13、 Car lifting J-Horner lifting platform.
Embodiment
The preferred embodiment of the present invention is illustrated below in conjunction with attached drawing, it will be appreciated that described herein preferred real Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1
As shown in Figure 1, the present invention provides a kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, including traverse table 1, Transfer lines 2, track switch 3, parking line 4 ship trench 5, mobile overhead crane 6, and solution compiles trench 7, fixed overhead traveling crane 8;
Traverse table 1:A kind of equipment similar to transfer bridge, its main function are to complete car body welding, application, assembling in vehicle And the connection after quiet tune with dynamic line transfer outside workshop, secondly vehicle can be by moving car after the dynamic debugging of dynamic line transfer completion is tested Platform goes to bicycle parking shipping line;
Transfer lines 2:The railway line arranged according to company's overall planning and process layout, is mainly used for vehicle and turns sequence;
Track switch 3:Using No. 7 track switches of standard, its main function is the reversing between satisfaction 1,2, No. 3 parking lines, because 2nd, No. 3 line arrangements, which understand, compiles trench, and vehicle must solve volume when dispatching a car for some special vehicles, and need solution during solution volume and compile ground Ditch could be completed;
Parking line 4:4 main function of parking line is the interim storage for vehicle, and the spacing of every track centerline is 4m, what safety factor when this is mainly according to vehicle appearance and size itself and consideration vehicle lifting determined.And gauge uses Standard gauge 1435mm meets the storage of a variety of models;
Ship trench 5:There is the situation of particular/special requirement to vehicle shipping form primarily directed to some special vehicles and owner, Shipping trench 5 can meet that vehicle directly shipping need not be lifted using overhead traveling crane, in a kind of optional embodiment, ship trench 5 Width 4.8m meets that lorry normally enters, its structural dimensions is above to do slope processing for 20 meters, behind 40 meters be a depth The trench of 1.3 meters of degree, ensures lorry by making it with depositing into the smooth trench of 40 meters of length, 1.3 meters of depth behind slope position Fare orbital docking ships so as to complete the vehicle of vehicle;
Mobile overhead crane 6:Bearing capacity 32t, main function is that the vehicle for solving editorial afterword is hung on lorry to ship, due to different Vehicle has different lifting points, so this overhead traveling crane is portable, has 18 meters of long displacement distances so as to meet different automobile types The vehicle lifting operation of different suspension centres;
Solution compiles trench 7:Main function is the solution volume process for vehicle, for most of vehicle, the shipping of vehicle Need to arrange trench ability when all needing to solve the single-row shipping of editorial afterword, but compiling the technological requirement vehicle solution volume of process according to solution Complete solution to compile, and solve 1.3 meters of depth for compiling trench, 1.2 meters of width, 20 meters of length is determined by related process requirement;
Fixed overhead traveling crane 8:Fixed overhead traveling crane 8 acts on substantially consistent with portable overhead traveling crane 6, and unique difference is exactly basis fixation It cannot vertically move, bearing capacity 32t.Since each module of every kind of vehicle and a kind of vehicle is all different, some modules are only An overhead traveling crane is needed to complete lifting, and most of vehicle modules are required for the operation at the same time of two overhead traveling cranes to complete vehicle Lifting shipping.
Parking line 4 is provided with 7 tracks, and track is arranged in parallel successively from top to bottom, and the center line distance of track is 4mm, Track is pressed is named as 1-7 tracks successively from top to bottom;
Transfer lines 2 is arranged on the right side of parking line 4, and passes through traverse table 1 and No. 1 orbital docking of parking line 4;So can be with Realize No. 1 track of the reorganization vehicle directly by transfer lines 2 by traverse table 1 to parking line 4, realize the bicycle parking of reorganization vehicle.
Track switch 3 using standard No. 7 track switches, be separately positioned on No. 1 track and No. 2 tracks, No. 1 track and No. 3 tracks it Between;If reorganizing vehicle needs to solve volume, No. 2 tracks or No. 3 tracks can be transported to vehicle will be reorganized by setting track switch 3, Reorganization vehicle is subjected to solution volume in solution compiles trench 7 again.
Ship trench 5 and the left side of parking line 4 is set, and be connected with No. 1 orbital docking position;Suitable for reorganization shipping when Wait, a reorganization vehicle can be carried out and directly carry out reorganization shipping by shipping trench 5.
Fixed overhead traveling crane 8 sets the left side of parking line 4, and is set up along the longitudinal direction across parking line 4;
Mobile overhead crane 6 is arranged on the fixed left side of overhead traveling crane 8, and is set up along the longitudinal direction across parking line 4, and mobile overhead crane 6 can Vertically moved along long rails;
Solution compiles trench 7 and is arranged on the left side of parking line 4, is attached with No. 2 tracks and No. 3 tracks;
Shipping trench 5 is made of shipping trench planar section 11 and shipping trench bevel phase 12;It is not small to ship 5 width of trench In 4.8m, 11 depth of shipping trench planar section is not less than 1.3 meters of trench, and length is not less than 40m;The shipping trench is oblique Face 12 length of section are 20m, and do slope processing, and shipping trench is mainly that the vehicle of convenient reorganization is shipped.
A kind of urban track traffic multi-vehicle-type parking method:Comprise the following steps:The first step:Traverse table 1 is moved to and 1 Number track and transfer lines 2 dock;Second step:Reorganization vehicle passes sequentially through transfer lines 2 and traverse table 1 enters No. 1 track;3rd Step:As needed, reorganization vehicle can be respectively enterd into No. 2 tracks and No. 3 tracks by track switch 3, completes the temporary of vehicle.
Embodiment 2
As shown in Fig. 2, a kind of three modules, five module tramcars shipping method:This tramcar 9 and subway are most bright The characteristics of aobvious, exactly three module tramcars 9 shared 2 bogies, and five module tramcars 9 only have 3 bogies altogether, and Subway has 2 bogies per train.According to 9 technological requirement of tramcar, tramcar 9 is unable to vehicle handling, can only solve volume Single-row lifting afterwards, and subway solution can be solved after compiling per train with independent ambulation but tramcar 9 editorial afterword part of module be cannot be only Vertical support and walking, vehicle shipping step is described in detail with the tramcar 9 of 3 modules below.
The shipping method of three module tramcars 9, comprises the following steps:
Such as Fig. 2(A)It is shown, the first step:1. tramcar 9 is moved to below overhead traveling crane, fixed overhead traveling crane 8 and portable day Car 6 acts directly on vehicle hoisting point position by suspender;2. after overhead traveling crane effect, technologist compiles the completion solution of trench 7 using solution and compiles, Head car is completely isolated out with two trains below;3. solve the head car of editorial afterword directly can be adjusted to shipping lorry 10 with overhead traveling crane, and Remaining two modules, which share two bogies, to stand and walk alone.
Such as Fig. 2(B)It is shown, second step:1. after a car is by overhead traveling crane handling, remaining two modules can directly be pushed into two overhead traveling cranes The suitable position of lower section;2. two overhead traveling cranes are acted on a car hoisting point position at the same time, then compiling trench 7 using solution carries out solution volume point From;3. overhead traveling crane acts on, after the completion of solution is compiled, head car can be directly hung on shipping lorry 10 by overhead traveling crane.
Such as Fig. 2(C)It is shown, the 3rd step:1. after all handlings of two head cars, remaining middle vehicle commander's degree is shorter and has one to turn Independently it can stand and walk to frame;2. middle car is moved into fixed overhead traveling crane 8 or the suitable position of the portable lower section of overhead traveling crane 6;3. Add four leg suspender belts can car directly in handling using an overhead traveling crane.
Embodiment 3
A kind of as shown in figure 3, railcar shipping method:Structure of the subway is typically all that four marshallings or six organize into groups modules, often The appearance and size of a module is essentially the same, its hoisting point position is basically identical, and need not solve volume trench during solution volume.Therefore subway Shipping it is relatively easy;The vehicle railcar solution editorial afterword being stored on parking line 4 being directly pushed into below two overhead traveling cranes Hoisting area, ensures that two days following distances are exactly the lifting point position of railcar so as to completing by adjusting portable overhead traveling crane 6 Lifting shipping;Railcar handling method, comprises the following steps:
Such as Fig. 3(A)Shown, the first step, when owner wants car preparation shipping, technologist directly can compile vehicle solution, and solution is compiled Can individually it walk per train afterwards;
Such as Fig. 3(B)Shown, second step, is pushed into suitable position below two overhead traveling cranes by head car first, adjusts mobile overhead crane 6, Two crown block hooks are in vehicle hoisting point position;
Such as Fig. 3(C)Shown, the 3rd step, after head car handling, promotes and all vehicles behind handling, completion lifting successively Shipping.
Embodiment 4
As shown in figure 4, in vehicle shipping process, owner considers that the various factors such as itself storage space, handling appliance can It can may require that the form for taking vehicle to ship when vehicle supplying unit vehicle hands over car, and be directed to 9 technological requirement of tramcar not Energy vehicle lifting, so using a kind of installation shipping fixture on shipping lorry 10 and the side for shipping trench 5 to ship can be combined Method.
Vehicle shipping method is shipped using trench 5 is shipped, is comprised the following steps:1. 5 depth of trench is shipped by shipping lorry 10 height and shipping fixture determine that width need to meet lorry in planar section normally to rail;2. lorry 10 is shipped by shipping trench Slope section 12 pours into shipping trench planar section 11 and completes with parking line 4 to rail;After 3. lorry completion and parking line 4 are to rail, The shipping lorry 10 on tramcar 9 is pushed directly on, recycles the shipping fixture of lorry to dispatch a car after vehicle is fixed.
Embodiment 5
As seen in figs. 5-6, vehicle shipping method is shipped using car lifting J-Horner lifting platform 13, comprised the following steps:1. it will need The tramcar 9 of shipping is pushed into the supporting point position of car lifting J-Horner lifting platform 13;2. starting car lifting J-Horner lifting platform 13, and car will be shipped Rise to certain altitude;3. shipping lorry 10 enters 13 lower section suitable position of car lifting J-Horner lifting platform, car lifting J-Horner lifting platform 13 is utilized Fall car to fix and then ship.
Present invention accomplishes conversion of each vehicle when subsequent handling and bicycle parking ship;Solves a variety of models mixing shipping Technical barrier and saved a large amount of vehicle production time costs;Solves the technology that the shipping of volume state is conciliate in a variety of models reorganization Problem;While reducing floor space a large amount of financial cost have been saved for company again;Meet that owner validates the car, hands over the need of car at any time Ask, improve company's integrated production capacity.
Finally it should be noted that:It these are only the preferred embodiment of the present invention, be not intended to limit the invention, although The present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can be right Technical solution described in foregoing embodiments is modified, or carries out equivalent substitution to which part technical characteristic.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on, should be included in the protection of the present invention Within the scope of.

Claims (6)

1. a kind of urban track traffic multi-vehicle-type bicycle parking shipping systems, it is characterised in that including traverse table(1), transfer lines(2), Track switch(3), parking line(4), ship trench(5), mobile overhead crane(6), solution volume trench(7), fixed overhead traveling crane(8);
The parking line(4)7 tracks are provided with, the track is arranged in parallel successively from top to bottom, the center line of the track Distance is 4m, and the track is pressed is named as 1-7 tracks successively from top to bottom;
The transfer lines(2)It is arranged on parking line parking line(4)Right side, and pass through traverse table(1)With parking line(4)No. 1 rail Dock in road;
The track switch(3)Using No. 7 track switches of standard, parking line is separately positioned on(4)No. 1 track and No. 2 tracks, No. 1 rail Between road and No. 3 tracks;
The shipping trench(5)Parking line is set(4)Left side, and be connected with No. 1 orbital docking position;
The fixed overhead traveling crane(8)Parking line is set(4)Left side, and along the longitudinal direction across parking line(4)Set up;
The mobile overhead crane(6)It is arranged on the fixed overhead traveling crane(8)Right side, and along the longitudinal direction across parking line(4)Set up, institute State mobile overhead crane(6)It can be vertically moved along long rails;
The solution compiles trench(7)It is arranged on parking line parking line(4)Left side, is attached with No. 2 tracks and No. 3 tracks.
2. urban track traffic multi-vehicle-type bicycle parking shipping systems according to claim 1, it is characterised in that:The shipping ground Ditch(5)It is by shipping trench planar section(11)With shipping trench bevel phase(12)Composition, ships trench(5)Width is not less than 4.8m, the shipping trench planar section(11)Depth is not less than 1.3 meters of trench, and length is not less than 40m;The shipping trench is oblique Face section(12)Length is 20m, and does slope processing.
3. the railcar lifting shipping method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1, It is characterised in that it includes following steps:
S1:When owner wants car preparation shipping, vehicle is directly compiled trench by technologist in solution(7)Solution is compiled, and solution editorial afterword can per train Individually to walk;
S2:Head car is pushed into fixed overhead traveling crane first(8)And mobile overhead crane(6)The suitable position in lower section, adjusts mobile overhead crane(6), Make fixed overhead traveling crane(8)And mobile overhead crane(6)Vehicle hoisting point position is acted directly on by suspender;
S3:After head car handling, promote successively and all vehicles behind handling, completion lifting shipping.
4. three module tramcar shipping sides of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1 Method, the three modules tramcar(9)Including 1 number car, middle car and 2 number cars, it is characterised in that comprise the following steps:
S1:By three module tramcars(9)It is moved to suitable position below overhead traveling crane, fixed overhead traveling crane(8)With portable overhead traveling crane (6)1 number car vehicle hoisting point position is acted directly on by suspender;Technologist compiles trench completion solution using solution and compiles, by 1 number Car is completely isolated out with middle car below and 2 number cars;Solve the automobile-used fixed overhead traveling crane of 1 number of editorial afterword(8)With portable day Car(6)It is adjusted to shipping lorry(10);
S2:After 1 number car is by overhead traveling crane handling, remaining middle car and 2 number car, two module can be directly pushed into below two overhead traveling cranes Suitable position;By fixed overhead traveling crane(8)With portable overhead traveling crane(6)2 number car hoisting point positions are acted at the same time, are then compiled using solution Trench(7)Carry out solution and compile separation;Pass through fixed overhead traveling crane(8)With portable overhead traveling crane(6)2 number cars are directly hung to shipping lorry (10)On;
S3:After all handlings of two head cars, remaining middle vehicle commander's degree is shorter and has a bogie independently can stand and walk; Middle car is moved into fixed overhead traveling crane(8)Or portable overhead traveling crane(6)The suitable position of lower section;Four leg suspender belts are added to hang using an overhead traveling crane Car in fortune, completes lifting shipping.
5. the tramcar of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 2 integrally ships method, It is characterised in that it includes following steps:
S1:In shipping lorry(10)Track of the upper installation with bicycle parking railway line to rail;
S2:Lorry will be shipped(10)Pour into shipping trench(5)And complete with bicycle parking railway line to rail;
S3:By tramcar(9)Vehicle is pushed into shipping lorry(10)On, and with being shipped after shipping fixture fixed vehicle.
6. the multi-vehicle-type parking method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1, its feature It is, comprises the following steps:
S1:By traverse table(1)It is moved to and No. 1 track and transfer lines(2)Docking;
S2:Reorganization vehicle passes sequentially through transfer lines(2)And traverse table(1)Into No. 1 track;
S3:As needed, reorganization vehicle is passed through into track switch(3)No. 2 tracks and No. 3 tracks can be respectively enterd, complete the temporary of vehicle Deposit.
CN201610731523.2A 2016-08-26 2016-08-26 A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems Active CN106276294B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610731523.2A CN106276294B (en) 2016-08-26 2016-08-26 A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610731523.2A CN106276294B (en) 2016-08-26 2016-08-26 A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems

Publications (2)

Publication Number Publication Date
CN106276294A CN106276294A (en) 2017-01-04
CN106276294B true CN106276294B (en) 2018-05-11

Family

ID=57676727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610731523.2A Active CN106276294B (en) 2016-08-26 2016-08-26 A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems

Country Status (1)

Country Link
CN (1) CN106276294B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112441089B (en) * 2019-08-30 2022-03-18 比亚迪股份有限公司 Train dispatching control method, platform and system, intelligent carriage and medium

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1378802A (en) * 1971-11-18 1974-12-27 Mini Verkehrswesen Railway marshalling yard system
CN2038076U (en) * 1988-07-06 1989-05-24 李宗录 Formation-disassembly of car group for freight train
CN2412801Y (en) * 1999-12-17 2001-01-03 王家庠 Rail train marshalling station railway carriage transversing transponting equipment
EP1129922A2 (en) * 2000-03-03 2001-09-05 Tiefenbach GmbH Method for controlling the gravity shunting from a slope of a marshalling yard of the wagons of a railway train to be segregated.
CN1743214A (en) * 2005-06-20 2006-03-08 向川北 Motor vehicle railway conveying system
CN101070122A (en) * 2006-05-12 2007-11-14 上海明路绳网索具有限公司 Container loading-unloading automatic flow-line
CN201659985U (en) * 2010-01-22 2010-12-01 北京铁道工程机电技术研究所 Comprehensive underfloor lifting system for high-speed electricity multiple units
CN102501852A (en) * 2011-11-21 2012-06-20 铁道第三勘察设计院集团有限公司 Layout structure for integration of train depot and junction station of urban rail
CN102529980A (en) * 2012-02-24 2012-07-04 铁道第三勘察设计院集团有限公司 Intensive structure for railcar-train parks
CN103770790A (en) * 2014-02-20 2014-05-07 四川大学 Overhead rail transport platform system
CN104742913A (en) * 2013-12-27 2015-07-01 王冠军 System and method for realizing station-front turning-back of urban rail transit

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1378802A (en) * 1971-11-18 1974-12-27 Mini Verkehrswesen Railway marshalling yard system
CN2038076U (en) * 1988-07-06 1989-05-24 李宗录 Formation-disassembly of car group for freight train
CN2412801Y (en) * 1999-12-17 2001-01-03 王家庠 Rail train marshalling station railway carriage transversing transponting equipment
EP1129922A2 (en) * 2000-03-03 2001-09-05 Tiefenbach GmbH Method for controlling the gravity shunting from a slope of a marshalling yard of the wagons of a railway train to be segregated.
CN1743214A (en) * 2005-06-20 2006-03-08 向川北 Motor vehicle railway conveying system
CN101070122A (en) * 2006-05-12 2007-11-14 上海明路绳网索具有限公司 Container loading-unloading automatic flow-line
CN201659985U (en) * 2010-01-22 2010-12-01 北京铁道工程机电技术研究所 Comprehensive underfloor lifting system for high-speed electricity multiple units
CN102501852A (en) * 2011-11-21 2012-06-20 铁道第三勘察设计院集团有限公司 Layout structure for integration of train depot and junction station of urban rail
CN102529980A (en) * 2012-02-24 2012-07-04 铁道第三勘察设计院集团有限公司 Intensive structure for railcar-train parks
CN104742913A (en) * 2013-12-27 2015-07-01 王冠军 System and method for realizing station-front turning-back of urban rail transit
CN103770790A (en) * 2014-02-20 2014-05-07 四川大学 Overhead rail transport platform system

Also Published As

Publication number Publication date
CN106276294A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
WO2014044006A1 (en) Layout structure and assembly method for bogie flexible production line
CN102817329B (en) Process for erecting construction auxiliary girder on existing railway
CN110055902A (en) Bridge construction method and its erection method on a kind of large-tonnage box beam normotopia bale handle
CN107933578A (en) A kind of transportation resources and pipeline
CN203866654U (en) Mobile assembly platform used for ballastless track laying construction
CN106276294B (en) A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems
CN201659985U (en) Comprehensive underfloor lifting system for high-speed electricity multiple units
CN102826094B (en) Rail transit train system
CN114542094A (en) Arrangement mode for battery car group rail transfer in miniature shield tunnel
CN203922540U (en) Hydraulic pressure change the outfit frame and complete equipment thereof
CN202743237U (en) Rail transit train system
CN208037564U (en) A kind of container rail-road movement system
CN207903820U (en) A kind of two-way side draw device
CN203769791U (en) Small curvature radius steering sliding device for shield train equipment
US10946876B2 (en) Connected transportation network system
CN211733747U (en) Compatible fixed frame vehicle system of float tram
CN202574213U (en) Intensive structure for railroad train park lot
CN202861765U (en) Bogie flexible assembly line layout structure
CN106218645B (en) A kind of rail traffic reorganization vehicle is dispatched a car system
CN112031490A (en) Vehicle base structure of moving platform of suspended monorail train and process flow
CN207293955U (en) The railway track construction for possessing new derricking gear is hung with just beam is traversing
CN213948443U (en) Power-concentrated motor train unit integrated sand feeding system
CN212507607U (en) Vehicle base structure of moving platform of suspension type monorail train
CN215710230U (en) Side loading and unloading system for road-rail combined transportation of containers
CN204738237U (en) 660t low clearance rail line fortune roof beam car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant