CN106276294A - A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems - Google Patents
A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems Download PDFInfo
- Publication number
- CN106276294A CN106276294A CN201610731523.2A CN201610731523A CN106276294A CN 106276294 A CN106276294 A CN 106276294A CN 201610731523 A CN201610731523 A CN 201610731523A CN 106276294 A CN106276294 A CN 106276294A
- Authority
- CN
- China
- Prior art keywords
- shipping
- vehicle
- trench
- car
- overhead traveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B1/00—General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
- B61B1/005—Rail vehicle marshalling systems; Rail freight terminals
Abstract
The invention discloses the system of a kind of urban track traffic multi-vehicle-type bicycle parking shipping, there is traverse table, transfer lines, track switch, parking line, shipping trench, mobile overhead crane, solution volume trench, fixing overhead traveling crane, tramcar, shipping lorry, shipping trench planar section, shipping trench bevel phase and car lifting J-Horner lifting platform.Present invention accomplishes the conversion when subsequent handling and bicycle parking ship of each vehicle;Solve the technical barrier of various vehicle mixing shipping and saved a large amount of vehicle production time cost;Solve the reorganization of various vehicle and conciliate the technical barrier of volume state shipping;A large amount of Financial cost has been saved for company again while reducing floor space;Meet owner to validate the car at any time, hand over the demand of car, improve company's integrated production capacity.
Description
Technical field
The present invention relates to the system of a kind of urban track traffic bicycle parking shipping, particularly to a kind of many cars of urban track traffic
The system of type bicycle parking shipping.
Background technology
In rail traffic vehicles manufacture process, the shipping of depositing and lift of vehicle is one and important step.Car
After depositing mainly vehicle manufacture, owner does not the most also have during demand to need to continue to deposit in plant area, due to vehicle temporarily
Volume own relatively big thus floor space the most greatly and back and forth between move backward the most relatively difficult.So how utilize limited field
Ground, reasonably to put various vehicle be an important process layout.
Entered it addition, need that when owner hands over car the vehicle deposited is gone to ships line by the method for lifting or car load shipping
Row shipping.Hoisting process must take into the shipping form of various vehicle, vehicle hoisting point position, vehicle overall size etc. because of
Element, to ensure to meet various vehicle, the requirement of dispatching a car of various shipping form.
So, car stowage is one and important step with shipping.The process layout rationalized, just right setting
Standby and correct apparatus and method could meet the various technological requirements that vehicle manufactures, and can save substantial amounts of people for company
Power and material resources, and the apparatus and method of a kind of multi-vehicle-type bicycle parking shipping can fully meet the bicycle parking shipping of existing various vehicle
Substantial amounts of Financial cost can be saved for company.
Summary of the invention
The present invention proposes the system of a kind of urban track traffic multi-vehicle-type bicycle parking shipping, solves bicycle parking in prior art
The problem that single vehicle can only be shipped by the system of shipping, it is fast that the system making bicycle parking ship uses enhanced convenience
Prompt.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
A kind of system of urban track traffic multi-vehicle-type bicycle parking shipping, wherein, including traverse table, transfer lines, track switch, parking line,
Shipping trench, mobile overhead crane, solve and compile trench, fixing overhead traveling crane;
Described parking line is provided with 7 tracks, and described track is arranged in parallel the most successively, the distance between center line of described track
For 4m, the most named 1-7 track pressed by described track;
Described transfer lines is arranged on the right side of parking line, and by traverse table and No. 1 orbital docking of parking line;
Described track switch uses No. 7 track switches of standard, be separately positioned on No. 1 track and No. 2 tracks, No. 1 track and No. 3 tracks it
Between;
Described shipping trench is arranged on the left of parking line, and is connected with No. 1 orbital docking position;
Described fixing overhead traveling crane is arranged on the left of parking line, and sets up across parking line along the longitudinal direction;
Described mobile overhead crane is arranged on the right side of described fixing overhead traveling crane, and sets up across parking line along the longitudinal direction, described mobile sky
Car can vertically move along long rails;
The described volume trench that solves is arranged on the left of parking line, is attached with No. 2 tracks and No. 3 tracks.
Further, described shipping trench is made up of shipping trench planar section and shipping trench bevel phase, ships trench
Width is not less than 4.8m, the described shipping trench planar section degree of depth trench not less than 1.3 meters, and length is not less than 40m;Described shipping
The a length of 20m of trench bevel phase, and put slope process.
Structure of the subway is typically all four marshallings or six marshalling modules, and the overall dimensions of each module is essentially the same, its suspension centre
Position is basically identical, and need not when solving volume solve compile trench.Therefore the shipping of railcar is relatively easy;Will be stored in parking line
On railcar solution editorial afterword be directly pushed into the vehicle hoisting area below two overhead traveling cranes, ensure two by adjusting portable overhead traveling crane
The position, lifting point of it following distance exactly railcar thus complete lifting shipping;A kind of railcar lifting shipping method,
Comprising the following steps: the first step, when owner wants car to prepare shipping, vehicle is directly being solved volume trench solution volume by technologist, solves and compiles
Rear every train can individually be walked;Second step, is first pushed into suitable position below fixing overhead traveling crane and mobile overhead crane by head car, adjusts
Whole mobile overhead crane, makes fixing overhead traveling crane and mobile overhead crane act directly on vehicle hoisting point position by suspender;3rd step, head car handling
After, promote successively and handling all vehicles below, complete lifting shipping.
The shipping method of three module tramcar: three module tramcar includes 1 number car, middle car and 2 number cars;Including
Following steps:
The first step: three module tramcar is moved to overhead traveling crane correct position, fixed overhead traveling crane and portable overhead traveling crane and passes through
Suspender acts directly on 1 number car vehicle hoisting point position;Technologist utilize solution compile trench complete solve compile, by 1 number car with after
Middle car and the 2 number cars in face are completely isolated out;The 1 automobile-used fixed overhead traveling crane of number and the portable overhead traveling crane that solve editorial afterword are adjusted to shipping
Lorry;
Second step: 1 number car is by after overhead traveling crane handling, and remaining middle car and 2 number car two modules can directly be pushed under two overhead traveling cranes
The correct position of side;Fixed overhead traveling crane and portable overhead traveling crane are acted simultaneously on 2 number car hoisting point positions, then utilizes to solve and compile ground
Ditch carries out solving compiles separation;Directly winch to ship on lorry by 2 number cars by fixed overhead traveling crane and portable overhead traveling crane;
3rd step: after two head car all handlings, remaining middle vehicle commander's degree shorter and have a bogie can independently stand and
Walking;Middle car is moved to the correct position below fixed overhead traveling crane or portable overhead traveling crane;Use an overhead traveling crane to add four lower limb suspender belts to hang
Car in fortune, completes lifting shipping.
The method of a kind of tramcar entirety shipping, comprises the following steps:
The first step: install the track with bicycle parking railway line tracking on shipping lorry;
Second step: shipping lorry is poured into shipping trench and completed and the tracking of bicycle parking railway line;
3rd step: tramcar car load is pushed on shipping lorry, and ships after fixing vehicle with shipping fixture.
A kind of urban track traffic multi-vehicle-type parking method, comprises the following steps:
The first step: move to traverse table dock with No. 1 track and transfer lines;
Second step: reorganization vehicle passes sequentially through transfer lines and traverse table enters No. 1 track;
3rd step: as required, can respectively enter No. 2 tracks and No. 3 tracks by reorganization vehicle by track switch, complete the temporary of vehicle
Deposit.
The present invention is reached to provide the benefit that:
1, the conversion when subsequent handling and bicycle parking ship of each vehicle is met.2, the technology of various vehicle mixing shipping is solved
A difficult problem and saved a large amount of vehicle production time cost.3, solve the reorganization of various vehicle and conciliate the technology difficulty of volume state shipping
Topic.4, a large amount of Financial cost has been saved for company again while reducing floor space.5, meet owner to validate the car at any time, hand over the need of car
Ask, improve company's integrated production capacity.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, with the reality of the present invention
Execute example together for explaining the present invention, be not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 be the present invention turn sequence plane arrangement structure schematic diagram;
Fig. 2 is the tramcar shipping step schematic diagram of the present invention;
Fig. 3 is the railcar shipping step schematic diagram of the present invention;
Fig. 4 is the utilization shipping trench shipping vehicle shipping schematic diagram of the present invention;
Fig. 5 is that the car lifting J-Horner lifting platform shipping vehicle that utilizes of the present invention ships schematic diagram;
Fig. 6 is that the car lifting J-Horner lifting platform shipping vehicle that utilizes of the present invention ships top view
In figure: 1, traverse table;2, transfer lines;3, track switch;4, parking line;5, shipping trench;6, mobile overhead crane;7, volume trench is solved;
8, fixing overhead traveling crane;9, tramcar;10, shipping lorry;11, shipping trench planar section;12, shipping trench bevel phase;13, unwheeling
Machine lifting platform.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred reality described herein
Execute example be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1
As it is shown in figure 1, the present invention provides the system that a kind of urban track traffic multi-vehicle-type bicycle parking ships, including traverse table 1, transhipment
Line 2, track switch 3, parking line 4, ship trench 5, mobile overhead crane 6, solve and compile trench 7, fixing overhead traveling crane 8;
Traverse table 1: a kind of equipment being similar to transfer bridge, its Main Function be vehicle complete car body welding, application, assembling and
The connection of dynamic line transfer with outside workshop after quiet tune, next to that vehicle completes to be turned by traverse table after dynamic debugging is tested in dynamic line transfer
Line is shipped to bicycle parking;
Transfer lines 2: the railway line arranged according to company's overall planning and process layout, is mainly used for vehicle and turns sequence;
Track switch 3: use No. 7 track switches of standard, its Main Function is to meet the reversing between 1,2, No. 3 parking lines, because 2, No. 3
Line is arranged to understand and is compiled trench, and when dispatching a car for some special vehicles, vehicle must solve volume, and need solution when solving volume and compile trench
Can complete;
Parking line 4: parking line 4 Main Function is temporarily depositing for vehicle, and the spacing of every track centerline is 4m, this
Mainly determine according to the safety factors when overall dimensions of vehicle own and consideration vehicle lifting.And gauge uses standard gauge
Depositing of various vehicle is met away from 1435mm;
Shipping trench 5: be primarily directed to some special vehicles and owner has the situation of particular/special requirement, shipping to vehicle shipping form
Trench 5 can meet car load and directly ship and need not use overhead traveling crane lifting, in a kind of optional embodiment, ships trench 5 width
4.8m meets lorry and normally enters, its structural dimensions be above 20 meters put slope process, after 40 meters be a degree of depth 1.3
The trench of rice, it is ensured that lorry makes itself and parking line rail by entrance length 40 meters, the smooth trench of the degree of depth 1.3 meters after putting position, slope
Road docks thus completes the car load shipping of vehicle;
Mobile overhead crane 6: bearing capacity 32t, Main Function is to winch to the vehicle solving editorial afterword ship, due to different vehicles on lorry
There is different Heave Heres, so this overhead traveling crane is portable, has 18 meters of long displacements thus meet different automobile types difference
The vehicle lifting operation of suspension centre;
Solve and compile trench 7: Main Function is the solution volume operation for vehicle, and for major part vehicle, the shipping of vehicle is all
Need to solve the single-row shipping of editorial afterword, but need to arrange that trench just can complete when the technological requirement vehicle solution compiling operation is compiled according to solving
Solving and compile, and solve the degree of depth 1.3 meters compiling trench, width 1.2 meters, length 20 meters is required to determine by related process;
Fixing overhead traveling crane 8: fixed overhead traveling crane 8 acts on substantially consistent with portable overhead traveling crane 6, and unique difference is exactly that basis is fixed from
Vertically move, bearing capacity 32t.Owing to each module of every kind of vehicle and a kind of vehicle is all different, some modules have only to
One overhead traveling crane completes to lift by crane, and major part vehicle modules is required for the operation simultaneously of two overhead traveling cranes and just can complete the lifting of vehicle
Shipping.
Parking line 4 is provided with 7 tracks, and track is arranged in parallel the most successively, and the distance between center line of track is 4mm,
The most named 1-7 track pressed by track;
Transfer lines 2 is arranged on the right side of parking line 4, and by No. 1 orbital docking of traverse table 1 with parking line 4;So can realize
Reorganization vehicle is directly passed through the traverse table 1 No. 1 track to parking line 4 by transfer lines 2, it is achieved the bicycle parking of reorganization vehicle.
Track switch 3 uses No. 7 track switches of standard, be separately positioned on No. 1 track and No. 2 tracks, No. 1 track and No. 3 tracks it
Between;Compile if reorganization vehicle needs to solve, can by arranging track switch 3 to reorganization vehicle being transported to No. 2 tracks or No. 3 tracks,
Carry out solving by reorganization vehicle in solving volume trench 7 again and compile.
Shipping trench 5 is arranged on the left of parking line 4, and is connected with No. 1 orbital docking position;Be applicable to reorganization shipping time
Wait, reorganization vehicle can be carried out directly to carry out reorganization shipping by shipping trench 5.
Fixing overhead traveling crane 8 is arranged on the left of parking line 4, and sets up across parking line 4 along the longitudinal direction;
Mobile overhead crane 6 is arranged on the left of fixing overhead traveling crane 8, and sets up across parking line 4 along the longitudinal direction, and mobile overhead crane 6 can be along
Long rails vertically moves;
Solve volume trench 7 and be arranged on the left of parking line 4, be attached with No. 2 tracks and No. 3 tracks;
Shipping trench 5 is made up of shipping trench planar section 11 and shipping trench bevel phase 12;Shipping trench 5 width is not less than
4.8m, described shipping trench planar section 11 degree of depth trench not less than 1.3 meters, length is not less than 40m;Described shipping trench inclined-plane
Section 12 a length of 20m, and put slope process, the vehicle of the most convenient reorganization of shipping trench ships.
A kind of urban track traffic multi-vehicle-type parking method: comprise the following steps: the first step: traverse table 1 is moved to and 1
Number track and transfer lines 2 dock;Second step: reorganization vehicle passes sequentially through transfer lines 2 and traverse table 1 enters No. 1 track;3rd
Step: as required, can respectively enter No. 2 tracks and No. 3 tracks by reorganization vehicle by track switch 3, completes the temporary of vehicle.
Embodiment 2
As in figure 2 it is shown, a kind of three module, five module tramcar shipping methods: this tramcar 9 and subway are the most obvious
Feature is exactly that three module tramcar 9 has 2 bogies, five module tramcars 9 only 3 bogies altogether, and subway
Every train has 2 bogies.According to tramcar 9 technological requirement, tramcar 9 can not car load handling, editorial afterword list can only be solved
Row lifting, and after subway solution volume, every train can solve editorial afterword part of module with independent ambulation but tramcar 9 is independently to prop up
Support and walking, below with the tramcar 9 of 3 modules describe in detail vehicle shipping step.
The shipping method of three module tramcar 9, comprises the following steps:
As shown in Figure 2 (A) shows, the first step: 1. tramcar 9 is moved to overhead traveling crane, fixed overhead traveling crane 8 and portable overhead traveling crane 6
Vehicle hoisting point position is acted directly on by suspender;2., after overhead traveling crane effect, technologist utilizes solution to compile trench 7 and completes to solve volume, will
Head car is completely isolated out with two trains below;3. the head car solving editorial afterword can be adjusted to ship lorry 10 by direct overhead traveling crane, and remains
Lower two modules have two bogies and can stand alone and walk.
As shown in Fig. 2 (B), second step: a 1. car is by after overhead traveling crane handling, and remaining two modules can directly be pushed into two overhead traveling cranes
The correct position of lower section;2. two overhead traveling cranes are acted simultaneously on a car hoisting point position, then utilizes solution to compile trench 7 and carry out solving volume point
From;3. overhead traveling crane effect, after solution volume completes, directly can winch to ship on lorry 10 by head car by overhead traveling crane.
As shown in Fig. 2 (C), the 3rd step: 1. by after two head car all handlings, remaining middle vehicle commander's degree is shorter and has to turn
Can independently stand to frame and walk;2. middle car is moved to the correct position below fixed overhead traveling crane 8 or portable overhead traveling crane 6;3.
Using an overhead traveling crane to add four lower limb suspender belts can direct car in handling.
Embodiment 3
As it is shown on figure 3, a kind of railcar shipping method: structure of the subway is typically all four marshallings or six marshalling modules, Mei Gemo
The overall dimensions of block is essentially the same, and its hoisting point position is basically identical, and need not when solving volume solve compile trench.Therefore railcar
Ship relatively easy;Will be stored in the railcar solution editorial afterword on parking line 4 and be directly pushed into the vehicle lifting below two overhead traveling cranes
District, ensures the position, lifting point of two days following distance exactly railcars by the portable overhead traveling crane 6 of adjustment thus completes lifting
Shipping;Railcar handling method, comprises the following steps:
As shown in Fig. 3 (A), the first step, when owner wants car to prepare shipping, vehicle solution can directly be compiled by technologist, solves editorial afterword every
Train can individually be walked;
As shown in Fig. 3 (B), second step, first head car is pushed into suitable position below two overhead traveling cranes, adjusts mobile overhead crane 6, two days
Car suspension hook is all at vehicle hoisting point position;
As shown in Fig. 3 (C), the 3rd step, after head car handling, promote successively and handling all vehicles below, complete lifting shipping.
Embodiment 4
As shown in Figure 4, in vehicle shipping process, owner considers that self various factors such as storage space, handling appliance may
Require vehicle supplying unit vehicle when handing over car, to take the form that car load ships, and be directed to tramcar 9 technological requirement can not be whole
Car lifts, so a kind of method that installation shipping fixture and combination shipping trench 5 ship on shipping lorry 10 can be used.
Utilize shipping trench 5 to ship vehicle shipping method, comprise the following steps: 1. shipping trench 5 degree of depth is by shipping lorry
10 height and shipping fixture determine, width need to meet lorry in the normal tracking of planar section;2. shipping lorry 10 is by shipping trench
Slope section 12 is poured shipping trench planar section 11 into and completes and the tracking of parking line 4;3. lorry complete with parking line 4 tracking after,
Pushing directly on the shipping lorry 10 on tramcar 9, the shipping fixture of recycling lorry can be dispatched a car after fixing for vehicle.
Embodiment 5
As seen in figs. 5-6, utilize car lifting J-Horner lifting platform 13 to ship vehicle shipping method, comprise the following steps: 1. needs are shipped
Tramcar 9 be pushed into the supporting point position of car lifting J-Horner lifting platform 13;2. start car lifting J-Horner lifting platform 13, and will shipping vehicle liter
To certain altitude;3. shipping lorry 10 enters correct position below car lifting J-Horner lifting platform 13, utilizes car lifting J-Horner lifting platform 13 to fall car
Fix and then ship.
Present invention accomplishes the conversion when subsequent handling and bicycle parking ship of each vehicle;Solve the mixing shipping of various vehicle
Technical barrier and saved a large amount of vehicle production time cost;Solve the reorganization of various vehicle and conciliate the technology of volume state shipping
A difficult problem;A large amount of Financial cost has been saved for company again while reducing floor space;Meet owner to validate the car at any time, hand over the need of car
Ask, improve company's integrated production capacity.
Finally it is noted that these are only the preferred embodiments of the present invention, it is not limited to the present invention, although
Being described in detail the present invention with reference to previous embodiment, for a person skilled in the art, it still can be right
Technical scheme described in foregoing embodiments is modified, or wherein portion of techniques feature is carried out equivalent.All
Within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in the protection of the present invention
Within the scope of.
Claims (6)
1. a urban track traffic multi-vehicle-type bicycle parking shipping systems, it is characterised in that include traverse table (1), transfer lines (2),
Track switch (3), parking line (4), shipping trench (5), mobile overhead crane (6), solve and compile trench (7), fixing overhead traveling crane (8);
Described parking line (4) is provided with 7 tracks, and described track is arranged in parallel the most successively, the centrage of described track
Distance is 4m, and the most named 1-7 track pressed by described track;
Described transfer lines (2) is arranged on parking line parking line (4) right side, and by No. 1 rail of traverse table (1) with parking line (4)
Road docks;
Described track switch (3) uses No. 7 track switches of standard, is separately positioned on No. 1 track of parking line (4) and No. 2 tracks, No. 1 rails
Between road and No. 3 tracks;
Described shipping trench (5) arranges parking line (4) left side, and is connected with No. 1 orbital docking position;
Described fixing overhead traveling crane (8) arranges parking line (4) left side, and sets up across parking line (4) along the longitudinal direction;
Described mobile overhead crane (6) is arranged on described fixing overhead traveling crane (8) right side, and sets up across parking line (4) along the longitudinal direction, institute
State mobile overhead crane (6) to vertically move along long rails;
Described volume trench (7) that solves is arranged on parking line parking line (4) left side, is attached with No. 2 tracks and No. 3 tracks.
Urban track traffic multi-vehicle-type bicycle parking shipping systems the most according to claim 1, it is characterised in that: described shipping ground
Ditch (5) is made up of shipping trench planar section (11) and shipping trench bevel phase (12), and shipping trench (5) width is not less than
4.8m, described shipping trench planar section (11) degree of depth trench not less than 1.3 meters, length is not less than 40m;Described shipping trench is oblique
Face section (12) a length of 20m, and put slope process.
3. the railcar lifting shipping method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1,
It is characterized in that, comprise the following steps:
When S1: owner wants car to prepare shipping, vehicle is directly compiled trench (7) solution in solution and is compiled by technologist, and solving the every train of editorial afterword can
With individually walking;
S2: first head car is pushed into fixing overhead traveling crane (8) and suitably position, mobile overhead crane (6) lower section, adjusts mobile overhead crane (6),
Fixing overhead traveling crane (8) and mobile overhead crane (6) is made to act directly on vehicle hoisting point position by suspender;
S3: after head car handling, promotes and handling all vehicles below successively, completes lifting shipping.
4. the three module tramcar shipping side of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1
Method, described three module tramcar (9) includes 1 number car, middle car and 2 number cars, it is characterised in that comprise the following steps:
S1: three module tramcar (9) is moved correct position to overhead traveling crane, fixed overhead traveling crane (8) and portable overhead traveling crane
(6) 1 number car vehicle hoisting point position is acted directly on by suspender;Technologist utilizes solution to compile trench and completes to solve volume, by 1 number
Car is completely isolated out with middle car below and 2 number cars;Solve the 1 automobile-used fixed overhead traveling crane of number (8) of editorial afterword and portable sky
Car (6) is adjusted to ship lorry (10);
S2:1 number car is by after overhead traveling crane handling, and remaining middle car and 2 number car two modules can directly be pushed into below two overhead traveling cranes
Correct position;Fixed overhead traveling crane (8) and portable overhead traveling crane (6) are acted simultaneously on 2 number car hoisting point positions, then utilizes to solve and compile
Trench (7) carries out solving compiles separation;Directly winch to ship lorry by 2 number cars by fixed overhead traveling crane (8) and portable overhead traveling crane (6)
(10) on;
S3:: after two head car handlings, remaining middle vehicle commander's degree is shorter and has a bogie can independently stand and go
Walk;Middle car is moved to fixed overhead traveling crane (8) or the correct position of portable overhead traveling crane (6) lower section;Use an overhead traveling crane to add four lower limbs to hang
Car in band handling, completes lifting shipping.
5. the tramcar entirety shipping method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 2,
It is characterized in that, comprise the following steps:
S1: at the upper track installed with bicycle parking railway line tracking of shipping lorry (10);
S2: shipping lorry (10) is poured into shipping trench (5) and completed and the tracking of bicycle parking railway line;
S3: tramcar (9) car load is pushed in shipping lorry (10), and ship after fixing vehicle with shipping fixture.
6. the multi-vehicle-type parking method of urban track traffic multi-vehicle-type bicycle parking shipping systems as claimed in claim 1, its feature
It is, comprises the following steps:
S1: move to traverse table (1) dock with No. 1 track and transfer lines (2);
S2: reorganization vehicle passes sequentially through transfer lines (2) and traverse table (1) enters No. 1 track;
S3: as required, can respectively enter No. 2 tracks and No. 3 tracks by reorganization vehicle by track switch (3), complete the temporary of vehicle
Deposit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610731523.2A CN106276294B (en) | 2016-08-26 | 2016-08-26 | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610731523.2A CN106276294B (en) | 2016-08-26 | 2016-08-26 | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106276294A true CN106276294A (en) | 2017-01-04 |
CN106276294B CN106276294B (en) | 2018-05-11 |
Family
ID=57676727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610731523.2A Active CN106276294B (en) | 2016-08-26 | 2016-08-26 | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106276294B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021036680A1 (en) * | 2019-08-30 | 2021-03-04 | 比亚迪股份有限公司 | Train dispatching control method, platform, and system, intelligent compartment, and medium |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1378802A (en) * | 1971-11-18 | 1974-12-27 | Mini Verkehrswesen | Railway marshalling yard system |
CN2038076U (en) * | 1988-07-06 | 1989-05-24 | 李宗录 | Formation-disassembly of car group for freight train |
CN2412801Y (en) * | 1999-12-17 | 2001-01-03 | 王家庠 | Rail train marshalling station railway carriage transversing transponting equipment |
EP1129922A2 (en) * | 2000-03-03 | 2001-09-05 | Tiefenbach GmbH | Method for controlling the gravity shunting from a slope of a marshalling yard of the wagons of a railway train to be segregated. |
CN1743214A (en) * | 2005-06-20 | 2006-03-08 | 向川北 | Motor vehicle railway conveying system |
CN101070122A (en) * | 2006-05-12 | 2007-11-14 | 上海明路绳网索具有限公司 | Container loading-unloading automatic flow-line |
CN201659985U (en) * | 2010-01-22 | 2010-12-01 | 北京铁道工程机电技术研究所 | Comprehensive underfloor lifting system for high-speed electricity multiple units |
CN102501852A (en) * | 2011-11-21 | 2012-06-20 | 铁道第三勘察设计院集团有限公司 | Layout structure for integration of train depot and junction station of urban rail |
CN102529980A (en) * | 2012-02-24 | 2012-07-04 | 铁道第三勘察设计院集团有限公司 | Intensive structure for railcar-train parks |
CN103770790A (en) * | 2014-02-20 | 2014-05-07 | 四川大学 | Overhead rail transport platform system |
CN104742913A (en) * | 2013-12-27 | 2015-07-01 | 王冠军 | System and method for realizing station-front turning-back of urban rail transit |
-
2016
- 2016-08-26 CN CN201610731523.2A patent/CN106276294B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1378802A (en) * | 1971-11-18 | 1974-12-27 | Mini Verkehrswesen | Railway marshalling yard system |
CN2038076U (en) * | 1988-07-06 | 1989-05-24 | 李宗录 | Formation-disassembly of car group for freight train |
CN2412801Y (en) * | 1999-12-17 | 2001-01-03 | 王家庠 | Rail train marshalling station railway carriage transversing transponting equipment |
EP1129922A2 (en) * | 2000-03-03 | 2001-09-05 | Tiefenbach GmbH | Method for controlling the gravity shunting from a slope of a marshalling yard of the wagons of a railway train to be segregated. |
CN1743214A (en) * | 2005-06-20 | 2006-03-08 | 向川北 | Motor vehicle railway conveying system |
CN101070122A (en) * | 2006-05-12 | 2007-11-14 | 上海明路绳网索具有限公司 | Container loading-unloading automatic flow-line |
CN201659985U (en) * | 2010-01-22 | 2010-12-01 | 北京铁道工程机电技术研究所 | Comprehensive underfloor lifting system for high-speed electricity multiple units |
CN102501852A (en) * | 2011-11-21 | 2012-06-20 | 铁道第三勘察设计院集团有限公司 | Layout structure for integration of train depot and junction station of urban rail |
CN102529980A (en) * | 2012-02-24 | 2012-07-04 | 铁道第三勘察设计院集团有限公司 | Intensive structure for railcar-train parks |
CN104742913A (en) * | 2013-12-27 | 2015-07-01 | 王冠军 | System and method for realizing station-front turning-back of urban rail transit |
CN103770790A (en) * | 2014-02-20 | 2014-05-07 | 四川大学 | Overhead rail transport platform system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021036680A1 (en) * | 2019-08-30 | 2021-03-04 | 比亚迪股份有限公司 | Train dispatching control method, platform, and system, intelligent compartment, and medium |
CN112441089A (en) * | 2019-08-30 | 2021-03-05 | 比亚迪股份有限公司 | Train dispatching control method, platform and system, intelligent carriage and medium |
Also Published As
Publication number | Publication date |
---|---|
CN106276294B (en) | 2018-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5863772B2 (en) | System for transporting, storing and distributing complex integrated containers | |
WO2020233501A1 (en) | Construction method for upright lifting of large-tonnage box girder to bridge, and erection method for large-tonnage box girder | |
CN107336714A (en) | Sitting posture train and the super meeting rail system of suspension train | |
CN103459279A (en) | Unloading and loading crane arrangement, container terminal and method for unloading and loading a ship | |
CN106585643A (en) | Mobile railway station, matched rail network and combination system of the two | |
CN107905121A (en) | Tire transportation technology under a kind of whole segment of Steel Bridge | |
CN107933578A (en) | A kind of transportation resources and pipeline | |
CN103640862A (en) | Transportation system for electrical equipment spare parts | |
CN106276294A (en) | A kind of urban track traffic multi-vehicle-type bicycle parking shipping systems | |
CN109911786A (en) | A kind of machine for collecting load rapid transport system and method at logistics node station | |
CN102060201B (en) | Arrangement method of coal-unloading device of wagon tipper with wagon pulled in or out from transfer platform side | |
CN101722955A (en) | Various pieces of equipment related to passing-station not-stopping system of train | |
CN107060390B (en) | Rail vehicle stop station | |
CN202743237U (en) | Rail transit train system | |
US20020134277A1 (en) | Bullet train which permits passenger loading and unloading without stopping | |
CN208037564U (en) | A kind of container rail-road movement system | |
CN106522095B (en) | Multidirectional method of operation in a kind of truss segment | |
CN106218645B (en) | A kind of rail traffic reorganization vehicle is dispatched a car system | |
CN112498422B (en) | Multi-type combined transport rail transport system | |
CN210140774U (en) | Can realize large-tonnage case roof beam normal position handle device of putting on bridge | |
US20190106124A1 (en) | A Connected Transportation Network System | |
CN202861765U (en) | Bogie flexible assembly line layout structure | |
CN112031490A (en) | Vehicle base structure of moving platform of suspended monorail train and process flow | |
CN206327354U (en) | A kind of assembling ladder type cab combination mid-air-bus system that can fall on prevailing roadway is random | |
CN212507607U (en) | Vehicle base structure of moving platform of suspension type monorail train |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |