CN106062279A - 检测和保障线路上部工程用机械的稳定的作业位置的方法 - Google Patents

检测和保障线路上部工程用机械的稳定的作业位置的方法 Download PDF

Info

Publication number
CN106062279A
CN106062279A CN201580007422.4A CN201580007422A CN106062279A CN 106062279 A CN106062279 A CN 106062279A CN 201580007422 A CN201580007422 A CN 201580007422A CN 106062279 A CN106062279 A CN 106062279A
Authority
CN
China
Prior art keywords
track
wheel
part work
load
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201580007422.4A
Other languages
English (en)
Inventor
H.沃尔戈特
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prasy-Tao Yier Railway Export Ltd Co
Original Assignee
Prasy-Tao Yier Railway Export Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prasy-Tao Yier Railway Export Ltd Co filed Critical Prasy-Tao Yier Railway Export Ltd Co
Publication of CN106062279A publication Critical patent/CN106062279A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F9/00Rail vehicles characterised by means for preventing derailing, e.g. by use of guide wheels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • E01B27/17Sleeper-tamping machines combined with means for lifting, levelling or slewing the track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Mechanical Engineering (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

一种在轨道上能够运行的线路上部工程用机械的实施作业的方法,其中,由于机械框架(2)与作业设备(11)之间的相对移动,产生针对轨道(3)的两条钢轨(7、8)的非对称的轮荷载,持续地测量在轮对(5)的每个车轮(6)上作用的轮荷载(t1、t2),并且相互间进行比较。如果超出了的两个车轮(6)之间的选择性地可设定的最大轮荷载差值极限,则自动地停止所述线路上部工程用机械(1)的前行,或者在所述线路上部工程用机械(1)停止时锁止所述线路上部工程用机械的前行。

Description

检测和保障线路上部工程用机械的稳定的作业位置的方法
本发明涉及一种在轨道上能够运行的线路上部工程用机械的实施作业的方法,其中,由于机械框架与作业设备之间的相对移动,产生针对轨道的两条钢轨的非对称的轮荷载。
这种已知的各种类型的线路上部工程用机械设计用于借助不同的作业设备处理轨道,并且在此可以在待处理的轨道上运行。作业设备通常安置在机械框架上,机械框架通过钢轨行走机构支承在轨道上,并且作业设备在投入作业时相对于机械框架可沿竖向和/或水平方向调节。尤其在处理岔道时,通常要求作业设备沿机械或轨道的横向相对较远地远离机械框架。由此产生通过钢轨行走机构的车轮在轨道的两条钢轨上作用的轮荷载的非对称。如果轮对的两个车轮之间的荷载差过大,则产生线路上部工程用机械可能的脱轨危险。
本发明所要解决的技术问题是,提供一种前述类型的方法,借此可以提高作业的安全性。
所述技术问题按照本发明通过一种按照权利要求1的技术特征的前述类型的方法解决。
通过按照本发明的方法步骤的优点在于,能够可靠地避免由于非对称的轮荷载而导致的脱轨危险,并且由此显著地改善了运行安全性。由此能够以希望的方式避免对操作人员、机械以及铁路轨道造成较大的损伤。附加的正面意义并且在人机工程学方面有利的是,可以自动地或者对作业人员无需干扰地启动和实施所述避免损伤的措施。
由从属权利要求和附图说明获得本发明的另外的优点。
以下结合在附图中示出的实施例进一步阐述本发明。在附图中:图1示出线路上部工程用机械的极为简化的侧视图,图2示出剖切机械的剖面示意图,和图3示出备选方案。
在图1示出的线路上部工程用机械1具有机械框架2,所述机械框架在轨道3上借助在端侧安置的钢轨行走机构4能够运行。所述钢轨行走机构具有轮对5,每个轮对分别具有两个车轮6,这些车轮相应地配属于轨道3的钢轨7、8。在机械框架2上还安置有驾驶和作业室9、用于提供能源的动力源10以及用于处理轨道3的作业设备11。
在作为实施例示出的可选方案中,线路上部工程用机械1是捣固机械,该捣固机械的作业设备11设计为捣固设备12和起道设备18。如在图2中更清楚地看到,捣固设备12设计用于在轨道3的道岔区域内相互独立地沿机械横向或轨道横向13可移动地实施作业,从而能够对道岔的分支钢轨进行处理。为此,捣固设备12支承在横向导引装置14上并且与移动驱动装置15相连接,该移动驱动装置会引起作业设备11与机械框架12之间的相对移动。
所谓的相对移动和由此伴随的巨大的重量转移会导致,由钢轨行走机构4的轮对5所施加的轴荷载非均匀地以非对称的轮荷载t1和t2的形式分配在轨道3的两条钢轨7和8上。当这种荷载差超过一定数量时会由此造成尤其在岔道区域和交叉区域内在继续行驶时出现线路上部工程用机械1的脱轨危险。
根据本发明,借助适合的(已知各种形式的)测量装置16持续地测量在轮对5的每个车轮6上作用的轮荷载t1和t2,并且相互间例如在控制单元17(图1)中进行比较。如果在此确定,超出了轮对5的两个车轮6之间的非对称的轮荷载t1和t2的(选择性地可设定的)最大差值极限,则随之通过控制单元17自动地触发停止机械前行。在线路上部工程用机械停车的情况下,则锁止线路上部工程用机械的前行。当完成作业设备11回移之后非对称的轮荷载t1和t2的差值重新处于设定的极值以内时,才再次取消这种安全措施。
备选地在轨道捣固机械中还可行的是(如图3所示),为了减小所述的非对称性,设有与机械框架2相连的装置20,该装置20在所示的实施例中由起道设备18构成。由此可以检测到承受较低荷载的钢轨7,并且借助起重压力缸19产生在竖向朝向轨道7的方向上作用的拉力f,该拉力f反作用于钢轨8上的荷载t2。通过起道设备18的滚动升降转台,也可以在线路上部工程用机械1的前行过程中实施上述措施。
本发明当然不仅限于捣固机械,而是在本发明的框架内同样包含具有横向可调节的作业设备的各种不同的线路上部工程用机械。

Claims (2)

1.一种在轨道上能够运行的线路上部工程用机械的实施作业的方法,其中,由于在机械框架(2)与作业设备(11)之间的相对移动,产生针对轨道(3)的两条钢轨(7、8)的非对称的轮荷载,其特征在于:
a)持续地测量在轮对(5)的每个车轮(6)上作用的轮荷载(t1、t2),并且相互间进行比较,
b)如果超出了在两个车轮(6)之间的选择性地可设定的最大轮荷载差值极限,则自动地停止所述线路上部工程用机械(1)的前行,或者在所述线路上部工程用机械(1)停止时锁止所述线路上部工程用机械的前行。
2.按照权利要求1所述的方法,其特征在于,通过与所述机械框架(2)相连的装置(20)检测承受较低荷载的钢轨(7),并且在所述装置(20)和机械框架(2)之间施加沿竖向在朝向该轨道(7)的方向上作用的拉力(f)。
CN201580007422.4A 2014-02-28 2015-02-03 检测和保障线路上部工程用机械的稳定的作业位置的方法 Pending CN106062279A (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ATA141/2014 2014-02-28
ATA141/2014A AT515507B1 (de) 2014-02-28 2014-02-28 Verfahren zum Arbeitseinsatz von Gleisbaumaschinen
PCT/EP2015/000199 WO2015128055A1 (de) 2014-02-28 2015-02-03 Verfahren zur erfassung und sicherung einer stabilen arbeitsposition einer gleisbaumaschine

Publications (1)

Publication Number Publication Date
CN106062279A true CN106062279A (zh) 2016-10-26

Family

ID=52473861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201580007422.4A Pending CN106062279A (zh) 2014-02-28 2015-02-03 检测和保障线路上部工程用机械的稳定的作业位置的方法

Country Status (4)

Country Link
EP (1) EP3111010A1 (zh)
CN (1) CN106062279A (zh)
AT (1) AT515507B1 (zh)
WO (1) WO2015128055A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103859A (zh) * 2017-12-27 2018-06-01 江苏燕宏达重工机械有限公司 一种防侧翻装置及其系统和应用
CN108860204A (zh) * 2018-05-03 2018-11-23 中国神华能源股份有限公司 防脱轨装置及具有其的配碴车
CN110453552A (zh) * 2019-08-21 2019-11-15 长沙瀚鹏电子技术有限公司 一种铁路道岔捣固车三轨同步起道的实现方法和装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE495633C (de) * 1930-04-09 Oberbau G M B H Kippwagensicherungszange
US4342263A (en) * 1979-12-19 1982-08-03 Sig Societe Industrielle Suisse Railway work-site machine equipped with a mechanical unit for displacement of the track
US4399881A (en) * 1979-10-05 1983-08-23 Franz Plasser Bahnbaumaschinen Industriegesellschaft Mbh Track working or transport vehicle
US4893565A (en) * 1987-02-27 1990-01-16 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile track switch working machine
CN1048359A (zh) * 1989-06-30 1991-01-09 王信培 全自动车身横向稳定悬挂装置
CN1054460A (zh) * 1990-02-06 1991-09-11 弗朗茨普拉瑟尔铁路机械工业有限公司 夯实道碴床的连续走行式线路施工机械
CN102233881A (zh) * 2010-04-30 2011-11-09 襄樊金鹰轨道车辆有限责任公司 一种铁道车辆防倾覆装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH066702U (ja) * 1992-06-30 1994-01-28 株式会社柳沢精機製作所 アキュムレータ
DE202006019036U1 (de) * 2006-12-16 2007-03-08 Windhoff Bahn- Und Anlagentechnik Gmbh Vorrichtung zur Vergrößerung der Arbeitskapazität bei Gleisfahrzeugen

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE495633C (de) * 1930-04-09 Oberbau G M B H Kippwagensicherungszange
US4399881A (en) * 1979-10-05 1983-08-23 Franz Plasser Bahnbaumaschinen Industriegesellschaft Mbh Track working or transport vehicle
US4342263A (en) * 1979-12-19 1982-08-03 Sig Societe Industrielle Suisse Railway work-site machine equipped with a mechanical unit for displacement of the track
US4893565A (en) * 1987-02-27 1990-01-16 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile track switch working machine
CN1048359A (zh) * 1989-06-30 1991-01-09 王信培 全自动车身横向稳定悬挂装置
CN1054460A (zh) * 1990-02-06 1991-09-11 弗朗茨普拉瑟尔铁路机械工业有限公司 夯实道碴床的连续走行式线路施工机械
CN102233881A (zh) * 2010-04-30 2011-11-09 襄樊金鹰轨道车辆有限责任公司 一种铁道车辆防倾覆装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103859A (zh) * 2017-12-27 2018-06-01 江苏燕宏达重工机械有限公司 一种防侧翻装置及其系统和应用
CN108860204A (zh) * 2018-05-03 2018-11-23 中国神华能源股份有限公司 防脱轨装置及具有其的配碴车
CN110453552A (zh) * 2019-08-21 2019-11-15 长沙瀚鹏电子技术有限公司 一种铁路道岔捣固车三轨同步起道的实现方法和装置

Also Published As

Publication number Publication date
AT515507B1 (de) 2016-03-15
WO2015128055A8 (de) 2016-09-01
EP3111010A1 (de) 2017-01-04
AT515507A1 (de) 2015-09-15
WO2015128055A1 (de) 2015-09-03

Similar Documents

Publication Publication Date Title
JP6535230B2 (ja) 鉄道軌道上で走行可能な保線用機械を駆動させるための軌道整正システム
SU1101176A3 (ru) Передвижна машина дл контактной стыковой сварки оплавлением рельсов
US10808363B2 (en) Maintenance vehicle
CN108291371B (zh) 捣固机和用于校正轨道位置的方法
CN106062279A (zh) 检测和保障线路上部工程用机械的稳定的作业位置的方法
JP6619821B2 (ja) 軌道のバラスト道床を圧縮するためのタンピング機械
CA2968590A1 (en) A method and device for compacting the ballast bed of a track
CN105540505A (zh) 一种履带行走车辆高空作业平台的平衡报警及实时防护装置
EA031749B1 (ru) Машина для стабилизации рельсового пути
JP6169155B2 (ja) 移動台車装置
CA3037213C (en) Rail vehicle having crane rails for a gantry crane
CN202830789U (zh) 一种移梁作业平台
CN103534159A (zh) 维护车辆
CN203603914U (zh) 盾构机整体过站装置
RU2293812C1 (ru) Устройство для удаления балласта из-под подошвы рельса железнодорожного пути
JP2015214827A (ja) レール削正車両
CN108368679B (zh) 用于更新由钢轨和轨枕构成的轨道的轨枕的方法和线路上部工程用机械
CA3010023C (en) Track-laying vehicle for performing track-laying works
CN104154069A (zh) 新型焊轨车支腿油缸
US10632864B2 (en) Work vehicle for maintenance of an electrical catenary
CN203728205U (zh) 一种适用于堆垛机的新型水平导轮装置
US20160265168A1 (en) Fall prevention device for a track-laying machine
CN204022296U (zh) 一种欧式电动单梁起重机
CN203817504U (zh) 摆动飞剪检修工装
CN204689596U (zh) 一种爬坡式行走机构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161026