CN105958371B - 一种电力检修滑车 - Google Patents

一种电力检修滑车 Download PDF

Info

Publication number
CN105958371B
CN105958371B CN201610359130.3A CN201610359130A CN105958371B CN 105958371 B CN105958371 B CN 105958371B CN 201610359130 A CN201610359130 A CN 201610359130A CN 105958371 B CN105958371 B CN 105958371B
Authority
CN
China
Prior art keywords
pulley
rope
electric power
embolism extinguishing
upper frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610359130.3A
Other languages
English (en)
Other versions
CN105958371A (zh
Inventor
林少明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric energy management (Shanghai) Co., Ltd.
Original Assignee
林少明
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 林少明 filed Critical 林少明
Priority to CN201610359130.3A priority Critical patent/CN105958371B/zh
Publication of CN105958371A publication Critical patent/CN105958371A/zh
Application granted granted Critical
Publication of CN105958371B publication Critical patent/CN105958371B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Handcart (AREA)
  • Braking Arrangements (AREA)

Abstract

本发明属于电力修检技术领域且公开了一种电力检修滑车,包括上部框架、转轴、刹车把手、改向滑轮、固定扣、上连接头、下连接头、消栓活动口、消栓、推动片和消栓固定槽,所述上部框架内侧通过转轴与移动绳索滑轮连接,所述移动绳索滑轮下侧设有滑动刹车片,所述滑动刹车片设置在挤压杆上,所述挤压杆左侧与上部框架转动连接,所述挤压杆右侧设有绳索固定杆。本发明设有滑动刹车片和整体滑动框架,通过将整体滑动框架增加本发明稳定性,防止脱落,同时可以利用滑动刹车片调节本发明滑动过程的快慢,并且本发明结构简单,使用灵活,安全可靠,生产成本低,便于推广,有效改善了现阶段电力修检时的工作环境。

Description

一种电力检修滑车
技术领域
本发明涉及一种检修滑车,具体涉及一种电力检修滑车,属于电力修检技术领域。
背景技术
电力是人们生活中必不可少的能源,人们无时无刻都需要电力系统,因此在电力系统需要形成了一个相当庞大的网络,以满足将电力供应到人们生活中的每一个角落,由于电力系统过于庞大,因此出现问题的几率也相当高,对此我们时刻需要对电力进行检修,在检修过程中常用的工具即是电力检修滑车。
但是现阶段的电力检修滑车结构都比较简单,稳定性不够好,在使用时存在一定的安全隐患,并且电力维修人员对其进行操作时也十分不便,不易控制滑车的滑动速度,因此不能够很好的满足现阶段在对电力进行修检时的多种必要要求,长此以往增加了电力维修人员的工作难度。
发明内容
本发明要解决的技术问题克服现有的缺陷,提供一种电力检修滑车,可以有效解决背景技术中的问题。
为了解决上述技术问题,本发明提供了如下的技术方案:
本发明提供一种电力检修滑车,包括上部框架、转轴、移动绳索滑轮、滑动刹车片、挤压杆、绳索固定杆、钢丝绳索、小滑轮,、合页、下部框架、大滑轮、绳索穿管、转动连接器、刹车把手、改向滑轮、固定扣、上连接头、下连接头、消栓活动口、消栓、推动片和消栓固定槽,所述上部框架内侧通过转轴与移动绳索滑轮连接,所述移动绳索滑轮下侧设有滑动刹车片,所述滑动刹车片设置在挤压杆上,所述挤压杆左侧与上部框架转动连接,所述挤压杆右侧设有绳索固定杆,所述绳索固定杆与钢丝绳索连接,所述移动绳索滑轮右侧设有小滑轮,且小滑轮与上部框架内侧固定连接,所述上部框架左侧通过合页与下部框架连接,所述下部框架内侧设有大滑轮,所述下部框架下侧设有绳索穿管,所述绳索穿管右侧通过转动连接器与刹车把手连接,所述转动连接器上侧设有改向滑轮,所述钢丝绳索绕过小滑轮和改向滑轮与刹车把手连接,所述上部框架和下部框架右侧通过固定扣连接,所述固定扣包括上连接头和下连接头,所述上连接头上设有消栓活动口,所述消栓活动口内设有消栓,所述消栓前侧设有推动片,所述下连接头上设有消栓固定槽。
作为本发明的一种优选技术方案,所述转轴为耐压不锈钢材料制成。
作为本发明的一种优选技术方案,所述滑动刹车片和挤压杆可更换。
作为本发明的一种优选技术方案,所述移动绳索滑轮和大滑轮的中心点设置在同一竖直线上。
作为本发明的一种优选技术方案,所述移动绳索滑轮上凹槽的半径为2.5cm。
本发明所达到的有益效果是:一种电力检修滑车,设有滑动刹车片和整体滑动框架,通过将整体滑动框架增加本发明稳定性,防止脱落,同时可以利用滑动刹车片调节本发明滑动过程的快慢,并且本发明结构简单,使用灵活,安全可靠,生产成本低,便于推广,有效改善了现阶段电力修检时的工作环境。
附图说明
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。
在附图中:
图1是本发明实施例所述的一种电力检修滑车整体结构示意图;
图2是本发明实施例所述的一种电力检修滑车固定扣结构示意图;
图中标号:1、上部框架;2、转轴;3、移动绳索滑轮;4、滑动刹车片;5、挤压杆;6、绳索固定杆;7、钢丝绳索;8、小滑轮;9、合页;10、下部框架;11、大滑轮;12、绳索穿管;13、转动连接器;14、刹车把手;15、改向滑轮;16、固定扣;17、上连接头;18、下连接头;19、消栓活动口;20、消栓;21、推动片;22、消栓固定槽。
具体实施方式
以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。
实施例:请参阅图1和图 2,本发明一种电力检修滑车,包括上部框架1、转轴2、移动绳索滑轮3、滑动刹车片4、挤压杆5、绳索固定杆6、钢丝绳索7、小滑轮8、合页9、下部框架10、大滑轮11、绳索穿管12、转动连接器13、刹车把手14、改向滑轮15、固定扣16、上连接头17、下连接头18、消栓活动口19、消栓20、推动片21和消栓固定槽22,所述上部框架1内侧通过转轴2与移动绳索滑轮3连接,所述移动绳索滑轮3下侧设有滑动刹车片4,所述滑动刹车片4设置在挤压杆5上,所述挤压杆5左侧与上部框架1转动连接,所述挤压杆5右侧设有绳索固定杆6,所述绳索固定杆6与钢丝绳索7连接,所述移动绳索滑轮3右侧设有小滑轮8,且小滑轮8与上部框架1内侧固定连接,所述上部框架1左侧通过合页9与下部框架10连接,所述下部框架10内侧设有大滑轮11,所述下部框架10下侧设有绳索穿管12,所述绳索穿管12右侧通过转动连接器13与刹车把手14连接,所述转动连接器13上侧设有改向滑轮15,所述钢丝绳索7绕过小滑轮8和改向滑轮15与刹车把手14连接,所述上部框架1和下部框架10右侧通过固定扣16连接,所述固定扣16包括上连接头17和下连接头18,所述上连接头17上设有消栓活动口19,所述消栓活动口19内设有消栓20,所述消栓20前侧设有推动片21,所述下连接头18上设有消栓固定槽22。
所述合页9为耐压不锈钢材料制成,可以防止重力拉伸导致合页9变形,同时防止腐蚀造成合页9不够结实,出现安全隐患;所述滑动刹车片4和挤压杆5可以更换,这样设置方便更换滑动刹车片4,防止滑动刹车片4磨损过度造成使用上的不便;所述移动绳索滑轮3和大滑轮11的中心点设置在同一竖直线上,可以保证本发明的重心稳定,防止向两边侧倾;所述移动绳索滑轮3上凹槽的半径为2.5cm,可以适应不同粗细的工作绳索。
需要说明的是,本发明为一种电力检修滑车,在使用该设备时先将高空的固定绳索穿过移动绳索滑轮3,然后将工作绳索穿过大滑轮11,起到固定工作人员的作用,工作绳索由绳索穿管12穿出,然后再利用固定扣16将上部框架1和下部框架10固定住,由上连接头17和下连接头18结合在一起,然后将消栓20下滑到消栓固定槽22底部,然后向左侧滑动推动片21,可用消栓20将上部框架1和下部框架10固定锁死,在工作过程中由使用者控制刹车把手14调节滑动刹车片4和移动绳索滑轮3之间的距离起到控制滑动速度的作用。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (5)

1.一种电力检修滑车,包括上部框架(1)、转轴(2)、移动绳索滑轮(3)、滑动刹车片(4)、挤压杆(5)、绳索固定杆(6)、钢丝绳索(7)、小滑轮(8)、合页(9)、下部框架(10)、大滑轮(11)、绳索穿管(12)、转动连接器(13)、刹车把手(14)、改向滑轮(15)、固定扣(16)、上连接头(17)、下连接头(18)、消栓活动口(19)、消栓(20)、推动片(21)和消栓固定槽(22),其特征在于:所述上部框架(1)内侧通过转轴(2)与移动绳索滑轮(3)连接,所述移动绳索滑轮(3)下侧设有滑动刹车片(4),所述滑动刹车片(4)设置在挤压杆(5)上,所述挤压杆(5)左侧与上部框架(1)转动连接,所述挤压杆(5)右侧设有绳索固定杆(6),所述绳索固定杆(6)与钢丝绳索(7)连接,所述移动绳索滑轮(3)右侧设有小滑轮(8),且小滑轮(8)与上部框架(1)内侧固定连接,所述上部框架(1)左侧通过合页(9)与下部框架(10)连接,所述下部框架(10)内侧设有大滑轮(11),所述下部框架(10)下侧设有绳索穿管(12),所述绳索穿管(12)右侧通过转动连接器(13)与刹车把手(14)连接,所述转动连接器(13)上侧设有改向滑轮(15),所述钢丝绳索(7)绕过小滑轮(8)和改向滑轮(15)与刹车把手(14)连接,所述上部框架(1)和下部框架(10)右侧通过固定扣(16)连接,所述固定扣(16)包括上连接头(17)和下连接头(18),所述上连接头(17)上设有消栓活动口(19),所述消栓活动口(19)内设有消栓(20),所述消栓(20)前侧设有推动片(21),所述下连接头(18)上设有消栓固定槽(22)。
2.根据权利要求1所述的一种电力检修滑车,其特征在于,所述合页(9)为耐压不锈钢材料制成。
3.根据权利要求1所述的一种电力检修滑车,其特征在于,所述滑动刹车片(4)和挤压杆(5)可更换。
4.根据权利要求1所述的一种电力检修滑车,其特征在于,所述移动绳索滑轮(3)和大滑轮(11)的中心点设置在同一竖直线上。
5.根据权利要求1所述的一种电力检修滑车,其特征在于,所述移动绳索滑轮(3)上凹槽的半径为2.5cm。
CN201610359130.3A 2016-05-27 2016-05-27 一种电力检修滑车 Active CN105958371B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610359130.3A CN105958371B (zh) 2016-05-27 2016-05-27 一种电力检修滑车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610359130.3A CN105958371B (zh) 2016-05-27 2016-05-27 一种电力检修滑车

Publications (2)

Publication Number Publication Date
CN105958371A CN105958371A (zh) 2016-09-21
CN105958371B true CN105958371B (zh) 2017-11-07

Family

ID=56909765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610359130.3A Active CN105958371B (zh) 2016-05-27 2016-05-27 一种电力检修滑车

Country Status (1)

Country Link
CN (1) CN105958371B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879468A (zh) * 2018-06-20 2018-11-23 广东电网有限责任公司 导线作业载人装置及系统

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107294001A (zh) * 2017-08-29 2017-10-24 国网青海省电力公司西宁供电公司 一种高空人体保护跟踪滑车
CN112454319B (zh) * 2020-11-17 2022-11-11 贵州电网有限责任公司 一种高压输导线路巡线机器人的行走爪刹车装置

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2713485A1 (de) * 1977-03-26 1978-10-05 Pfisterer Elektrotech Karl Freileitungs-fahrwagen
JPH05328553A (ja) * 1992-05-20 1993-12-10 Hiroshima Kensetsu Kogyo Kk 制動機構付きケーブル金車
JP2009153244A (ja) * 2007-12-19 2009-07-09 Chugoku Electric Power Co Inc:The ケーブル弛み防止吊り車
CN101764375A (zh) * 2009-12-25 2010-06-30 江苏省电力公司无锡供电公司 输电线路行走式吊篮
CN102709839A (zh) * 2012-05-31 2012-10-03 石家庄供电公司 带电作业登高用高空行走装置
CN202978114U (zh) * 2012-12-14 2013-06-05 国家电网公司 输电线路导线滑车
JP2013158147A (ja) * 2012-01-30 2013-08-15 Chugoku Electric Power Co Inc:The 足場装置
CN103259218A (zh) * 2013-04-27 2013-08-21 河南省电力公司信阳供电公司 新型滑车滑轮
CN204040892U (zh) * 2014-08-01 2014-12-24 国家电网公司 一种电力软梯滑轮制动装置
CN204947473U (zh) * 2015-10-02 2016-01-06 国家电网公司 一种新型电力滑车
CN105226561A (zh) * 2015-10-23 2016-01-06 江苏省电力公司无锡供电公司 刹车装置和巡检电动飞车
CN205791209U (zh) * 2016-05-27 2016-12-07 林少明 一种电力检修滑车

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201274388Y (zh) * 2008-09-19 2009-07-15 衡水供电公司 防脱落飞车
CN203345549U (zh) * 2013-04-09 2013-12-18 吉林省送变电工程公司 一种运输吊轮
CN203504060U (zh) * 2013-09-10 2014-03-26 国家电网公司 轴传动出线飞车

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2713485A1 (de) * 1977-03-26 1978-10-05 Pfisterer Elektrotech Karl Freileitungs-fahrwagen
JPH05328553A (ja) * 1992-05-20 1993-12-10 Hiroshima Kensetsu Kogyo Kk 制動機構付きケーブル金車
JP2009153244A (ja) * 2007-12-19 2009-07-09 Chugoku Electric Power Co Inc:The ケーブル弛み防止吊り車
CN101764375A (zh) * 2009-12-25 2010-06-30 江苏省电力公司无锡供电公司 输电线路行走式吊篮
JP2013158147A (ja) * 2012-01-30 2013-08-15 Chugoku Electric Power Co Inc:The 足場装置
CN102709839A (zh) * 2012-05-31 2012-10-03 石家庄供电公司 带电作业登高用高空行走装置
CN202978114U (zh) * 2012-12-14 2013-06-05 国家电网公司 输电线路导线滑车
CN103259218A (zh) * 2013-04-27 2013-08-21 河南省电力公司信阳供电公司 新型滑车滑轮
CN204040892U (zh) * 2014-08-01 2014-12-24 国家电网公司 一种电力软梯滑轮制动装置
CN204947473U (zh) * 2015-10-02 2016-01-06 国家电网公司 一种新型电力滑车
CN105226561A (zh) * 2015-10-23 2016-01-06 江苏省电力公司无锡供电公司 刹车装置和巡检电动飞车
CN205791209U (zh) * 2016-05-27 2016-12-07 林少明 一种电力检修滑车

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879468A (zh) * 2018-06-20 2018-11-23 广东电网有限责任公司 导线作业载人装置及系统

Also Published As

Publication number Publication date
CN105958371A (zh) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105958371B (zh) 一种电力检修滑车
CN202492278U (zh) 一种可调式翻转吊具
CN207651926U (zh) 一种用于单根输电导线的空中作业平台
CN204190277U (zh) 一种输电线路自动升降高空作业平台
CN206654044U (zh) 一种客运缆车索道双传动机构
CN102530715A (zh) 一种可调式翻转吊具
CN206023046U (zh) 架空导线放线滑轮
CN205791209U (zh) 一种电力检修滑车
CN208103745U (zh) 一种防摇摆防脱门式起重机装置
CN204434011U (zh) 一种升降机的应急下降系统
CN207656871U (zh) 一种破竹装置
CN204236784U (zh) 一种高度可调的移动式安全系留装置
CN211141410U (zh) 一种建筑施工用升降装置
CN203833307U (zh) 一种铁皮卷绕设备
CN206424374U (zh) 挤压式输液装置
CN205763499U (zh) 一种钢轨加工用手动式安全防护栏
CN207158697U (zh) 一种摩托车维修升降平台
CN205114581U (zh) 一种货运火车散状物料压实装置
CN207027360U (zh) 拆除弯辊缸缸杆辅助工具
CN206218972U (zh) 电力输电线缆缠绕机
CN204597301U (zh) 刀闸检修平台
CN203954658U (zh) 一种六环过山车
CN203306284U (zh) 一种消防材料装包装置
CN204075017U (zh) 一种高空铁丝剪断工具
CN204281032U (zh) 一种起吊行车上的挂吊装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Taiwanese Investment Zone Dongyuan Town Village 362100 Dongyuan Quanzhou city in Fujian Province

Applicant after: Lin Shaoming

Address before: 363210, No. 375 Danshan street, deep earth Town, Zhangpu County, Zhangzhou, Fujian

Applicant before: Lin Shaoming

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190725

Address after: No. 38, Lane 555, Huanqiao Road, Pudong New Area, Shanghai, 200120

Patentee after: Electric energy management (Shanghai) Co., Ltd.

Address before: 362100 Dongyuan Village, Dongyuan Town, Taiwanese Investment District, Quanzhou City, Fujian Province

Patentee before: Lin Shaoming

TR01 Transfer of patent right