CN105927272A - Floor anchoring constraint tunnel lining structure - Google Patents

Floor anchoring constraint tunnel lining structure Download PDF

Info

Publication number
CN105927272A
CN105927272A CN201610407642.2A CN201610407642A CN105927272A CN 105927272 A CN105927272 A CN 105927272A CN 201610407642 A CN201610407642 A CN 201610407642A CN 105927272 A CN105927272 A CN 105927272A
Authority
CN
China
Prior art keywords
base plate
tunnel
arch wall
lining structure
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610407642.2A
Other languages
Chinese (zh)
Other versions
CN105927272B (en
Inventor
林本涛
卿伟宸
郑伟
高杨
张磊
钟昌桂
朱勇
陶伟明
曾宏飞
黄华
孟祥磊
吴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201610407642.2A priority Critical patent/CN105927272B/en
Publication of CN105927272A publication Critical patent/CN105927272A/en
Application granted granted Critical
Publication of CN105927272B publication Critical patent/CN105927272B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a floor anchoring constraint tunnel lining structure, so as to effectively reduce vertical deformation of a base and enhance hydraulic pressure resistance and floating resistance of the lining structure. The floor anchoring constraint tunnel lining structure comprises a primary arch wall bracing structure, a secondary lining structure, a waterproof and drainage system and a central drainage channel, and the waterproof and drainage system is arranged between the primary arch wall bracing structure and the secondary lining structure. The secondary lining structure comprises a secondary arch wall lining and a floor, the floor is located on a base leveling course, and two ends of the floor are solidified with two ends of the secondary arch wall lining. Vertical constraint members are arranged in a base rock and soil layer under the floor transversely in a spaced manner as well as in the route extension direction in a spaced manner, the lower end of each vertical constraint member extends into a stable rock and soil layer, and the upper end of each vertical constrain member penetrates the base leveling course to be fixedly connected with the floor.

Description

Base plate anchoring restricted type tunnel lining structure
Technical field
The present invention relates to tunnel lining structure, the karst area grown particularly to a kind of subsoil water can Control the lining structure of substrate vertical deformation.
Background technology
Enter 21st century, railway construction in China high speed development, the above high standard of speed per hour 200km Quasi-double track railway is built more and more, especially in Southwest Mountainous Areas, and karsts developing area, and circuit show line is by song The restriction of the many factors such as line radius is big, topographic and geologic complicated condition, Karst Tunnel scale increases sharply. Grow due to karst and karst water and there is the features such as complexity, multiformity and irregularities, karst of growing up Tunneling risk particularly operations risks is more and more higher.
In recent years, there occurs some nothings during suitable ten thousand, Shanghai elder brother, the expensive Railway Tunnel operation such as extensively The water damage event such as the deformation of tiny fragments of stone, coal, etc. railway roadbed, inverted arch protuberance, lining cutting percolating water, cause Railway Design, construction, Build and the great attention of operation each side.
Tradition double track tunnel lining cutting typically uses the liner structure form of bent wall band inverted arch, such as Fig. 5 institute Show.Using Concrete Filled as railway roadbed basis on inverted arch, in construction, inverted arch is filled with inverted arch and is separately watered Build.Arranging Central drain+bilateral ditch in tunnel, Central drain is placed in the obturator on inverted arch. Underground water discharge path is: country rock → preliminary bracing → draining blind pipe → lateral sulcus → transverse drain → in Edema with the heart involved ditch, the i.e. water of tunnel structure periphery enter tunnel by preliminary bracing infiltration via draining blind pipe ejectment Central drain within road structural body, outside final discharge hole.The defect of conventional drainage systems maximum exists In: within Central drain is located at tunnel structure, main ejectment main ejectment arch wall scope circumferentially under Water, the hydrops below tunnel inverted arch cannot effectively ejectment.Especially in the close region of ground hydraulic connection, Under continuous rainfall or rainstorm weather, because of groundwater run off abruptly increase, traditional drainage system often cannot and Time ejectment in the gutter in tunnel structure body, thus cause level of ground water drastically to raise.At Gao Shui Under pressure effect, cause inverted arch at the bottom of tunnel or inverted arch to fill protuberance, thus destroy ballast bed structure.
Therefore, optimize liner structure and drainage system, it is ensured that at the bottom of tunnel, draining is unobstructed, reduce tunnel bottom water pressure, Strengthen tunnel bottom structure ability resistant to pressure, become reduction tunnel, karst area water damage risk, it is ensured that operation peace Complete in the urgent need to.
Summary of the invention
The technical problem to be solved is to provide a kind of base plate anchoring restricted type tunnel-liner structure Make, to effectively reduce substrate vertical deformation, increase that liner structure is resistant to pressure and anti-floating ability.
The technical solution adopted for the present invention to solve the technical problems is as follows:
The present invention base plate anchoring restricted type tunnel lining structure, including arch wall preliminary bracing structure, two Secondary liner structure, waterproof and water drainage system and central row tank, waterproof and water drainage system is arranged at arch wall preliminary bracing Between structure, secondary liner structure, it is characterized in that: described secondary liner structure includes that arch wall secondary serves as a contrast Building and base plate, base plate is positioned on substrate screed-coat, and its two ends consolidate with arch wall secondary lining two ends; Lateral separation and arrange vertical along circuit bearing of trend interval in fundamental rock soil layer below described base plate Confining part, the lower end of each vertical confining part extends in stable rock-soil layer, and upper end is looked for through substrate Flat bed is fixing with base plate to be connected.
The invention has the beneficial effects as follows, use vertical confining part to add base plate form and replace tradition inverted arch shape Formula, can increase base plate bearing capacity, also can increase that tunnel bottom structure is resistant to pressure and anti-floating ability;At the bottom of tunnel Use base arrangement, it is not required to apply Concrete Filled body, effectively prevent the bent wall band inverted arch of tradition Lining cutting is filled out owing to subsoil water enters extruding destruction between inverted arch and inverted arch blind by inverted arch construction joint Fill body, cause track structure to destroy;Using plate structure at the bottom of tunnel, excavation operation is more convenient, overcomes biography The wayward problem such as lead of system lining types inverted arch foundation excavation curvature;Realize liner structure " external row Water ", arch wall secondary lining subsoil water behind is not passed through abutment wall and introduces tunnel lateral sulcus, and is introduced directly into the end The central row tank B arranged under plate, is prevented effectively from rain flood subsoil water in season excessive lateral sulcus drainability not Pour in railway roadbed enough;Owing to central row tank is positioned under base plate, can guarantee that the smooth and easy of subsoil water all the time Drain and avoid high hydraulic pressure to cause bottom slab crack to swell.
Accompanying drawing explanation
This specification includes following four width accompanying drawings:
Fig. 1 is the section structure schematic diagram of base plate of the present invention anchoring restricted type tunnel lining structure;
Fig. 2 is the section structure schematic diagram of base plate of the present invention anchoring restricted type tunnel lining structure;
Fig. 3 is the section structure schematic diagram of base plate of the present invention anchoring restricted type tunnel lining structure;
Fig. 4 is the enlarged drawing of A local in Fig. 1;
Fig. 5 is the bent wall band inverted arch liner structure schematic diagram of tradition.
Component shown in figure, toponym and corresponding labelling: central row tank B;The arch wall initial stage props up Protection structure 10, arch wall shotcrete layer 10a, arch wall steelframe 10b, arch wall system anchor bolt 10c; Substrate screed-coat 11;Waterproof and water drainage system 20, non-woven geotextile 20a, circle draining blind pipe 20b, anti- Water plate 20c;Tapping pipe 21;Arch wall secondary lining 30, base plate 31, frid 32;Anchor pile 40, Anchor pole or anchor tube 41, anchor cable 42.
Detailed description of the invention
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
With reference to Fig. 1, the present invention includes arch wall preliminary bracing structure 10, secondary liner structure, anti- Drainage system 20 and central row tank B, waterproof and water drainage system 20 is arranged at arch wall preliminary bracing structure 10, between secondary liner structure.Described secondary liner structure includes arch wall secondary lining 30 and base plate 31, base plate 31 is positioned on substrate screed-coat 11, and its two ends are solid with arch wall secondary lining 30 two ends Knot.In fundamental rock soil layer below described base plate 31 lateral separation and along circuit bearing of trend interval set Putting vertical confining part, the lower end of each vertical confining part extends in stable rock-soil layer, and upper end passes Substrate screed-coat 11 is fixing with base plate 31 to be connected.Use vertical confining part to add base plate form and replace biography System inverted arch form, can increase base plate bearing capacity, also can increase that tunnel bottom structure is resistant to pressure and anti-floating energy Power.Use base arrangement at the bottom of tunnel, it is not required to apply Concrete Filled body, effectively prevent tradition bent Wall band inverted arch lining cutting enters between inverted arch and inverted arch blind crowded due to subsoil water by inverted arch construction joint Crush bad obturator, cause track structure to destroy.
With reference to Fig. 1, Fig. 2 and Fig. 3, described vertical confining part is anchor pile 40, anchor pole or anchor tube 41 or anchor cable 42.
Formed by the frid 32 being arranged at below base plate 31 with reference to Fig. 1, described central row tank B, The upper end of frid 32 two side consolidates or hinged with base plate 31.The bottom of described waterproof and water drainage system 20 It is connected with the top of central row tank B.The top of described frid 32 two side is along circuit extension side Bury tapping pipe 21 underground to interval, the inner of each tapping pipe 21 is connected with central row tank B, outer end Then through substrate screed-coat 11 to Tunnel Base.Described central row tank B is arranged at tunnel center bottom Plate 31 times, base plate 31 ascender line road bearing of trend is arranged at intervals with and is connected with central row tank B Inspection well head.Arch wall secondary lining 30 subsoil water behind is not passed through abutment wall and introduces tunnel lateral sulcus, and It is introduced directly into the central row tank B that base plate is arranged for 31 times, is prevented effectively from rain flood subsoil water in season excessive Lateral sulcus drainability is not enough and pours in railway roadbed, it is achieved liner structure " external draining ".Due to central row Tank B is positioned at base plate 31 times, can guarantee that the smooth and easy excretion of subsoil water avoids high hydraulic pressure to cause all the time Bottom slab crack swells.
With reference to Fig. 4, described waterproof and water drainage system 20 includes the non-woven geotextile 20a that arch wall scope is laid And the splash guard 20c that arch wall scope is laid, and it is laid in nonwoven geotechnique along interval, tunnel excavation direction Circle draining blind pipe 20b between cloth 20a and splash guard 20c.With reference to Fig. 1, described circle draining is blind The two ends of pipe 20b are introduced directly into central row tank B along bottom upper plate 31 lower edge.The described arch wall initial stage props up Protection structure 10 includes covering the arch wall shotcrete layer 10a of arch wall country rock and along the quincunx cloth of arch wall The arch wall system anchor bolt 10c put.Along between tunnel excavation direction in described arch wall shotcrete layer 10a Every laying arch wall steelframe 10b, in arch wall shotcrete layer 10a, add bar-mat reinforcement.
The above the one of base plate of the present invention anchoring restricted type tunnel lining structure that simply explains through diagrams A little principles, are not intended to the present invention be confined in shown and described concrete structure and the scope of application, Therefore every corresponding amendment being likely utilized and equivalent, belong to the present invention apllied specially Profit scope.

Claims (6)

1. base plate anchoring restricted type tunnel lining structure, including arch wall preliminary bracing structure (10), two Secondary liner structure, waterproof and water drainage system (20) and central row tank (B), waterproof and water drainage system (20) sets It is placed between arch wall preliminary bracing structure (10), secondary liner structure, it is characterized in that: described secondary Liner structure includes arch wall secondary lining (30) and base plate (31), and base plate (31) is positioned at substrate and looks for On flat bed (11), its two ends consolidate with arch wall secondary lining (30) two ends;Described base plate (31) Lower section fundamental rock soil layer in lateral separation and along circuit bearing of trend interval vertical confining part is set, The lower end of each vertical confining part extends in stable rock-soil layer, and upper end passes substrate screed-coat (11) Fix with base plate (31) and be connected.
2. base plate anchoring restricted type tunnel lining structure as claimed in claim 1, is characterized in that: Described vertical confining part is anchor pile (40), anchor pole or anchor tube (41) or anchor cable (42).
3. base plate anchoring restricted type tunnel lining structure as claimed in claim 1, is characterized in that: Described central row tank (B) is formed by the frid (32) being arranged at base plate (31) lower section, frid (32) The upper end of two side is integrated with base plate (31) consolidation;The bottom of described waterproof and water drainage system (20) with The top of central row tank (B) is connected;The top of described frid (22) two side is prolonged along circuit Stretch interval, direction and bury tapping pipe (21), the inner of each tapping pipe (21) and central row tank (B) underground Being connected, outer end is then through substrate screed-coat (11) to Tunnel Base.
A kind of tunnel lining structure with hydrophobic function at the bottom of tunnel, its Feature is: described central row tank (B) is arranged under tunnel center line, base plate (31) ascender line road Bearing of trend is arranged at intervals with the inspection well head being connected with central row tank (A).
A kind of tunnel lining structure with hydrophobic function at the bottom of tunnel, its Feature is: described waterproof and water drainage system (20) includes the non-woven geotextile (20a) that arch wall scope is laid And the splash guard (20c) that arch wall scope is laid, and it is laid in nonwoven soil along interval, tunnel excavation direction Circle draining blind pipe (20b) between work cloth (20a) and splash guard (20c).
A kind of tunnel lining structure with hydrophobic function at the bottom of tunnel, its Feature is: the two ends of described circle draining blind pipe (20b) are introduced directly into along bottom upper plate (31) lower edge Central row tank (B).
CN201610407642.2A 2016-06-12 2016-06-12 Bottom plate anchors restricted type tunnel lining structure Active CN105927272B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610407642.2A CN105927272B (en) 2016-06-12 2016-06-12 Bottom plate anchors restricted type tunnel lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610407642.2A CN105927272B (en) 2016-06-12 2016-06-12 Bottom plate anchors restricted type tunnel lining structure

Publications (2)

Publication Number Publication Date
CN105927272A true CN105927272A (en) 2016-09-07
CN105927272B CN105927272B (en) 2019-01-04

Family

ID=56832660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610407642.2A Active CN105927272B (en) 2016-06-12 2016-06-12 Bottom plate anchors restricted type tunnel lining structure

Country Status (1)

Country Link
CN (1) CN105927272B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100630A (en) * 2017-07-03 2017-08-29 北京市市政工程设计研究总院有限公司 Pile foundation type bored tunnel and construction method in deep backfill
CN107191210A (en) * 2017-06-16 2017-09-22 中铁第勘察设计院集团有限公司 Shield tunnel anti-floating system and its construction method based on prestress anchorage cable
CN107524458A (en) * 2017-08-30 2017-12-29 中铁二院工程集团有限责任公司 A kind of tunnel lining structure with tunnel bottom deformation allowance
CN107829407A (en) * 2017-10-18 2018-03-23 中国电建集团中南勘测设计研究院有限公司 One kind can drainage for overhaul tunnel, construction method and repair method
CN107905812A (en) * 2017-12-27 2018-04-13 中铁二院工程集团有限责任公司 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN107975379A (en) * 2017-12-27 2018-05-01 中铁二院工程集团有限责任公司 Both sides set the liner structure for the L-shaped base for having draining, carrying and supporting and retaining system function concurrently
CN108005690A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system
CN108005678A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 π shape tunnels bottom liner structure with low level sluicing kinetic energy
CN108005688A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 The external dewatering type lining cutting of buried lateral sulcus and its drainage system
CN108086993A (en) * 2017-12-27 2018-05-29 中铁二院工程集团有限责任公司 Tunnel bottom sets the haunch floor type tunnel-liner of leaked oil and drainage system constructs and its construction method
CN108222963A (en) * 2017-12-27 2018-06-29 中铁二院工程集团有限责任公司 The not contour longeron carrying stalk floor type lining cutting of tunnel bottom setting longitudinal direction collection drainage gallery and its drainage system construction
CN108222960A (en) * 2017-12-27 2018-06-29 中铁二院工程集团有限责任公司 The V-arrangement skewback floor type lining cutting of tunnel bottom setting drainage gallery and its drainage system construction
CN108222975A (en) * 2017-12-27 2018-06-29 中铁二院工程集团有限责任公司 Big skewback floor type lining cutting and its drainage system construction
CN108316062A (en) * 2018-02-11 2018-07-24 中铁二院工程集团有限责任公司 A kind of control device and its construction method of non-fragment orbit tunnel arching of bottom
CN109681270A (en) * 2018-11-30 2019-04-26 金础础 A kind of constructing tunnel fault belt row's stone drainage arrangement
CN110273708A (en) * 2019-07-01 2019-09-24 长沙矿山研究院有限责任公司 A kind of hydrophobic method of roadway support structural body control
CN113464174A (en) * 2021-07-05 2021-10-01 广东冠粤路桥有限公司 Construction method of tunnel drainage waterproof comprehensive treatment system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0597634A (en) * 1991-03-25 1993-04-20 Lion Corp Shampoo composition for hair
KR100986157B1 (en) * 2010-04-08 2010-10-07 주식회사 도화종합기술공사 Tunnel with drain bracing and supporting channel
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN203515597U (en) * 2013-10-18 2014-04-02 四川省交通运输厅公路规划勘察设计研究院 Tunnel structure applicable to soft stratum
CN204253054U (en) * 2014-11-28 2015-04-08 中铁第四勘察设计院集团有限公司 Mountain tunnel stake arch cap excavation method comprehensive support structure
CN104594946A (en) * 2015-01-19 2015-05-06 中铁十八局集团有限公司 Water-rich narrow tunnel water drainage structure under soft surrounding rock condition
CN105569674A (en) * 2016-01-28 2016-05-11 西南交通大学 Tunnel structure for weak and broken high-temperature water-bearing stratum
CN206016853U (en) * 2016-06-12 2017-03-15 中铁二院工程集团有限责任公司 Base plate anchors restricted type tunnel lining structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5097634B2 (en) * 2008-07-17 2012-12-12 株式会社ケー・エフ・シー Tunnel waterproof structure and its construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0597634A (en) * 1991-03-25 1993-04-20 Lion Corp Shampoo composition for hair
KR100986157B1 (en) * 2010-04-08 2010-10-07 주식회사 도화종합기술공사 Tunnel with drain bracing and supporting channel
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN203515597U (en) * 2013-10-18 2014-04-02 四川省交通运输厅公路规划勘察设计研究院 Tunnel structure applicable to soft stratum
CN204253054U (en) * 2014-11-28 2015-04-08 中铁第四勘察设计院集团有限公司 Mountain tunnel stake arch cap excavation method comprehensive support structure
CN104594946A (en) * 2015-01-19 2015-05-06 中铁十八局集团有限公司 Water-rich narrow tunnel water drainage structure under soft surrounding rock condition
CN105569674A (en) * 2016-01-28 2016-05-11 西南交通大学 Tunnel structure for weak and broken high-temperature water-bearing stratum
CN206016853U (en) * 2016-06-12 2017-03-15 中铁二院工程集团有限责任公司 Base plate anchors restricted type tunnel lining structure

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191210A (en) * 2017-06-16 2017-09-22 中铁第勘察设计院集团有限公司 Shield tunnel anti-floating system and its construction method based on prestress anchorage cable
CN107100630A (en) * 2017-07-03 2017-08-29 北京市市政工程设计研究总院有限公司 Pile foundation type bored tunnel and construction method in deep backfill
CN107524458A (en) * 2017-08-30 2017-12-29 中铁二院工程集团有限责任公司 A kind of tunnel lining structure with tunnel bottom deformation allowance
CN107524458B (en) * 2017-08-30 2023-09-22 中铁二院工程集团有限责任公司 Tunnel lining structure with tunnel bottom reserved deformation
CN107829407A (en) * 2017-10-18 2018-03-23 中国电建集团中南勘测设计研究院有限公司 One kind can drainage for overhaul tunnel, construction method and repair method
CN108222975A (en) * 2017-12-27 2018-06-29 中铁二院工程集团有限责任公司 Big skewback floor type lining cutting and its drainage system construction
CN107975379A (en) * 2017-12-27 2018-05-01 中铁二院工程集团有限责任公司 Both sides set the liner structure for the L-shaped base for having draining, carrying and supporting and retaining system function concurrently
CN108005678A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 π shape tunnels bottom liner structure with low level sluicing kinetic energy
CN108005688A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 The external dewatering type lining cutting of buried lateral sulcus and its drainage system
CN108086993A (en) * 2017-12-27 2018-05-29 中铁二院工程集团有限责任公司 Tunnel bottom sets the haunch floor type tunnel-liner of leaked oil and drainage system constructs and its construction method
CN108222963A (en) * 2017-12-27 2018-06-29 中铁二院工程集团有限责任公司 The not contour longeron carrying stalk floor type lining cutting of tunnel bottom setting longitudinal direction collection drainage gallery and its drainage system construction
CN108222960A (en) * 2017-12-27 2018-06-29 中铁二院工程集团有限责任公司 The V-arrangement skewback floor type lining cutting of tunnel bottom setting drainage gallery and its drainage system construction
CN107905812A (en) * 2017-12-27 2018-04-13 中铁二院工程集团有限责任公司 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN108086993B (en) * 2017-12-27 2023-11-17 中铁二院工程集团有限责任公司 Construction method of haunched floor type tunnel lining and drainage system structure with drainage gallery arranged at tunnel bottom
CN108005690A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system
CN107975379B (en) * 2017-12-27 2024-03-22 中铁二院工程集团有限责任公司 Lining structure with L-shaped base with drainage, bearing and retaining functions at two sides
CN108005690B (en) * 2017-12-27 2024-01-19 中铁二院工程集团有限责任公司 Arch structure non-inverted arch type lining of boot-shaped base
CN108316062B (en) * 2018-02-11 2020-04-21 中铁二院工程集团有限责任公司 Construction method of control device for tunnel bottom upper arch of ballastless track
CN108316062A (en) * 2018-02-11 2018-07-24 中铁二院工程集团有限责任公司 A kind of control device and its construction method of non-fragment orbit tunnel arching of bottom
CN109681270A (en) * 2018-11-30 2019-04-26 金础础 A kind of constructing tunnel fault belt row's stone drainage arrangement
CN109681270B (en) * 2018-11-30 2020-05-19 北京城建中南土木工程集团有限公司 Broken stone drainage device that takes of fault for tunnel construction
CN110273708A (en) * 2019-07-01 2019-09-24 长沙矿山研究院有限责任公司 A kind of hydrophobic method of roadway support structural body control
CN113464174B (en) * 2021-07-05 2023-05-26 广东冠粤路桥有限公司 Construction method of tunnel row waterproof comprehensive treatment system
CN113464174A (en) * 2021-07-05 2021-10-01 广东冠粤路桥有限公司 Construction method of tunnel drainage waterproof comprehensive treatment system

Also Published As

Publication number Publication date
CN105927272B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN105927272A (en) Floor anchoring constraint tunnel lining structure
CN105863671B (en) Frame-type subdrain system tunnel lining structure
CN106437748B (en) A kind of separate type can repair tunnel lining structure
CN105840210B (en) The compound arch tunnel lining structure in box tunnel bottom with hydrophobic function
CN205677631U (en) It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN106089244A (en) Frame props up arched tunnel lining structure
CN105840211A (en) Pi-shaped plate and inverted arch combined tunnel bottom lining structure
CN206220972U (en) Frame branch arched tunnel lining structure
CN102605793B (en) Moisture transfer and ecological management method for loess slope
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN207673371U (en) A kind of novel tunnel drainage system construction
CN107905811A (en) The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system
CN104653195A (en) Gully landform tunnel portal structure and construction method thereof
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN206016821U (en) Frame-type subdrain system tunnel lining structure
CN205936632U (en) Tunnel lining structure can be maintained to disconnect -type
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN106761771A (en) A kind of construction method for crossing native shallow tunnel on rock under the location of mountain valley
CN207568626U (en) A kind of tunnel structure for expansive stratum
CN206016823U (en) π shapes plate and inverted arch combined type tunnel bottom lining structure
CN108533317A (en) A kind of tunnel bottom discharge structure
CN112983461A (en) Construction method for bias tunnel portal in slope volume
CN208168937U (en) A kind of tunnel bottom discharge structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant