CN205677631U - It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function - Google Patents
It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function Download PDFInfo
- Publication number
- CN205677631U CN205677631U CN201620563442.1U CN201620563442U CN205677631U CN 205677631 U CN205677631 U CN 205677631U CN 201620563442 U CN201620563442 U CN 201620563442U CN 205677631 U CN205677631 U CN 205677631U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- arch wall
- arch
- box
- central row
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function, introduce in tunnel to be prevented effectively from underground water, rain flood is overcome to cause underground water enchroachment (invasion) bubble railway roadbed due to tunnel medial sulcus and central trench drainability deficiency season, ensure that level of ground water is less than under tunnel floor, thus eliminate the destruction risk to liner structure particularly tunnel bottom structure for the rain flood underground water in season.It including arrange arch wall preliminary bracing structure, secondary liner structure and substrate screed-coat from outside to inside, is arranged at arch wall preliminary bracing structure, the waterproof and water drainage system between secondary liner structure is connected with central row tank.Secondary liner structure includes arch wall secondary lining and the box type baseboard structure being made up of base plate, frid, and the two ends of base plate consolidate with the bottom of arch wall secondary lining, frid formation recessed relative to top plate face central row tank.The top of frid two side buries tapping pipe underground along circuit bearing of trend interval, and the inner of each tapping pipe is connected with central row tank, and outer end then passes through substrate screed-coat to Tunnel Base.
Description
Technical field
The utility model relates to tunnel lining structure, grows particularly to a kind of underground water or underground water is by seasonal effect
Greatly, without the tunnel lining structure under high-ground stress geological condition.
Background technology
Enter 21st century, with the high speed development of railway construction in China, speed per hour 200km above high standard two-wire iron
Road is built more and more, especially in mountainous region in middle and western China, circuit show line is big by sweep, topographic and geologic complicated condition etc. multiple because of
The restriction of element, tunnel scale increases sharply, and long mountain tunnel gets more and more.Grow due to underground water and there is complexity, various
The feature such as property and irregularities, major long tunnel builds risk, and particularly to run water damage risk more and more higher.
Tradition double track tunnel lining cutting typically uses the liner structure form of bent wall band inverted arch, as shown in Figure 1.Use on inverted arch
Concrete Filled is as railway roadbed basis, and in construction, inverted arch is filled with inverted arch and separately poured.Central drain+bilateral water is set in tunnel
Ditch, Central drain is placed in the obturator on inverted arch.Underground water discharge path is: country rock → preliminary bracing → draining blind pipe →
Lateral sulcus → transverse drain → Central drain, the i.e. water of tunnel structure periphery are permeated via draining blind pipe ejectment by preliminary bracing
Enter the Central drain within tunnel structure body, outside final discharge hole.The maximum defect of conventional drainage systems is: middle edema with the heart involved
Ditch is located within tunnel structure, the periphery underground water of main ejectment main ejectment arch wall scope, the ponding below tunnel inverted arch without
The effective ejectment of method.Especially in the close region of ground hydraulic connection, under continuous rainfall or rainstorm weather, because groundwater run off is rapid
Increase, traditional drainage system often cannot ejectment in time in the gutter in tunnel structure body, thus cause level of ground water urgency
Acute rising.Under high hydraulic pressure effect, inverted arch at the bottom of tunnel or inverted arch is caused to fill protuberance.In recent years, suitable ten thousandth, Shanghai elder brother, the expensive railway such as extensively
There occurs the water damage events such as some abutment wall crackings, inverted arch protuberance, ballastless track bed deformation during tunnel operation, cause railway and set
Meter, construction, the great attention building and runing each side.
Optimize liner structure and drainage system is the key technology solving tunnel, karst area water damage risk.Therefore, how
It is unified in unobstructed for safe and reliable for structure and draining under a kind of supporting construction, become reduction tunnel, karst area water damage risk, protect
Card operation security in the urgent need to.
Utility model content
Technical problem to be solved in the utility model is to provide and is combined arched tunnel at the bottom of the box tunnel with hydrophobic function
Lining structure, introduces in tunnel to be prevented effectively from underground water, overcomes rain flood season due to tunnel medial sulcus and central trench drainability
Not enough and cause underground water enchroachment (invasion) bubble railway roadbed, it is ensured that level of ground water is less than under tunnel floor, thus eliminates rain flood underground water pair in season
The destruction risk of liner structure particularly tunnel bottom structure.
It is as follows that the utility model solves the technical scheme that its technical problem used:
It is combined arch tunnel lining structure, including set from outside to inside at the bottom of the box tunnel with hydrophobic function of the present utility model
Put arch wall preliminary bracing structure, secondary liner structure and substrate screed-coat, be arranged at arch wall preliminary bracing structure, secondary lining knot
Waterproof and water drainage system between structure is connected with central row tank, it is characterized in that: described secondary liner structure includes that arch wall secondary serves as a contrast
The box type baseboard structure built and be made up of base plate, frid, the two ends of base plate consolidate with the bottom of arch wall secondary lining, and frid is relative
In the recessed formation in top plate face central row tank;The top of described frid two side buries sluicing underground along circuit bearing of trend interval
Pipe, the inner of each tapping pipe is connected with central row tank, and outer end then passes through substrate screed-coat to Tunnel Base.
The beneficial effects of the utility model are, use box type baseboard structure to replace tradition inverted arch structure, and on the one hand construction is opened
Dig operation more convenient, succinct, overcome tradition lining types and cause inverted arch to be constructed owing to inverted arch foundation excavation curvature is wayward
And the problems such as the cracking protuberance that cause inconsistent with design;On the other hand, it is achieved liner structure " external draining ", arch wall secondary lining
Build underground water behind to be not passed through abutment wall and introduce tunnel lateral sulcus, and be introduced directly into central row tank at the bottom of tunnel, be prevented effectively from rain flood season
Underground water excessive lateral sulcus drainability pours in railway roadbed not.Simultaneously because gutter is positioned under base plate, can guarantee that ground all the time
Lower water smooth and easy eliminating and avoid causing bottom slab crack to swell.
Brief description
This specification includes following four width accompanying drawings:
Fig. 1 is the bent wall band inverted arch liner structure schematic diagram of tradition;
Fig. 2 is that the utility model has at the bottom of the box tunnel of hydrophobic function and is combined the section structure of arch tunnel lining structure and shows
It is intended to;
Fig. 3 is that the utility model has at the bottom of the box tunnel of hydrophobic function and is combined the section structure of arch tunnel lining structure and shows
It is intended to;
Fig. 4 is the enlarged drawing of B local in Fig. 2;
Component shown in figure, toponym and corresponding mark: central row tank A;Arch wall preliminary bracing structure the 10th, arch wall
Shotcrete layer 10a, arch wall steelframe 10b, arch wall system anchor bolt 10c;Substrate screed-coat 11;Waterproof and water drainage system the 20th, nonwoven soil
Work cloth 20a, circle draining blind pipe 20b, splash guard 20c;Tapping pipe 21;Arch wall secondary lining 30;Base plate the 31st, frid 32.
Detailed description of the invention
With embodiment, the utility model is further illustrated below in conjunction with the accompanying drawings.
It with reference to Fig. 2 and Fig. 3, at the bottom of the box tunnel with hydrophobic function of the present utility model, is combined arch tunnel lining structure,
It including arrange arch wall preliminary bracing structure the 10th, secondary liner structure and substrate screed-coat 11 from outside to inside, is arranged at the arch wall initial stage
Waterproof and water drainage system 20 between supporting construction the 10th, secondary liner structure is connected with central row tank A.Described secondary liner structure
Including arch wall secondary lining 30 and by the base plate box type baseboard structure that the 31st, frid 22 is constituted, the two ends of base plate 31 and arch wall secondary
The bottom consolidation of lining cutting 30, frid 22 formation recessed relative to top board 31 plate face central row tank A.Described frid 22 two side
Top buries tapping pipe 21 underground along circuit bearing of trend interval, and the inner of each tapping pipe 21 is connected with central row tank A, and outer end is then
Through substrate screed-coat 11 to Tunnel Base.
The utility model is by construction and drainage system at the bottom of reasonable reformation tunnel, it is achieved liner structure " external draining ", will
Tradition liner structure underground water is changed into the drainage pattern outside agent structure by the drainage pattern entering outside structure in structure, keeps away
Exempt from underground water to introduce in tunnel.Rain flood is effectively overcome to cause underground due to tunnel medial sulcus and central trench drainability deficiency season
Water enchroachment (invasion) steeps railway roadbed;Meanwhile, arrange in conjunction with tunnel bottom structure, strengthen central row sink size, reduce central row tank absolute altitude, it is ensured that ground
Lower water level is less than under tunnel floor, thus eliminates the destruction wind to liner structure particularly tunnel bottom structure for the rain flood underground water in season
Danger.
With reference to Fig. 2, generally, described central row tank A is arranged under tunnel center line., base plate 31 ascender line road bearing of trend
It is arranged at intervals with the inspection well head being connected with central row tank A.With reference to Fig. 2 and Fig. 4, described waterproof and water drainage system 20 includes arch wall
The splash guard 20c that the non-woven geotextile 20a of scope laying and arch wall scope are laid, and be laid in along tunnel excavation direction interval
Circle draining blind pipe 20b between non-woven geotextile 20a and splash guard 20c.The two ends of described circle draining blind pipe 20b are along base plate 31
Lower edge is introduced directly into central row tank A.
With reference to Fig. 2 and Fig. 3, described arch wall preliminary bracing structure 10 includes the arch wall shotcrete layer covering arch wall country rock
10a and the arch wall system anchor bolt 10c along arch wall quincuncial arrangement.Along tunnel excavation side in described arch wall shotcrete layer 10a
Lay arch wall steelframe 10b to interval, in arch wall shotcrete layer 10a, add bar-mat reinforcement.
The above the utility model that simply explains through diagrams has at the bottom of the box tunnel of hydrophobic function and is combined arched tunnel lining
Build some principles of construction, be not intended to the utility model is confined in shown and described concrete structure and the scope of application,
Therefore every corresponding modification being possible to be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.
Claims (6)
1. it is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function, including arrange arch wall preliminary bracing from outside to inside
Structure (10), secondary liner structure and substrate screed-coat (11), be arranged at arch wall preliminary bracing structure (10), secondary liner structure
Between waterproof and water drainage system (20) be connected with central row tank (A), it is characterized in that: described secondary liner structure includes arch wall two
Secondary lining cutting (30) and the box type baseboard structure being made up of base plate (31), frid (22), the two ends of base plate (31) serve as a contrast with arch wall secondary
Build the bottom consolidation of (30), frid (22) formation recessed relative to top board (31) plate face central row tank (A);Waterproof and water drainage system
(20) bottom is connected with central row tank (A) top;The top of described frid (22) two side is along between circuit bearing of trend
Every burying tapping pipe (21) underground, the inner of each tapping pipe (21) is connected with central row tank (A), and outer end then passes through substrate screed-coat
(11) to Tunnel Base.
2. it is combined arch tunnel lining structure at the bottom of the box tunnel as claimed in claim 1 with hydrophobic function, it is characterized in that: institute
Stating central row tank (A) to be arranged under tunnel center line, base plate (31) ascender line road bearing of trend is arranged at intervals with and center draining
The inspection well head that groove (A) is connected.
3. it is combined arch tunnel lining structure at the bottom of the box tunnel as claimed in claim 1 with hydrophobic function, it is characterized in that: institute
State the non-woven geotextile (20a) that waterproof and water drainage system (20) includes that arch wall scope lays and the splash guard (20c) that arch wall scope is laid,
And it is spaced the circle draining blind pipe being laid between non-woven geotextile (20a) and splash guard (20c) along tunnel excavation direction
(20b)。
4. it is combined arch tunnel lining structure at the bottom of the box tunnel as claimed in claim 3 with hydrophobic function, it is characterized in that: institute
The two ends stating circle draining blind pipe (20b) are introduced directly into central row tank (A) along bottom upper plate (31) lower edge.
5. it is combined arch tunnel lining structure at the bottom of the box tunnel as claimed in claim 1 with hydrophobic function, it is characterized in that: institute
State arch wall preliminary bracing structure (10) to include covering the arch wall shotcrete layer (10a) of arch wall country rock and along the quincunx cloth of arch wall
The arch wall system anchor bolt (10c) put.
6. it is combined arch tunnel lining structure at the bottom of the box tunnel as claimed in claim 5 with hydrophobic function, it is characterized in that: institute
Arch wall steelframe (10b), arch wall shotcrete layer is laid along tunnel excavation direction interval in stating arch wall shotcrete layer (10a)
(10a) bar-mat reinforcement is added in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620563442.1U CN205677631U (en) | 2016-06-12 | 2016-06-12 | It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620563442.1U CN205677631U (en) | 2016-06-12 | 2016-06-12 | It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205677631U true CN205677631U (en) | 2016-11-09 |
Family
ID=57432777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620563442.1U Withdrawn - After Issue CN205677631U (en) | 2016-06-12 | 2016-06-12 | It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205677631U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105840210A (en) * | 2016-06-12 | 2016-08-10 | 中铁二院工程集团有限责任公司 | Box type tunnel-bottom composite arched tunnel lining structure with water drain function |
CN106677821A (en) * | 2017-02-10 | 2017-05-17 | 西南交通大学 | Assembly type tunnel lining back circumferential drainage structure and implementation method thereof |
CN107012791A (en) * | 2017-03-22 | 2017-08-04 | 中交公局厦门工程有限公司 | Tunnel-Type Anchorage of Suspension Bridge waterproof and water drainage system is with building construction method |
CN107905811A (en) * | 2017-12-27 | 2018-04-13 | 中铁二院工程集团有限责任公司 | The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system |
CN107905812A (en) * | 2017-12-27 | 2018-04-13 | 中铁二院工程集团有限责任公司 | The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power |
CN108005690A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system |
CN108005688A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | The external dewatering type lining cutting of buried lateral sulcus and its drainage system |
CN111271118A (en) * | 2020-03-30 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Drainage structure suitable for reconstruction of tunnel bottom structure of karst tunnel and construction method thereof |
-
2016
- 2016-06-12 CN CN201620563442.1U patent/CN205677631U/en not_active Withdrawn - After Issue
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105840210A (en) * | 2016-06-12 | 2016-08-10 | 中铁二院工程集团有限责任公司 | Box type tunnel-bottom composite arched tunnel lining structure with water drain function |
CN106677821A (en) * | 2017-02-10 | 2017-05-17 | 西南交通大学 | Assembly type tunnel lining back circumferential drainage structure and implementation method thereof |
CN106677821B (en) * | 2017-02-10 | 2019-01-25 | 西南交通大学 | A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method |
CN107012791A (en) * | 2017-03-22 | 2017-08-04 | 中交公局厦门工程有限公司 | Tunnel-Type Anchorage of Suspension Bridge waterproof and water drainage system is with building construction method |
CN107905811A (en) * | 2017-12-27 | 2018-04-13 | 中铁二院工程集团有限责任公司 | The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system |
CN107905812A (en) * | 2017-12-27 | 2018-04-13 | 中铁二院工程集团有限责任公司 | The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power |
CN108005690A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system |
CN108005688A (en) * | 2017-12-27 | 2018-05-08 | 中铁二院工程集团有限责任公司 | The external dewatering type lining cutting of buried lateral sulcus and its drainage system |
CN108005690B (en) * | 2017-12-27 | 2024-01-19 | 中铁二院工程集团有限责任公司 | Arch structure non-inverted arch type lining of boot-shaped base |
CN107905811B (en) * | 2017-12-27 | 2024-01-19 | 中铁二院工程集团有限责任公司 | Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure |
CN111271118A (en) * | 2020-03-30 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Drainage structure suitable for reconstruction of tunnel bottom structure of karst tunnel and construction method thereof |
CN111271118B (en) * | 2020-03-30 | 2024-06-04 | 中铁二院工程集团有限责任公司 | Drainage structure suitable for reconstruction of karst tunnel bottom structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205677631U (en) | It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function | |
CN105840210B (en) | The compound arch tunnel lining structure in box tunnel bottom with hydrophobic function | |
CN105863671B (en) | Frame-type subdrain system tunnel lining structure | |
CN105927272B (en) | Bottom plate anchors restricted type tunnel lining structure | |
CN106437748B (en) | A kind of separate type can repair tunnel lining structure | |
CN106089244A (en) | Frame props up arched tunnel lining structure | |
CN206220972U (en) | Frame branch arched tunnel lining structure | |
CN105840211A (en) | Pi-shaped plate and inverted arch combined tunnel bottom lining structure | |
CN208533546U (en) | A kind of series-parallel underground stereo drainage system suitable for side landslide engineering | |
CN206016853U (en) | Base plate anchors restricted type tunnel lining structure | |
CN110004935A (en) | A kind of locally deep pit drain measure trench system and construction method | |
CN109024458A (en) | A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage | |
CN107965327A (en) | Arcuately tunnel bottom liner structure and its drainage system | |
CN207673371U (en) | A kind of novel tunnel drainage system construction | |
CN102383408B (en) | Greening method for high water level impermeable saline and alkaline lands and greening system | |
CN206016821U (en) | Frame-type subdrain system tunnel lining structure | |
CN206016823U (en) | π shapes plate and inverted arch combined type tunnel bottom lining structure | |
CN205936632U (en) | Tunnel lining structure can be maintained to disconnect -type | |
CN203924082U (en) | Anti-floating of underground building structure | |
CN109371919A (en) | The native stone water-retaining structure of seepage prevention of core wall | |
CN107905810A (en) | Boot last pedestal combed tunnel bottom liner structure and its drainage system | |
CN203050779U (en) | Tunnel drainage structure suitable for bias pressure rich water strata | |
CN209760299U (en) | light and shade of avoiding house to tear open and move is dug and is combined subway station structure | |
CN208168937U (en) | A kind of tunnel bottom discharge structure | |
CN111424685A (en) | Deep water falling hole processing structure and method for backfilling foundation in large karst depression |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161109 Effective date of abandoning: 20180921 |
|
AV01 | Patent right actively abandoned |