CN107905812A - The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power - Google Patents

The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power Download PDF

Info

Publication number
CN107905812A
CN107905812A CN201711498095.4A CN201711498095A CN107905812A CN 107905812 A CN107905812 A CN 107905812A CN 201711498095 A CN201711498095 A CN 201711498095A CN 107905812 A CN107905812 A CN 107905812A
Authority
CN
China
Prior art keywords
tunnel
drainage system
tunnel bottom
arch
arch wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711498095.4A
Other languages
Chinese (zh)
Inventor
卿伟宸
曾宏飞
林本涛
高杨
钟昌桂
张磊
朱勇
郑伟
黄华
孟祥磊
王芳
陈锡武
王若晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201711498095.4A priority Critical patent/CN107905812A/en
Publication of CN107905812A publication Critical patent/CN107905812A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power, effect of the underground water to tunnel-liner polycrystalline substance is even eliminated to reduce, karst or the regional tunnel inverted arch floating deformation of underground water development or tunnel bottom structure cracking destruction are effectively solved the problems, such as, to ensure the stabilization and security of constructing tunnel and operation.Arch wall secondary liner structure both sides abutment wall bottom tunnel bottom construct arranged below is as bearing structure, the tunnel bottom construct is hollow type structure of falling from power, formed by upper plate, both sides transversal web and longitudinally spaced lower plate, longitudinal web overall perfusion, longitudinally spaced tunnel bottom cavity is formed in it.Longitudinally through Central drain, Central drain connection each tunnel bottom cavity are set under upper plate plate face along longitudinal center.Drainage system includes arch wall scope drainage system, tunnel bottom drainage system and the tunnel inner water drainage system being connected with tunnel bottom cavity.

Description

The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
Technical field
The present invention relates to tunnel-liner and drainage system to construct, and more particularly to one kind applies to underground water development location or rock Molten regional tunnel-liner and its waterproof and water drainage system construction.
Background technology
Come into 21st century, railway construction in China high speed development, speed per hour 200km above high standard double track railways are built It is more and more, it is especially more by big, the topographic and geologic complicated condition of sweep etc. in Southwest Mountainous Areas, karsts developing area, and circuit show line The restriction of kind factor, Karst Tunnel scale increase sharply.Since karst and karst water development are with complexity, diversity and random The features such as rule property, it is higher and higher that Karst Tunnel of growing up builds risk particularly operations risks.
In recent years, suitable ten thousand, during Shanghai elder brother, the expensive Railway Tunnel operation such as wide there occurs some ballastless track beds deformations, The water damage event such as inverted arch and filling protuberance, causes Railway Design, construction, construction and the great attention for runing each side.Through investigating, Both wired water damage was broadly divided into two classes:
(1) inverted arch filling, which is floated, deforms.The construction joint that the construction in layer of its performance predominantly tunnel bottom structure is brought is in hydraulic pressure Deformation, expansion under effect.
1. code requirement inverted arch should be separated with inverted arch filling and poured.This engineering method forms construction joint between inverted arch and filling, But underground water penetrates into inverted arch by inverted arch circular construction joint and fills bottom, and about 3~4m heads can cause filling to be floated.
2. in practice of construction, to prevent railway roadbed construction surface from being destroyed by Construction traffic, inverted arch filling often uses placement layer by layer Mode, inverted arch filling top layer (or regulating course) thickness about 0.2~0.4m of placing before railway roadbed construction, it is only necessary to 0.5~1m High head can cause to fill top layer floating, and then cause railway roadbed to deform.
3. ballastless track bed to road bed board and inverted arch fill surface using the connectionless way of contact, it is right there are construction interface It is more notable in the sensitiveness of tunnel bottom infiltration, often also there is " gap " lifting phenomenon and wear phenomenon, under the action of water, disease Evil feature is particularly evident.Its stiffness difference huge with tunnel structure, deformation and track structure are very poor to foundation deformation Adaptability be further exacerbated by adverse effect and difficulty of governance of the tunnel bottom water damage to operation security.
(2) liner structure particularly inverted arch strain cracking.
1. limited by vertical, the circumferential blind pipe and abutment wall spilled water hole drainability that are set in tunnel, after work drainage system by Physical (silt, fine grained deposition are silted up), chemical type block (soluble matter separates out, concrete and slurry reaction residue condense) Impeded drainage will be all caused etc. reason, hydraulic pressure change dramatically, causes liner structure cracking failure.
2. the structures such as abutment wall longitudinal direction construction joint, circular construction joint, inverted arch bottom and waterproof weak link recurring structure deformation, Cracking and waterproof failure;There is water spray, gushes silt etc. in local location.
3. level of ground water seasonal fluctuations, cause lining cutting to bear " dynamic load " influence.In continuous rainfall or Severe rainstorm weather Under the conditions of, level of ground water increases suddenly, and lining cutting bears higher hydraulic pressure.
The tunnel designed at present is largely to have inverted arch lining cutting.By taking one-tunnel two-tracks tunnel as an example, its drainage system is with " tunnel Internal draining " is Main Patterns, and underground water discharge path is:Country rock → preliminary bracing → draining blind pipe → lateral sulcus → transverse drainage Pipe → Central drain, the i.e. water on tunnel structure periphery are permeated by preliminary bracing enters tunnel structure sheet via the ejectment of draining blind pipe Central drain within body, it is final to discharge outside hole.
Drainage system in tunnel body main drawback is that:
It is arranged on 1. the pressure release point for having pressure underground water is respectively positioned on inside lining cutting agent structure, causes lining cutting agent structure to bear Hydrostatic pressing or hydrodynamic scope are larger.
2. Central drain (or lateral sulcus) is arranged within tunnel structure, the periphery underground water of main ejectment arch wall scope, tunnel Ponding below inverted arch can not effective ejectment, once under continuous rainfall or rainstorm weather, under Local topography inverted arch crevice water or Pipeline water because can not ejectment in time cause hydraulic pressure drastically to raise.Under the effect of high hydraulic pressure, cause tunnel bottom inverted arch cracking failure.
3. tunnel is in underground water seasonal fluctuation zone etc. and the close region of extraneous hydraulic connection, in continuous rainfall or heavy rain Under weather, because of groundwater run off abruptly increase, limited by abutment wall sluicing pore size and spacing, it is difficult in time by its ejectment to tunnel structure body In interior gutter, so as to cause level of ground water drastically to raise.Under the effect of high hydraulic pressure, Lining cracks are caused to destroy.
4. being needed by ballast bed structure, hole auxiliary structures and tunnel cross-section engineering economy being restricted, consider that construction is difficult The cross-section of river free degree of easy degree, hole medial sulcus or Central drain is little, and discharge capacity is limited, and often causes water damage in hole.
5. since tunnel bottom is arc-shaped, excavate that control is more difficult, and it is big that tunnel bottom void slag cleans out difficulty completely, during operation Due to tunnel bottom underground water can not ejectment, Train induced load repeated action in addition, easily causes tunnel bottom the disaster such as to rise soil.
Therefore, optimize liner structure and drainage system, ensure that draining is unobstructed, reduce and even eliminate tunnel bottom hydraulic pressure, become drop Low karst area tunnel water damage risk, ensure operation security there is an urgent need to.
The content of the invention
The technical problems to be solved by the invention be to provide it is a kind of it is hollow fall from power the compound arch tunnel-liner in type tunnel bottom and its Drainage system constructs, and even eliminates effect of the underground water to tunnel-liner polycrystalline substance to reduce, effectively solves karst or underground The problem of regional tunnel inverted arch floating deformation of water development or tunnel bottom structure cracking destruction, to ensure the stabilization of constructing tunnel and operation And security.
The technical solution adopted by the present invention to solve the technical problems is as follows:
Hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction of the present invention, including arch wall branch at initial stage Protection structure, arch wall secondary liner structure and arch wall scope waterproof layer, and drainage system, it is characterized in that:The secondary lining of arch wall Structure both sides abutment wall bottom tunnel bottom construct arranged below is built as bearing structure, which is hollow type knot of falling from power Structure, is formed by upper plate, both sides transversal web and longitudinally spaced lower plate, longitudinal web overall perfusion, formation longitudinal direction in it The tunnel bottom cavity at interval;Longitudinally through Central drain is set under the upper plate plate face along longitudinal center, which connects Logical each tunnel bottom cavity;The drainage system includes arch wall scope drainage system, the tunnel bottom drainage system being connected with tunnel bottom cavity With tunnel inner water drainage system.
Tunnel bottom drainage system includes lateral separation and lays and connect longitudinal Permeable blind pipe of adjacent tunnel bottom cavity, longitudinal direction Permeable blind pipe, tunnel bottom cavity and Central drain form solid netted drainage system, and suction takes drainage tunnel bottom underground water by force, avoids underground water Drainage difficulty or heavy rain season groundwater run off abruptly increase cause base arrangement protuberance or cracking destruction.
The arch wall scope drainage system includes circle draining blind pipe, and the circle draining blind pipe is along between tunnel excavation direction Every being laid between non-woven geotextile and splash guard, it is bent into upper plate lower edge in the cavity of tunnel bottom, arch wall scope underground water passes through ring It is discharged into after collecting to draining blind pipe in the cavity of tunnel bottom.
The tunnel inner water drainage system includes being fixedly installed on the hole medial sulcus of upper plate both lateral sides and extends along circuit Direction interval is embedded in the tapping pipe in the foundation of arch wall secondary lining two sides, and in hole medial sulcus and upper plate it is inbuilt logical Toward the contact water pipe of tunnel bottom cavity, underground water collects and precipitates through tapping pipe introducing hole medial sulcus, and tunnel bottom is introduced through contacting water pipe In cavity.
The beneficial effects are mainly as follows following aspects:
1st, tunnel bottom uses hollow type structure of falling from power, and tunnel bottom excavation face is plane, excavates operation and is more convenient, overcomes traditional lining Block form inverted arch foundation excavation curvature is difficult to control the problems such as leading.The liner structure that traditional tunnel bottom is inverted arch form is compared to, Construction material is saved, effectively reduces engineering construction investment;
2nd, tunnel bottom uses hollow type structure of falling from power, and is not required to apply Concrete Filled body thereon, effectively prevent traditional bent wall Band inverted arch lining cutting destroys obturator since underground water enters extruding between inverted arch and inverted arch blind by inverted arch construction joint, causes Track structure destroys;
3rd, tunnel bottom uses hollow type structure of falling from power, the bearing structure as arch wall secondary lining, on the one hand, to weak surrounding rock Location tunnel, can effectively control arch supporting construction sedimentation and deformation;On the other hand, to karst area tunnel, one can effectively be crossed over It is sized the Karst Features (molten chamber, filling solution cavity, corroded breaking zone etc.) of scope;
The 4th, arch wall scope drainage system, tunnel bottom drainage system and tunnel inner water drainage system totally three sets of drainage systems are set, can By property higher, drainability is stronger, can effectively drainage arch wall scope and tunnel bottom underground water, avoid traditional liner structure because of underground water Lining cutting structure crack destroys after drainage difficulty or heavy rain season groundwater run off abruptly increase cause inverted arch.
The present invention changes tunnel bottom structure stress form and row by transforming conventional tunnel lining cutting tunnel bottom structure form Water system, reduces and even eliminates effect of the underground water to tunnel-liner polycrystalline substance, effectively solve karst or underground water developmentally The problem of inverted arch floating deformation of area tunnel or tunnel bottom structure cracking destruction, to ensure the stabilization and safety of constructing tunnel and operation Property.
Brief description of the drawings
This specification includes following nine width attached drawing:
Fig. 1 is the hollow compound arch tunnel-liner in type tunnel bottom and its drainage system organigram of falling from power of the present invention;
Fig. 2 is the enlarged drawing of A parts in Fig. 1;
Fig. 3 is that I-I lines cut open figure along Fig. 1;
Fig. 4 is the profile of II-II line along Fig. 1;
Fig. 5 is the profile of III-III line along Fig. 3;
Fig. 6 is the profile of IV-IV line along Fig. 3;
Fig. 7 is the profile of V-V line along Fig. 3;
Fig. 8 is the profile of VI-VI line along Fig. 3;
Fig. 9 is the profile of VII-VII line along Fig. 4.
Component, toponym and corresponding mark are shown in figure:Arch wall preliminary bracing structure 10, arch wall shotcrete layer 10a, arch wall steelframe 10b, arch wall system anchor bolt 10c, arch wall scope waterproof layer 20, non-woven geotextile 20a, splash guard 20b, circumferential direction Draining blind pipe 31a, longitudinal Permeable blind pipe 32a,
Tapping pipe 33a, lateral ties water pipe 33b,
Arch wall secondary liner structure 40, tunnel bottom construct 41, upper plate 41a, lower plate 41b, transversal web 41c, longitudinal direction Web 41d, tunnel bottom cavity B, Central drain C, inspection well head D, hole medial sulcus E, cover board 42.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
Referring to figs. 1 to Fig. 7, the present invention hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction, bag Include arch wall preliminary bracing structure 10, arch wall secondary liner structure 40 and arch wall scope waterproof layer 20, and drainage system.The arch 40 both sides abutment wall bottom tunnel bottom construct 41 arranged below of wall secondary liner structure is used as bearing structure, which is Hollow type structure of falling from power, can effectively control arch supporting construction sedimentation and deformation, to karst area tunnel to weak surrounding rock location tunnel Road can be effectively across the Karst Features (molten chamber, filling solution cavity, corroded breaking zone etc.) of certain size scope.It is not required to apply thereon mixed Solidifying soil obturator, effectively prevent traditional bent wall band inverted arch lining cutting since underground water by inverted arch construction joint enters inverted arch and inverted arch Extruding, which destroys obturator, between blind causes track structure to destroy.Tunnel bottom excavation face is plane, excavates operation and is more convenient, overcomes Traditional lining types inverted arch foundation excavation curvature is difficult to control the problems such as leading.Traditional inverted arch type lining cutting is compared to, can be reduced Tunnel excavation amount, saves construction material, effectively reduces engineering construction investment.
Referring to figs. 1 to Fig. 7, tunnel bottom construct 41 is by upper plate 41a, both sides transversal web 41c and longitudinally spaced bottom Plate 41b, longitudinal web 41d overall perfusions form, and longitudinally spaced tunnel bottom cavity B is formed in it.Under the upper plate 41a plate faces Longitudinally through Central drain C, Central drain C is set to connect each tunnel bottom cavity B along longitudinal center.The drainage system includes Arch wall scope drainage system, tunnel bottom drainage system and the tunnel inner water drainage system being connected with tunnel bottom cavity B.The present invention sets three Cover drainage system, reliability higher, drainability is stronger, can effectively drainage arch wall scope and tunnel bottom underground water, avoid traditional lining Structure is built because ground water discharge is not smooth or heavy rain season groundwater run off abruptly increase causes lining cutting structure crack after inverted arch to destroy.
Referring to Figures 1 and 2, the arch wall scope waterproof layer 20, positioned at 10 structure of arch wall preliminary bracing and the secondary lining of arch wall Between building structure 40, including the splash guard 20b of the geotextiles 20a of internal layer and outer layer.The arch wall preliminary bracing structure 10 includes Cover the arch wall shotcrete layer 10a and the arch wall system anchor bolt 10c along arch wall quincuncial arrangement of arch wall country rock.The arch wall Arch wall steelframe 10b is laid along tunnel excavation direction interval in shotcrete layer 10a, is added in arch wall shotcrete layer 10a Bar-mat reinforcement.
With reference to Fig. 1, Fig. 3 to Fig. 9, tunnel bottom drainage system includes lateral separation and lays and connect adjacent tunnel bottom cavity B Longitudinal Permeable blind pipe 32a, longitudinal Permeable blind pipe 32a, tunnel bottom cavity B and Central drain C form solid netted drainage system, inhale Take drainage tunnel bottom underground water by force, avoid ground water discharge not smooth or heavy rain season groundwater run off abruptly increase causes base arrangement to swell or open Split destruction.
With reference to Fig. 3, Fig. 4, Fig. 6, Fig. 7 and Fig. 9, longitudinally spaced set leads to tunnel bottom cavity B at 41 center of upper plate Inspection well head D, check and set cover board 34 to close at well head D upper ends, prevent that tunnel underflow water is poured in tunnel during operation.Operation Period, can carry out dredging from checking that well head D enters in the cavity B of tunnel bottom.
With reference to Fig. 1 and Fig. 7, the arch wall scope drainage system includes circle draining blind pipe 31a, the circle draining Blind pipe 31a is laid between non-woven geotextile 20a and splash guard 20b along tunnel excavation direction interval, is bent into upper plate 41a lower edges In the cavity B of tunnel bottom, arch wall scope underground water is discharged into after being collected by circle draining blind pipe 31a in the cavity B of tunnel bottom.
With reference to Fig. 1 and Fig. 9, the tunnel inner water drainage system includes being fixedly installed in the hole of upper plate 41a both lateral sides Lateral sulcus E and the tapping pipe 33a in 40 two sides foundation of arch wall secondary lining is embedded in along circuit extending direction interval, and in hole The inbuilt contact water pipe 33b towards tunnel bottom cavity B in lateral sulcus E and upper plate 41a, underground water are introduced in hole through tapping pipe 33a Lateral sulcus E collects and precipitates, and is introduced through contacting water pipe 33b in tunnel bottom cavity B.
The above is the hollow compound arch tunnel-liner in type tunnel bottom and its draining system of falling from power of the present invention that explain through diagrams Some principles of system construction, are not intended to the present invention being confined in shown and described concrete structure and the scope of application, therefore all It is corresponding modification and the equivalent for being possible to be utilized, belongs to the apllied the scope of the claims of the present invention.

Claims (7)

1. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction, including arch wall preliminary bracing structure (10), arch wall secondary liner structure (40) and arch wall scope waterproof layer (20), and drainage system, it is characterized in that:The arch wall Secondary liner structure (40) both sides abutment wall bottom tunnel bottom construct (41) arranged below is used as bearing structure, the tunnel bottom construct (41) be hollow type structure of falling from power, by upper plate (41a), both sides transversal web (41c) and longitudinally spaced lower plate (41b), Longitudinal web (41d) overall perfusion forms, and longitudinally spaced tunnel bottom cavity (B) is formed in it;Under upper plate (41a) plate face Longitudinally through Central drain (C), the Central drain (C) connection each tunnel bottom cavity (B) are set along longitudinal center;The draining system System includes arch wall scope drainage system, tunnel bottom drainage system and the tunnel inner water drainage system being connected with tunnel bottom cavity (B).
2. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction as claimed in claim 1, its feature It is:Tunnel bottom drainage system includes lateral separation and lays and connect longitudinal Permeable blind pipe (32a) of adjacent tunnel bottom cavity (B), Longitudinal Permeable blind pipe (32a), tunnel bottom cavity (B) and Central drain (C) form solid netted drainage system, inhale with taking drainage tunnel bottom by force Lower water, avoids ground water discharge not smooth or heavy rain season groundwater run off abruptly increase causes base arrangement protuberance or cracking destruction.
3. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction as claimed in claim 1, its feature It is:The arch wall scope drainage system includes circle draining blind pipe (31a), and the circle draining blind pipe (31a) is along tunnel excavation Direction interval is laid between non-woven geotextile (20a) and splash guard (20b), and tunnel bottom cavity (B) is bent into upper plate (41a) lower edge In, arch wall scope underground water is discharged into after being collected by circle draining blind pipe (31a) in tunnel bottom cavity (B).
4. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction as claimed in claim 1, its feature It is:The tunnel inner water drainage system includes being fixedly installed on the hole medial sulcus (E) of upper plate (41a) both lateral sides and prolongs along circuit Stretch the tapping pipe (33a) that direction interval is embedded in the foundation of arch wall secondary lining (40) two sides, and hole medial sulcus (E) and upper The inbuilt contact water pipe (33b) towards tunnel bottom cavity (B) in bottom plate (41a), underground water are introduced on the inside of hole through tapping pipe (33a) Ditch (E) collects and precipitates, and is introduced through contacting water pipe (33b) in tunnel bottom cavity (B).
5. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction as claimed in claim 1, its feature It is:The longitudinally spaced inspection well head (D) set towards tunnel bottom cavity (B), checks on well head (D) at upper plate (41) center Cover board (34) closing is set at end, prevents that tunnel underflow water is poured in tunnel during operation.
6. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction as claimed in claim 1, its feature It is:The arch wall scope waterproof layer (20) is located between arch wall preliminary bracing (10) structure and arch wall secondary liner structure (40), The splash guard (20b) of geotextiles (20a) and outer layer including internal layer.
7. hollow the fall from power compound arch tunnel-liner in type tunnel bottom and its drainage system construction as claimed in claim 1, its feature It is:The arch wall preliminary bracing structure (10) includes the arch wall shotcrete layer (10a) of covering arch wall country rock and along arch wall plum The arch wall system anchor bolt (10c) of flower-shape arrangement.Laid in the arch wall shotcrete layer (10a) along tunnel excavation direction interval Arch wall steelframe (10b), arch wall shotcrete layer (10a) is interior to add bar-mat reinforcement.
CN201711498095.4A 2017-12-27 2017-12-27 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power Pending CN107905812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711498095.4A CN107905812A (en) 2017-12-27 2017-12-27 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711498095.4A CN107905812A (en) 2017-12-27 2017-12-27 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power

Publications (1)

Publication Number Publication Date
CN107905812A true CN107905812A (en) 2018-04-13

Family

ID=61872417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711498095.4A Pending CN107905812A (en) 2017-12-27 2017-12-27 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power

Country Status (1)

Country Link
CN (1) CN107905812A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108757027A (en) * 2018-05-23 2018-11-06 中铁二院工程集团有限责任公司 Multi-functional lobby water system in a kind of tunnel
CN109519192A (en) * 2019-01-23 2019-03-26 四川省交通运输厅公路规划勘察设计研究院 Store up drainage pressure-reducing construction and the tunnel structure across soft rock section in tunnel

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025278A (en) * 2012-07-27 2014-02-06 Kaiei-Kyowa Concrete Co Ltd Side ditch block with retaining wall for constructing side ditch and watchman passage
CN105927272A (en) * 2016-06-12 2016-09-07 中铁二院工程集团有限责任公司 Floor anchoring constraint tunnel lining structure
CN105986836A (en) * 2016-06-14 2016-10-05 中铁隧道勘测设计院有限公司 Single-line railway tunnel substrate waterproof and drainage reinforcing system
CN205677631U (en) * 2016-06-12 2016-11-09 中铁二院工程集团有限责任公司 It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN106089244A (en) * 2016-06-12 2016-11-09 中铁二院工程集团有限责任公司 Frame props up arched tunnel lining structure
CN205895312U (en) * 2016-05-16 2017-01-18 中铁第四勘察设计院集团有限公司 Be used for rich irrigated land section tunnel water handling system
CN106437748A (en) * 2016-06-12 2017-02-22 中铁二院工程集团有限责任公司 Separated maintainable tunnel lining structure
CN206016853U (en) * 2016-06-12 2017-03-15 中铁二院工程集团有限责任公司 Base plate anchors restricted type tunnel lining structure
CN106640189A (en) * 2017-02-22 2017-05-10 西南交通大学 Pressure bearing tunnel bottom structure drainage system and construction method thereof
CN206386134U (en) * 2016-12-13 2017-08-08 中铁二院工程集团有限责任公司 A kind of Underground Subway Station guarded drainage construction
CN208073504U (en) * 2017-12-27 2018-11-09 中铁二院工程集团有限责任公司 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025278A (en) * 2012-07-27 2014-02-06 Kaiei-Kyowa Concrete Co Ltd Side ditch block with retaining wall for constructing side ditch and watchman passage
CN205895312U (en) * 2016-05-16 2017-01-18 中铁第四勘察设计院集团有限公司 Be used for rich irrigated land section tunnel water handling system
CN105927272A (en) * 2016-06-12 2016-09-07 中铁二院工程集团有限责任公司 Floor anchoring constraint tunnel lining structure
CN205677631U (en) * 2016-06-12 2016-11-09 中铁二院工程集团有限责任公司 It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN106089244A (en) * 2016-06-12 2016-11-09 中铁二院工程集团有限责任公司 Frame props up arched tunnel lining structure
CN106437748A (en) * 2016-06-12 2017-02-22 中铁二院工程集团有限责任公司 Separated maintainable tunnel lining structure
CN206016853U (en) * 2016-06-12 2017-03-15 中铁二院工程集团有限责任公司 Base plate anchors restricted type tunnel lining structure
CN105986836A (en) * 2016-06-14 2016-10-05 中铁隧道勘测设计院有限公司 Single-line railway tunnel substrate waterproof and drainage reinforcing system
CN206386134U (en) * 2016-12-13 2017-08-08 中铁二院工程集团有限责任公司 A kind of Underground Subway Station guarded drainage construction
CN106640189A (en) * 2017-02-22 2017-05-10 西南交通大学 Pressure bearing tunnel bottom structure drainage system and construction method thereof
CN208073504U (en) * 2017-12-27 2018-11-09 中铁二院工程集团有限责任公司 The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈建芹;: "武广客运专线大瑶山一号隧道防排水施工技术", 隧道建设, no. 04, pages 89 - 95 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108757027A (en) * 2018-05-23 2018-11-06 中铁二院工程集团有限责任公司 Multi-functional lobby water system in a kind of tunnel
CN108757027B (en) * 2018-05-23 2023-11-21 中铁二院工程集团有限责任公司 Multifunctional drainage system in tunnel
CN109519192A (en) * 2019-01-23 2019-03-26 四川省交通运输厅公路规划勘察设计研究院 Store up drainage pressure-reducing construction and the tunnel structure across soft rock section in tunnel
CN109519192B (en) * 2019-01-23 2023-10-10 四川省公路规划勘察设计研究院有限公司 Tunnel stores up drainage decompression structure and stride across tunnel structure in soft rock district

Similar Documents

Publication Publication Date Title
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN208310794U (en) The tunnel-liner of haunch floor type and the drainage system of leaked oil is arranged in tunnel bottom
CN108222963A (en) The not contour longeron carrying stalk floor type lining cutting of tunnel bottom setting longitudinal direction collection drainage gallery and its drainage system construction
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN107905811A (en) The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system
CN208220818U (en) The external dewatering type lining cutting of buried lateral sulcus and its drainage system
CN108468555A (en) A kind of lining cutting of single-track railway floor type and its drainage system construction that inspection shaft is set using refuge chamber
CN208073504U (en) The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN208310807U (en) A kind of single-track railway floor type lining structure using refuge chamber setting inspection shaft
CN208310791U (en) Box pedestal separates bearing type liner structure with bridge-type tunnel bottom structure sound
CN107905810A (en) Boot last pedestal combed tunnel bottom liner structure and its drainage system
CN108590697A (en) Box pedestal detaches bearing type liner structure and its drainage system with bridge-type tunnel bottom structure sound
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN107905812A (en) The hollow compound arch tunnel-liner in type tunnel bottom and its drainage system construction of falling from power
CN208073508U (en) The not contour longeron of the longitudinal collection drainage gallery of tunnel bottom setting carries stalk floor type lining structure
CN208073501U (en) Foundation base type is without inverted arch type tunnel lining structure and its drainage system
CN208310793U (en) Mirror holder type entirety tunnel bottom arch lining structure
CN108222975A (en) Big skewback floor type lining cutting and its drainage system construction
CN107905808A (en) The foundation carrying of falling groove-shaped longitudinal beam is without tunnel bottom structure arch lining cutting and its drainage system
CN108194096A (en) Foundation base type is without inverted arch type tunnel lining structure and its drainage system
CN108005677A (en) The bottom arch lining cutting of mirror holder type entirety tunnel and its drainage system
CN107905809A (en) Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure and separate type drainage system
CN208473887U (en) Big skewback floor type lining structure
CN208073520U (en) Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system
CN208220807U (en) The V-arrangement skewback floor type lining structure of tunnel bottom setting drainage gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180413

WD01 Invention patent application deemed withdrawn after publication