CN206016821U - Frame-type subdrain system tunnel lining structure - Google Patents

Frame-type subdrain system tunnel lining structure Download PDF

Info

Publication number
CN206016821U
CN206016821U CN201620563287.3U CN201620563287U CN206016821U CN 206016821 U CN206016821 U CN 206016821U CN 201620563287 U CN201620563287 U CN 201620563287U CN 206016821 U CN206016821 U CN 206016821U
Authority
CN
China
Prior art keywords
arch wall
tunnel
base plate
subdrain
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620563287.3U
Other languages
Chinese (zh)
Inventor
张磊
卿伟宸
王芳
高杨
朱勇
郑伟
孟祥磊
曾宏飞
黄华
钟昌桂
李泽龙
陈锡武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201620563287.3U priority Critical patent/CN206016821U/en
Application granted granted Critical
Publication of CN206016821U publication Critical patent/CN206016821U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Frame-type subdrain system tunnel lining structure, by transforming to conventional tunnel lining cutting tunnel bottom structure form, change tunnel bottom structure stress form, reduce, liner structure " external draining " is realized simultaneously, so as to be particularly rain flood season tunnel lining structure safety during ensureing operation.Including arch wall preliminary bracing structure, arch wall secondary liner structure and base plate that arch wall scope is arranged from outside to inside, and the waterproof and water drainage system between arch wall preliminary bracing structure and arch wall secondary liner structure.The tunnel bottom framework structure being made up of foundation beam, short column and crossbeam is set under the base plate, used as the horizontal bearing structure in bottom and the vertical bearing structure of base plate of arch wall secondary liner structure.Guide the tunnel longitudinal drainage passage being arranged in the tunnel bottom framework inside configuration space in the lower end of the waterproof and water drainage system.

Description

Frame-type subdrain system tunnel lining structure
Technical field
The utility model is related to tunnel lining structure, and more particularly to a kind of underground water is big by seasonal effect or underground water is developed Karst area tunnel lining structure.
Background technology
Entrance 21st century comes, and railway construction in China high speed development, the above high standard double track railway of speed per hour 200km are built More and more, especially in Southwest Mountainous Areas, karsts developing area, and circuit show line is more by big, topographic and geologic complicated condition of sweep etc. The restriction of the factor of kind, Karst Tunnel scale increase sharply.As karst and karst water development have complexity, diversity and random The features such as rule property, Karst Tunnel of growing up, build risk and are particularly operations risks more and more higher.
In recent years, suitable ten thousand, there occurs during Shanghai elder brother, the expensive Railway Tunnel operation such as wide some ballastless track beds deformations, The water damage events such as inverted arch protuberance, lining cutting percolating water, cause Railway Design, construction, the great attention for building and runing each side.
As shown in figure 4, traditional two-wire railway tunnel lining is typically adopted with bent liner structure form of the wall with inverted arch, Using Concrete Filled as railway roadbed basis on inverted arch, in construction, inverted arch is separately poured with inverted arch filling, and frame is considered in partial line road test Beam machine is transported, inverted arch filling even placement layer by layer.Central drain+bilateral ditch is set in tunnel, and lateral sulcus passes through horizontal aqueduct Lateral sulcus water is accessed central trench.Splash guard is set in arch wall scope between preliminary bracing and secondary lining, splash guard leans on preliminary bracing Side is spaced 5~10m along tunnel excavation direction and arranges circle draining blind pipe, and arranges longitudinal drainage blind pipe in abutment wall pin, vertical, ring Draining blind pipe introduces lateral sulcus directly through abutment wall.
Under Severe rainstorm or continuous rainy weather, lateral sulcus and center are exceeded by the water yield that draining blind pipe is entered in tunnel Ditch designs drainability, causes railway roadbed ponding;Secondly as groundwater run off abruptly increase, lining cutting behind underground water can not be by vertical, ring Discharged to draining blind pipe in time, hydraulic pressure is drastically raised, cause inverted arch protuberance even abutment wall cracking;Again, under the effect of high hydraulic pressure, Waterproof measure destruction at inverted arch construction joint, underground water is entered between inverted arch and blind and lifts filling, so as to destroy railway roadbed Structure.
Ensure that draining is unobstructed, reduce, be to solve karst The key point of regional tunnel water damage risk.Therefore, how a kind of supporting knot is unified in by unobstructed for safe and reliable for structure and draining Under structure, become reduction karst area tunnel water damage risk, it is ensured that operation security in the urgent need to.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of frame-type subdrain system tunnel lining structure, By transforming to conventional tunnel lining cutting tunnel bottom structure form, change tunnel bottom structure stress form, reduce Effect of the water to tunnel-liner polycrystalline substance, while liner structure " external draining " is realized, so as to be particularly during ensureing operation Rain flood season tunnel lining structure safety.
It is as follows that the utility model solves the technical scheme adopted by its technical problem:
Frame-type subdrain system tunnel lining structure of the present utility model, is arranged from outside to inside including arch wall scope Arch wall preliminary bracing structure, arch wall secondary liner structure and base plate, and it is located at arch wall preliminary bracing structure and the secondary lining of arch wall The waterproof and water drainage system between structure is built, be it is characterized in that:The tunnel underframe being made up of foundation beam, short column and crossbeam is set under the base plate Frame structure, used as the horizontal bearing structure in bottom and the vertical bearing structure of base plate of arch wall secondary liner structure;The guarded drainage Guide the tunnel longitudinal drainage passage being arranged in the tunnel bottom framework inside configuration space in the lower end of system.
The beneficial effects of the utility model are to replace traditional inverted arch form, first, tunnel bottom using frame-type tunnel bottom construction Frame structure structural system is set under plate, by the use of tunnel bottom framework inside configuration space as tunnel longitudinal drainage passage, it is ensured that tunnel Bottom draining is unobstructed, and underground water is not directly had an effect with tunnel floor, it is to avoid traditional lining cutting is due to the spilled water hole draining of abutment wall bottom Smooth or drainability deficiency does not cause inverted arch hydraulic pressure to be uprushed and causes tunnel bottom structure to destroy;Secondly, tunnel bottom is excavated operation and is more convenient, Overcome traditional lining types to cause inverted arch construction as inverted arch foundation excavation curvature is wayward with designing inconsistent and cause The problems such as inverted arch cracking protuberance;Again, using frame-type tunnel bottom structure, bending rigidity is greatly increased, and dramatically increases tunnel bottom structure Bearing capacity;Finally, realize that liner structure " external draining ", arch wall secondary lining behind underground water are not passed through abutment wall and introduce tunnel Lateral sulcus, and in the space being introduced directly under tunnel floor, it is prevented effectively from the excessive lateral sulcus drainability of rain flood season groundwater run off not Foot and pour in railway roadbed, it is ensured that the smooth excretion of underground water is avoiding causing tunnel bottom structure cracking protuberance.
Description of the drawings
This specification includes following four width accompanying drawing:
Fig. 1 is the section structure schematic diagram of the utility model frame-type subdrain system tunnel lining structure;
Fig. 2 is the enlarged drawing of A local in Fig. 1;
Fig. 3 is the profile of I-I lines along Fig. 1;
Fig. 4 is traditional song wall band inverted arch liner structure schematic diagram.
Component, toponym and corresponding mark are shown in figure:Arch wall preliminary bracing structure 10, arch wall shotcrete layer 10a, arch wall steelframe 10b, arch wall system anchor bolt 10c;Substrate close layer 11;Waterproof and water drainage system 20, non-woven geotextile 20a, ring Draining blind pipe 20b, splash guard 20c;Arch wall secondary liner structure 30, base plate 31;Foundation beam 41, crossbeam 42, short column 43.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is further illustrated.
With reference to Fig. 1, frame-type subdrain system tunnel lining structure of the present utility model, including arch wall scope by outer The arch wall preliminary bracing structure 10, arch wall secondary liner structure 30 of interior setting and base plate 31, and tie positioned at arch wall preliminary bracing Waterproof and water drainage system 20 between structure 10 and arch wall secondary liner structure 30.The base plate is arranged by foundation beam 41, short column 43 for 31 times The tunnel bottom framework structure constituted with crossbeam 42, the horizontal bearing structure in bottom and base plate 31 as arch wall secondary liner structure 30 Vertical bearing structure.Guide the tunnel being arranged in the tunnel bottom framework inside configuration space in the lower end of the waterproof and water drainage system 20 Longitudinal drainage passage..Traditional inverted arch form is replaced using frame-type tunnel bottom construction, first, frame structure is set under tunnel floor System, by the use of tunnel bottom framework inside configuration space as tunnel longitudinal drainage passage, it is ensured that the draining of tunnel bottom is unobstructed, underground water not with Tunnel floor is directly had an effect, it is to avoid traditional lining cutting is due to abutment wall bottom spilled water hole impeded drainage or drainability is not enough causes to lead Cause inverted arch hydraulic pressure to uprush and cause tunnel bottom structure to destroy.Secondly, tunnel bottom is excavated operation and is more convenient, overcome traditional lining types by In inverted arch foundation excavation curvature wayward cause inverted arch construction with design inconsistent and cause inverted arch cracking protuberance the problems such as;Again Secondary, using frame-type tunnel bottom structure, bending rigidity is greatly increased, and dramatically increases tunnel bottom structure bearing capacity;Finally, lining cutting is realized Structure " external draining ", arch wall secondary lining behind underground water are not passed through abutment wall and introduce tunnel lateral sulcus, and are introduced directly into tunnel bottom In space under plate, it is prevented effectively from the excessive lateral sulcus drainability deficiency of rain flood season groundwater run off and pours in railway roadbed, it is ensured that ground The smooth excretion of lower water is avoiding causing tunnel bottom structure cracking protuberance.
With reference to Fig. 1, the tunnel bottom framework structure is laid along tunnel excavation direction interval, as the bearing structure of base plate 31, The base plate 31 is opening up inspection shaft mouth along tunnel center line interval.With reference to Fig. 1 and Fig. 3, the tunnel bottom framework structure includes Foundation beam 41, the crossbeam 42 that lays is spaced along circuit bearing of trend, between corresponding up and down foundation beam 41, crossbeam 42 transversely Interval setting is attached thereto the short column 43 being integrated.The foundation beam 41 is embedded in ground, basic top surface and substrate close layer 11 Surface flushes.The substrate close layer 11 is used for closing exposed country rock surface between foundation beam 41, prevents current scour and sapping Foundation.
See figures.1.and.2, the waterproof and water drainage system 20 includes the non-woven geotextile 20a and arch wall model of arch wall scope laying The splash guard 20c of laying is enclosed, and the ring between non-woven geotextile 20a and splash guard 20c is laid in along tunnel excavation direction interval To draining blind pipe 20b.The two ends of the circle draining blind pipe 20b through arch wall secondary liner structure 30 abutment wall under base plate 31 Edge guides tunnel longitudinal drainage passage into.
See figures.1.and.2, the arch wall preliminary bracing structure 10 includes the arch wall shotcrete layer for covering arch wall country rock Along tunnel excavation side in the 10a and arch wall system anchor bolt 10c along arch wall quincuncial arrangement, the arch wall shotcrete layer 10a Arch wall steelframe 10b is laid to interval, in arch wall shotcrete layer 10a, bar-mat reinforcement is added.
Some of the above the utility model frame-type subdrain system tunnel lining structure that simply explains through diagrams Principle, be not intended to by the utility model be confined to shown in and described concrete structure and the scope of application in, therefore every all can The corresponding modification that can be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (5)

1. frame-type subdrain system tunnel lining structure, ties including the arch wall preliminary bracing that arch wall scope is arranged from outside to inside Structure (10), arch wall secondary liner structure (30) and base plate (31), and secondary positioned at arch wall preliminary bracing structure (10) and arch wall Waterproof and water drainage system (20) between liner structure (30), is characterized in that:Arrange under base plate (31) by foundation beam (41), short column (43) the horizontal bearing structure in bottom and the tunnel bottom framework structure that constitutes of crossbeam (42), as arch wall secondary liner structure (30) and The vertical bearing structure of base plate (31);Guide into and be arranged at the tunnel bottom framework inside configuration in the lower end of waterproof and water drainage system (20) Tunnel longitudinal drainage passage in space.
2. frame-type subdrain system tunnel lining structure as claimed in claim 1, is characterized in that:The tunnel bottom framework knot Structure is laid along tunnel excavation direction interval, and base plate (31) are opening up inspection shaft mouth along tunnel center line direction interval.
3. frame-type subdrain system tunnel lining structure as claimed in claim 1, is characterized in that:The tunnel bottom framework knot Structure includes being spaced foundation beam (41), the crossbeam (42) that lays along circuit bearing of trend, up and down corresponding foundation beam (41), crossbeam (42) between, laterally spaced setting is attached thereto the short column (43) being integrated;In described foundation beam (41) embedded ground, basis Top surface is flushed with substrate close layer (11) surface.
4. frame-type subdrain system tunnel lining structure as claimed in claim 2, is characterized in that:The waterproof and water drainage system (20) include the non-woven geotextile (20a) of arch wall scope laying and the splash guard (20c) of arch wall scope laying, and open along tunnel Excavation is laid in the circle draining blind pipe 20b between non-woven geotextile (20a) and splash guard (20c) to interval;The circle draining Tunnel longitudinal drainage is guided through the abutment wall of arch wall secondary liner structure (30) into along base plate (31) lower edge and led in the two ends of blind pipe (20b) Road.
5. frame-type subdrain system tunnel lining structure as claimed in claim 1, is characterized in that:The arch wall initial stage Protection structure (10) includes covering the arch wall shotcrete layer (10a) of arch wall country rock and the arch wall system along arch wall quincuncial arrangement Anchor pole (10c);Arch wall steelframe (10b), arch wall are laid along tunnel excavation direction interval in arch wall shotcrete layer (10a) Bar-mat reinforcement is added in shotcrete layer (10a).
CN201620563287.3U 2016-06-12 2016-06-12 Frame-type subdrain system tunnel lining structure Withdrawn - After Issue CN206016821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620563287.3U CN206016821U (en) 2016-06-12 2016-06-12 Frame-type subdrain system tunnel lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620563287.3U CN206016821U (en) 2016-06-12 2016-06-12 Frame-type subdrain system tunnel lining structure

Publications (1)

Publication Number Publication Date
CN206016821U true CN206016821U (en) 2017-03-15

Family

ID=58241807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620563287.3U Withdrawn - After Issue CN206016821U (en) 2016-06-12 2016-06-12 Frame-type subdrain system tunnel lining structure

Country Status (1)

Country Link
CN (1) CN206016821U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863671A (en) * 2016-06-12 2016-08-17 中铁二院工程集团有限责任公司 Frame type low-position draining system tunnel lining structure
CN108005690A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system
CN108316943A (en) * 2018-02-11 2018-07-24 中铁二院工程集团有限责任公司 A kind of device and its construction method preventing the deformation of non-fragment orbit tunnel bottom

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863671A (en) * 2016-06-12 2016-08-17 中铁二院工程集团有限责任公司 Frame type low-position draining system tunnel lining structure
CN108005690A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 Boot last pedestal domes are without the lining cutting of inverted arch type and its drainage system
CN108005690B (en) * 2017-12-27 2024-01-19 中铁二院工程集团有限责任公司 Arch structure non-inverted arch type lining of boot-shaped base
CN108316943A (en) * 2018-02-11 2018-07-24 中铁二院工程集团有限责任公司 A kind of device and its construction method preventing the deformation of non-fragment orbit tunnel bottom
CN108316943B (en) * 2018-02-11 2019-07-26 中铁二院工程集团有限责任公司 A kind of construction method for the device preventing the deformation of non-fragment orbit tunnel bottom

Similar Documents

Publication Publication Date Title
CN105863671B (en) Frame-type subdrain system tunnel lining structure
CN105840210B (en) The compound arch tunnel lining structure in box tunnel bottom with hydrophobic function
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN205677631U (en) It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN106437748B (en) A kind of separate type can repair tunnel lining structure
CN206220972U (en) Frame branch arched tunnel lining structure
CN106089244A (en) Frame props up arched tunnel lining structure
CN201835198U (en) Drainage roadbed for high underground water level
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN105840211A (en) Pi-shaped plate and inverted arch combined tunnel bottom lining structure
CN206016821U (en) Frame-type subdrain system tunnel lining structure
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN103147614A (en) Pool with multi-layer structure and building method thereof
CN107905811A (en) The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system
CN210857182U (en) Roadbed drainage structure
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN205936632U (en) Tunnel lining structure can be maintained to disconnect -type
CN103290911A (en) Ecological reinforced concrete drainage ditch and construction method thereof
CN206016823U (en) π shapes plate and inverted arch combined type tunnel bottom lining structure
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN208797546U (en) A kind of cable trough
CN208293317U (en) A kind of Plateau Permafrost Areas high-speed railway cutting water blocking discharge structure
CN208168937U (en) A kind of tunnel bottom discharge structure
CN214887086U (en) Slope debris flow guide-discharge type open cut tunnel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170315

Effective date of abandoning: 20190315