CN105697019A - 立井井壁现浇混凝土接茬及其支模装置和施工方法 - Google Patents
立井井壁现浇混凝土接茬及其支模装置和施工方法 Download PDFInfo
- Publication number
- CN105697019A CN105697019A CN201610127469.0A CN201610127469A CN105697019A CN 105697019 A CN105697019 A CN 105697019A CN 201610127469 A CN201610127469 A CN 201610127469A CN 105697019 A CN105697019 A CN 105697019A
- Authority
- CN
- China
- Prior art keywords
- concrete
- borehole wall
- wall concrete
- shaft wall
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000009415 formwork Methods 0.000 title claims abstract description 13
- 230000002787 reinforcement Effects 0.000 claims abstract description 21
- 239000011435 rock Substances 0.000 claims abstract description 18
- 238000001125 extrusion Methods 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 5
- 238000011065 in-situ storage Methods 0.000 claims description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 210000003205 muscle Anatomy 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 3
- 238000005498 polishing Methods 0.000 claims description 3
- 230000011218 segmentation Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000000465 moulding Methods 0.000 abstract description 2
- 239000002023 wood Substances 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000003825 pressing Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/11—Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/12—Accessories for making shaft linings, e.g. suspended cradles, shutterings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Wood Science & Technology (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127469.0A CN105697019B (zh) | 2016-03-07 | 2016-03-07 | 立井井壁现浇混凝土接茬及其支模装置和施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127469.0A CN105697019B (zh) | 2016-03-07 | 2016-03-07 | 立井井壁现浇混凝土接茬及其支模装置和施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105697019A true CN105697019A (zh) | 2016-06-22 |
CN105697019B CN105697019B (zh) | 2018-04-24 |
Family
ID=56220040
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610127469.0A Active CN105697019B (zh) | 2016-03-07 | 2016-03-07 | 立井井壁现浇混凝土接茬及其支模装置和施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105697019B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106313286A (zh) * | 2016-06-28 | 2017-01-11 | 中天建设集团有限公司 | 一种圆孔混凝土结构工具模板 |
CN107345483A (zh) * | 2017-08-21 | 2017-11-14 | 安徽理工大学 | 一种新建防渗煤矿井筒及其制备方法 |
CN109695452A (zh) * | 2019-01-07 | 2019-04-30 | 中国矿业大学 | 一种能够轴向让压的单层井筒及其施工方法 |
CN114607386A (zh) * | 2022-04-18 | 2022-06-10 | 中国矿业大学 | 一种带接茬止水结构和注浆系统的单层井壁及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10205271A (ja) * | 1997-01-24 | 1998-08-04 | Kato Kensetsu:Kk | 沈設体用セグメントピースおよび沈設体の構築方法 |
CN101550833A (zh) * | 2009-03-28 | 2009-10-07 | 中国矿业大学 | 现浇混凝土接茬板及其施工工艺 |
CN201448115U (zh) * | 2009-03-28 | 2010-05-05 | 中国矿业大学 | 现浇混凝土接茬板 |
CN205422720U (zh) * | 2016-03-07 | 2016-08-03 | 马钢(集团)控股有限公司 | 立井井壁现浇混凝土接茬及其支模装置 |
CN105952476A (zh) * | 2016-06-14 | 2016-09-21 | 山东华联矿业股份有限公司 | 矿山立井井壁接茬工艺 |
-
2016
- 2016-03-07 CN CN201610127469.0A patent/CN105697019B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10205271A (ja) * | 1997-01-24 | 1998-08-04 | Kato Kensetsu:Kk | 沈設体用セグメントピースおよび沈設体の構築方法 |
CN101550833A (zh) * | 2009-03-28 | 2009-10-07 | 中国矿业大学 | 现浇混凝土接茬板及其施工工艺 |
CN201448115U (zh) * | 2009-03-28 | 2010-05-05 | 中国矿业大学 | 现浇混凝土接茬板 |
CN205422720U (zh) * | 2016-03-07 | 2016-08-03 | 马钢(集团)控股有限公司 | 立井井壁现浇混凝土接茬及其支模装置 |
CN105952476A (zh) * | 2016-06-14 | 2016-09-21 | 山东华联矿业股份有限公司 | 矿山立井井壁接茬工艺 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106313286A (zh) * | 2016-06-28 | 2017-01-11 | 中天建设集团有限公司 | 一种圆孔混凝土结构工具模板 |
CN107345483A (zh) * | 2017-08-21 | 2017-11-14 | 安徽理工大学 | 一种新建防渗煤矿井筒及其制备方法 |
CN107345483B (zh) * | 2017-08-21 | 2023-02-28 | 安徽理工大学 | 一种新建防渗煤矿井筒及其制备方法 |
CN109695452A (zh) * | 2019-01-07 | 2019-04-30 | 中国矿业大学 | 一种能够轴向让压的单层井筒及其施工方法 |
CN114607386A (zh) * | 2022-04-18 | 2022-06-10 | 中国矿业大学 | 一种带接茬止水结构和注浆系统的单层井壁及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105697019B (zh) | 2018-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105697019A (zh) | 立井井壁现浇混凝土接茬及其支模装置和施工方法 | |
CN109577166B (zh) | 上跨现役公路门洞支架及施工方法 | |
CN105275097A (zh) | 一种后浇带止水钢板和快易收口网安装方法 | |
CN108951840B (zh) | 基于定型支架单侧支模地下室弧形外墙施工方法 | |
CN203383508U (zh) | 一种背靠砖混挡土墙的单侧支模体结构 | |
CN110359586B (zh) | 后浇带结构及施工方法 | |
CN111042569B (zh) | 医院地下室有限空间内加建直线加速器机房施工方法 | |
CN205422720U (zh) | 立井井壁现浇混凝土接茬及其支模装置 | |
CN113290673B (zh) | 一种墙板模具侧向伸出钢筋堵浆结构及方法 | |
CN103590599B (zh) | 自挤密锁模装置及使用方法 | |
CN108222656B (zh) | 预制装配式围墙的施工方法 | |
CN212642115U (zh) | 一种清水混凝土内凹弧形屋面内边梁吊模系统 | |
CN211230494U (zh) | 一种用于高速公路隧道整体衬砌台车的沟槽衬砌成型装置 | |
CN108729466B (zh) | 一种构筑无锚钉砼挡墙的大模板支撑方法 | |
CN209818080U (zh) | 一种节段拼装式管棚浇筑施工结构 | |
CN211038666U (zh) | 基于拼装式脚手架的套衬浇筑施工结构 | |
CN204876554U (zh) | 外墙中部构造柱模壳安装结构 | |
CN108086302A (zh) | 一种基于地下墙体施工的横向整浇墙幅下沉工艺 | |
CN210068171U (zh) | 隧洞模喷混凝土支护施工装置 | |
CN211397147U (zh) | 一种窗台压顶结构 | |
CN210508372U (zh) | 地下室悬挑免拆模板梁板 | |
CN102162224B (zh) | 混凝土节制闸缝墩的到顶一次浇筑工艺 | |
TWI632273B (zh) | 凹字型建築物施工方法 | |
CN111794446A (zh) | 一种立式pc构件及其制作方法和安装方法 | |
CN206844636U (zh) | 墙体和楼盖现浇铝模板支撑体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180813 Address after: 243071 No. 1899 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui Patentee after: Magang Group mining industry Co., Ltd Address before: 243000 8 Jiuhua Road, Yushan, Ma'anshan, Anhui Patentee before: Magang (Group) Holding Company Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 243071 No. 1899 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui Patentee after: Anhui Maanshan Iron and Steel Mining Resources Group Co., Ltd. Address before: 243071 No. 1899 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui Patentee before: Magang Group mining industry Co., Ltd |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210204 Address after: 243000 Taibai Town, Dangtu County, Ma'anshan City, Anhui Province Patentee after: Anhui Magang mining resources group Gushan Mining Co.,Ltd. Patentee after: Anhui Maanshan Iron and Steel Mining Resources Group Co.,Ltd. Address before: 243071 No. 1899 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui Patentee before: Anhui Maanshan Iron and Steel Mining Resources Group Co.,Ltd. |