CN105952476A - 矿山立井井壁接茬工艺 - Google Patents
矿山立井井壁接茬工艺 Download PDFInfo
- Publication number
- CN105952476A CN105952476A CN201610415983.4A CN201610415983A CN105952476A CN 105952476 A CN105952476 A CN 105952476A CN 201610415983 A CN201610415983 A CN 201610415983A CN 105952476 A CN105952476 A CN 105952476A
- Authority
- CN
- China
- Prior art keywords
- borehole wall
- vertical shaft
- construction
- concrete
- connects
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/11—Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610415983.4A CN105952476B (zh) | 2016-06-14 | 2016-06-14 | 矿山立井井壁接茬工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610415983.4A CN105952476B (zh) | 2016-06-14 | 2016-06-14 | 矿山立井井壁接茬工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105952476A true CN105952476A (zh) | 2016-09-21 |
CN105952476B CN105952476B (zh) | 2018-07-06 |
Family
ID=56905480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610415983.4A Active CN105952476B (zh) | 2016-06-14 | 2016-06-14 | 矿山立井井壁接茬工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105952476B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105697019A (zh) * | 2016-03-07 | 2016-06-22 | 马钢(集团)控股有限公司 | 立井井壁现浇混凝土接茬及其支模装置和施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB392231A (en) * | 1931-11-19 | 1933-05-18 | Mcalpine Malcolm | An improved method of and means for building and reinforcing the walls of tunnels, shafts and the like |
CN1270271A (zh) * | 2000-04-11 | 2000-10-18 | 山东科技大学防水建材研究所 | 冻结井防渗漏复合井壁及其施工方法 |
CN1900484A (zh) * | 2006-06-27 | 2007-01-24 | 中国矿业大学 | 带接茬板的单层井壁及其施工方法 |
CN101397909A (zh) * | 2008-09-17 | 2009-04-01 | 中冶集团武勘岩土基础工程公司 | 坍塌超深竖井人工掘进修复新工法 |
CN202370525U (zh) * | 2011-12-28 | 2012-08-08 | 陕西煤业化工建设(集团)有限公司 | 回风立井风化基岩段井筒壁后注浆施工结构 |
CN103470266A (zh) * | 2013-06-16 | 2013-12-25 | 钱自卫 | 防渗井壁 |
CN104763431A (zh) * | 2015-01-22 | 2015-07-08 | 隋忠良 | 一种新的立井施工方法 |
JP2016030942A (ja) * | 2014-07-29 | 2016-03-07 | 大成建設株式会社 | 深礎工法 |
-
2016
- 2016-06-14 CN CN201610415983.4A patent/CN105952476B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB392231A (en) * | 1931-11-19 | 1933-05-18 | Mcalpine Malcolm | An improved method of and means for building and reinforcing the walls of tunnels, shafts and the like |
CN1270271A (zh) * | 2000-04-11 | 2000-10-18 | 山东科技大学防水建材研究所 | 冻结井防渗漏复合井壁及其施工方法 |
CN1900484A (zh) * | 2006-06-27 | 2007-01-24 | 中国矿业大学 | 带接茬板的单层井壁及其施工方法 |
CN101397909A (zh) * | 2008-09-17 | 2009-04-01 | 中冶集团武勘岩土基础工程公司 | 坍塌超深竖井人工掘进修复新工法 |
CN202370525U (zh) * | 2011-12-28 | 2012-08-08 | 陕西煤业化工建设(集团)有限公司 | 回风立井风化基岩段井筒壁后注浆施工结构 |
CN103470266A (zh) * | 2013-06-16 | 2013-12-25 | 钱自卫 | 防渗井壁 |
JP2016030942A (ja) * | 2014-07-29 | 2016-03-07 | 大成建設株式会社 | 深礎工法 |
CN104763431A (zh) * | 2015-01-22 | 2015-07-08 | 隋忠良 | 一种新的立井施工方法 |
Non-Patent Citations (1)
Title |
---|
殷世荣: "《顾桥南区回风井井筒快速施工》", 《煤炭技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105697019A (zh) * | 2016-03-07 | 2016-06-22 | 马钢(集团)控股有限公司 | 立井井壁现浇混凝土接茬及其支模装置和施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105952476B (zh) | 2018-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264676A (zh) | 高层建筑基础大体积混凝土施工方法 | |
CN106948504A (zh) | 装配式墙板防渗止水竖向接缝结构及其施工方法 | |
CN103276728B (zh) | 一种桩头修补及加固的方法 | |
CN104358275B (zh) | 较深电梯井或集水井施工方法 | |
CN104264700A (zh) | 一种地下建筑轻型降水井点后浇带的防渗漏施工方法 | |
CN104790381B (zh) | 基于uea微膨胀剂的内衬墙混凝土浇注逆作方法 | |
CN102322149B (zh) | 核电站循环水管沟全段整体浇筑施工方法 | |
CN204221939U (zh) | 一种预制混凝土电缆沟盖板模具系统 | |
CN107514141A (zh) | 一种预制叠合板止水反梁一次预制技术施工工艺 | |
CN105952476A (zh) | 矿山立井井壁接茬工艺 | |
CN109113068A (zh) | 一种深基坑逆筑施工的施工缝结构 | |
CN107859061A (zh) | 一种箱涵一次性浇筑的施工方法 | |
CN105064500A (zh) | 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法 | |
CN209040133U (zh) | 适用于地下水丰富区域的降水井封井装置 | |
CN112412013A (zh) | 结构外墙预留洞封堵建造方法 | |
CN112593978A (zh) | 一种二次衬砌拱顶防脱空装置及施工方法 | |
CN106638262A (zh) | 变截面鱼腹式箱梁混凝土对称叠合浇筑结构及其施工方法 | |
CN110965770A (zh) | 一种装配式斜屋面混凝土保护层的施工方法 | |
CN206625437U (zh) | 一种砌块防水构造 | |
CN102827980A (zh) | 高炉风口区域浇注材料免支模的施工方法 | |
CN216076481U (zh) | 混凝土侧墙孔洞封堵施工装置 | |
CN108589939A (zh) | 混凝土结构接缝处纤维连续的施工方法 | |
CN206273557U (zh) | 一种带底检查井浇筑成型装置 | |
CN211397147U (zh) | 一种窗台压顶结构 | |
CN208088534U (zh) | 可实现连续浇筑的混凝土施工变形缝结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Jiwei Inventor after: Zhao Xueping Inventor after: Tang Guangyong Inventor after: Chen Gang Inventor after: Geng Guobin Inventor before: Chen Gang Inventor before: Geng Guobin Inventor before: Tang Guangyong |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Shaft wall joining technology of mine shaft Effective date of registration: 20211203 Granted publication date: 20180706 Pledgee: YIYUAN JINYUAN MINING Co.,Ltd. Pledgor: SHANDONG HUALIAN MINING Co.,Ltd. Registration number: Y2021980014001 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220713 Granted publication date: 20180706 Pledgee: YIYUAN JINYUAN MINING Co.,Ltd. Pledgor: SHANDONG HUALIAN MINING Co.,Ltd. Registration number: Y2021980014001 |