CN107859061A - 一种箱涵一次性浇筑的施工方法 - Google Patents
一种箱涵一次性浇筑的施工方法 Download PDFInfo
- Publication number
- CN107859061A CN107859061A CN201710940994.9A CN201710940994A CN107859061A CN 107859061 A CN107859061 A CN 107859061A CN 201710940994 A CN201710940994 A CN 201710940994A CN 107859061 A CN107859061 A CN 107859061A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- box culvert
- plate
- full hall
- spacer bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
一种箱涵一次性浇筑的施工方法,包括如下步骤:S1、设置箱涵垫层,再搭建底板钢筋、侧板钢筋、底板模板与侧墙模板;S2、在底板模板上设置竖向的预埋支撑钢筋;S3、搭建满堂脚手架立管,再搭建满堂脚手架横管;S4、设置顶板钢筋、顶板模板;S5、浇筑混凝土;S6、待混凝土养护达到所需强度后,将裸露于底板上端面的预埋支撑钢筋切除,再拆除脚手架、底板模板、侧墙模板、顶板模板,即得箱涵。其优点是:由于满堂脚手架立管底端与底部浇筑的混凝土具有间隙,在后期进行一次性浇筑混凝土后,只需将预埋的预埋支撑钢筋裸露于底板上端面的部分切除即可,减去传统方法中,等待底板混凝土达到强度所需时间,同时增加施工的连续性,缩短工期。
Description
技术领域
本发明涉及箱涵浇筑技术领域,具体地说是一种箱涵一次性浇筑的施工方法。
背景技术
在城市管网的施工中,往往由于城市交通、居民生活、城市环境等问题,施工工期非常紧。在箱涵的施工中,一般施工方法是进行两次浇筑,先浇筑底板和部分侧墙(即底部顶面以上300mm~500mm处),待底板混凝土达到设计强度后,在底板上架设满堂脚手架、置模板、绑扎钢筋,再进行顶板及余下侧墙的浇筑,两次浇筑的施工缝设置止水钢板。
发明内容
为了解决上述技术缺陷,本发明提供一种箱涵一次性浇筑的施工方法,具体为箱涵施工过程中,在满堂脚手架立杆的底部加焊钢筋,用于支撑满堂脚手架立杆,一次性浇筑成型,加焊的钢筋落在垫层上作为支撑,减少等待底板达到强度而作为支撑面的时间。
一种箱涵一次性浇筑的施工方法,包括如下步骤:
S1、设置箱涵垫层,再搭建底板钢筋、侧板钢筋、底板模板与侧墙模板;
S2、在底板模板上设置竖向的预埋支撑钢筋,使得预埋支撑钢筋的下端预埋于底板模板,上端裸露于底板模板的端面以上;
S3、搭建满堂脚手架立管,且满堂脚手架立管的底端侧壁与步骤S2设置的预埋支撑钢筋的顶端侧壁焊接固定,用于支撑满堂脚手架立管,再搭建满堂脚手架横管;
S4、设置顶板钢筋、顶板模板;
S5、浇筑混凝土:由于满堂脚手架立管底部未与底板模板接触,此时先浇筑底板和部分侧墙板,振捣,在混凝土初凝前再浇筑剩下的侧墙板与顶板,形成一次性浇筑;
S6、待混凝土养护达到所需强度后,将裸露于底板上端面的预埋支撑钢筋切除,再拆除脚手架、底板模板、侧墙模板、顶板模板,即获得箱涵;
优选地,步骤S2中,预埋支撑钢筋裸露于底板模板端面上的长度大于箱涵底板的厚度。
优选地,步骤S3中,满堂脚手架立管底端面距离底板模板的距离大于箱涵底板的厚度;
步骤S3中,预埋支撑钢筋与满堂脚手架立管重叠焊接的长度大于10倍的预埋支撑钢筋直径长度。
优选地,步骤S6中,沿底板上端面横向平切裸露于底板上端面的预埋支撑钢筋。
一种箱涵一次性浇筑的施工方法,其优点是:
在设置满堂脚手架立管之前,在底板模板上预埋预埋支撑钢筋,用预埋支撑钢筋支撑满堂脚手架立管,由于满堂脚手架立管底端与底部浇筑的混凝土具有间隙,在后期进行一次性浇筑混凝土后,只需将预埋的预埋支撑钢筋裸露于底板上端面的部分切除即可,减去了传统方法中,等待底板混凝土达到强度所需要的时间,同时增加了施工的连续性,缩短了施工工期;
底板模板上预埋支撑钢筋的设计,减少了施工缝、以及止水钢板材料的使用,且利用施工预料作为预埋支撑钢筋,节省了施工成本。
附图说明
图1为预埋有预埋支撑钢筋的部分施工示意图;
其中,
1、箱涵垫层,2、预埋支撑钢筋,3、满堂脚手架立管,4、满堂脚手架横管,5、底板,6、侧墙板、7、顶板。
具体实施方式
为了本发明的目的、技术方案和优点更加清楚明白,以下结合具体实施例,并参照附图,对本发明作进一步详细说明:
一种箱涵一次性浇筑的施工方法,包括如下步骤:
S1、设置箱涵垫层1,再搭建底板钢筋、侧板钢筋、底板模板与侧墙模板;
搭建过程中,垫层厚度为100mm,垫层混凝土为C15;底板横向钢筋设置(设置2层带肋钢筋,直径为22mm,间距为150mm),底板纵向钢筋设置(设置2层带肋钢筋,直径为16mm,间距为150mm);侧板竖向钢筋设置(设置2层带肋钢筋,直径为22mm,间距为150mm),侧板纵向钢筋设置(设置2层带肋钢筋,直径为16mm,间距为150mm);结构混凝土为C30,底板厚度为500mm,侧板450mm。
S2、在底板模板上设置竖向的预埋支撑钢筋2,支撑钢筋为直径22mm螺纹钢,长度为730mm,使得预埋支撑钢筋2的下端预埋于底板模板且落于箱涵垫层,上端裸露于底板模板的端面以上;
S3、搭建满堂脚手架立管3,且满堂脚手架立管3的底端侧壁与步骤S2设置的预埋支撑钢筋2的顶端侧壁焊接固定,焊接长度为220mm,用于支撑满堂脚手架立管3,再搭建满堂脚手架横管4;
S4、设置顶板钢筋、顶板模板,且顶板横向钢筋设置(设置2层带肋钢筋,直径为22mm,间距为150mm),顶板纵向钢筋设置(设置2层带肋钢筋,直径为16mm,间距为150mm),结构混凝土为C30,底板厚度为450mm;
S5、浇筑混凝土:由于满堂脚手架立管3底部未与底板模板接触,此时先浇筑底板5和部分侧墙板6,振捣,在混凝土初凝前再浇筑剩下的侧墙板6与顶板7,形成一次性浇筑,解决底板未浇筑时,无法搭设满堂脚手架支管、满堂脚手架横管的情况,同时,解决了浇筑底板与侧板交汇处混凝土由于涌浆造成不平整的问题发生;
S6、待混凝土养护达到所需强度后,将裸露于底板5上端面的预埋支撑钢筋2切除,再拆除脚手架、底板模板、侧墙模板、顶板模板,即获得箱涵;
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种箱涵一次性浇筑的施工方法,其特征在于:包括如下步骤
S1、设置箱涵垫层,再搭建底板钢筋、侧板钢筋、底板模板与侧墙模板;
S2、在底板模板上设置竖向的预埋支撑钢筋,使得预埋支撑钢筋的下端预埋于底板模板,上端裸露于底板模板的端面以上;
S3、搭建满堂脚手架立管,且满堂脚手架立管的底端侧壁与步骤S2设置的预埋支撑钢筋的顶端侧壁焊接固定,用于支撑满堂脚手架立管,再搭建满堂脚手架横管;
S4、设置顶板钢筋、顶板模板;
S5、浇筑混凝土:先浇筑底板和部分侧墙板,振捣,在混凝土初凝前再浇筑剩下的侧墙板与顶板,形成一次性浇筑;
S6、待混凝土养护达到所需强度后,将裸露于底板上端面的预埋支撑钢筋切除,再拆除脚手架与各模板,即获得箱涵。
2.根据权利要求1所述方法,其特征在于:步骤S2中,预埋支撑钢筋裸露于底板模板端面上的长度大于箱涵底板的厚度。
3.根据权利要求1所述方法,其特征在于:步骤S3中,满堂脚手架立管底端面距离底板模板的距离大于箱涵底板的厚度。
4.根据权利要求1所述方法,其特征在于:步骤S3中,预埋支撑钢筋与满堂脚手架立管重叠焊接的长度大于10倍的预埋支撑钢筋直径长度。
5.根据权利要求1所述方法,其特征在于:步骤S6中,沿底板上端面横向平切裸露于底板上端面的预埋支撑钢筋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710940994.9A CN107859061A (zh) | 2017-10-11 | 2017-10-11 | 一种箱涵一次性浇筑的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710940994.9A CN107859061A (zh) | 2017-10-11 | 2017-10-11 | 一种箱涵一次性浇筑的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107859061A true CN107859061A (zh) | 2018-03-30 |
Family
ID=61699695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710940994.9A Pending CN107859061A (zh) | 2017-10-11 | 2017-10-11 | 一种箱涵一次性浇筑的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107859061A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113512958A (zh) * | 2021-05-10 | 2021-10-19 | 山西四建集团有限公司 | 一种现浇混凝土小截面箱涵一次成型方法 |
CN113585337A (zh) * | 2021-08-18 | 2021-11-02 | 中国十七冶集团有限公司 | 一种现浇管廊新型模板支撑系统 |
CN113882432A (zh) * | 2021-09-01 | 2022-01-04 | 武汉市政工程设计研究院有限责任公司 | 一种小面积较深竖井的装配式顶板快速施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6040434A (ja) * | 1983-08-15 | 1985-03-02 | Kajima Corp | 地下構造物の構築方法 |
CN202164555U (zh) * | 2011-07-12 | 2012-03-14 | 济南黄河路桥工程公司 | 砼箱涵模板支架立柱底支撑 |
CN102877486A (zh) * | 2012-10-22 | 2013-01-16 | 济南城建集团有限公司 | 整体现浇电缆沟施工方法 |
CN105401580A (zh) * | 2014-09-16 | 2016-03-16 | 天津二十冶建设有限公司 | 地下通廊混凝土浇筑施工方法 |
-
2017
- 2017-10-11 CN CN201710940994.9A patent/CN107859061A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6040434A (ja) * | 1983-08-15 | 1985-03-02 | Kajima Corp | 地下構造物の構築方法 |
CN202164555U (zh) * | 2011-07-12 | 2012-03-14 | 济南黄河路桥工程公司 | 砼箱涵模板支架立柱底支撑 |
CN102877486A (zh) * | 2012-10-22 | 2013-01-16 | 济南城建集团有限公司 | 整体现浇电缆沟施工方法 |
CN105401580A (zh) * | 2014-09-16 | 2016-03-16 | 天津二十冶建设有限公司 | 地下通廊混凝土浇筑施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113512958A (zh) * | 2021-05-10 | 2021-10-19 | 山西四建集团有限公司 | 一种现浇混凝土小截面箱涵一次成型方法 |
CN113585337A (zh) * | 2021-08-18 | 2021-11-02 | 中国十七冶集团有限公司 | 一种现浇管廊新型模板支撑系统 |
CN113882432A (zh) * | 2021-09-01 | 2022-01-04 | 武汉市政工程设计研究院有限责任公司 | 一种小面积较深竖井的装配式顶板快速施工方法 |
CN113882432B (zh) * | 2021-09-01 | 2022-09-16 | 武汉市政工程设计研究院有限责任公司 | 一种小面积较深竖井的装配式顶板快速施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383628B (zh) | 筒仓结构后施工减压锥的施工装置及施工方法 | |
CN106592426A (zh) | 横向预应力全宽钢筋混凝土桥面板预制模板体系及施工方法 | |
CN107859061A (zh) | 一种箱涵一次性浇筑的施工方法 | |
CN105804395B (zh) | 基于整体式定型模板的楼梯一次连续浇筑成型施工方法 | |
CN102587663A (zh) | 一种超高层建筑钢管柱混凝土施工工艺 | |
CN108130837A (zh) | 一种预制化道路板块及其施工方法 | |
CN104164951B (zh) | 楼梯休息平台及其施工方法 | |
CN205894670U (zh) | 楼层间混凝土接茬施工的模板结构 | |
CN108638322B (zh) | 一种装配式建筑中预制柱混凝土浇筑方法 | |
CN107514141A (zh) | 一种预制叠合板止水反梁一次预制技术施工工艺 | |
CN204112712U (zh) | 一种一侧根部加腋现浇墙模板安装装置 | |
CN105064500A (zh) | 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法 | |
CN106193093B (zh) | 杯口基础模板加固及液压拆除施工工艺 | |
CN106049665B (zh) | 轻质砌块墙现浇芯体的施工方法 | |
CN205476487U (zh) | 一种控制轻质块体填充内模上浮的可拆卸循环利用装置 | |
CN112609986A (zh) | 控制混凝土斜柱浇筑成型质量的方法 | |
CN208792746U (zh) | 一种伸缩缝定型化工具钢板模板 | |
CN207273486U (zh) | 用于制作砌筑三角塞缝砖的模具 | |
CN104912209B (zh) | 现浇板管道预留洞封堵装置及加工与封堵施工方法 | |
CN207193782U (zh) | 一种一次性浇筑地下箱涵的立杆式箱涵支撑预埋件 | |
CN104032958A (zh) | 一种医院特种结构的防辐射室接施工工法 | |
CN108204044A (zh) | 一种圆钢管约束钢筋混凝土柱的施工方法 | |
CN108071194A (zh) | 一种现浇楼板及钢筋保护层厚度控制装置及其施工工艺 | |
CN209040549U (zh) | 一种斜形拱面结构混凝土浇筑的支模结构 | |
CN207392530U (zh) | 一种免拆式地下室外墙翻边单侧支模装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180330 |
|
RJ01 | Rejection of invention patent application after publication |