CN105052289B - A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method - Google Patents

A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method Download PDF

Info

Publication number
CN105052289B
CN105052289B CN201510501534.7A CN201510501534A CN105052289B CN 105052289 B CN105052289 B CN 105052289B CN 201510501534 A CN201510501534 A CN 201510501534A CN 105052289 B CN105052289 B CN 105052289B
Authority
CN
China
Prior art keywords
water
salt discharge
fresh water
rice
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510501534.7A
Other languages
Chinese (zh)
Other versions
CN105052289A (en
Inventor
向镜
朱德峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Rice Research Institute
Original Assignee
China National Rice Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Rice Research Institute filed Critical China National Rice Research Institute
Priority to CN201510501534.7A priority Critical patent/CN105052289B/en
Publication of CN105052289A publication Critical patent/CN105052289A/en
Application granted granted Critical
Publication of CN105052289B publication Critical patent/CN105052289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture

Landscapes

  • Soil Working Implements (AREA)
  • Agricultural Machines (AREA)

Abstract

The invention provides a kind of method of saline and alkaline rice field desalinization of soil by flooding or leaching salt discharge, including:Transplanting ploughs deeply cultivated in first 5~10 days, then pours into fresh water, makes fresh water higher than 2~4cm of field face, and then rotary tillage, soaked field were discharged after 1~2 day;Continue to pour into fresh water, make fresh water higher than 2~4cm of field face, then rotary tillage is carefully harrowed, and soaked field to top layer clarification of water heel row goes out;Fresh water is poured into again, keeps field face 1~2cm water layers, transplanting rice rice shoot;After rice seedling is turned green, a shallow ridges is opened every 3~4m;Zanjon is excavated on the inside of ridge;Gutter is excavated on the outside of ridge, the gutter bottom of trench is less than 15~20cm of arable layer;The pre-buried salt discharge hidden pipe in arable layer bottom, the outlet of the salt discharge hidden pipe are communicated with the gutter, are provided with valve on the salt discharge hidden pipe;Lower water level measurement device is configured in ridge, level of ground water pours into the fresh water desalinization of soil by flooding or leaching when declining, the valve salt discharge on salt discharge hidden pipe is opened when level of ground water rises.

Description

A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method
Technical field
The invention belongs to Rice Cropping technical field, more particularly to a kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method.
Background technology
Salt-soda soil rice cultivation, main salt damage show as causing Oryza sativa L. percentage establishment of seedling low, and tiller amount is greatly decreased, increment Little, heading is difficult, and causing of having can not be eared or phimosis, grain husk flower fertility difference and the low salt damage symptom of mass of 1000 kernel, ultimately results in salt Alkali ground rice yield is not high.Accordingly, it would be desirable to improve to salt-soda soil.
At present, China's alkaline land improving carries out the soaked field desalinization of soil by flooding or leaching, and passes through mainly by pressing the measures such as salt, the desalinization of soil by flooding or leaching before rice transplanting Trophophase is basined irrigation and changes water with draining, the salinity for rinsing and draining in soil, can play a part of quickly to improve salt-soda soil.Such as Zhao State's minister et al. has invented the cultivated method of soil preparation (CN201110224232.1) of salt-soda soil paddy field quick desalination alkali, after Oryza sativa L. autumn harvest Rice field in, sun the earth which has been ploughed up after being ploughed with the big plough autumn after applying fertilizer to the subsoil, spring next year drought rotation ground is slightly raked the soil level after ridging, soaked field levelling, to mud Transplant after slurry precipitation, can reach saving water resource, quick desalination alkali, the purpose for optimizing Soil structure, improving fragile ecological environment, Promote saline and alkaline adverse circumstance rice high yield, stable yields and sustainable development.Wang Zhichun et al. has invented water ash rice in saline-alkali field ridge culture and has hided Salt water-saving planting method (CN201110413732.X), the invention using severe Saline-Sodic area ridge waist position pH value and The characteristics of EC values are minimum, creates the environment of suitable paddy growth, and it is low to solve soda alkaline land Rice Cropping survival rate, growth Downtrod problem.Huang Lihua et al. has invented a kind of rice transplanting method of soda alkaline land Oryza sativa L. compact planting in narrow row (CN201210405420), the method reduces moisture evaporation, by population effect by increasing unit area rice cropping quantity Strengthen Rice Resistance Saline Alkali Stress ability.Hou Ligang et al. has invented a kind of Saline-Sodic Oryza sativa L. carburetting, oxygen supplement, has increased anti-three increasing comprehensively Implantation methods (CN201210565645).There is researcher in Jilin Province using rice in saline-alkali field film-covering planting, improves soil hydro-thermal Situation, suppresses root region soil salinity, while improving rice in saline-alkali field yield, has reached water saving purpose again.But, above-mentioned measure Exist the desalinization of soil by flooding or leaching often, the shortcomings of fresh water water consumption is big, and to cultivate time long in land for growing field crops.
The content of the invention
In view of this, it is an object of the invention to provide a kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method, the side that the present invention is provided Method desalinization of soil by flooding or leaching number of times is few, can reduce fresh water water consumption and time is cultivated in land for growing field crops.
The invention provides a kind of method of saline and alkaline rice field desalinization of soil by flooding or leaching salt discharge, including:
Transplanting ploughs deeply cultivated in first 5~10 days, then pours into fresh water, makes fresh water higher than 2~4cm of field face, then rotary tillage, soaked field 1 Discharge after~2 days;Continue to pour into fresh water, make fresh water higher than 2~4cm of field face, then rotary tillage is carefully harrowed, after the clarification of water of soaked field to top layer Discharge;Fresh water is poured into again, keeps field face 1~2cm water layers, transplanting rice rice shoot;
After rice seedling is turned green, a shallow ridges is opened every 3~4m;Zanjon is excavated on the inside of ridge;Gutter is excavated on the outside of ridge, The gutter bottom of trench is less than 15~20cm of arable layer;The pre-buried salt discharge hidden pipe in arable layer bottom, the outlet of the salt discharge hidden pipe with The gutter communicates, and is provided with valve on the salt discharge hidden pipe;Lower water level measurement device is configured in ridge, under level of ground water The fresh water desalinization of soil by flooding or leaching is poured into during drop, the valve salt discharge on salt discharge hidden pipe when level of ground water rises, is opened.
The present invention is synchronous with the desalinization of soil by flooding or leaching by site preparation, carries out ploughing deeply cultivated within 5~10 days before transplanting rice, carries out within more preferably front 7 days Plough deeply cultivated.Ploughing deeply pour into fresh water after ploughing thereto to make fresh water to be higher than 2~4cm of field face, then carries out rotary tillage, increases soil and fresh water Contact surface, makes fresh water be fully contacted with soil particle, improves desalinization of soil by flooding or leaching speed, reduces fresh water dosage.Discharge light after 1~2 day in soaked field Water, continues to pour into fresh water, makes fresh water higher than 2~4cm of field face, and then rotary tillage is carefully harrowed, and soaked field to top layer clarification of water heel row goes out;Again Fresh water is poured into, field face 1~2cm water layers, transplanting rice rice shoot is kept.
After transplanting rice rice shoot is turned green to rice shoot, a shallow ridges is excavated every 3~4 meters in rice terrace, the shallow ridges is again Claim good harvest ditch, improve rice yield;Excavate zanjon on the inside of rice terrace ridge, the zanjon is also known as enclosing ditch, it is possible to increase Oryza sativa L. Yield;Gutter is excavated on the outside of ridge, the bottom of trench in the gutter is less than 15~20cm of arable layer.In the present invention, it is described A width of 15~the 20cm of ditch of shallow ridges, ditch depth are 10~15cm.The a width of 35cm of ditch of the zanjon, ditch depth is 30cm.The draining A width of 40~the 50cm of ditch of ditch.
The present invention is provided with valve on the salt discharge hidden pipe, institute also in the pre-buried salt discharge hidden pipe in arable layer bottom for salt discharge The outlet for stating salt discharge hidden pipe is communicated with the gutter.The present invention is preferably in arable layer bottom every the pre-buried salt discharge hidden pipes of 5m.
The present invention is also configured to lower water level measurement device in ridge, for monitoring level of ground water.The present invention is preferably in field Lower water level measurement device is configured to every 10m in the ridge, it is that level of ground water determines pipe that the level of ground water determines device.
When level of ground water rises, the valve for opening salt discharge hidden pipe carries out salt discharge;When underground water level decreasing, in field Pouring into fresh water carries out the desalinization of soil by flooding or leaching.When there is a large amount of precipitation, the valve that can also open salt discharge hidden pipe carries out auxiliary salt discharge.
Saline and alkaline rice field engineering design in the method for the saline and alkaline rice field desalinization of soil by flooding or leaching salt discharge provided for the present invention referring to Fig. 1, Fig. 1 is illustrated Figure, wherein, 11 is arable layer, and 12 is soil horizon, and 13 is shallow ridges, and 14 is zanjon, and 15 is gutter, and 16 is valve, and 17 is salt discharge Hidden pipe, 18 is that level of ground water determines pipe.
In the desalinization of soil by flooding or leaching Salt discharge method that the present invention is provided, site preparation is synchronous with the desalinization of soil by flooding or leaching, and rotary tillage increases soil and fresh water into contact face, washes Salt speed is fast, and fresh water dosage is greatly reduced, and desalinization of soil by flooding or leaching effect is good, dart transfer.Meanwhile, the present invention is in deployment level of ground water Monitoring system, rotary tillage desalinization of soil by flooding or leaching when water level is high, salt discharge during water level decreasing, and pressure salt of pouring water, with reference to earth's surface salt discharge, balk is per 5 meters Be provided with certain depth with valve hidden pipe salt discharge, arable layer salt discharge is homogeneous, and salt discharge effect is good.The present invention is herein in connection with rice high yield Water management pattern, excavates high yield ditch, encloses the supporting draining salt discharge in main drain outside ditch and field, and salt washing and controlling allows Oryza sativa L. high simultaneously Produce.Comprehensive physical engineering means of the present invention and improve the rice field methods of cultivation and rice high yield water management technology and desalinization of soil by flooding or leaching salt discharge The measure for combining, improves to saline and alkaline paddy soil, the quick salt discharge desalinization of soil by flooding or leaching, fresh-water-saving, improves saline and alkaline paddy rice and produces Amount.
Description of the drawings
Saline and alkaline rice field engineering design schematic diagram in the method for the saline and alkaline rice field desalinization of soil by flooding or leaching salt discharge that Fig. 1 is provided for the present invention.
Specific embodiment
Below the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment Only a part of embodiment of the invention, rather than the embodiment of whole.Based on the embodiment in the present invention, the common skill in this area The every other embodiment obtained under the premise of creative work is not made by art personnel, belongs to the model of present invention protection Enclose.
Embodiment 1
During salt-soda soil is organized into rice terrace, in salt-soda soil arable layer bottom every the pre-buried salt discharge hidden pipes of 5m, for arranging Salt, is provided with valve on salt discharge hidden pipe, the outlet of salt discharge hidden pipe is communicated with the gutter.And arrange every 10m in ridge Level of ground water determines pipe, for monitoring level of ground water.
Carry out ploughing deeply cultivated within 10 days before transplanting rice.Ploughing deeply pour into fresh water after ploughing thereto to make fresh water to be higher than field face 2cm, so After carry out rotary tillage, increase soil and fresh water into contact face, fresh water is fully contacted with soil particle, improve desalinization of soil by flooding or leaching speed, reduction light Water consumption.Fresh water was discharged after 1 day in soaked field, continued to pour into fresh water, made fresh water higher than field face 2cm, and then rotary tillage is carefully harrowed, and soaked field is to table Discharge after layer clarification of water;Fresh water is poured into again, keeps field face 1~2cm water layers, transplanting rice rice shoot.
After transplanting rice rice shoot is turned green to rice shoot, a high yield ditch, ditch a width of 15 are excavated every 3~4 meters in rice terrace ~20cm, ditch depth are 10~15cm;Excavate on the inside of rice terrace ridge and enclose ditch, a width of 35cm of ditch, ditch depth is 30cm;Outside ridge Gutter is excavated in side, and a width of 40~50cm of ditch, the bottom of trench in gutter are less than 15~20cm of arable layer.
Outer other field managements of moisture removal management are consistent with normal Rice Cropping.Water management is mainly in combination with level of ground water Change and rainfall are carried out.When level of ground water rises, the valve for opening salt discharge hidden pipe carries out salt discharge;When underground water level decreasing, Fresh water is poured into in field carries out desalinization of soil by flooding or leaching pressure salt.When there is a large amount of precipitation, the valve that can also open salt discharge hidden pipe carries out auxiliary row Salt.
Embodiment 2
During salt-soda soil is organized into rice terrace, in salt-soda soil arable layer bottom every the pre-buried salt discharge hidden pipes of 5m, for arranging Salt, is provided with valve on salt discharge hidden pipe, the outlet of salt discharge hidden pipe is communicated with the gutter.And arrange every 10m in ridge Level of ground water determines pipe, for monitoring level of ground water.
Carry out ploughing deeply cultivated within 7 days before transplanting rice.Ploughing deeply pour into fresh water after ploughing thereto to make fresh water to be higher than field face 2cm, so After carry out rotary tillage, increase soil and fresh water into contact face, fresh water is fully contacted with soil particle, improve desalinization of soil by flooding or leaching speed, reduction light Water consumption.Fresh water was discharged after 1 day in soaked field, continued to pour into fresh water, made fresh water higher than field face 2cm, and then rotary tillage is carefully harrowed, and soaked field is to table Discharge after layer clarification of water;Fresh water is poured into again, keeps field face 1~2cm water layers, transplanting rice rice shoot.
After transplanting rice rice shoot is turned green to rice shoot, a high yield ditch, ditch a width of 15 are excavated every 3~4 meters in rice terrace ~20cm, ditch depth are 10~15cm;Excavate on the inside of rice terrace ridge and enclose ditch, a width of 35cm of ditch, ditch depth is 30cm;Outside ridge Gutter is excavated in side, and a width of 40~50cm of ditch, the bottom of trench in gutter are less than 15~20cm of arable layer.
Outer other field managements of moisture removal management are consistent with normal Rice Cropping.Water management is mainly in combination with level of ground water Change and rainfall are carried out.When level of ground water rises, the valve for opening salt discharge hidden pipe carries out salt discharge;When underground water level decreasing, Fresh water is poured into in field carries out desalinization of soil by flooding or leaching pressure salt.When there is a large amount of precipitation, the valve that can also open salt discharge hidden pipe carries out auxiliary row Salt.
Embodiment 3
During salt-soda soil is organized into rice terrace, in salt-soda soil arable layer bottom every the pre-buried salt discharge hidden pipes of 5m, for arranging Salt, is provided with valve on salt discharge hidden pipe, the outlet of salt discharge hidden pipe is communicated with the gutter.And arrange every 10m in ridge Level of ground water determines pipe, for monitoring level of ground water.
Carry out ploughing deeply cultivated within 5 days before transplanting rice.Ploughing deeply pour into fresh water after ploughing thereto to make fresh water to be higher than field face 4cm, so After carry out rotary tillage, increase soil and fresh water into contact face, fresh water is fully contacted with soil particle, improve desalinization of soil by flooding or leaching speed, reduction light Water consumption.Fresh water was discharged after 2 days in soaked field, continued to pour into fresh water, made fresh water higher than field face 4cm, and then rotary tillage is carefully harrowed, and soaked field is to table Discharge after layer clarification of water;Fresh water is poured into again, keeps field face 1~2cm water layers, transplanting rice rice shoot.
After transplanting rice rice shoot is turned green to rice shoot, a high yield ditch, ditch a width of 15 are excavated every 3~4 meters in rice terrace ~20cm, ditch depth are 10~15cm;Excavate on the inside of rice terrace ridge and enclose ditch, a width of 35cm of ditch, ditch depth is 30cm;Outside ridge Gutter is excavated in side, and a width of 40~50cm of ditch, the bottom of trench in gutter are less than 15~20cm of arable layer.
Outer other field managements of moisture removal management are consistent with normal Rice Cropping.Water management is mainly in combination with level of ground water Change and rainfall are carried out.When level of ground water rises, the valve for opening salt discharge hidden pipe carries out salt discharge;When underground water level decreasing, Fresh water is poured into in field carries out desalinization of soil by flooding or leaching pressure salt.When there is a large amount of precipitation, the valve that can also open salt discharge hidden pipe carries out auxiliary row Salt.
The rice yield and its structure of output of the plantation of above three embodiment are analyzed, it is as a result as follows:
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (7)

1. a kind of method of saline and alkaline rice field desalinization of soil by flooding or leaching salt discharge, including:
Transplanting ploughs deeply cultivated in first 5~10 days, then pours into fresh water, makes fresh water higher than 2~4cm of field face, then rotary tillage, soaked field 1~2 day After discharge;Continue to pour into fresh water, make fresh water higher than 2~4cm of field face, then rotary tillage is carefully harrowed, and soaked field to top layer clarification of water heel row goes out; Fresh water is poured into again, keeps field face 1~2cm water layers, transplanting rice rice shoot;
After rice seedling is turned green, a shallow ridges is opened every 3~4m;Zanjon is excavated on the inside of ridge;Gutter is excavated on the outside of ridge, it is described Gutter bottom of trench is less than 15~20cm of arable layer;The pre-buried salt discharge hidden pipe in arable layer bottom, the outlet of the salt discharge hidden pipe with it is described Gutter communicates, and is provided with valve on the salt discharge hidden pipe;Lower water level measurement device is configured in ridge, when level of ground water declines The fresh water desalinization of soil by flooding or leaching is poured into, the valve salt discharge on salt discharge hidden pipe when level of ground water rises, is opened.
2. method according to claim 1, it is characterised in that a width of 15~20cm of ditch of the shallow ridges, ditch depth is 10~ 15cm。
3. method according to claim 2, it is characterised in that a width of 35cm of ditch of the zanjon, ditch depth is 30cm.
4. method according to claim 3, it is characterised in that a width of 40~50cm of ditch in the gutter.
5. the method according to Claims 1 to 4 any one, it is characterised in that level of ground water is set every 10m in ridge Determine device.
6. method according to claim 5, it is characterised in that it is level of ground water measure that the level of ground water determines device Pipe.
7. the method according to Claims 1 to 4 any one, it is characterised in that arable layer bottom is every the pre-buried salt discharges of 5m Hidden pipe.
CN201510501534.7A 2015-08-14 2015-08-14 A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method Active CN105052289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510501534.7A CN105052289B (en) 2015-08-14 2015-08-14 A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510501534.7A CN105052289B (en) 2015-08-14 2015-08-14 A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method

Publications (2)

Publication Number Publication Date
CN105052289A CN105052289A (en) 2015-11-18
CN105052289B true CN105052289B (en) 2017-03-29

Family

ID=54482029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510501534.7A Active CN105052289B (en) 2015-08-14 2015-08-14 A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method

Country Status (1)

Country Link
CN (1) CN105052289B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106171110A (en) * 2016-07-15 2016-12-07 山东胜伟园林科技有限公司 A kind of planting lawn in saline-alkali soil modifying agent and modification method thereof
CN106376266A (en) * 2016-08-26 2017-02-08 山东胜伟园林科技有限公司 Improving method for saline-alkali soil
CN106376407A (en) * 2016-08-31 2017-02-08 山东胜伟园林科技有限公司 Energy-saving planting method of paddy rice in saline and alkaline land
CN106973574B (en) * 2017-03-31 2019-09-24 广东省农业科学院农业资源与环境研究所 The modification method in sour regurgitation field
CN106942020A (en) * 2017-04-17 2017-07-14 盐城师范学院 Agriculture fishery rapidly and efficiently fills drainage system
CN109156108B (en) * 2018-07-31 2022-09-09 杭州市园林绿化股份有限公司 Comprehensive treatment method for soil saline-alkali soil
CN109601096A (en) * 2019-01-28 2019-04-12 中国水稻研究所 A kind of fertilizing method of rice in saline-alkali field
CN111771639A (en) * 2020-07-13 2020-10-16 江苏天海泵业有限公司 Method for planting rice in heavy saline-alkali soil by fresh water irrigation, drainage and salt control
CN112237069A (en) * 2020-10-26 2021-01-19 中国科学院东北地理与农业生态研究所 Method for transforming soda saline-alkali land waste fishpond into cattail wetland
CN114667819B (en) * 2022-04-24 2022-09-02 中国科学院东北地理与农业生态研究所 Improvement method for removing slurry of soda saline-alkali rice field and application thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5393312A (en) * 1992-08-07 1995-02-28 Shin-Etsu Chemical Co. Ltd. Agent for prevention of salt damage of plants and a method of preventing salt damage of plants using the same
CN201630045U (en) * 2010-04-13 2010-11-17 启东建筑集团山水园林建设有限公司 Saline-alkali soil landscaping water-soil improvement facility
CN202455774U (en) * 2012-01-13 2012-10-03 孙剑桥 Anti-soaking saline-alkali water drainage device for improved saline-alkali soil paddy field bed
CN102919090A (en) * 2012-10-23 2013-02-13 中国科学院东北地理与农业生态研究所 One-hole multi-plants close planting method for saline-alkali soil rice
CN102900059B (en) * 2012-11-06 2015-07-29 河海大学 The compound drainage control salt system in a kind of salt-soda soil
CN103460843B (en) * 2013-08-29 2015-06-24 青岛农业大学 Quick saline-alkali land desalting system method by means of concealed-tube irrigation and drainage

Also Published As

Publication number Publication date
CN105052289A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105052289B (en) A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method
CN104472049B (en) A kind of heavy salinized wasteland, inland quick improvement method
CN101779537B (en) Method for planting dryland crops by crashing soil
Humphreys et al. Halting the groundwater decline in north-west India—which crop technologies will be winners?
CN102273335B (en) Treatment and utilization method of muddy seashore saline soil
CN102792846B (en) Wheat-corn double cropping symbiotic cultivation method in moderate saline-alkali soil based on buried pipe drainage and salt elimination
CN102246676B (en) Crushing and ridging culture method of rice
CN104488493B (en) Inland is arid, cool Saline-alkali Land Semen Maydis full-film covering implantation methods
CN102422735A (en) Ecological integrated improved facility and improving method for saline and alkaline land
CN101878684B (en) Quick desalination method of coastal beach saline-alkali
CN101536643A (en) Saline and alkali land improvement method
CN104521464A (en) Potato drip irrigation planting method
CN103975666A (en) Method for controlling salinity of medium and severe salinized soils applicable for cotton culture
CN109257987A (en) Arid and semi-arid lands salt-soda soil dry type desalination and efficient technique of rainwater utilization scheme
CN110073756A (en) A kind of beach newly encloses tideland for cultivation the efficient modification method of farmland soil
CN108496723A (en) A kind of beach saline land rice field-pond fishman's method of comprehensive utilization
CN106922240A (en) A kind of coastal saline-alkali soil cultivating layer quick desalination method and application
CN105248067A (en) Method for constructing coastal muddy saline-alkali soil jerusalem artichoke vegetation
CN104541641A (en) Method of thinning, eliminating soil salt and increasing yield by arranging crushed ridge bind drain system
CN107182339B (en) A kind of beach saline land ecology improvement system and its cotton yield implantation methods
CN102197725A (en) Method for modifying soda alkaline earth by no-tillage rice growing and salt leaching
CN104521653A (en) Paddy ridge smashing cultivation method
Mondal et al. Community water management and cropping system synchronization: The keys to unlocking the production potential of the polder ecosystems in Bangladesh
CN108605676A (en) A kind of water-saving oily certain herbaceous plants with big flowers method of control salt plantation of saline-alkali wetland
Chunxia et al. Effects of timing and duration under brackish water mulch drip irrigation on cotton yield in northern Xinjiang, China

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant